HomeMy WebLinkAboutRES-2022-156RESoLUnoN no. J pAA- I blo
BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter
of initiating a county road project designated as:
GRP NO: 315-22 JOB NO: RC 2194-BR
lT lS HEREBY RESOLVED that Cooke Canyon Rd Bridge #80181 be improved as follows:
The project will replace the existing single span, structurally deficient, load posted concrete bridge with a single span,
prestressed concrete girder structure to meet current design standards and to improve the hydraulic opening.
ARTERIAL
ACCESS
This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report and
proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070).
lT lS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County
Engineers estimate, is hereby made in the amounts and for the purposes shown:
PURPOSE AMOUNT TOTALS
PRELMINARY ENGINEERING $ 745,170.00
CONSTRUCTION ENGINEERING $ 536,522.00
RIGHT-OF-WAY ACQU ISITION $ 100,000.00
SUB-TOTAL $ 1,381,692.00
Countv Forces coNSTRUcroN $
CONTRACT CONSTRUCTION $ 1.341.308.00
SUB-TOTAL $ 1.341.308.00
TOTAL PROJECT COST $ 2.723.000.00
s
Grant Source: FY 2022 WSDOT Local Bridoe Prooram
TOTAL COUNry ROAD FUND ALLOCATION $0
X
Zs
)doshua Fred ridk-son, P. E.- County Engineer
x THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2022 ANNUAL ROAD PROGRAM AS
ITEM NO. 08
THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM IN
ACCORDANCE WITH RCW 36.81.1 30
IT IS FURTHER RESOLVED THAT:
THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN E WITH RCW 36.77.020 ET.SEQ.
THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CO
wAc 136-18.
WTH RCW36.77.065 AND
ith, Commissioner
ADoPTED this YA day ot LJql$t ,2022