BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter
of initiating a county road project designated as:
CRP NO: 316-22 JOB NO: RC 2195-BR
lT lS HEREBY RESOLVED that Faust Rd Bridge #88212 be improved as follows:
The project will replace the existing single span, structurally deficient, load posted concrete bridge with a single span,
prestressed concrete girder structure to meet current design standards and to improve the hydraulic opening.
ARTERIAL
ACCESS
This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report and
proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070).
lT lS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County
Engineers estimate, is hereby made in the amounts and for the purposes shown:
ua Fredrickson, P.E
County Engineer
THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2022 ANNUAL ROAD PROGRAM AS
ITEM NO.
THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM IN
ACCORDANCE WTH RCW 36.81.130
IT IS FURTHER RESOLVED THAT:
THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN AC H RCW 36.77.020 ET.SEQ
THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY
wAc 136-18.
RCW 36.77.065 AND
X
n
?nh*ot (tr tt 9,fi1fh{ .2022.^JJ
=u)
ADOPTED this
BOARD OF COUNTY COMMISSIONERS
ith, Commissioner
PURPOSE AMOUNT TOTALS
PRELMINARY ENGINEERING $ 690,831.00
CONSTRUCTION ENGINEERING $ 497,399.00
RIGHT-OF-WAY ACQU ISITION $ 100,000.00
SUB-TOTAL $ 1,288,230.00
Countv Forces coNsrRucloN $
CONTRACT CONSTRUCTION $ 1,243.570.00
SUB-TOTAL $ 1.243.570.00
TOTAL PROJECT COST $ 2,531.800.00
GRANT OR OTHER FUNDS
Grant Source: FY 2022 WSDOT Local B eP ram