HomeMy WebLinkAbout2022-11-08-minutes-solid-waste-and-maintenanceSofld Waste and Rflau tenance
Regular Meeting
Tuesday November 8, 2022 e 2o00 GTPA
BOCC Conference Room
205 West 5th Room 108 - Ellensburg
1. Call to Order
2. Citizen Comments (1 min. time limit)
3. Public Health Fees Update
4. Solid Waste Updates
5. Review Parking Lot Designs
6. Jail Elevator/Grinder Pump Update
7. Request Board approval to purchase Energy Software
8. Discuss Airport Building Maintenance Structure
9. Other business
10. Concluded
Created on 11/4/2022 10:07:22 AM
KITTITAS COUNTY
SOLID WASTE AND MAINTENANCE MINUTES
BOCC CONFERENCE ROOM, 205 WEST 5TH ROOM 108 - ELLENSBURG
Regular Meeting
TUESDAY 2:00 PM November 8, 2022
Board members present: Laura Osiadacz, Chairman via Webex, Cory Wright, Vice -Chairman
(Absent) and Commissioner Brett Wachsmith.
Others: Patti Stacey and Lisa Lawrence
Meeting called to order at 2:00 p.m.
Citizen Comments (1 min. time limit) None
Public Health Fees Update: Item pulled from Agenda
Solid Waste Updates: Patti informed the Board that interviews with consultants for final design
of the new Transfer Station are scheduled for tomorrow. She informed the Board that she has not
heard back from the Public Works Trust Fund Loan. Discussion was held on the grinder at the
Compost Facility being down for two weeks and that Pape has replaced the belts and is working
with Mobark to get it repaired. Further discussion included money set aside in reserves for major
equipment replacement. Patti thanked the Board for approving the two day a week position. Patti
informed the Board that she has a Planning Commission meeting for a Recycling Level of
Service Ordinance in the Urban Growth areas. Discussion was held on Waste Managements
implementation and the inability to get trucks and wanting Suncadia to bring it to the Curb which
their covenants do not allow.
Review Parking Lot Designs: Patti recommended Option 2 to the Board stating that it would be
easier to maintain. Discussion was held on the other options having more parking spaces but
would be harder to plow snow and maintain. The Board 2-0 in favor of Option 2.
Jail Elevator/Grinder Pump Update: Patti informed the Board that the elevator is down, and it
will probably be the 1St of February before they can get and replace the main shaft and that the
cost will be $104,000.00. Patti told the Board that she requested a quote to repair the doors at the
same time and she should have that by the end of the week.
2022-11-08 MINUTES
Patti informed the Board that they found a Grinder pump, but staff was not capable of installing
it. She informed the Board that McKinstry would install for $3600.00, and it would be around
$24,000.00 to fix it. She said she is working on a solution and is getting the paperwork to
purchase grinder and installation. Discussion was held on Patti meeting with Brian on the line
items and where the money transfers from in the budget. Patti informed the Board that the
Outdoor Rec needs to be re -surfaced. She said with the recent freeze and rain the cracks
separated and leaked into the Sally Port causing damage to the ceiling tile. Patti said they would
seal the cracks for the winter and then go out to bid to get an Architect to look at it.
Request Board approval to purchase Energy Software: Patti informed the Board that Facility
Dude, which is now Brightly has an Energy Software program that tracks how much energy each
building uses. This will assist us in being ready to meet State requirements.
Discuss Airport Building Maintenance Structure: Patti informed the Board that the Airport
has been submitting maintenance request for HVAC, plumbing etc., and asked for direction
regarding the request since Maintenance has never provided service to the Airport and doesn't
have a budget line for them. Discussion was held on what they did before, the Board directed
staff to check with Mark and David and on how it has been handled in the past.
OTHER BUSINESS: None
Meeting Concluded at 2:26 p.m.
Lisa Lawrence
2022-11-08 MINUTES 2
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Laura Osiadacz, Chairman
PREPARED FOR
Kittitas County ("Subscriber")
Patti Stacey
Facilities & Solid Waste Director
205 W. 5Th Avenue
Kittitas, WA 98926-2890
PREPARED BY
Brightly Software Inc ("Company")
11000 Regency Parkway, Suite 400
Cary, NC 27518
PUBLISHED ON
October 30, 2022
NO
Q-317723
Service Term: 36 months (01/01/2023 - 12/31/2025)
Energy Manager Professional 1/12023 12/31/2023 1,623.09 USD
Utility Bill Population 1/1/2023 12/31/2023 1,228.52 USD
Subscription 2,851.61 USD
Year 1 Total:
The Services invoice for Year 1 will be issued upon acceptance of the Order Form. Subsequent Services Invoices
will be sent annually.
*2 months included at no charge on the first invoice.
Energy Manager Implementation 1,710.00 USD
Utility Bill Population Implementation 2,034.90 USD
Historical Utility Bill Population 438.90 USD
Historical Utility Bill Population 438.90 USD
Professional Services 4,622.70 USD
Year 1 Total:
Q-317723
Remaining Services Invoices
Year 2 1/1/2024 3,627.26 USD
2
r
Year 1/1/2025 3,844.89 USD
r
Energy Manager - Standard Implementation
Statement of Work
Purpose
Brightly (Company) Energy Manager Standard Implementation is designed to provide our clients with guidance
by experienced subject matter experts to ensure an effective and efficient implementation and a faster
ROI. With over 12,000 clients successfully using our software, we understand what it takes to successfully
implement your solution and look forward to working with you through our Standard Implementation service.
Value
By partnering with Brightly and taking advantage of our Standard Implementation Service, you are provided
expert guidance in the best practice configuration and usage of Energy Manager. By following our focused
project plan, you will experience fast time to value and will see your account configured and ready to use
within 30 days from project kickoff, plus an additional 30 days of go -live support from your Implementation
Specialist. Our Train -the -Trainer approach streamlines the implementation process and empowers the Client
Project Lead to fully own and operationalize Energy Manager quickly within their organization.
Deliverables
• Project Kick -Off Call
• Access to Financial Force Community project collaboration tool
• 30 day implementation support
• Standard database configuration imports using account setup template
• 1 -on -1 configuration guidance by dedicated Implementation Specialist
• 30 day go -live support
• Train -the -trainer best practices and content to onboard your team
• Unlimited access to Help Site, Virtual Classroom Trainings, and Best Practice webinars with office
hours during and after project
• Account configuration guidance by dedicated Implementation Specialist
Methodology and Approach
Brightly understands the importance of moving quickly to be able to configure a new system and drive adoption
within your organization to facilitate a smooth transition from your current system to Energy
Manager. Your Standard Implementation will begin with a Kickoff Call with one of our Implementation
Specialists. From there, a dedicated Implementation Specialist will guide and assist you through the
implementation project. The first 30 days are focused on account configuration and training while the final 30
days are dedicated towards go -live support to ensure account enablement. By following this plan you'll be
empowered to effectively streamline your utility accounting operations using Energy Manager. Below is a
sample Standard Implementation timeline:
Sample Standard Implementation
Your dedicated implementation team will be here to assist you during the duration starting during the Kick -
Off Call.
4
r
Kick Off
Kickoff Call with Implementation Specialist Agenda:
• Introductions - Project Roles and Responsibilities
• Overview of Implementation Process and Tools
Discuss Current Processes and Goals
• Review Financial Force Community and Resources
• Review Account Setup Spreadsheet
• Determine Timeline and Next Steps
Building Your Foundation (Weeks 1-3)
Implementation
Specialist
Key Client
Personnel
(Client Project
Lead, other
major stake
holders)
• Attend Energy Manager Introduction virtual classroom training .
or review equivalent help content
• Understand basic navigation and configuration requirements
• Compile Facility, Vendor, Account, Meter, and Bill data for
Client Project
input
Lead
• Initial Data Review Call with Implementation Specialist
Account Setup
Login to Energy Manager pending client data load
Im P
Implementation
and
• Become familiar with basic functionality of the system
Specialist
Configuration
• Configure System Settings,
Facilities, Vendors, Accounts, Meters, and Line Items
• Configuration Import - Facilities, Vendors, Accounts, and
Meters
• Connect with Implementation Specialist on account
configuration progress
Bill Entry (Weeks 3-4)
Client Project
• Attend Bill Entry virtual classroom training or review equivalent
Lead
Configuration
help content
• Create Line Item Types
Implementation
• Start entering utility bills into Energy Manager
Specialist
S P
Bill Entry
Connect with Implementation Specialist on
account configuration and bill entry progress
5
• Attend Energy Manager Reporting 101 virtual classroom
Client Project
training or review equivalent help content
Client Project
• Review the top reports in Energy Manager
Lead
• How to break out individual facilities, groups of facilities, or the
Implementation
Reporting entire organization in reports
Specialist
• The difference between Line Item and Bill Date Proration
Other key client
reporting methodology
personnel
• Different output options for reports and saving reports for use
needed for Use
later
Case Tests
• Perform use case testing to ensure solution readiness
Client Project
• Enter 3-6 months of bill entries to confirm Accounts and
Lead
Meters setup correctly
Implementation
• Run Reports in Energy Manager to confirm data is consistent
Specialist
Use Case Testing Have representatives from various user roles login to confirm
and User they can execute job functions as expected
Other key client
Training
personnel
• End users access and review online help documentation
needed for Use
• Confirm users can access Energy Manager and perform
Case Tests
expected job functions
End Users
• Confirm goals defined during Kickoff Call have been met
Implementation Confirm database setup completion and readiness for use Implementation
Complete and Introduce ongoing Company resources Specialist
Project Close Close project
Client Project Lead
Excluded from Standard Implementation
The following services are not included with Standard Implementation:
• Evaluation of your current practices, policies and procedures for the purposes of performance
improvements
• Migration of data from other systems or locations
• Export of data to any other systems or third parties
• Bill Import Template Creation
• Historical Bill Population Service
• Utility Bill Population or Utility Bill Population Management Services
• Interval Data Recording and Interval Data Recording - Management Services
2
Er
Cost Avoidance Setup
Energy Star Sync Setup
Public Facing Billboard Setup
Role -based end user trainings
Client Assumptions
• The client will schedule time for the appropriate resources to be available to the Implementation
Specialist for all scheduled required activity. The success of this process is dependent on the attendance
and full engagement of the key stakeholders.
• The Client Project Lead shall be primarily responsible for providing access and training on Energy
Manager to end-users.
• Client will provide facility, vendor, account, and meter data to be imported in a timely manner and in the
template format provided via Financial Force Community so the Implementation Specialist has an
opportunity to import the data during the project period.
• If there is no existing data, the Implementation Specialist will guide the client to focus first on
key facilities, vendors, accounts, and meters. This can be manually entered into Energy Manager.
Energy Manager - Utility Bill Import Setup
Service
Company designs, constructs and tests the file format(s) for use in importing energy data.
After completion of the import format, the importing of utility bill invoice data into Energy Manager will
be performed by Kittitas County.
Kittitas Countywill be responsible for verifying and importing cost, consumption, accuracy and/or the
appropriateness of invoice data provided by the utility provider or client.
Utility Bill Population and Historical UBP -
Standard Implementation Statement of Work
Purpose
Brightly (Company) Utility Bill Population Standard Implementation is designed to provide our clients with
guidance by experienced subject matter experts to ensure an effective and efficient implementation and a
faster ROL With over 12,000 clients successfully using our software, we understand what it takes to successfully
implement your solution and look forward to working with you through our Standard Implementation service.
Value
Ni
By partnering with Brightly and taking advantage of our Standard Implementation Service, you are provided
expert guidance in the best practice enrollment of the Utility Bill Population service (Historical and/or Ongoing)
in conjunction with your Energy Manager database.
By following our focused project plan, you will experience faster time to value with utility bill data populating
into your Energy Manager database. Our approach streamlines the enrollment process and empowers the
Client Project Lead to fully own and operationalize Energy Manager with historical and/or current, ongoing
utility bill data quickly within their organization. The sooner your login credentials are validated and/or utility
bills are uploaded to your folder, the sooner data will come in to the database.
Any changes to this statement of work shall be handled through project change controls.
Deliverables
• Project Kick -Off Call
• Access to Financial Force Community project collaboration tool
• Final utility bill population configuration supported by 1 -on -1 bill acquisition and enrollment guidance
• Go -live support during enrollment and launch
• Unlimited access to Help Site, Virtual Classroom Trainings, and Best Practice webinars with office hours
during and after project
• Support resources are available for technical assistance by Phone and Email between 8am - 6pm EST,
Monday - Friday
•
Phone: 1-877-655- 3833
• Email: su000rt(a dudesolutions com(mailto:supoortPdudesolutions.com)
Methodology and Approach
Brightly understands the importance of moving quickly to be able to configure a new system and drive adoption
within your organization to facilitate a smooth transition from your current system to Energy Manager. Your
Standard Utility Bill Population Implementation will begin with a Kickoff Call with one of our Implementation
Specialists. From there, an Implementation Specialist will guide and assist you through the enrollment. Below is
a summary of the standard implementation process.
Standard Implementation for Historical and Ongoing Utility Bill Population Service
Your implementation team will be here to assist you during the duration, beginning with the Kick -Off Call.
Kick Off
Kickoff Call with Implementation Specialist.
(Concurrent with Energy Manager)
Agenda:
• Introductions - Project Roles and
Responsibilities
• Overview of Implementation Process
and Tools
• Discuss Current Processes and Goals
• Review Basecamp and Resources
• Review Utility Bill Population
Spreadsheet
• Determine Timeline and Next Steps
Implementation Specialist
Key Client Personnel
(Client Project Lead, other
major stake holders)
Vit
W
Client fills out the Utility Bill
Population Spreadsheet:
• Enter Vendor Name for Each
Account to be Enrolled in UBP
Service
• Enter Utility Bill Account
Numbers to be Enrolled in
UBP Service
• Enter the Vendor Websites
where bills are to be gathered
• Enter User Name for Vendor
Websites where bills are to be
gathered
• Enter Passwords for Vendor
Websites where bills are to be
gathered
• If bills cannot be gathered online,
client must indicate that clean PDF
bills will be supplied.
• Client will be given a secure
ShareFile link where PDF bills can be
Account and uploaded by the client for processing
Bill Gathering and import into Energy Manager.
• Implementation Specialist will review
Utility Bill Population Spreadsheet
with the client and discuss any
issues that would prohibit
enrollment and population of bills.
• Implementation Specialist will work
with data vendors to conduct
preliminary enrollment and identify
issues with selected accounts.
• Implementation Specialist will advise
client of any enrollment issues
identified, make changes as needed,
and will produce a final Utility Bill
Population spreadsheet.
• Client approves final Utility Bill
Population spreadsheet and
provides final validation of accounts
to be enrolled after which
modifications to accounts or
enrollments will be handled through
the change control process.
Client Project Lead
.Implementation Specialist
101
i[7
Utility Account Enrollment
N
m
• Implementation Specialist will
formally enroll vendors with bills
available online with the.Utility Bill
Population service.
• Implementation Specialist will
formally enroll vendors with PDF
copies of bills with the Utility Bill
Population service.
• If sub -accounts are identified during
enrollment that add to the total
number of accounts then a re -
Enrollment and Post scoping and re -pricing exercise
Enrollment might be necessary to finalize the
number of accounts.
• Implementation Specialist will
coordinate with the Energy Data
Team on any issues that arise during
bill retrieval or population
• Implementation Specialist will work
with client to resolve issues as
needed.
• Client may connect with
Implementation Specialist on
enrollment progress.
Utility Bill Population
Client Project Lead
Implementation Specialist
Di�J
12
r
Bill Population
Utility Bill Population
Enrollment Completion
and
Ongoing Support
Energy Data Team will import utility
bill data into the client's database as
it is made available by the utility
vendors received for historical and/
or ongoing population within 20
business days for historical bill data
and 10 business days for ongoing bill
data from being posted by vendor.
Energy Data Team will import utility
bill data into the client's database as
it is made available by the client for
historical and/or ongoing population
within 30 business days for historical
bill data and 10 business days for
ongoing bill data from being posted
to Share File by the client.
Energy Data Team will work to
resolve any issues that arise during
import of historical or ongoing utility
bill population.
• Confirm goals defined during Kickoff
Call have been met
• Client will contact the Company, Inc.
Legendary Support Team if bill data
is missing or imported incorrectly
through phone or email.
• Company Support by Phone:
1-877-655-3833
• Company Support by
Email: su000rtPdudesolutions.com
(mailto:suonort(adudesolutions.com)
Special Conditions for Utility Bill Population
Client Project Lead
Energy Data Team
Client Project Lead
Implementation Specialist
The Utility Bill Population Service is subject to additional terms that include the following:
Login Requirements: The client must provide usernames, passwords and billing statements for utility
accounts.
UBP Agreement Term: The term of this agreement is to exist and continue for one year which is to
begin at the date of the acceptance of this proposal.
Invoice: The invoice is sent when the Utility Bill Population service is launched and the support phase of
the process is started.
13
Automatic Renewal: Automatic invoicing of annual fee will occur at the end of each term unless
request for non -renewal is received in writing 45 days prior to renewal date.
Termination: Notwithstanding any other provision to the contrary, this agreement can only be
terminated for cause during the Term of this agreement.
Additional Accounts: Additional accounts beyond those documented in this proposal can be set up by
contacting the Company Client Service Center and are subject to additional set-up charges and renewal
amounts.
• Refunds: The purchase price for this service is due upon acceptance and is non-refundable.
• Cancellation: If payment is not received prior to renewal date, service will be cancelled.
Responsibilities and Assumptions
Client Resource Availability: The client will schedule time for the appropriate resources to be available
to the Implementation Specialist for all scheduled required activity. The success of this process is
dependent on the attendance and full engagement of the key stakeholders.
Online Access: The client will need to provide Company authorization via login names and passwords to
your utility providers' websites in order to access, process, and enter bills that are available online.
Softcopy Bills: It is client's responsibility to provide legible PDF softcopies for all utility bills without
online access for any utility providers and associated accounts that the client wishes to have included in
the Utility Bill Population service. This will allow Company to retrieve current utility bill data so that data
can be populated in the software solution for the corresponding accounts on a monthly basis. We can
furnish a guide that outlines the scanning and PDF requirements that should be followed when this
service is purchased.
Accuracy and Availability: It is the client's responsibility to contact their utility providers regarding
missing or inaccurate utility bill data for accounts included in the Utility Bill Population. Company is
responsible for accurate and timely entry of utility bill data into the corresponding Energy Manager
account.
• Line Items: Company has designed the Utility Bill Population Service to capture specific line items from
the bills based on the specific utility type. This is a standard list that can be provided and shows which
lines items we track.
• Utility Bill Population Import Template: As part of the service, Company will add a bill import
template called "Utility Bill Population Import" or similar. It will contain the columns and tags needed in
order to provide the UBP Service each month.
• Historical Utility Bill Population: The same authorization is needed as the ongoing Utility Bill
Population service if Company is going to be accessing historical bill data online. You may also provide
legible, electronic PDF file copies of utility bills that are historical in nature to build out the requested
historical data in Energy Manager if they are not available to be gathered online. Most utility companies
have between 18 - 24 months of historical bills, but it will vary per vendor.
• Working with Utility Companies: In most cases, Company is notable to work directly with your Utility
Companies to obtain bills or other information. In limited circumstances, we can work directly with
Utility Companies; however, this can incur additional costs and must be specifically included in the
proposed services. This also often extends the timeline to deliver populated data because Utility
Companies are often slow to respond to non -customer requests. If Company includes working with your
vendors as part of our proposed services, due to privacy policies and best practices, Utility Companies
often ask for a Letter of Authorization from their customers in order to talk with a 3rd Party, such as
Company. These letters only authorize Company to make inquiries about our clients' accounts and bills,
14
and does not usually mean full access to online accounts and bills. We still need our clients to provide
bills either through online login credentials that can access bills and/or PDF copies.
Change Controls
After the Utility Account Enrollment phase is complete and bill population has begun, any changes to
enrolled accounts, facilities, or other data configuration changes need to be directed to Company
Support and might require a re -scoping and re -pricing exercise.
Parties may agree to modify the Services through a written change order specifically referencing this
applicable Statement of Work. Such change order will become part of the applicable Statement of Work
when executed by both Parties, and the services described therein will become part of the Services.
You may request that Company add services not in the Specifications by submitting a written proposed
change order to Company. Such change order will become part of the applicable Statement of Work
when executed by both Parties, and the services described therein will become part of the Services.
Project Terms and Conditions
This Statement of Work ("SOW") is entered into by and between Brightly, Inc. ("Company") and
#OrganizationName# pursuant to and subject to the project terms and conditions ("Project Terms and
Conditions") specified below.
Acceptance of this SOW on behalf of a company or legal entity represents that you have authority to bind such
entity and its affiliates to the order, terms and conditions herein. If you do not have such authority, or you do
not agree with the Terms set forth herein, you must not accept this SOW and may not use the Service.
In addition, the terms of the Company Master Subscription Agreement, found at
http://brightlysoftware.com/terms (http://briahtlysoftware.com/terms)("Terms"), shall govern the Services,
unless Subscriber has a separate written agreement executed by Brightly, Inc. ("Company") for the Services, in
which case the separate written agreement will govern. The terms of the SOW shall take precedence in the
event of a conflict between the Terms and the Project Terms and Conditions. Acceptance by electronic
signature is considered a valid and legally binding form of receipt.
Company reserves the right to require that overdue Client accounts be paid to current for all prior Company
completed projects before a new SOW can be executed.
SOW must be accepted and signed by Client within 60 days, after which Company reserves the right to adjust or
requote the engagement.
The term of this SOW shall be effective and binding and commence on the date signed by Client and shall
terminate as provided herein or upon written acceptance of the work performed with final payment received.
15
r
Qrder Form terms
By accepting this Order Form, and notwithstanding anything to the contrary in any other purchasing
agreement, Subscriber agrees to pay all relevant Fees for the full Services Term defined above.
The "Effective Date" of the Agreement between Subscriber and Company is the date Subscriber accepts
this Order Form.
• This Order Form and its Services are governed by the terms of the Brightly Software, Inc. Master
Subscription Agreement found at hitp /brightlysoftware.com/terms (hht :/n /brighhlysoftware.com/
rms) ("Terms"), unless Subscriber has a separate written agreement executed by Brightly Software, Inc.
("Company") for the Services, in which case the separate written agreement will govern. Acceptance is
expressly limited to these Terms. Any additional or different terms proposed by Subscriber (including,
without limitation, any terms contained in any Subscriber purchase order) are objected to and rejected
and will be deemed a material alteration hereof.
• To the extent professional services are included in the Professional Services section of this Order Form,
the Professional Services Addendum found at htt :/� /brightlysoftware.com/terms
(htt:/n /brightlysoftware_com/terms) is expressly incorporated into the Terms by reference.
• During the Term, Company shall, as part of Subscriber's Subscription Fees, provide telephone and email
support ("Support Services") during the hours of 8:00 AM and 6:00 PM EST, (8:00 am - 8:00 pm EST for
Community Development Services) Monday through Friday ("Business Hours"), excluding Company
Holidays.
• Unless otherwise specified on this Order Form, Company maintains the right to increase Subscription
Fees within the Services Term by an amount not to exceed the greater of 6% or the applicable CPI and
other applicable fees and charges every 12 months. Any additional or renewal Service Terms will be
charged at the then -current rate.
• Acceptance of this Order Form on behalf of a company or legal entity represents that you have authority
to bind such entity and its affiliates to the order, terms and conditions herein. If you do not have such
authority, or you do not agree with the Terms set forth herein, you must not accept this Order Form and
may not use the Service.
• Proposal expires in sixty (60) days.
• Subscriber shall use reasonable efforts to obtain appropriation in the full amount required under this
Order Form annually. If the Subscriber fails to appropriate funds sufficient to maintain the Service(s)
described in this Order Form, then the Subscriber may terminate the Service(s) at no additional cost or
penalty by giving prior written notice documenting such non -appropriation. Subscriber shall use
reasonable efforts to provide at least thirty (30) days prior written notice of non -
appropriation. Subscriber agrees non -appropriation is not a substitute for termination for convenience,
and further agrees Service(s) terminated for non -appropriation may not be replaced with functionally
similar products or services prior to the expiration of the Services Term set forth in this Order Form.
Subscriber will not be entitled to a refund or offset of previously paid, but unused Fees.
Additional information
P4
Prices shown above do not include any taxes that may apply. Any such taxes are the responsibility of
Subscriber. This is not an invoice. For customers based in the United States, any applicable taxes will be
determined based on the laws and regulations of the taxing authority(ies) governing the "Ship To"
location provided by Subscriber. Tax exemption certifications can be sent to
• Billing frequency other than annual is subject to additional processing fees.
• Please reference Q-317723 on any applicable purchase order and email to
a o n sr ivabl (&bright(ysoftware.com (mailto:a oun sr ivabl Obright(ysoftware.com)
• Brightly Software, Inc. maintains the necessary insurance coverage for its products and professional
services, including but not limited to liability and errors & omissions coverage. Proof of insurance can be
provided upon request.
Illuminate: Bringing the best Ideas to Light
Bringing Assets Into Focus
Brightly's Illuminate conference is a place for operations and asset management leaders to gather and share
our collective wisdom, spotlighting the best new ideas and learning from one another to realize a brighter
future. Take stock of where you've been and plan for where you're going while connecting with industry peers
and experts as passionate to help their organizations thrive as you are.
Brightly's Illuminate conference is a gathering of the brightest minds in operations and asset management,
where you can connect with leaders in their field, exchange expertise, and uncover new opportunities to realize
a brighter future
Illuminate is March 12th -15th, 2023. Attendees are in for the best in-person conference yet, with more
knowledge, training, and technology than ever before.
Enlighten Share your expertise and level up your knowledge with hands-on education and training you can
bring back to your team.
Envision
Explore the brightest ideas and smartest solutions to elevate the work your organization is doing and realize
your vision for the future.
Engage
Broaden your professional network by sharing wisdom with fellow operations and asset management leaders.
17
Admission for Illuminate is $895 for tuition only and $1795 for the "Brightly Bundle". The Brightly
Bundle includes meals, a 4 -night hotel stay and tuition. Registration is open beginning September
1st through March 10th, 2023.
N
IN
Signature
Presented to:
Q-317723
Accepted by:
Printed Name
Signed Name
Title
Date
WE
pg 8
B �
e
0
0
Ila
i
---
u c_3 3nN3AVHLN3A3S
— _ _ _______
11
------ _ w
___-__
------ - _ -w------- ---_ - -- 3w._..q,-
11 I It II,
II I I ' •� I Li____J
I, /A I I II III I I ��•,
V / I I I II II 1 II
IA
Y I i l� IIhm, 4 C_ W1
1 I I I II i��l If 4 I
I I 1 1 II II O II ;
I I I I I 11 1j 1
I I I I i II j 1 I i g1
1t I I 11 1 I I dl
S 1 I 11 III'1 li 4
I I I I I 11 �' I I II FI
I
I I I I I III I Its
I I I I II III II F
1 1 1 I I 11 II I
1{ I I I 11 i1 1 I
I I I I I II IIII II F
I
I I 1 I
I I i t II 1'I I I I� 4
I I <1 I
I 13 I 1 II fIi '
11 1 11 II '�y
I I 11 it cll� 1 I 1 '
I I I I I
1t I I 1
ttttt j}j} II �� I I 4
II )1 I 1I 4
i I 1 I 11 'fill) � t
I I I 1
I I I 11 II 9j� 1 £
II 0
{{{ 1 I II IIII III
I �I 11 If II
I I I I II iII O p'Qy
I I I I I 11 II 11
�-=nom-----------�------
c_� b 31RAY WAS 1
jr
---------------------- --------
--- j-,tj..
: O
O 5
211
L I O
o p
s
L
R i
1391 SSm
2
F
LL
C=7
3nN3WKLt3A3S
;ir _ __--Dr.___.w..,._p-"_-- -- — !.
I
n w ui I �� ______________ ____ ------ -
I11 I I\� --__-__-
V l> i � � ;; ill; � �I I �.•,
I A I I III
lil
1
Y
1 I I II ryil / I a 0
1
11 1 I I II F
F-
II
III �
It({t 1 I I II I i I Q I Y
1� I I II I U O 11
I
I I I 11 II I� I IIC I of
I{ I I I I II III III - �
{{{{ II I I
f l I i jj Ir I II Y
O I
lc
I I
I Ita
I I I I I II °in
'Ill I O
ItttS 1111 1 1 II ;I I I !I q; j
I I 11 II dqIjl I 1 14 }I`I
I 1 I I II sI �„4
I I I I I
I I I I II IIII l f l
(j i I 11 II I g 41
1 W II IIII
IQ i 1 I If IIII I 1^�''�f
I IU I 1 1 a pll o f 1 n
I i
IIII 8 1
1�76j1
_
Fm
3nN3AV Was !I
a
........... y -
_i , 3�
m
d � O
O
pg 8
a � �
Z
K
O
I--- II r�__________�__-________-_-_________=== =w'====__
c=y 3nN3AVHLN S
----------------------------
T--
___ 11 II11 I 1 I.__.yp,__
--- a ----- a ----- y1_
--------------------------------a
1� o
.-
1,7 A 1 1 IIII �
V I'A 1 1 II II.1 O ISI 1 `�•• -i it
III 8
Y Al 11 'I �_—_ I I •w Y
1 1 it SLI O 11 1 Y
I I 1 1 II LLItt t
I I I I I jj 'it 1 1 4
I I 1 1 11 ; 11 Ib 1
I I 1 1 Il 1 e I
II III 1 I
l i Il
Irll 1 I I I
1 1 ii na�
il II c 1'i
Ilk
JFF
11 4�� gggppp& R L
I
I I 11 II :;I k I 1 1 1 1 II q,l 41 I
I I
i I 11 1111 1 c .�
11 I I 1 1
I 1 1 1 II 111 ' QI 1; I
1 u
I I I 1 1 II 111 I 3 0 71
I 1 1 1 it Ilil 1 r; I 1
O
1 1 � II TTTTTT�i O ,
I QIP I I I it 1111 O 1, I � + � ---
1 I11 I I i II 1111 O f 1 I b
I I I t II 911 \ � I D0� I � 1 ®I
1 1 1 .Lj II 21II
• "
-Im-i 11 itti
AE -
+BIO__ 1 r0 11
....... ....________-_1___JL
FF
s
I m ¢
Z
c=2
f 3
4 �-1-----'---------------------__�------------------ a ass
-T -
Mw G r wr a• 4 p =
N m
s
Z
O
3
0
r � x
III'_--_- __..--_._..._-__.-_--------__--------_____
ccs
c=11 �i
3nN3AVRLN3A3S
_a ---------
-tL.w_•i.o,..._•,,.—.w"'-O"-"^'—-._----
------------------
r -----
11 II �I I{I J ____ ___ _____
I __ __ n_°� •_ .ice
�
tl i i II II i '1., I
fI�
�,i1 I I II V� Biq I
i,{�i i i ii III
'1
r, n
Y {{{ 1 I I 11
I I I I I II I I
I I I I II Ij�l 1; g
I I II I U 0 1� 4I
I I I 11 II I I
I I I i II I I� I
I 1 I I II III I�
11
II I I :I 1
f--
1 1 1 i i II ill 11 3 Is
II II I I I
I I I I It i
rl 1
I i i t BILI I
1 1 1 1 II l I (t YI
I i i i II :lel 1 � F
1 1 i I li j�I II I gl Ri 1
I I I 1 II 111 II (1 ®1
I I I I i ii ;�ji I gl ter: i 1
_--
I
ii riil � I / i I"b
I I wi I I �9y
� II 1111 I ••I I
--- J
--�-----------------
r_� '•� 3f1N3AtlHll(IS �
c=3
t
-------------
It,
�
��iein r ft �r -- --J---- -
It,