Loading...
HomeMy WebLinkAboutResolution_CookeCanyonRoad_ProspectusKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: September 6, 2022 ACTION REQUESTED: Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the Replacement of Bridge No. 80181 on Cooke Canyon Road over the Hiline Canal CRP 315-22. BACKGROUND: On July 14, 2022, Kittitas County Public Works was advised that our Cooke Canyon Road — Hiline Canal bridge replacement project was selected to receive funding through the federal Local Bridge Program. This project will require a 13.5 percent match in local funds for the engineering and design. If construction is authorized before December 2025 there will be 100 percent federal funding for eligible costs. This Project Prospectus covers the Federal Funding for the Preliminary Engineering phase of the project. Public Works is preparing to solicit for design support in the fall of 2022. It is anticipated that Public Works staff will perform 50 percent of the Preliminary Engineering. INTERACTION: Public Works RECOMMENDATION: Approve the Resolution Authorizing the Chair's signature on the Local Agency Federal Aid Project Prospectus for the Replacement of Bridge No. 80181 on Cooke Canyon Road over the Hiline Canal. HANDLING: Return two (2) originals to Public Works ATTACHMENTS: Resolution, Local Agency Federal Aid Project Prospectus LEAD STAFF: Josh Fredrickson, County Engineer BOARD OF COUNTY COMMISSII COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2022 - AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL AID PROJECT PROSPECTUS ENGINEERING PHASE FOR THE COOKE CANYON ROAD BRIDGE #80181 OVER THE HILINE CANAL REPLACEMENT PROJECT CRP 315-22 WHEREAS: The Cooke Canyon Road Bridge No. 80181 Replacement Project was awarded Federal Funding through the 2022 Local Bridge Program; and WHEREAS: The federal funding will be used for the preliminary engineering phase to design, develop and prepare construction plans and specifications for these improvements; and WHEREAS: In preparation to begin work, Kittitas County Public Works is requesting the Washington State Department of Transportation release the federal funds for preliminary engineering; and WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair of the Board of County Commissioners acknowledging the project has been reviewed and is consistent with the County's comprehensive plan for community development; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby approve the Chair's signature on the Local Agency Federal Aid Project Prospectus for the Cooke Canyon Road Bridge #80181 Over the Hiline Canal Replacement Project CRP 315-22. DATED on this 6th day of September 2022, at Ellensburg, Washington. Attest: ❑ Clerk of the Board- Julie Kjorsvik ❑ Deputy Clerk of the Board- Mandy Buchholz BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Laura Osiadacz, Chairman Cory Wright, Vice -Chairman Brett Wachsmith, Commissioner ��, Washington State �I/ Department of Transportation Local Agency Federal Aid Project Prospectus DOT Form 140-101 Previous Editions Obsolete Revised 01/2022 Prefix Route ( ) Date 8/29/2022 DUNS Number 01-020-2547 Federal Aid Project Number Local Agency( CRP 315-22 / RC 2194 -BR WSDOT 1 Use Only J Federal Employer Tax ID Number 91-601349 Project Number ` Agency CAAgency Federal Program Title Kittitas County Public Works ❑� Yes ❑ No 0✓ 20.205 ❑ Other Local Bridge Program Project Title Start Latitude N 47.0491650 Start Longitude W -120.385876° Cooke Canyon over HiLine Canal End Latitude N 47.049165° End Longitude W -120.385876 - -120.385876°Project Project Termini From -To Nearest City Name Project Zip Code (+4) 0.24 0.24 Kittitas 98926-6637 Begin Mile Post End Mile Post Length of Project Award Type ✓❑ Loral ❑ Local Forces ❑ State ❑ Railroad 0.24 0.24 0.00 Route ID Begin Mile Point End Mile Point City Number County Number County Name 0.24 0.24 N/A 19 Kittitas WSDOT Region Legislative Districts) Congressional Districts) Urban Area Number South Cenaal Region 13 g Total Local Agency Federal Funds Phase Start Phase Estimated Cost Nearest Hundred Dollar Funding Nearest Hundred Dollar Nearest Hundred Dollar Date Month Year P. E. 317,800.00 42,900.00 274,900.00 10/2022 R/VV Const. 2,405,200.00 2,405,200.00 8/2023 Total 2,723,000.00 142,900.00 2,723,000.00 Description of Existing Facility (Existing Design and Present Condition) Roadway Width Number of Lanes 24 2 single span, structurally deficient, load posted concrete bridge Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary) Replace existing single span, structurally deficient, load posted concrete bridge with a longer, :single span, prestressed concrete girder structure to meet current design standards and to improve the hydrc opening. Local Agency Contact Person Title Phone Darren Case Construction Manager 509-962-7019 Mailing Address City Ellensburg State WA Zip Code 98926 411 N. Ruby, Suite 1 By Approving Authority Project Prospectus Title County Engineer Date 8/29/2022 Page 1 DOT Form 140-101 Previous Editions Obsolete Revised 01/2022 Agency Kittitas County Public Works Project Title Cooke Canyon over HiLine Canal Date 8/29/2022 osed Work 1 all that Apply) dway Width Number of Lanes ruction ❑Path/Trail 7FD�Newconstruction q2-R 2tion ] ❑ Pedestrian / Facilities ❑ Parking Z✓ Bridge Geometric Design Data Description Crossroad Arterial ❑ Principal Arterial Federal erial =Rural ❑ Minor Arterial ❑ Urban ❑ Collector Functional E]ElMajor Collector ❑Rural E] Major Collector Classification El F1Minor Collector NHS ❑ Minor Collector ✓❑ Local Access ❑ Local Access Terrain ❑✓ Flat ❑ Roll ❑ Mountain ❑ Flat ❑ Roll ❑ Mountain Posted Speed 50 Design Speed 50 Existing ADT 268 Design Year ADT 268 Design Year 2022 Design Hourly Volume (DHV) Performance of Work Preliminary Engineering Will Be Performed By Others Agency shared agency and consultant 50 % 50 % Construction Will Be Performed By Contract Agency contract 100 % % Environmental Classification ��J ❑ Class I - Environmental Impact Statement (EIS) ❑✓ Class II - Categorically Excluded (CE) ❑ Project Involves NEPA/SEPA Section 404 El Projects Requiring Documentation Interagency Agreement (Documented CE) ❑ Class III - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreements Environmental Considerations work over irrigation canal will be performed while canal system is not in service between November and April Page 2 DOT Form 140-101 Previous Editions Obsolete Revised 01/2022 Project Title Date Agency Cooke Canyon over HiLine Can 8/29/2022 Krttitas County Public Works Y Right of Way ✓� No Right of Way Needed ❑Right of Way Needed * All construction required by the ❑ No Relocation ❑ Relocation Required contract can be accomplished within the existing right of way. Utilities Railroad ❑ No utility work required ✓0 No railroad work required ✓� All utility work will be completed prior to the start ❑ All railroad construction rlte contract mpleted prior to the start of of the construction contract ❑ All utility work will be completed in coordination ❑ All the railroad work will be completed in coordination with the construction contract with the construction contract Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project Utilities will be required to temporarily relocate prior to the project and then install permanent after the construction project. FAA Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed Remarks [:]Yes W✓ No This project has been reviewed by the legislative body of the administration agency or agencies, or its designee, and is not inconsistent with the agency's comprehensive plan for community development. Agency Date By Mayor/Chairperson Page 3 DOT Form 140-101 Previous Editions Obsolete Revised 01/2022