HomeMy WebLinkAbout2022-08-08-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS Public Works Study Session Regular Meeting Monday August 8, 2022 - 1:30 PM Commissioners' Auditorium 205 West 5th Room 109 - Ellensburg 1. Call to Order 2. Citizen Comments (1 min. time limit) 3. Request to Approve Resolution to establish County Road Project (CRP) number supporting roadway improvements to Micheletto Rd 4. Fairgrounds Survey 5. Bowers Field (ELN) Wetland Mitigation Design 6. Other business 7. Concluded Created on 8/3/2022 10:57:26 AM KITTITAS COUNTY PUBLIC WORKS STUDY SESSION MINUTES In -Person and Webex Regular Meeting MONDAY 1:30 PM August 8, 2022 Board Members Present: Chairman Laura Osiadacz, and Vice -Chairman Cory Wright. Others: Mark Cook, Josh Fredrickson, Rebecca Cruse, Public Works; Jessica Miller, Community Development Services. At 1:31 pm Chairman Laura Osiadacz opened the Public Works Study Session. CITIZEN COMMENTS No comments REQUEST TO APPROVE A RESOLUTION TO ESTABLISH COUNTY ROAD PROJECT (CRP) NUMBER SUPPORTING ROADWAY IMPROVEMENTS TO MICHELETTO ROAD County Engineer, Josh Fredrickson, informed the Board of County Commissioners that in 2021 Micheletto Road was established on the county road system. Josh Fredrickson explained that the road needs improvements to the surfacing and an appropriate turnaround constructed. Josh Fredrickson is requesting Board approval of a Resolution to establish the project. Vice -Chairman Cory Wright motioned to approve Resolution 2022-159 and Chairman Laura Osiadacz seconded the motion. Motion passed. FAIRGROUNDS SURVEY Mark Cook briefed the Board of County Commissioners on a request Public Works received from the City of Ellensburg and Deputy Prosecuting Attorney Chris Horner to bring clarity to the boundary lines between the City of Ellensburg properties and the Fairgrounds (Kittitas Valley Event Center). Mark Cook stated that County Surveyor Justin Turnbull would take lead on the project and estimated the cost for the survey services. Mark Cook continued that the City of Ellensburg showed interest in sharing the costs. Mark Cook requested support from the Board of County Commissioners and direction that staff perform the requested survey. Board of County Commissioners approves of staff moving forward with the survey. BOWERS FIELD (ELN) WETLAND MITIGATION DESIGN Mark Cook requested the Board of County Commissioners support to secure FAA design grants supporting the onsite wetland mitigation. Mark Cook stated that grant match of 10% is required for the anticipated $170,000 grant. Mark Cook added that staff has prepared 2022-8-8 Minutes solicitation for on-call airport consultation services, with the current contract ending in October 2023.Discussion was held. Meeting concluded at 1:55 pm. &"t-CV4A/c�7✓ Rebecca Cruse, Administrative Assistant 2022-8-8 Minutes KITTITAS COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Laura Osiadacz, Chairman KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS STUDY SESSION STAFF REPORT STUDY SESSION DATE: August 8, 2022 ACTION REQUESTED: Request to Approve a Resolution to establish County Road Project (CRP) number supporting roadway improvements to Micheletto Road BACKGROUND: In 2021 Micheletto Road was established onto the Public Road Network. Micheletto Road extends approximately 0.245 miles east from the intersection with Swauk Prairie Road. The roadway surfacing is currently gravel and is narrow without a turnaround. It is proposed to improve the roadway by improving the surfacing and constructing an appropriately sized turnaround at the east end of the roadway. County forces will perform the work to reconstruct the roadway surface and installation of a turnaround. Funding in the amount of $40,000.00 will come from the County Road Fund. INTERACTION: Public Works RECOMMENDATION: Approve the Resolution establishing a County Road Project (CRP) number supporting the road improvements to Micheletto Road. HANDLING: Return one (1) original to Public Works ATTACHMENTS: Resolution establishing CRP No. 312-21 LEAD STAFF: Joshua Fredrickson, County Engineer RESOLUTION NO. BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter of initiating a county road project designated as: CRP NO: 312-21 JOB NO: RC 2294-B1 IT IS HEREBY RESOLVED that Micheletto Road be improved as follows: The project will improve Micheletto Road by installing a turnaround at the east end of the roadway and regrading/resurfacing the roadway. ARTERIAL ACCESS X This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County Engineers estimate, is hereby made in the amounts and for the purposes shown: PURPOSE AMOUNT TOTALS PRELMINARY ENGINEERING $ 5,000.00 CONSTRUCTION ENGINEERING $ 8,000.00 RIGHT-OF-WAY ACQUISITION $ SUB -TOTAL J $ 13,000.00 County Forces CONSTRUCTION $ CONTRACT CONSTRUCTION $ 27,000.00 SUB -TOTAL $ 27,000.00 TOTAL PROJECT COST $ 40,000.00 GRANT OR OTHER FUNDS $ Grant Source: FY 2022 WSDOT Local Bridge Program is TOTAL COUNTY ROAD FUND ALLOCATION 40,000.00 Aoshua Fredrickson, P.E. County Engineer ® THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2022 ANNUAL ROAD PROGRAM AS ITEM NO. 13 ❑ THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM IN ACCORDANCE WITH RCW 36.81.130 IT IS FURTHER RESOLVED THAT: ❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT INAQCtpf p� V, ITH RCW 36.77.020 ET.SEQ. ® THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORd WAC 136-18. ADOPTED this day of a 2022. iS IN ACCORD"-AMW WITH RCW 36.77.065 AND BO �OF-COUNTYCOMMI$SIONERS n •., KIT TAS COUNTY, INGTON� ',,,-0, Laura siadac hair _ o r hair Brett g:\base\forms\eng\crp-frm 8/1/2022 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: August 8, 2022 TOPIC: Fairgrounds Survey ACTION REQUESTED: Direct Staff LEAD STAFF: Mark R. Cook RECOMMENDATION: Direct Public Works (PW) perform the requested survey of the fairgrounds. BRIEFING SUMMARY: • Recently, the city of Ellensburg City Attorney contacted Deputy Prosecuting Attorney Horner discussing the need to survey the fairgrounds • City and county ownerships are not clear • County Surveyor Turnbull has prepared a cost estimate for survey services and the city is interested in cost sharing the work • PW proposes using our existing cost reimbursement agreement with the city for shared survey effort expenses • The work is expected to take six weeks to complete. BACKGROUND: The city is beginning to plan for redesign of various portions of Reed Park. The parcel layer is not sufficiently clear allowing ownership decisions impacting the park redesign plan. The city desires surveying the fairgrounds resolving ownership issues. DISCUSSION: A survey of the fairgrounds is expected to clarify ownership issues between the city and the county. Providing support from the Board of County Commissioners, work could begin in the next several weeks. The work will likely take six weeks to complete. project costs are expected to be equally shared between the city and the county. FISCAL IMPACTS: Project costs are estimated in the $12-13 thousand dollar range. ATTACHMENTS: None. Page 1 of 1 Public Works "Work Session Staff Report", 2022 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: August 8, 2022 TOPIC: Bowers Field (ELN) Wetland Mitigation Design ACTION REQUESTED: Direct Staff LEAD STAFF: Mark R. Cook RECOMMENDATION: Secure a Federal Aviation Administration (FAA) design grants supporting wetland mitigation needs at ELN. BRIEFING SUMMARY: • Recently, the FAA issued the anticipated Finding of No Significance Impact (FONSI) supporting the airport's capital construction program. • Construction of the parallel taxiway and rehabilitation of runway 11/29 impacts existing wetlands. • Design of wetland mitigation is now required. • The FONSI prequalifies onsite wetland mitigation. BACKGROUND: Public Works (PW) was successful in moving required wetland mitigation form offsite to onsite wetland mitigation. The proposal removes portions of an old taxi -lane and reconnects existing wetlands. Flood mitigation efforts will also require design ahead of parallel taxiway design slated for 2024. DISCUSSION: PW has conducted an Independent Fee Evaluation (IFE) on Century West's proposed design grant with the FAA (CivilAir Engineers PLLC). We are finalizing the wetland specialist subcontractor scope of work and anticipate obtaining FAA concurrence in the next several weeks. The mitigation construction is expected in 2023 clearing the way for several years of capital construction at the airport. FISCAL IMPACTS: A grant match of ten percent is required for the anticipated $170,000 grant ($17,000). Funding is expected to come from the General Fund. ATTACHMENTS: EXHIBIT 1: WETLAND MITIGATION DESIGN SCOPE OF WORK EXHIBIT 2: FUNDING ESTIMATE Page 1 of 3 Public Works "Work Session Staff Report", 2022 EXHIBIT 1: WETLAND MITIGATION DESIGN SCOPE OF WORK Page 2 of 3 Public Works "Work Session Staff Report", 2022 )I(( 0 � � e NOW | ,;,l, : ; - ! . � © ! w� � J` >%�� ^ � ` ,■■ |� \ §fw! §!§§ , . CENTURY WEST ENGINEERING TASK ORDER #12 AGREEMENT AND AUTHORIZATION FOR ENGINEERING CONSULTING SERVICES By this Agreement dated July 19, 2022, the Kittitas County (Client) authorizes Century West Engineering Corporation (Consultant) to carry out and complete the following Services in consideration of the mutual covenants set forth in the Professional Services Agreement (Master Agreement), executed between Kittitas County and CWEC, and dated on October 7, 2019; and for projects with Federal funding the following attachment: FAA Professional Service (A/E) Contract Provisions. Project:Task Order #12 — Wetland and Stream Mitigation Design Project No.: 12436.018.01 Scope of Services: Overview Kittitas County (the County) has solicited Century West Engineering services for design development of on -Airport wetland and stream mitigation located in the northwest corner of the Airport. An exhibit showing the general area of mitigation, has been attached. Additionally, a figure showing additional detail has been included on the last page of this scope. That figure was taken from a memo titled Justification for Wetland Mitigation at Bowers Field (ELN) dated December 9, 2021 written by Jacobs Engineering for Kittitas County Generally, the mitigation involves re-establishment of wetlands through removal of historic fill and deteriorated asphalt, which formally served as a taxilane, and regrading the surface and planting of select plant species. The mitigation is a requirement in the County's recently approved Environmental Assessment (EA) and of the FAA's Finding of No Significant Impact (FONSI). As stated in the FONSI, the requirements include: • Provide mitigation for impacts to water resources (0.55 -acre of wetland and 0.03 acre of stream) resulting from the installation of storage berms for flood reduction and drainage improvements as well as runway improvements. • Proposed mitigation includes removal of approximately 1.1 acres of derelict pavement adjacent to wetlands in the northwest corner of the Airport. Mitigation would be developed to meet federal, state, and local requirements through the re-establishment of impacted wetlands, improved wetland connectivity, and restoration of lost functions and values. Mitigation acreages proposed would follow Washington State Joint Guidance from the USACE and Ecology and provide a replacement ratio of 2:1. • Provide monitoring and adaptive management of mitigation site per the requirements of the permittee - responsible mitigation plan approved by USACE and Ecology. • Avoid and minimize impacts to Whiskey Creek water quality during construction by implementing the following requirements of the USACE Nationwide 401 Water Quality Certification. This project scope addresses the first two bullet points above and provides for the preparation of mitigation plans, technical specifications, and bidding documents for construction. The second two bullet points will be addressed along with construction administration and observation services under a separate agreement. The prime consultant for this project is Century West Engineering. Century West Engineering will hire a subcontractor to provide wetland specialist and topographic services. The activities and work elements for each task are described as follows. TASK 1— Project Management Administrative tasks will include the following: 1. Perform pre -design coordination with the County and FAA, using the FAA pre -design conference checklist as a basis of the scope development. This effort includes attending and participating in one conference call meeting with the County and FAA. 2. Finalize work scope, schedule, and negotiate contract with the County. 3. Provide the County with documents needed for obtaining an independent fee estimate (IFE) by a separate Engineer. 4. Carry out project administration including, but not limited to monitoring design and project schedules, coordination of project with the County, monitoring and reporting technical and budget issues to the County, preparation of monthly consultant invoices for submittal to the County. Assume 4 hours per month over a 6 - month period. 5. Coordinate project team and sub -consultants. 6. Provide a project schedule to the County and FAA. Up to 3 revisions are anticipated. 7. Prepare an AIP Design Grant application and associated sketches. It is assumed one grant will be issued for design. This task includes assisting the County with submittal of FAA Sponsor Certification forms. 8. Assist the County in the administration and reporting for FAA and/or other funding programs and development of overall program costs. Assume 2 hours per month over a 6 -month period. 9. Prepare and submit an FAA form 7460 for temporary construction activities. Up to 2 submittals are anticipated. 30. Prepare and submit up to two (2) FAA Quarterly Performance Reports and annual financial reporting (forms 425, and 270/271). 11. Perform DBE plan/goal reporting for FY 2022. An update of the County's DBE goal is not included in this scope. TASK 2 — Survey & Base Map Set Up 1. Topographical Survey Services. Perform full topographic survey of the project site. The area is approximately 2.5 acres. The consultant will engage a utility locate firm to denote and mark on -airport utilities within the project site. 2. Consultant will prepare a (CAD) base map using the topographic survey completed in Task 2.1 and supplemented with mapping from previous projects on the airport provided by the County. DELIVERABLES: • Civil3D base map of the project area TASK 3 — Agency Coordination Related to JARPA Submittal 1. Joint Aquatic Resources Permit Application (DARPA) preparation and submittal is included as part of a separate AIP grant for Advanced Engineering for NEPA Analysis (ELN 3-53-0026-015-2020), however this task is related to coordination of and attending a site visit (either in person or virtual, if necessary) in which the consultant will meet permitting agencies (US Army Corps of Engineers, Washington Dept of Fish and Wildlife, and Kittitas County Planning Dept) on-site to discuss the mitigation concept, if the agencies are able and willing to do so. DELIVERABLES: • One site visit/meeting, at the Airport, to meet permitting agencies and walk the proposed area of mitigation, in conjunction with the JARPA submittal. • Site visit meeting agenda and meeting minutes. TASK 4 — Critical Area Report Update 1. A Critical Areas Report (CAR) was assembled as part of the EA project under a separate AIP grant (ELN 3-53- 0026-013-2018). The CAR was assembled with reference to Kittitas County Critical Areas Ordinance, which was updated during the later stages of the EA project. This task involves the updating of the CAR to reflect the current version of the Kittitas County Critical Areas Ordinance, for use in permitting related to the wetland and stream mitigation project. 2. This task will also address Washington Department of Fish and Wildlife's comments on the CAR and proposed mitigation that was received during the EA phase. 3. It is anticipated that there will be two rounds of review of the CAR, one by the Airport and one by Kittitas County Community Development. DELIVERABLES: • An updated Critical Areas Report, based on current Kittitas County Critical Areas Ordinance. TASK 5— Mitigation Plan o This task includes the production of a Compensatory Mitigation Plan that reflects the current version of the Kittitas County Critical Areas Ordinance, to address impacts to regulated ecological critical areas by the project. o An initial assessment of the viability and justification for on-site wetland mitigation was conducted as part of the EA. This information was described in a memo titled Justification for Wetland Mitigation at Bowers Field (ELN) dated December 9, 2021 written by Jacobs Engineering for Kittitas County. and the information and mitigation concept presented in this memo will be utilized and advanced for this Mitigation Plan. o It is anticipated that there will be two rounds of review of the Mitigation Plan, one by the Airport and one by Kittitas County Community Development. o It is anticipated that there will be a virtual meeting with Kittitas County Community Development Services to confirm the proposed mitigation ratios and buffer mitigation requirements. DELIVERABLES: ® A Mitigation Plan, based on current Kittitas County Critical Areas Ordinance. TASK 6 — Preliminary (60% and 90%) Design 1. The project manager and project engineer will make one (1) site visit and inspection during the survey. 2. Design existing pavement demolition, grading, planting and temporary irrigation for the proposed mitigation. 3. Prepare 60% technical specifications related to the mitigation, grading, planting and temporary irrigation plans for inclusion in the contract manual. 4. Prepare 60% construction cost estimate. 5. Prepare 60% Plan Set —Approximately 12 sheets • Coversheet • Survey control plan • Construction work area/phasing/safety plan • Erosion control plan • Erosion control details • Demolition plan • Grading plans and details (2 sheets) • Planting plan • Planting details • Temporary irrigation plan • Temporary irrigation details 6. The project manager and project engineer will attend a 60% virtual review meeting with the County to discuss the 60% design. Prepare a National Pollutant Discharge Elimination System (NPDES) Notice of Intent (NOI) and Stormwater Pollution Prevention Plan (SWPPP) permit application and obtain the permit on behalf of the County. The County will pay permit application fees. 8. Prepare construction phasing recommendations, construction operations and safety plan and prepare associated report to FAA requirements. Submit the construction safety and phasing plan (CSPP) to FAA, along with 60% safety and phasing plans, for approval. 9. Prepare preliminary 90% contract documents, including contract boilerplate and technical specifications for the Project. 10. Prepare 90% construction cost estimate. 11. Prepare preliminary 90% plan set (12 sheets assumed). 12. Provide five (5) sets of the 60% and 90% documents. One (1) set of each to be sent to FAA. Allow four (4) weeks for FAA review of the 90% documents. 13. Prepare preliminary (90%) engineer's design report to the established FAA requirements (FAA standard handout 620-04). 14. Submit Engineer's Preliminary Design Report and 90% documents 15. The project manager and project engineer will attend a 90% virtual review meeting with the County to discuss the 90% design. DELIVERABLES: • 60% and 90% level plans (PDF) • 60% and 90% level project manual of bidding documents (PDF) • 60% and 90% level engineer's estimate (PDF) • 90% Construction Safety and Phasing Plan (CSPP) (PDF) TASK 7 — Final Design 1. Review intermediate level review comments from the County; address and respond to comments. 2. Non -FAA agency comments or conditions of approval (from USACE, USFWS, or otherwise) will be responded to, and incorporated into the bid documents as necessary. 3. Based on FAA comments, prepare final CSPP. 4. Prepare final plans. 12 plan sheets are anticipated. 5. Prepare final project manual of bidding documents and specifications. 6. Prepare final construction cost estimate. 7. Compile final submittal package and submit to the County for advertisement of bids. Bid documents will be sent to FAA as well. 8. Prepare FAA AIP grant closeout documentation in accordance with FAA Order 5100.38D. DELIVERABLES: • Final plans (PDF) • Final project manual of bidding documents (PDF) • Final engineer's estimate (PDF) • Final Construction Safety and Phasing Plan (CSPP) (PDF) TASK 8 — Bid Services 1. Consolidate and upload bidding documents to Quest CDN bid documents website. 2. Provide an advertisement for the public bidding of the project. The County will send the Invitation to Bid to media outlets for advertisement, and pay advertising fees. 3. Provide project coordination with the County throughout the bidding period. 4. Review, research, and prepare answers to technical questions during bidding. 5. Prepare addenda as necessary to clarify bid documents. Addenda will be distributed by the Engineer. For scoping purposes this scope assumes two addenda will be prepared. Addenda will be consolidated into one pdf electronic file and uploaded to the Quest CDN website. 6. Coordinate, attend, and facilitate a pre-bid conference forthe project at the airport. Prepare meeting agenda, sign -in sheet. The Project Manager will attend the pre-bid conference. 7. The County will facilitate the bid opening and provide the Engineer with copies of all bid packages received. 8. Prepare bid tabulation and prepare a Bid Analysis Letter to the Airport for award of bid. It is assumed the County will issue the Notice of Award letter. DELIVERABLES: • PDF bid documents for upload to Quest CDN website • Bid tabulation/Bid Analysis Letter • Recommendation of Award Letter EXCLUSIONS: The following items are excluded from this scope, but as necessary will be included in a subsequent contract task order. Excluded work items include: • Construction inspection services • Wetland mitigation monitoring services ASSUMPTIONS: • Geotechnical investigations collected as part of the Environmental Assessment (ELN AIP -015) will be relied upon to inform the design of this project • An initial assessment of the viability and justification for on-site mitigation was conducted as part of the EA. This information was described in a memo titled Justification for Wetland Mitigation at Bowers Field (ELN) dated December 9, 2021 written by Jacobs Engineering for Kittitas County and the information and mitigation concept presented in this memo will be utilized and advanced for this design project. Proposed Mitigation Area Diversion 1—I HUNGRY JUNCTION RD 1 e Diversion 2 Proposed Mitigation Site Wetland — Whiskey Creek Whiskey Creek Side Channel 0 100 200 N Feet u awr. oenNry ., CnB�nearuN. rtnulas Gounry, m", sahIa ep SourcesEan, Max3r. Ealhsrm Geographies, USDA FSA, USGS. Aeroprid, IGN, IGP, and the GIS User C mumry EXHIBIT 2: FUNDING ESTIMATE Page 3 of 3 Public Works "Work Session Staff Report", 2022 PROIECTTITLE: BOWERS FIELD AIRPORT- WETLAND ANO STREAM MITIGATION DESIGN PROJECT CLIENT'. KITTITAS COUNTY IOBNUMBER: TBA PRINCIPAL SRPROI FEW PR01 ENGREN CADD ENGR MGR MGR BNGR TRAINING DSGN CLER. TOTAL PROJECT TASK PROIECTTASK $280.00 $224W S16800 $13010 SIM00 SI38W S82.00 HRS COST COST TASK 1-Pmjxl Kno,moenl $12,483.00 1 Postage 0 0 4 3 2 0 0 8 S1.140$LgXW 3 postage Scapi $d'NUIFE Fa eaM Sc ulut 0 1 8 0 0 0 0 9 51,519.00 3 Pmvidc 0 0 1 0 0 n 1 1 $250.00 ost rnmehinlsfar IF 4 ProComweom,Figualiinfg months) p 0 0 0 0 24 $4032W S COUrtli Sehoete aM Subs 0 0 8 8 4 d n 0 0 12 5$864.00 6 PraviMP jecl SCFastromete Pr 0 0 1 0 0 0 2 unNSNelcMs for Design O PrequFAA 0 0 4 2 0 1 1 1.0200 $1.62.00 FAAGremA GrGram mons p 0 0 0 6 0 0 0 6 6 $]80.00 9 Formi I 9 Prepare FAA Farm 0 0 1 2 0 0 3 S42800 lO Pmpyc Amwalvtl Quarterly Rerena Qua 0 0 0 6 0 0 0 6 SMANO 11 P<rform DBE report,0 0 0 J 0 0 0 0 l $390S19U.00 TASK 2 -Suri, & Base Ma, Set Up 1 Topageopbical Survey Servires See, Sub-Comullma Feebelow "W.00 2 Bax Map Set Up 0 0 0 1 0 2 0 3 54060, TASK 3 -Agee, CmNi rition Related to IARPA Submittal $2.548.00 I Site Visit AgeMa, erN Mceting Mitmte p 0 8 8 11 0 2 18 $2,54800 TASK 4Lrircal Area Repan U,nK $0,A) 1 Cntiwl Ago, Repon Update See Sub-Comullo nl Fces below TASK 5 -Mitigation Plan San 1 Mitigation Plan LOttwllam Fasbeoro TASK6-Poilimiwy (60%Ard 911%) Design 1 site visit 0 0 8 8 0 0 0 16 $2,38410 $49,840W 2 Perform Merged Po gs Elemen6 0 p 4 24 0 4 0 32 $4344up 3 Preptc 60% bibelots Documents eM SpUes 0 2 32 0 0 11 4 38 $6,15210 4 Prepare 0% Cost Fusion, 0 1 4 8 II 2 0 IS S2,212W 5 Prepare 60% Comlrvclion Plum 0 1 8 16 11 34 1 No $7,04200 660%Review Mceting 0 0 4 8 0 0 0 12 SI,11200 I WDES SWPPP Ferr it 0 0 4 8 11 2 1 15 53170.00 8 Pigpen Frtbmiwry CSPP 0 1 4 % 0 1' 0 14 S207400 9 Exports 90%Bid ng Wcumenls aN Sons 0 1 2. 0 0 0 0 21 S3.584W 10 Prepare 90%Cog piping 11 1 8 16 0 0 0 25 S364800 11 Propose, 90% Cottonton Plems 0 1 12 16 16 16 2 63 583%. 12 Provide 5 Sets of60% atW 906 Rc,icw Documems 11 0 0 4 0 0 8 13 $1,176.W 13 Prepare %% FAA Engireees Design Repot II 1 8 12 0 0 1 22 $3,210M 14 Submit NM/a Das 0 0 0 2 0 0 2 4 U24W 1590%Review Ageu, 0 0 4 6 0 0 0 10 $IA52W TASK 7 -Fit. Design I Rommod W Caunty Ptelimirmy Design Comorms 0 0 2 4 0 0 0 6 $856. S13,140W 2 Rgpond to Non -FAA PNimirery Daign Connors 0 0 2 4 0 0 II 6 $856. 3 Premium Fit. CSPP 0 1 2 3 n 1 0 7 $$08800 4 Prepare Fiml Commuclion Plates 0 2 6 8 0 10 0 M $3,826.00 5 Prepare Pin Bilk, Doineub on Spcs 0 2 16 0 0 II 4 22 $346400 6 Prelpm Food Cost E9ima¢ 0 0 2 4 0 0 0 6 $85600 9 Submiml Firel Comlmems. Documcn6 0 0 0 1 0 0 1 2 S212W 8 FAA Gmnt Closeout 0 n 4 8 0 1 1 14 $1,93200 TASK 7 -BN Sees 1 Uplool Bi lding Documents n 0 0 2 0 0 0 2 S3b1.n SAM W 2 Pmvitle Airmiscmem for Bidders 0 n 1 0 u 0 1 2 SMOG 3 Coighomion Dunn, Bidding 0 0 4 0 0 0 4 8 SLIM 00 4 Respoul to BNders Congo. 0 0 2 4 0 0 0 6 $856. 5 Prepare AddtMa As Naticd 0 0 2 3 0 0 0 5 $726,00 6Pro-Bid Cents— 0 0 8 10 0 0 n 19 $2,644W 7 Proper, Bid Tabulation A 0 1 1 0 0 1 3 $ Labor SWwul 0 IS 231 223 18 64 35 586 SIN.732.00 EXPENSES'. Cost Air Grow RT. T2vtl: Per Urm Tips To, Days Miles Markup Lodging SO .W 0 1.0 $0.00 RrnUI Carmen Mdome $0.585 5 140 LO 540450 Aid— SQW 0 II IA $u.. MnH $3000 5 10 SIMM Mia, espeucs'. MISC SO Our PHOTO COPIES S75 W POSTAGE $122.50 PRIMING $75. PLOTTING Sg000 FIELD SUPPLIES 5000 SubComulmnts: 1. Topagmpbie Survcy Subcomphom, $5,733T. 10 $5,73100 2. WrilaM SWissisl Sureomulum $7012300 1.0 $70.12300 Suite.] -Sept., S912W Strong - Suberrommoss $75,KMou Ton- $161.500 C0