My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES-2022-155
>
Meetings
>
2022
>
08. August
>
2022-08-02 10:00 AM - Commissioners' Agenda
>
RES-2022-155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2022 8:42:45 AM
Creation date
8/9/2022 8:42:43 AM
Metadata
Fields
Template:
Meeting
Date
8/2/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Establish County Road Project (CRP) Number Supporting the Replacement of Bridge #88212 Faust Road over Town Ditch
Order
10
Placement
Consent Agenda
Row ID
92041
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESoLUnoN No. a or,A* ll.q) <br />BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter <br />of initiating a county road project designated as: <br />CRP NO: 316-22 JOB NO: RC 2195-BR <br />lT lS HEREBY RESOLVED that Faust Rd Bridge #88212 be improved as follows: <br />The project will replace the existing single span, structurally deficient, load posted concrete bridge with a single span, <br />prestressed concrete girder structure to meet current design standards and to improve the hydraulic opening. <br />ARTERIAL <br />ACCESS <br />This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report and <br />proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). <br />lT lS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County <br />Engineers estimate, is hereby made in the amounts and for the purposes shown: <br />ua Fredrickson, P.E <br />County Engineer <br />THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2022 ANNUAL ROAD PROGRAM AS <br />ITEM NO. <br />THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM IN <br />ACCORDANCE WTH RCW 36.81.130 <br />IT IS FURTHER RESOLVED THAT: <br />THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN AC H RCW 36.77.020 ET.SEQ <br />THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY <br />wAc 136-18. <br />RCW 36.77.065 AND <br />X <br />n <br />?nh*ot (tr tt 9,fi1fh{ .2022.^JJ <br />=u) <br />ADOPTED this <br />BOARD OF COUNTY COMMISSIONERS <br />ith, Commissioner <br />PURPOSE AMOUNT TOTALS <br />PRELMINARY ENGINEERING $ 690,831.00 <br />CONSTRUCTION ENGINEERING $ 497,399.00 <br />RIGHT-OF-WAY ACQU ISITION $ 100,000.00 <br />SUB-TOTAL $ 1,288,230.00 <br />Countv Forces coNsrRucloN $ <br />CONTRACT CONSTRUCTION $ 1,243.570.00 <br />SUB-TOTAL $ 1.243.570.00 <br />TOTAL PROJECT COST $ 2,531.800.00 <br />GRANT OR OTHER FUNDS <br />Grant Source: FY 2022 WSDOT Local B eP ram <br />TOTAL $0 <br />g :\base\forms\eng\crp-frm <br />HINGTON <br />U <br />ght, Vice-Chair <br />7t26t2022
The URL can be used to link to this page
Your browser does not support the video tag.