Loading...
HomeMy WebLinkAboutRES-2022-155RESoLUnoN No. a or,A* ll.q) BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter of initiating a county road project designated as: CRP NO: 316-22 JOB NO: RC 2195-BR lT lS HEREBY RESOLVED that Faust Rd Bridge #88212 be improved as follows: The project will replace the existing single span, structurally deficient, load posted concrete bridge with a single span, prestressed concrete girder structure to meet current design standards and to improve the hydraulic opening. ARTERIAL ACCESS This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). lT lS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County Engineers estimate, is hereby made in the amounts and for the purposes shown: ua Fredrickson, P.E County Engineer THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2022 ANNUAL ROAD PROGRAM AS ITEM NO. THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM IN ACCORDANCE WTH RCW 36.81.130 IT IS FURTHER RESOLVED THAT: THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN AC H RCW 36.77.020 ET.SEQ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY wAc 136-18. RCW 36.77.065 AND X n ?nh*ot (tr tt 9,fi1fh{ .2022.^JJ =u) ADOPTED this BOARD OF COUNTY COMMISSIONERS ith, Commissioner PURPOSE AMOUNT TOTALS PRELMINARY ENGINEERING $ 690,831.00 CONSTRUCTION ENGINEERING $ 497,399.00 RIGHT-OF-WAY ACQU ISITION $ 100,000.00 SUB-TOTAL $ 1,288,230.00 Countv Forces coNsrRucloN $ CONTRACT CONSTRUCTION $ 1,243.570.00 SUB-TOTAL $ 1.243.570.00 TOTAL PROJECT COST $ 2,531.800.00 GRANT OR OTHER FUNDS Grant Source: FY 2022 WSDOT Local B eP ram TOTAL $0 g :\base\forms\eng\crp-frm HINGTON U ght, Vice-Chair 7t26t2022