Loading...
HomeMy WebLinkAboutRES-2022-149_RedactedBOARD OF COUNTY COMMISSIONERS COUNTY OF'KITTITAS STATE OF WASHINGTON t+qRESOLUTION NO. 2022 - AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL AID PROJECT PROSPECTUS CONSTRUCTION PHASE FOR VANTAGE HIGIIWAY ovER CASCADE CANAL (BRTDGE 89342) REPLACEMENT PROJECT CNP 2021-202 WHEREAS:The Vantage Highway Over Cascade Canal (Bridge 89342) Replacement Project was awarded Federal Funding through the Surface Transportation Block Grant Regional Funds Program (STBG); and WHEREAS: The final plans, specifications and estimate are near completion; and WHEREAS:In preparation to advertise the project for construction in August 2022,Public Works is requesting the Washington State Department of Transportation to release the Federal Funds for construction; and WHEREAS:A Local Agency Federal Aid Project Prospectus must be executed by the Chair of the Board of County Commissioners acknowledging the project has been reviewed and is consistent with the agency's comprehensive plan for community development; and NOW' THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest ofthe public, does hereby approve the Chair's signature on the Local Agency Federal Aid Project Prospectus Construction Phase for Vantage Highway Over Cascade Canal (Bridge 89342) Replacement Project CRP 2021-202. DATED on this 19th day of July 2022, at Ellensburg, Washinglon. BOARD OF COI.INTY COMMISSIONERS KITTITAS COLINTY, WASHINGTON ABSENT Laura of the Board- Julie Kjorsvik V n Deputy Clerk of the Board- Mandy Buchholz Commissioner ^-.w Washington State Department of Transportation Local Agency Federal Aid Pro ect Prospectus (WSDOT Use Only Prefix Route () FederalAid Proiect Number Local Agency Project Number cRP 310-2t lRC2292 Date T lts/2022 DUNS Number FederalEmployer Tax lD Number Agency Kittitas County Public Works CAAgency [7l Yes l-l tto Federal Program Title Yzo.zos n otner Project Title Vantage Highway over Cascade Canal (89342) Replacemenl Start Latitude N 47.0002 End Latitude N 47.0002 Start Longitude W I20.4414 End Lonqitude W I20.438t Project Termini From-To MP 5.17 MP 5.33 Nearest City Name Ellensburg Project Zip Code (++1 98926-9559 Begin Mile Post 5.r7 End Mile Post 5.33 Length of Project 0.16 f, tocat! tocat Forces ! State n Raitroad Award Type Route lD 94001 Begin Mile Point 5.17 End Mile Point 5.33 City Number N/A County Number t9 County Name Kittitas WSDOT Region South Central Region Legislative District(s) 13 Congressional District(s) 8 Urban Area Number N/A Phase Total Estimated Cost (Nearest Hundred Dollar) Local Agency Funding (Nearest Hundred Dollar) Federal Funds (Nearest Hundred Dollar) Phase Start Date Month Year P.E RYW Const.1,838,000.00 1,838,000.00 0812022 Total 1,838,000.00 Description of Existing Facility (Existing Design and present Gondition ) Roadway Width 28 Number of Lanes 2 The existing bridge (no.89342) along Vantage Highway spanning the Cascade krigation Canal requires replacement. The existing bridge is currently load restricted and has recent damage from a vehicle accident. Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary) Replace existing bridge that is damaged and load rated with a new bridge, guardrail, and approaches that meet WSDOT's current specifications for safety. Local Agency Contact Person Darren Case Title Construction Manager Phone 509-962-7019 Mailing Address 411N. Ruby, Suite 1 City Ellensburg State WA Zip Code 98926 Project Prospectus By Approving Authority 111;s County Engineer t"ls)"lz*z Date r' Revised 0112022 Previous Editions 0bsolete Page 1 Agency Kittitas County Public Works Project Title Date Tlts/2022 Type of Proposed Work Project Type (Check all thatApply) f] ttew Construction n Path / Trait n g-n ! Reconstruction ! eedestrian / Facilities f] Z-n ! Railroad f]Parking I otner M erioge Roadway Width 32 Number of Lanes 2 Geometric Design Data Description Through Route Crossroad Federal Functional Classification ! uroan fl Rurat n r.rns ! erincipalArterial ! tvtinorArterial ! collector M tUajor Collector ! Vtinor Collector ! tocal Access Urban Rural ! PrincipalArterial ! tvtinornrterial ! collector n Vajor Collector ! tvtinor Collector ! Locat Access ! NHs Terrain M rt"t Roll flMountain n nut fl nott Mountain Posted Speed 50 Design Speed 50 Existing ADT 3851 Design YearADT Design Year 2022 Design Hourly Volume (DHV) Performance of Work Preliminary Engineering Will Be Performed By Consultant / County Others 75 of/o Agency 25 ot TO Conshuction Will Be Performed By Contractor Contract 100 % Agency Yo Environmental Glassification ! Class I - Environmental lmpact Statement (ElS) ! Project lnvolves NEPA/SEPA Section 404 lnteragency Agreement I Ctass lll - EnvironmentalAssessment (EA) I erolect lnvolves NEPA/SEPA Section 404 I nteragency Agreements M Ctass ll - Categorically Excluded (CE) ! erolects Requiring Documentation (Documented CE) Environmental Considerations Revised 0112022 Previous Editions Obsolete Agency Kittitas County Public Works Project Title Date 71t512022 Right of Way Z tto Right of Way Needed * All construction required by the contract can be accomplished within the existing right of way. ! nignt of Way Needed E ruo Relocation E Rebcation Required Description of Utility Relocation orAdjustments and Existing Major Shuctures lnvolved in the Project PSE gas line to be relocated by utility owner prior to construction Consolidated Communications will move their copper and fiber communication lines prior to construction. FM lnvolvement ls any ai located within 3.2 kilometers (2 miles) of the proposed nYes M ruo Remarks No Airport within 2 miles s project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development. Agency Date Mayor/Chairperson Thi DOT Form 140-101 Revised 0112022 "Tlrqla4 Utilities Railroad n ruo utility work required M rut utility work will be completed prior to the start of the construction contract nnff utility work will be completed in coordination with the construction contract M ruo railroad work required Ent railroad work will be completed prior to the start of the construction contract nnlf the railroad work will be completed in coordination with the construction contract By Previous Editions Obsolete Page 3