Loading...
HomeMy WebLinkAboutResolution_CookeCynBridgeKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: August 2, 2022 ACTION REQUESTED: Request to Approve a Resolution to establish County Road Project (CRP) number supporting the replacement of Bridge #80181 Cooke Canyon Road Bridge over the Hiline Canal. BACKGROUND: Kittitas County Public Works has been awarded 2022 Local Bridge Program federal funds in the amount of $2,723,00.00. These funds will be used to replace the existing single span, structurally deficient, load posted concrete bridge on Cooke Canyon Road over the Hiline Canal. The work will include replacing the existing bridge with single span, prestressed concrete girder structure to meet current design standards and to improve the hydraulic opening. INTERACTION: Public Works RECOMMENDATION: Approve the Resolution to establish County Road Project (CRP) number supporting the replacement of Bridge #80181 Cooke Canyon Road Bridge over the Hiline Canal. HANDLING: Return one (1) original to Public Works ATTACHMENTS: Resolution LEAD STAFF: Josh Fredrickson, County Engineer RESOLUTION NO. BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter of initiating a county road project designated as: CRP NO: 315-22 JOB NO: RC 2194 -BR IT IS HEREBY RESOLVED that Cooke Canyon Rd Bridge #80181 be improved as follows: The project will replace the existing single span, structurally deficient, load posted concrete bridge with a single span, prestressed concrete girder structure to meet current design standards and to improve the hydraulic opening. ARTERIAL ACCESS X This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County Engineers estimate, is hereby made in the amounts and for the purposes shown: 141 0 4/ PURPOSE AMOUNT TOTALS PRELMINARY ENGINEERING $ 745,170.00 CONSTRUCTION ENGINEERING $ 536,522.00 RIGHT-OF-WAY ACQUISITION $ 100,000.00 SUB -TOTAL $ 1,381,692.00 Is County Forces CONSTRUCTION $ CONTRACT CONSTRUCTION $ 1,341,308.00 SUB -TOTAL 1,341,308.00 TOTAL PROJECT COST I $ 2,723,000.00 GRANT OR OTHER FUNDS $ Grant Source: FY 2022 WSDOT Local Bridge Program TOTAL COUNTY ROAD FUND ALLOCATION Is 0 osFredric County Engineer THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2022 ANNUAL ROAD PROGRAM AS ITEM NO. 08 THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM IN ACCORDANCE WITH RCW 36.81.130 IT IS FURTHER RESOLVED THAT: THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ. THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND WAC 136-18. ADOPTED this day of BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Laura Osiadacz, Chair 2022 Attest: i s Clerk of the Board Cory Wright, Vice -Chair Brett Wachsmith, Commissioner g:\base\forms\eng\crp-frm 7/26/2022