Loading...
HomeMy WebLinkAboutResolution_WSE TO 8_Amendment 6_WhiskeyMercerKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS 2022 AGENDA STAFF REPORT AGENDA DATE: October 4, 2022 ACTION REQUESTED: Request to approve a Resolution to authorize the Chair's Signature on Amendment No. 6 to Watershed Science and Engineering Task Order No. 8 Whiskey and Mercer Creek LOMR Support BACKGROUND: Public Works currently has a Task Order with Watershed Science and Engineering for Letter of Map Revision (LOMR) support for Whiskey and Mercer Creeks. Recently, the Department of Natural Resources released 2019 LiDAR covering the study area, and Public Works recommends that Watershed Science and Engineering update the Whiskey -Mercer analysis to reflect this updated LiDAR. Additionally, the Federal Emergency Management Agency had directed Kittitas County to extend the model downstream to the confluence of Mercer Creek with Wilson Creek, which necessitates including the City of Ellensburg in the model. Amendment No. 6 adds approximately $15,000 to the Task Order supporting this request by Public Works. The original task order was for $40,000 and the new amount is $55,000. INTERACTION: Public Works. RECOMMENDATION: Approve the Resolution to authorize the Chair's signature on Amendment No. 6 to Watershed Science and Engineering Task Order No. 8 Whiskey and Mercer Creek LOMR Support HANDLING: Return one original to Public Works. ATTACHMENTS: Resolution; Amendment No. 6 to Task Order No. 8 with Watershed Science and Engineering Whiskey and Mercer Creek LOMR Support LEAD STAFF: Arden Thomas, Water Resource Manager BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2022 - AUTHORIZING THE CHAIR'S SIGNATURE ON AMENDMENT NO.6 TO WATERSHED SCIENCE AND ENGINEERING TASK ORDER NO. 8 FOR WHISKEY AND MERCER CREEK LOMR SUPPORT WHEREAS: Public Works has a Task Order contract with Watershed Science and Engineering for hydraulic model and mapping support for Whiskey and Mercer Creek; and WHEREAS: The Department of Natural Resources recently made the 2019 LiDAR topographic dataset available to Kittitas County for the Whiskey and Mercer Creek study area; and WHEREAS: Updating the Whiskey and Mercer Creek 2 -Dimensional Hydraulic model with the new 2019 LiDAR topographic dataset will enable our Letter of Map Revision (LOMR) request to the Federal Emergency Management Agency (FEMA) to be based on the best available information; and WHEREAS: Kittitas County previously submitted the Whiskey and Mercer Creek 2 -Dimensional Hydraulic model to FEMA and was directed to revise the model so that it extends downstream to the confluence of Mercer Creek with Wilson Creek; and WHEREAS: The additional $15,000 needed to incorporate updated LiDAR from 2019 and extend the model downstream as directed by FEMA requires Board of County Commission authorization, NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby authorize the Chairman's signature on Watershed Science and Engineering Amendment No. 6 to Task Order No. 8 increasing the amount of the Task Order from $40,000 to $55,000. DATED this 4th day of October 2022, at Ellensburg, Washington. Attest: ❑ Clerk of the Board- Julie Kjorsvik ❑ Deputy Clerk of the Board- Mandy Buchholz BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Laura Osiadacz, Chairman Cory Wright, Vice -Chairman Brett Wachsmith, Commissioner ``��� `"",, KZTTITAS COYTNTY t `> DEPARTMENT OF PUBLIC WORKS gTl'ITAS COUNT l' Formal Task Order Document WATERSHED Science & Engineering Task Order Number 8 Amendment 6 Maximum Amount Payable $55,000 Completion Date 12/31/2023 The general provisions and clauses of Local Agency Agreement Number KCPW2017- 19HYD2 shall be in full force and effect for this Task Order. Location of Project: Kittitas County Project Title: Whiskey and Mercer Creek LOMR Support Amendment Summary: This sixth amendment to Task Order No. 8 changes the Scope of Work and increases the budget. Description of Work added to Scope of Work: The current Whiskey -Mercer LOMB hydraulic model and mapping uses 2011 LiDAR topography. The DNR recently released 2019 LiDAR covering the study area, and the County has requested that WSE update the Whiskey -Mercer analysis to reflect the updated LiDAR. Results will be used to support floodplain mapping for the Whiskey and Mercer Creek LOMR covering Kittitas County. Additionally, FEMA has directed Kittitas County to extend the model downstream to the confluence of Mercer Creek with Wilson Creek, which necessitates including the City of Ellensburg in the model. Cost Estimate: $15,000 is added to the Maximum Amount Payable, increasing the current maximum amount payable from $40,000 to $55,000. Project Schedule: There is no change to the project schedule. Agency Signature: Consultant Signature: Date: Date: 9 /28/7,o?,'L