HomeMy WebLinkAboutRequest for SOQ_Hydraulic 2D Modeling_NF Teanaway (3)KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
2022 AGENDA STAFF REPORT
AGENDA DATE: August 16, 2022
ACTION REQUESTED: Request to Advertise a Request for Statement of
Qualifications for "Hydrology and Hydraulic Modeling
Services Creating a Two -Dimensional Flow Model for
North Fork Teanaway River in Kittitas County, WA."
BACKGROUND: Kittitas County desires to solicit for statements of
qualifications for hydrology and hydraulic modeling
services to create a two-dimensional flow model for re -
mapping the regulatory floodplain along the North Fork
Teanaway River in Kittitas County. This activity is funded
by the Federal Emergency Management Agency through
the Cooperating Technical Partnership Program.
INTERACTION: Public Works.
RECOMMENDATION: Authorize advertising for statement of qualifications for
hydrologic and hydraulic services for North Fork
Teanaway River flow modeling.
HANDLING: Return one original to Public Works.
ATTACHMENTS: Notice of Request for Statement of Qualifications;
Statement of Qualifications.
LEAD STAFF: Arden Thomas, Water Resource Manager.
6/3/22. 12:36 PM newspaper -text (34).html
Public Notice
Kittitas County, Ellensburg WA
REQUEST FOR STATEMENT OF QUALIFICATIONS
HYDROLOGY AND HYDRAULIC MODELING SERVICES CREATING A TWO-DIMENSIONAL FLOW
MODEL FOR NORTH FORK TEANAWAY RIVER IN KITTITAS COUNTY, WA
All submittals received after 10:00 a.m. Local Time on September 9, 2022, will be discarded.
PURPOSE:
Kittitas County desires creating a two-dimensional flow model utilizing current regulatory mapping requirements for re -
mapping regulatory floodplain along the North Fork Teanaway River in Kittitas County. The model will encompass
approximately 6.9 miles of FEMA detailed standard.
SCOPE OF PROJECT SUMMARY:
CONSULTANT will integrate Kittitas County survey information and other data creating the modeling surface for the
compliant FEMA two-dimensional flow model. The model will incorporate the most recent available LiDAR data set(s) and
any supplement information provided by the County. The CONSULTANT will conduct hydrologic analysis. The
CONSULTANT will provide draft and final regulatory flood maps and submit the final maps to FEMA for technical review.
CONSULTANT will support review of the final maps by FEMA contractors through FEMA acceptance.
PROCEDURES FOR SUBMITTAL:
If you wish to be considered for work under this SOQ, you must be a registered consultant on the Municipal Research and
Service Center of Washington — Shared Small Works and Consultant Roster (www.mrscroster.otg).
If interested in providing FEMA floodplain modeling services for the North Fork Teanaway River in Kittitas County, submit
a sealed envelope to Arden Thomas, Public Works Water Resources Manager at 411 N. Ruby St. Suite 1, Ellensburg WA
98926. Submittals shall include a one-page cover letter with the firm name as listed on the MRSC web site, and contact
information. Submittals shall also include four copies of your Statement of Qualifications describing the firm's or team's
ability to professionally provide the aforementioned services. Statements are limited to a maximum of twenty pages
(single sided) or ten pages double sided. Minimum font size is 11 -point. Noncompliant responses may be disqualified
from review.
For your records, the County will provide a confirmation email to the contacts provided in the submittal confirming receipt
of your interest in the proposal. Submittals received after September 9, 2022, at 10:00 AM Local Time will be disregarded.
The County may elect to interview firms prior to awarding the modeling contract. Kittitas County encourages
disadvantaged, minority and women owned consultant firms to respond.
The County reserves the right to reject any and all submittals.
SELECTION PROCESS AND PROPOSED SCHEDULE:
Kittitas County selection will be based on the following review of submitted materials:
1. The firm's or team's qualifications, experience and ability to perform the work (20 points);
2. Demonstrated experience with similar projects in Kittitas County within the past ten years (30 points);
3. Demonstrated experience integrating CONSULTANT efforts with agency staff producing model hydraulics (40
points);
4. Demonstrated ability to keep projects on time and within budget specifically delivering approximate and detailed two-
dimensional flow models to FEMA contractor model reviewers (20 points);
5. Demonstrated ability to communicate and work effectively with the public, other consultants, staff, policy and review
bodies and regulatory agencies (20 points).
Responders are encouraged to pay attention to the point allocation listed above as this is the basis for responder selection.
file:///C:/Users/candie.leader/Downloads/newspaper-text (34).html 1/2
8/3/22, 12:36 PM newspaper -text (34).html
Anticipated Dates and Tasks:
September 9, 2022 - Deadline for SOQ submittals
September 16, 2022 - Selection of Firms to Interview (if desired)
September 23, 2022 - Interviews and Reference Checks (if desired)
September 28, 2022 - Selection of firms and prepare contracts
October 4, 2022 - BOCC Award of Contracts
The selection process shall be, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42
U.S.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any
contract entered into pursuant to this advertisement, disadvantaged business enterprises and airport concession
disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and
will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
The above noted schedule is tentative and may be changed based on the number of proposals submitted.
AGREEMENT OF SERVICES:
The selected consultant(s) will be expected to enter into a standard Kittitas County Professional Services Agreement.
Insurance requirements are included in that agreement. The contract period shall be October 2022 through September 2024.
Persons with disabilities may request this information be prepared and supplied in alternate forms by calling collect (509-
962-7523).
Kittitas County reserves the right to accept or reject any and all proposals or any items or part thereof or to waive any
information or irregularities in the proposals. Kittitas County shall have the sole discretion to determine the most
responsible proposal.
ADDITIONAL INFORMATION:
No cost or fee schedules shall be submitted with your proposal. Consultants will be selected on the basis of their
qualifications and experience, with fees determined through negotiations following selection. The qualifications of
consultants are evaluated, and the best qualified consultant is selected, subject to a mutual understanding of the scope of
services and negotiation of a fair and reasonable fee.
INQUIRIES:
Direct all inquiries regarding this request for services to Arden Thomas, Public Works Water Resources Manager at (509)
962-7523 or via email: Arden Thomas arden.thomas@co.kittitas.wa.us
More information is online at http://www.co.kittitas.wa.us/notices/.
Clerk of the Board
Publish:
Daily Record: 08/18/2022; 08/25/2022; 09/01/2022
Daily Journal of Commerce: 08/18/2022; 08/25/2022; 09/01/2022
file:///C:/Users/candie.leader/Downloads/newspaper-text (34).html 2/2
8/3122,12:36 PM www -text (33).html
For more information, contact Public Works
Kittitas County shall evaluate statements of qualifications and performance data submitted by firms regarding
the proposed project. Following the evaluation, the county may invite one or more firms to meet with county
officials to discuss the project and the relative benefits of various methods of providing the desired services. The
county then selects from among those firms the one "most highly qualified' to provide the required services.
County procedures and guidelines are to include a plan to ensure that women, minority, and veteran -owned firms
have the maximum opportunity to compete for the contract. The level of firm participation should be consistent
with their availability within the relevant professional community.
After choosing the most qualified firm, the county then negotiates with that firm for a contract at a price the
county determines is fair and reasonable, considering the estimated value of the services to be rendered, as well
as the scope and complexity of the project. If a satisfactory contract cannot be negotiated, the county formally
terminates the negotiations with that firm and attempts to negotiate a contract with the next most qualified firm.
The process continues until an agreement is reached or the search is terminated.
In emergency situations, the process outlined above for procuring services maybe dispensed with upon a finding
by the county that an emergency requires the immediate execution of the work involved.
All submittals shall become the property of Kittitas County.
Kittitas County reserves the right to reject all submittals and re -advertise if necessary.
file:///C:/Users/candie.leader/Downloads/wawa-text (33).html 1/1
cnscnm's _.rot„p .
KZTTZTgB COZJNTY
DEPARTMENT OF PUBLIC WORKS
Mark Cook, Director
IaTTRAS COONTY
REQUEST FOR STATEMENT OF QUALIFICATIONS
HYDROLOGY AND HYDRAULIC MODELING SERVICES CREATING A TWO-
DIMENSIONAL FLOW MODEL FOR NORTH FORK TEANAWAY RIVER IN KITTITAS
COUNTY, WA
All submittals received after 10:00 a.m. Local Time on September 9 2022
will be discarded.
PURPOSE:
Kittitas County desires creating a two-dimensional flow model utilizing current regulatory
mapping requirements for re -mapping regulatory floodplain along the North Fork Teanaway
River in Kittitas County. The model will encompass approximately 6.9 miles of FEMA detailed
standard.
SCOPE OF PROJECT SUMMARY:
CONSULTANT will integrate Kittitas County survey information and other data creating the
modeling surface for the compliant FEMA two-dimensional flow model. The model will
incorporate the most recent available LiDAR data set(s) and any supplement information
provided by the County. The CONSULTANT will conduct hydrologic analysis. The
CONSULTANT will provide draft and final regulatory flood maps and submit the final maps to
FEMA for technical review. CONSULTANT will support review of the final maps by FEMA
contractors through FEMA acceptance.
PROCEDURES FOR SUBMITTAL:
If you wish to be considered for work under this SOQ, you must be a registered consultant on
the Municipal Research and Service Center of Washington — Shared Small Works and
Consultant Roster (www.mrscroster.org).
If interested in providing FEMA floodplain modeling services for the North Fork Teanaway River
in Kittitas County, submit a sealed envelope to Arden Thomas, Public Works Water Resources
Manager at 411 N. Ruby St. Suite 1, Ellensburg WA 98926. Submittals shall include a one-
page cover letter with the firm name as listed on the MRSC web site, and contact information.
Submittals shall also include four copies of your Statement of Qualifications describing the firm's
or team's ability to professionally provide the aforementioned services. Statements are limited
to a maximum of twenty pages (single sided) or ten pages double sided. Minimum font
size is 11 -point. Noncompliant responses maybe disqualified from review.
411 N. Ruby St. Suite 1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
Dept. of Public Works
Page 2
For your records, the County will provide a confirmation email to the contacts provided in the
submittal confirming receipt of your interest in the proposal. Submittals received after
September 9, 2022, at 10:00 AM Local Time will be disregarded.
The County may elect to interview firms prior to awarding the modeling contract. Kittitas County
encourages disadvantaged, minority and women owned consultant firms to respond.
The County reserves the right to reject any and all submittals.
SELECTION PROCESS AND PROPOSED SCHEDULE:
Kittitas County selection will be based on the following review of submitted materials:
1. The firm's or team's qualifications, experience and ability to perform the work (20 points);
2. Demonstrated experience with similar projects in Kittitas County within the past ten
years (30 points);
3. Demonstrated experience integrating CONSULTANT efforts with agency staff producing
model hydraulics (40 points);
4. Demonstrated ability to keep projects on time and within budget specifically delivering
approximate and detailed two-dimensional flow models to FEMA contractor model
reviewers (20 points);
5. Demonstrated ability to communicate and work effectively with the public, other
consultants, staff, policy and review bodies and regulatory agencies (20 points).
Responders are encouraged to pay attention to the point allocation listed above as this is the
basis for responder selection.
Anticipated Dates
Tasks
September 9, 2022
Deadline for SOQ submittals
September 16, 2022
Selection of Firms to Interview (if
desired
September 23, 2022
Interviews and Reference Checks (if
desired
September 28, 2022
Selection of firms and prepare
contracts
October 4, 2022
BOCC Award of Contracts
The selection process shall be, in accordance with the provisions of Title VI of the Civil Rights
Act of 1964 (78 Stat. 252, 42 U.S.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies
all bidders that it will affirmatively ensure that any contract entered into pursuant to this
advertisement, disadvantaged business enterprises and airport concession disadvantaged
business enterprises will be afforded full and fair opportunity to submit bids in response to this
invitation and will not be discriminated against on the grounds of race, color, or national origin it
consideration for an award.
The above noted schedule is tentative and may be changed based on the number of proposals
submitted.
Page 2 of 3
Dept. of Public Works
Page 3
AGREEMENT OF SERVICES:
The selected consultant(s) will be expected to enter into a standard Kittitas County Professional
Services Agreement. Insurance requirements are included in that agreement. The contract
period shall be October 2022 through September 2024.
Persons with disabilities may request this information be prepared and supplied in alternate
forms by calling collect (509-962-7523).
Kittitas County reserves the right to accept or reject any and all proposals or any items or part
thereof or to waive any information or irregularities in the proposals. Kittitas County shall have
the sole discretion to determine the most responsible proposal.
ADDITIONAL INFORMATION:
No cost or fee schedules shall be submitted with your proposal. Consultants will be selected on
the basis of their qualifications and experience, with fees determined through negotiations
following selection. The qualifications of consultants are evaluated, and the best qualified
consultant is selected, subject to a mutual understanding of the scope of services and
negotiation of a fair and reasonable fee.
INQUIRIES:
Direct all inquiries regarding this request for services to Arden Thomas, Public Works Water
Resources Manager at (509) 962-7523 or via email:
Arden Thomas
arden.thomaspeo.kittitas.wa us
Dates of publication: Ellensburg Daily Record —August 18, 2022, August 25, 2022, and
September 1, 2022
Daily Journal of Commerce — August 18, 2022, August 25, 2022, and
September 1, 2022
Page 3 of 3