HomeMy WebLinkAboutResolution_Faust Road_ProspectusKITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
AGENDA STAFF REPORT
AGENDA DATE: September 6, 2022
ACTION REQUESTED: Request to Approve a Resolution Authorizing the Chair's
Signature on the Local Agency Federal Aid Project
Prospectus for the Replacement of Bridge No. 88212 on
Faust Road over Town Ditch CRP 316-22.
BACKGROUND: On July 14, 2022, Kittitas County Public Works was
advised that our Faust Road — Town Ditch bridge
replacement project was selected to receive funding
through the federal Local Bridge Program.
This project will require a 13.5 percent match in local funds
for the engineering and design. If construction is authorized
before December 2025 there will be 100 percent federal
funding for eligible costs.
This Project Prospectus covers the Federal Funding for the
Preliminary Engineering phase of the project.
Public Works is preparing to solicit for design support in
the fall of 2022. It is anticipated that Public Works staff
will perform 50 percent of the Preliminary Engineering.
INTERACTION: Public Works
RECOMMENDATION: Approve the Resolution Authorizing the Chair's signature
on the Local Agency Federal Aid Project Prospectus for the
Replacement of Bridge No. 88212 on Faust Road over
Town Ditch CRP 316-22.
HANDLING: Return two (2) originals to Public Works
ATTACHMENTS: Resolution, Local Agency Federal Aid Project Prospectus
LEAD STAFF: Josh Fredrickson, County Engineer
BOARD OF COUNTY COMMISSI4
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2022 -
AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL
AID PROJECT PROSPECTUS ENGINEERING PHASE FOR THE FAUST ROAD
BRIDGE #88212 OVER THE TOWN DITCH REPLACEMENT PROJECT CRP 316-22
WHEREAS: The Faust Road Bridge No. 88212 Replacement Project was awarded Federal
Funding through the 2022 Local Bridge Program; and
WHEREAS: The federal funding will be used for the preliminary engineering phase to design,
develop and prepare construction plans and specifications for these
improvements; and
WHEREAS: In preparation to begin work, Kittitas County Public Works is requesting the
Washington State Department of Transportation release the federal funds for
preliminary engineering; and
WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair
of the Board of County Commissioners acknowledging the project has been
reviewed and is consistent with the County's comprehensive plan for community
development; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best
interest of the public, does hereby approve the Chair's signature on the Local
Agency Federal Aid Project Prospectus for the Faust Road Bridge #88212 Over
the Town Ditch Replacement Project CRP 316-22.
DATED on this 6th day of September 2022, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Laura Osiadacz, Chairman
Cory Wright, Vice -Chairman
Brett Wachsmith, Commissioner
Adift
� Washington State
WI/ Department of Transportation
Local Agency Federal Aid
Project Prospectus
DOT Form 140-101 Page 1
Revised 01/2022 Previous Editions Obsolete
Prefix
Route
( )
Date
1 8/29/2022
Federal Aid
DUNS Number
01-020-2547
Project Number
LocalAgency
CRP 316-22 / RC 2195 -BR
i
WSDO y 1
Federal Employer
91-601349
Project Number
`
Use Only /
Tax ID Number
Agency
CAAgency
Federal Program Title
Kittitas County Public Works
Z Yes ❑ No
0 20.205 ❑ Other Local Bridge Program
Project Title
Start Latitude N 47.030593°
Start Longitude W -120.592656°
Faust Road over Towne Ditch
End Latitude N 47.030593°
End Longitude W -120.592656°
Project Termini From -To
Nearest City Name
Project Zip Code (+4)
0.59 0.59
Ellensburg
98926-6590
Begin Mile Post
End Mile Post
Length of Project
Award Type
0.59
0.59
0.00
0 Local ❑ Local Forces ❑ State ❑ Railroad
Route ID
Begin Mile Point
End Mile Point
City Number
County Number
County Name
0.59
0.59
N/A
19
Kittitas
WSDOT Region
Legislative District(s)
Congressional District(s)
Urban Area Number
South Central Region
13
8
Total
Local Agency
Federal Funds
Phase Start
Phase
Estimated Cost
Funding
Date
Nearest Hundred Dollar
Nearest Hundred Dollar
Nearest Hundred Dollar
Month Year
P.E.
317,800.00
42,900.00
274,900.00
10/2022
R/W
Const.
2,214,000.00
2,214,000.00
8/2023
Total
2,531,800.00
142,900.00
2,488,900.00
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width Number
of Lanes
20 2
single span, structurally deficient, load posted concrete bridge
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
Replace existing single span, structurally deficient, load posted concrete bridge with a longer, single span,
prestressed concrete girder structure to meet current design standards and to improve the hydraulic opening.
Local Agency Contact Person
Title
Phone
Darren Case
Construction Manager
509-962-7019
Mailing Address
City
State
Zip Code
411 N. Ruby, Suite 1
Ellensburg
WA
98926
By
Approving Authority
Project Prospectus
Title County Engineer
Date 8/29/2022
DOT Form 140-101 Page 1
Revised 01/2022 Previous Editions Obsolete
Agency
Project Title
Date
Kittitas County Public Works
Faust Road over Towne Ditch
8/29/2022
Type of Proposed Work
Project Type (Check all that Apply)
Roadway Width
Number of Lanes
❑ New Construction ❑ Path / Trail
❑ 3-R
32
2
❑ Reconstruction ❑ Pedestrian / Facilities
❑ 2-R
❑ Railroad ❑ Parking
❑ Other
Bridge
Geometric Design Data
Description
Through Route
Crossroad
❑ Principal Arterial
❑ Principal Arterial
FederalEJMinor
❑Urban
Arterial
E] Urban
El Minor Arterial
Functional
❑✓ Rural
Collector
E] Collector
E] Rural
Collector
Classification
❑ NHS
❑ Major Collector
❑ NHS
❑ Major Collector
❑ Minor Collector
❑ Minor Collector
❑✓ Local Access
❑ Local Access
Terrain
❑ Flat
Z✓ Roll ❑ Mountain
[:]Flat
❑ Roll ❑ Mountain
Posted Speed
35
Design Speed
35
Existing ADT
100
Design Year ADT
100
Design Year
2022
Design Hourly Volume (DHV)
Performance of Work
Preliminary Engineering Will Be Performed By
Others
Agency
split between consultant and agency
50 %
50
Construction Will Be Performed By
Contract
Agency
contract
100 %
"fie
Environmental Classification
❑ Class I - Environmental Impact Statement (EIS) ❑✓ Class II - Categorically Excluded (CE)
❑ Project Involves NEPA/SEPA Section 404
❑ Projects Requiring Documentation
Interagency Agreement
(Documented CE)
❑ Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreements
Environmental Considerations
work over irrigation canal will be performed while
canal system is not in service between November and
April.
DOT Form 140-101 Page 2
Revised 0112022 Previous Editions Obsolete
Agency
Project Title
Date
Kittitas County Public Works
Faust Road over Towne Ditch
8/29/2022
Right of Way
✓❑ No Right of Way Needed
❑ Right of Way Needed
*All construction required by the
❑ No Relocation ❑ Relocation Required
contract can be accomplished
within the existing right of way.
Utilities
Railroad
❑ No utility work required
❑✓ No railroad work required
❑✓ All utility work will be completed prior to the start
❑ All railroad work will be completed prior to the start of
of the construction contract
the construction contract
El All utility work will be completed in coordination
F-1 All the railroad work will be completed in coordination
with the construction contract
I with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
Utilities will be required to temporarily relocate prior to the project and then install permanent after the
construction project.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes ❑✓ No
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Agency
Date By
Mayor/Chairperson
DOT Form 140-101 Page 3
Revised 0112022 Previous Editions Obsolete