HomeMy WebLinkAbout2022-05-23-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS Public Works Study Session Regular Meeting Monday May 23, 2022 -1:30 PM Commissioners' Auditorium 205 West 5th Room 109 - Ellensburg and Webex 1. Call to Order 2. Fire Evacuation Route Planning Effort 3. Safe Route to School Grant Proposal 4. Fiscal Analyst/PW Technology Specialist 5. Yakima River Access Wayfinding Signs Update 6. Silverton Road Vacation 7. Water Mitigation Refund Policy 8. Floodplain Development Community Assistance Visit 9. Other business 10. Adjourn Created on 5/20/2022 8:18:43 AM KITTITAS COUNTY PUBLIC WORKS STUDY SESSION MINUTES In -Person and Webex Regular Meeting MONDAY 1:30 PM May 23, 2022 Board Members Present: Chairman Laura Osiadacz, Vice -Chairman Cory Wright, and Commissioner Brett Wachsmith. Others: Mark Cook, Arden Thomas, Josh Fredrickson, Rebecca Cruse, Candie Leader, Public Works; Jeremiah Cromie, Community Development Services; (2) Members of the Public At 1:30 pm Vice -Chairman Cory Wright opened the Public Works Study Session. FIRE EVACUATION ROUTE PLANNING EFFORT Mark Cook presented a proposed work program for the Fire Evacuation Route efforts. Mark Cook proposed that land use designation around evacuation routes be addressed, and land use limitations may occur for high-risk areas not suitable for defense. Questions pursued about what land use restrictions could be expected. Mark Cook added that additional planning will be needed to utilize an alert system for emergencies, particularly in Upper County areas with extensive recreational camping occurring. Vice -Chairman Cory Wright requested a buildable land survey be completed. The BOCC supports staff efforts and concluded that the survey will be fundamental in moving forward. SAFE ROUTE TO SCHOOL GRANT PROPOSAL Mark Cook seeks the Board of County Commissioners support on submission of a grant application to "Safe Routes to School" grant program. Mark Cook explained that this grant will assist in improving a corridor for students to safely travel to school from Roslyn. Questions pursued about easements and the affect on private properties adjacent to the proposed route. Vice -Chairman Cory Wright requested this proposal be presented to COG. BOCC supports submission of the application and directs staff to engage in additional outreach easement acquisition be performed prior implementation. FISCAL ANALYST/PW TECHNOLOGY SPECIALIST Mark Cook requested the Board of County Commissioners direction to formalize the Fiscal Analyst/ PW Technology Specialist position. The Board of County Commissioners supports moving the job description forward with Kittitas County Human Resources Department for finalization. 2022-5-23 Minutes YAKIMA RIVER ACCESS WAYFINDING SIGNS UPDATE Josh Fredrickson requested the Board of County Commissioners to direct staff to proceed in acquisition and installation of signs funded by a tourism grant awarded in 2020. The Board supports Public Works efforts and implementation. Vice -Chairman Cory Wright requested staff inform the BOCC for when the project is complete. SILVERTON ROAD VACATION Josh Fredrickson briefed the Board of County Commissioners on an application received from a resident of Silverton Road to vacate a portion of the unconstructed roadway. Josh Fredrickson continued that the applicant owns the adjacent properties and would like to better utilize the agricultural land unincumbered by the easement. Staff was directed to prepare enabling documents for a public hearing to consider the vacation of a portion of Silverton Road. WATER MITIGATION REFUND POLICY Arden Thomas asked for direction on implementation of a refund policy addressing the real cost of water mitigation. Arden Thomas emphasized that Kittitas County incurs cost associated with issuing the water mitigation certificate and is proposing that approximately 25% of the original fee be retained to cover the administration costs. Staff was directed to move forward with implementation of the refund policy. FLOODPLAIN DEVELOPMENT COMMUNITY ASSISTANCE VISIT Arden Thomas informed the Board of County Commissioners on a recent visit by the Floodplain Development Community Assistance Program. Arden Thomas added that at the end of June 2022 County Staff will meet with representatives from the State of Washington to address issues of concern presented by the Community Assistance Visit. Meeting concluded at 2:28 pm. 2022-5-23 Minutes Rebecca Cruse, Administrative Assistant 2022-5-23 Minutes KITTITAS COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Laura Osiadacz, Chairman KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: May 23, 2022 TOPIC: Fire Evacuation Route Planning Effort ACTION REQUESTED: Direct Staff LEAD STAFF: Mark R. Cook RECOMMENDATION: Endorse the proposed planning effort. BRIEFING SUMMARY: • Ongoing drought conditions in the Pacific Northwest are exasperating fuel conditions in Kittitas County forests. • Public Works (PW) recently briefed the Board of County Commissioners on recent Department of Natural Resources (DNR) fire planning efforts for the Cle Elum Ridge and Teanaway forested areas. • PW, in collaboration with Community Development Services has prepared a fire evacuation route planning proposal for fall 2022 ending in spring 2024. • PW and CDS propose a robust public outreach campaign near the end of the planning effort that could result in land use restrictions in high fire risk areas. BACKGROUND: For the past several years, the Fire Chief s Association, PW and the Sheriff s Office has flirted with the idea of identifying fire evacuation routes in high fire risk areas in the county. Recent DNR planning efforts now make the effort a realistic proposition. Using data generated by DNR, PW proposes leading an evacuation route planning effort supported by the fire/life/safety community. DISCUSSION: Time is running out to have a readily deployable evacuation plan in hand before the next big devastating fire in Kittitas County. The science developed and utilized in DNR's state required planning process, provides a unique opportunity for the county to jump start a legitimate fire evacuation route planning effort (EXHIBIT 1). Collecting additional data, route selection and land use overlay creation is expected to take the effort into mid 2023. Public outreach and land use considerations — along with capital facility plan inclusion — is expected to extend the project into second quarter 2024 (EXHIBIT 2). Page 1 of 4 Public Works "Work Session Staff Report", 2022 FISCAL IMPACTS: Approximately $150,000 in staff time, data collection and public outreach is estimated supporting the planning effort. ATTACHMENTS: EXHIBIT 1: SCOPE OF WORK EXHIBIT 2: PROJECT DESCRIPTION AND TIMELINE Page 2 of 4 Public Works "Work Session Staff Report", 2022 EXHIBIT 1: SCOPE OF WORK Page 3 of 4 Public Works "Work Session Staff Report", 2022 Fire Evacuation Route Planning Staff Planning Effort Task Items May 9, 2022 Planning Need The proliferation of long dead-end roads serving residential development has been Kittitas County's legacy for decades — beginning in the 1960s. Secondary access requirements did not become plat preliminary conditions until well after the turn of the current century. Steep terrain in upper Kittitas County and the increasing size of fire response apparatus have worked together making a bad situation worse for evacuating county residents in an active fire. Recent advances in fire behavior modeling allow a new look at possible fire evacuation routes serving upper county residents. TASK 1: Existing Data Collection Staff will gather all existing fire behavior model results from the Washington State Department of Natural Resources and the United States Department of Agriculture — United States Forest Service that are readily available. The data will be combined and if possible, placed onto a single data platform for staff use. DELIVERABLE: Combined existing data sets. TASK 2: Stakeholder Identification Outreach efforts will target known current and previous stakeholders associated with fire prevention efforts, fire -fighting efforts, cultural concerns, habitat interests, recreational user groups, major landowners, emergency responders, and road access managers to public lands. Staff will compile a list of contacts with contact information: name, stakeholder interest, electronic mail address, phone contact number and agency/entity. Staff will develop a list (not to exceed 20) for Board of County Commission consideration. DELIVERABLE: Project stakeholder list. TASK 3: Data Gap Analysis Results from Task 1 will be presented to the stakeholder group and the group will be solicited for missing data. Data gaps will be cataloged by category and a master list produced for stakeholder concurrence. Stakeholders will assist staff determining the likely responsible parties (missing data) and help identify the initial party contact. Once all responsible parties have responded with data gap assessment concurrence, staff will work with responsible parties identifying the level of effort and cost closing identified data gaps. DELIVERABLE: Identified data gaps and level of effort closing said gaps. Page 1 of 3 TASK 4: Additional Data Collection Staff will coordinate with local, state, and federal agencies securing additional data identified in Task 3. In the absence of funding, the stakeholder group will prioritize data gap needs for Board of County Commission funding consideration. Public Works will solicit consultant services as appropriate securing prioritized data gap needs. DELIVERABLE: Prioritized additional data. TASK 5: Evacuation Routes Identified Public Works will compile existing and additional data and identify potential evacuation routes for stakeholder evaluation. The stakeholder group will prioritize the list of routes and identify additional routes as appropriate. Public Works will assess the prioritized list of routes and develop planning level cost estimates for: existing route improvement and/or new route establishment. DELIVERABLE: Prioritized listing of fire evacuation routes for implementation with planning level cost estimates assigned to each route. 5B. Land Use Overlay Using results from Task 5, staff will compile land use data in impacted areas specifically identifying buildable parcels for future development. DELIVERABLE: Compiled land use data within identified potential overlay areas. TASK 6: Community Outreach The stakeholder group will work with the County developing a public outreach campaign effort. The outreach campaign will be designed to confirm community appetite funding the implementation of the routes from Task 5. DELIVERABLE: Outreach campaign defining public appetite to implement. 6B. Land Use Public Outreach Three public meetings presenting prioritized fire evacuation routes with associated land use overlays. DELIVERABLE: Three community outreach meetings. TASK 7: Prioritized Evacuation Routes Implementation Plan Public Works will develop an implementation plan for Board of County Commission consideration. Available funding sources will be assigned to prioritized routes and incorporated into the County's Capital Facility Plan for construction implementation. Where appropriate, staff will coordinate potential funding with state and federal agencies. DELIVERABLE: Implementation of prioritized routes. Page 2 of 3 7B. Restricted Land Use Zoning Overlav Staff will produce a land use overlay map identifying potential land use development restricted areas associated with identified high fire risk areas. Staff will present the mapped area to the Planning Commission for commission comment and recommendation to the Board of County Commissioners. Staff will docket a public hearing with the Board of County Commissioners receiving public testimony regarding potential land use development restrictions in identified high fire risk mapped areas. DELIVERABLE: Land use restrictions in mapped high fire risk areas. Table 1: Estimated Project Human Resource and Additional Costs Task Number Staff Allocation (hours) Estimated Staff Cost (Blended hourly rate at $120 Estimated Additional Project Costs Total Estimated Project Costs 1 80 $9,600 $9,600 2 20 $2,400 $2,400 3 80 $9,600 $9,600 4 120 $14,400 $60,000 $74,400 5 80 $1,600 $1,600 5B 40 $4,800 $4,800 6 40 $4,800 $10,000 $14,800 6B 20 $2,400 $2,400 7 40 $4,800 $4,800 7B 40 $4,800 $4,800 Totals 560 $67,200 $70,000 $137,200* *Staff cost represent benefits loaded and only for departments of the Board of County Commissioners. Sheriff Office and Fire District costs are additional to this estimate. Page 3 of 3 EXHIBIT 2: PROJECT DESCRIPTION AND TIMELINE Page 4 of 4 Public Works "Work Session Staff Report", 2022 N O N N + W 77 ƒ I Cl) — ;73± CDM & E o $ _ _ c30 .2o \_E /§ƒ/ \n\�\§ ( d aa CDa)@/�¥cn /2] _0/ ? \)$ 5 \E/ & ) C if Co CD Cn < \ K = ° = n _ — ®§ CD cn = o = _ — « _ m = n 2 \7 }±\/CD 2 / cn 0- \ = ® E # \ § a $ E + z 4'x g �' g s 9 12 k y S Rz �c IT .S 1 i00 n gg F S E a 9? YF s n y i a 45 m a 6� a3s a� xx� G > Z z 3 z 4'x or 9 12 CNN T z D sf a T K D Z c Z 1 Z a Z F c D A or 12 k y S Rz �c i00 n a $Y 'Y a 9? YF s n y i �yi 1. • 7� m .;!S a� xx� G > Z z 3 __• 2 Y It .lj 3 I N �a .� o m �Orgg1 3 , p ;3 a 0 3 3 w uo', m' -• ro o a yySX� 3 a c c m d 7'lC F mp d w 9 �0FA 3 r a oN° o cro =og n 2.5 m. .3_ 3 g a a Iz A a m e 7 ,G `�C 9 3 0 w o '�C 't' N ry mg D f`pY pt 0 3'3 ¢ ro G w c �' a a x n no ?��It 2oo vx m � � A e �` n'. v R • � � m � c' a 'ca 3 y R A a `S ro a . 5, 3 3 a g 0 O $ L1CL a� a z a r o 0 .4 w,5 CL ti a _ 0 1O p m �\ ^ o3i p y W entR�S ;2- 0* r,afla�nfR = N o C a N `uR v p Nb; rp A n 3 C p A a 0 ro a: v m=N,3 A0m 0 t�o10 �c C 1 1�3 N iw9 Ofl ay goy � _ m < m 0 E m 0 _ m 0 E 7 � � _ D. =3 � 0 � � 0 n CD § CD 2 $c ®/ ° § § E § \ 5' e n = _ _. _ _. _ \\ = 5 o \ 0\ \/ �/ <G = O cn(n p 3 0) = p( g 2 ? g $ $ _0] _ o CD ® CD / Z, / 2 7 \ S 5 S ] _ §/ CD \ \ 3 k\ ° ) § ) (n R = 7 7 o S o /$ ƒ / o ? J - g _ \ / �' / \ / k. k \ \ \CD \ CD/ / \ 3 \ \ \ \ / } g °_ / a a _ \ G \ \ ® \] \k 6 ƒ » 5 ] k § (n ° _ _ E _ cn \ \ CD \ \ U) D = 7 J = ¥ G D \ 0 \ \ k \ $ &CD = O E 3 s = § } ƒ & k \ r \ 0 / } ] k \ ƒ § 2 \ =3 2 3 \ 7 & = \' / to £ = o \ § } \ \ \ a / 7 G = E n / \ \ \ � _ m < m 0 E m 0 _ m 0 E 7 � � _ D. =3 � 0 � � 0 n CD § KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: May 23, 2022 TOPIC: Safe Route to School Grant Proposal ACTION REQUESTED: Direct Staff LEAD STAFF: Mark R. Cook RECOMMENDATION: Support Public Works submitting a "Safe Routes to School' grant application connecting Cle Elum to Roslyn. BRIEFING SUMMARY: • A safe pedestrian and bike route connecting Roslyn to the Cle Elum School District is much needed. • Public Works (PW) proposes using Shaft Street to South Avenue as the pedestrian and bike corridor connecting the two communities. • Kittitas County has poor historic utilization of the "Safe Routes to School' grant program. • Use if Alliance Street will require an easement from the property owner. BACKGROUND: For several years PW has desired constructing a pedestrian and bike connection from the Cle Elum school district to the City of Roslyn. Previous attempts using state highway have failed. The proposed route has a crossing on State Highway 903 and requires a private easement along Alliance Road. The majority of the route utilizes Shaft Street. PW has historic under -utilization of the "Safe Routes to School' grant program. DISCUSSION: Providing a safe connection for school kids to walk or ride bikes to school from Roslyn to Cle Elum is a priority for PW. Earlier this year the state contacted PW ensuring we were aware of the 2022 grant program. PW is proposing to extend the existing walkway along school district 903 frontage, constructing a pedestrian crossing at Highway 903, a short pathway segment along Alliance Road and then bulk of the six-foot paved pathway along Shaft Street to just short of South Avenue in Roslyn. FISCAL IMPACTS: Request under $800,000 do not require a grant match. Our engineering estimate is for $778,932. Page 1 of 4 Public Works "Work Session Staff Report", 2022 ATTACHMENTS: EXHIBIT 1: MAP EXHIBIT 2: GRANT APPLICATION EXHIBITS and COST ESTIMATE Page 2 of 4 Public Works "Work Session Staff Report", 2022 EXHIBIT 1: MAP Page 3 of 4 Public Works "Work Session Staff Report", 2022 c nac�"a `s5 S�tePa0.c�'i 3 C�,h b� hsc Q m O� D i ' W C O b � � O y ,ate ti a _�co9 O ,a io- y W v o ob .�p EtN w y 'd 1 c nac�"a `s5 S�tePa0.c�'i 3 C�,h b� hsc Q° a Peuy 6o.��ing � a 0 Ve. n v d� i s` y _�co9 Q° a Peuy 6o.��ing � a 0 Ve. n v EXHIBIT 2: GRANT APPLICATION EXHIBITS and COST ESTIMATE Page 4 of 4 Public Works "Work Session Staff Report", 2022 2 _ \ r \ ( ° =§;y 8 �jGƒ� {$qfE E > n _ > E\�$E ° `*§/ k\f/O boo0o » \ m / 9) « » » m % kJ§\2 §=�;2 £ @ 3 § 3 E f 2 f A //% / a e E = R »�$ ^o 2\\om 2t$wo e=) E�- �m2E2E o ± m E22 = S5 4G% =e=o =clm0 e % ww 9 IMAM .*. 3 , i 9 IMAM .*. /| \ n - J! ;\ ,.., -— ----- —-------\)\ / !■\ z )) - �( | :i 4z \(� o _ .! ; §: )° /( ` _ .|§ ,,�, ...--------- --- --- ------ --- ..��.�,;% , \�\ - [\ ` | 6-6 z }\ ( a � (- _ §\\ , 2,r |=e # }( ---a. § 40..0-- m | /J §Z ) k|) | � C , . \\ } \) �; _ , \ !; )\| z � }§ 1,..�■ Z-8 Project title: Safe Routes to School Trail Development MP TO Job Number: TBD PROJECT LENGTH 5850 FT SCOPING ESTIMATE $787,731 RUCTION TUR! CREATED: 5/18/2022 By: Develop a paved path that would extend from the existing paved path currently at Cie Elum/Roslyn school and extend along Shaft St to Roslyn in order to provide increases in safety for pedestrians. Crossing would be made at the east end of the school property and at the intersection of Alliance Rd. QUANT. UNIT ITEM NO. ITEM UNIT PRICE AMOUNT] PROJECT TOTAL $787,731 PREPARATION 1 LS 0001 MOBILIZATION 10% $47,516 1 ACRE 0025 CLEARING AND GRUBBING $12,396.00 $13,222 GRADING 850 C.Y. 0310 ROADWAY EXCAVATION INCL. HAUL $31.75 $26,988 400 C.Y. 0431 COMMON BORROW INCL. HAUL $23.52 $9,408 STRUCTURES 15 L.F. 1182 CULVERT EXTENSION 18" $165.00 $2,475 350 S.Y. 7055 CEMENT CONCRETE SIDEWALK $114.64 $40,124 SURFACING 1,100 C.Y. 5095 CRUSHED SURFACING BASE COURSE $120.00 $132,000 HOT MIX ASPHALT 740 TON 5767 HMA CL. 1/2 IN. PG 64-28 $165.00 $122,100 EROSION CONTROL AND ROADSIDE PLANTING 1 ACRE 6422 SEEDING AND MULCHING $14,550.00 $12,416 1 EST NIS TESC PLACEHOLDER $5,000.00 $4,267 TRAFFIC 4 EACH SOLAR RECTANGULAR RAPID FLASHER BEACON $12,000.00 $48,000 120 S.F. 7054 DETECTABLE WARNING SURFACE $138.59 $16,631 230 S.F. 6857 PLASTIC CROSSWALK LINES $11.00 $2,534 1 L.S. 6869 TRAFFIC CONTROL $25,000.00 $25,000 OTHER ITEMS 1 L.S. 7038 ROADWAY SURVEYING $10,000.00 $10,000 1 EST 7480 ROADSIDE CLEANUP $10,000.00 $10,000 PROJECT CHANGE TRACKING D ITEM SUBTOTAL WIO MOBILIZATION $475,164 Date By Comments MOBILIZATION 10.00% $47,516.4; BID ITEM SUBTOTAL $522,681 DESIGN ALLOCATIONS 10.00% $52,268 BID ITEM TOTAL $574,949 SALES TAX @ 0.00% $0 PROJECT SUBTOTAL $574,949 CONSTRUCTION ENGINEERING @ 10% $57.495 CONTINGENCIES@ 10% $57,495 CN ESTIMATE $689,938 PE PHASE 12% 82,793 PROJECT TOTAL $787,731 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: May 23, 2022 TOPIC: Fiscal Analyst/PW Technology Specialist ACTION REQUESTED: Direct Staff LEAD STAFF: Mark R. Cook RECOMMENDATION: Direct staff forward to Human Resources. BRIEFING SUMMARY: • For the past several years, Fiscal Analyst Casey (FAC) has been acting as Public Works technology specialist interfacing with Cayenta, SmartGov, RTA Fleet Management and other software packages with external vendors and the IT Department. Printer issues and low-level technology hardware issues have also been managed. • It is efficient for PW and IT to have these services performed by department staff (FAC). • PW desires formalizing the assumed duties by altering the existing Fiscal Analyst job description. • Recent authorization of the Lead Fiscal Analyst and backfilling of the pending Finance Manger's retirement creates the opportunity to formalize job duty ahead of the pending Cayenta system upgrade. BACKGROUND: PW is the only department of the Board that utilizes job cost accounting within Cayenta. We also utilize a customized payroll feature that interfaces with the job cost accounting feature of Cayenta as well as other unique software. PW sponsored a software code writing course for FAC several years ago supporting the need for service provided by FAC. IT cannot adequately support PW owing to the complexity of Cayenta, ongoing minor issues with Cayenta and the interface between job cost accounting, time entry and other systems. The pending significant Cayenta upgrade will require a large commitment from FAC. PW desires formalizing the service and need for technology specialist support into the existing Fiscal Analyst job description. DISCUSSION: FAC has been providing technology specialist services to PW for the past several years without formal recognition. Routinely, FAC has served as a system administrator for multiple software systems and written custom reports in SmartGov, RTA and the CRAB Page 1 of 3 Public Works "Work Session Staff Report", 2022 road reporting system. FAC has also regularly worked with Cayenta Support to resolve operational issues discovered by PW staff and enhance Cayenta reporting to meet business needs. It seems reasonable to allow IT to defer low level technical requests to PW for in-house support without burdening the IT request system. There is no resource in the county with the knowledge and understanding of Cayenta job cost accounting and time entry that FAC possesses. PW desires having full access to FAC's skills supporting the pending Cayenta system upgrade. FISCAL IMPACTS: Undetermined at this time. Owing to significant unfilled position in PW during fiscal year 2022, personnel budget exists to cover potential costs associated with rerating the requested position. ATTACHMENTS: EXHIBIT 1: PROPOSED JOB DESCRIPTION Page 2 of 3 Public Works "Work Session Staff Report", 2022 EXHIBIT 1: PROPOSED JOB DESCRIPTION Page 3 of 3 Public Works "Work Session Staff Report", 2022 Job Description Kittitas County, Washington TITLE: Fiscal Analyst/PW Technology Specialist CREATED: 05/16/2022 REPORTS TO: PW Finance Manager DEPARTMENT: Public Works JOB SUMMARY: CATEGORY: Full-time OCCUPATION CODE: AFFILIATION: Union HOURS/WEEK: 40 FLSA STATUS: Non-exempt DRS ELIGIBILITY: PERS ESSENTIAL FUNCTIONS TECHNOLOGY: • Support computer systems and printers/copiers/plotters; Follow up with co-workers to ensure satisfactory resolution of issues. • Acquire and maintain knowledge of relevant hardware and software products used by Public Works. • Attend training, assist in training, and provide individual user training. • Act as liaison between Public Works and IT for Tier II Support. • Act as liaison with support vendors; ensure timely notice to IT if vendor network access is required. • Keep up to date on new technologies and best practices. Provide advice to division management on best practices as it relates to technology. • Assist with the development and support of technology policies and procedures within Public Works. • Support inventory, computer rotation and appropriate disposal of technology. • In coordination with the information Technology Department, plan for and respond to emergencies involving data loss, hardware failure and disaster recovery. • Create, schedule and run reports to improve office productivity and provide custom reports to meet departmental reporting needs. • Analyze processes and recommend improvements using standardization, automation, and technology systems. • Develop strategies for integrating, testing, adopting, and implementing emerging technologies. • Assign software user accounts for Public Works related programs, ensure new users receive necessary training prior to use. Fiscal Analyst/Technology Specialist — Public Works Page 1 • Maintain and update Public Works software for operational changes. Coordinate software patches/updates with IT and/or vendors. • Act as a consultant and trainer for office staff on related Public Works programs. • Work closely with the IT to ensure open and frequent communication about projects, problems, and opportunities. • Oversee cell phone assignment, usage verification, and facilitate solutions to cell phone technology issues. ACCOUNTING • Create and assist in preparing management reports for division managers. • Set up new projects in the job cost integrated accounting system. • Assist in maintaining job area/general ledger cross reference controls and other system tables. • Audit timekeeping system forjob coding, earning codes, and measures/accomplishments and prepare or facilitate corrective action. • Prepare and process payroll batch uploads. • Prepare payroll audit reports. • Create and facilitate processes/reports to ensure integrity between the financial system and other software including the fleet management, permitting and road reporting systems. • Assist with coordinating and validating financial system updates. • Aid with data management and analysis for all funds within Public Works. • Provide backup for Fiscal Analyst positions. OTHER FUNCTIONS • Perform other support services as assigned. This job description is a summary of the primary functions and expectations for this position. Additional department -related duties may be assigned as required. MINIMUM QUALIFICATIONS • High School Diploma or GED • Three (3) years of experience providing computer maintenance services of a technical nature, supporting a wide variety of users in a Windows environment, • College courses in Computer Science or Management Information Services may substitute for some experience requirements • A bachelors degree in Accounting or equivalent field. • Valid Washington State driver's license • A criminal history and background check will be performed on qualified candidates. Convictions may preclude candidates from employment in certain circumstances. Factors relativity to the position such as age at time of the offense, seriousness and nature of the violation, and rehabilitation will be taken into account. Fiscal Analyst/Technology Specialist — Public Works Page 2 REQUIRED SKILLS/KNOWLEDGE/OTHER • Be familiar with current Microsoft Windows desktop operating systems; • Possess ability to quickly learn new technology and stay on top of trends. • Basic networking troubleshooting. • Self-starter with strong self-management skills and good judgment. • Able to handle high -stress situations while maintaining a high level of customer service and professionalism. • Able to organize projects and manage multiple priorities; ability to change direction without disruption and with a positive approach. • Proficient in the use of modern office equipment. • Experience with procedures and practices applicable to accounting. • Possess adequate knowledge and skills to provide other support services when needed. • Excellent problem solving and research skills. • Excellent communication and presentation skills, verbal, written, technical and non- technical communication skills. • Must maintain confidentiality. • Able to work well with others, take direction, and constructive criticism. PREFERRED QUALIFICATIONS • Associate or Bachelor's degree in Computer Science or Management Information Systems WORKING CONDITIONS Regular attendance and punctuality are required and expected Monday — Friday from 8:00 AM to 5:00 PM; however, extended or weekend hours may be required on occasion. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions. PREPARED & REVIEWED BY Must be completed with all revisions of the job description. A copy will be returned to supervisor. Supervisor Name Title Date HR Representative Name Title Date Fiscal Analyst/Technology Specialist — Public Works Page 3 EMPLOYEE ACKNOWLEDGEMENT I understand the job duties and responsibilities contained within this position description and as described by the immediate supervisor. Employee Name Date Fiscal Analyst/Technology Specialist — Public Works Page 4 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: May 23, 2022 TOPIC: Yakima River Access Wayfinding Signs Update ACTION REQUESTED: Direction to Staff LEAD STAFF: Joshua Fredrickson RECOMMENDATION: Direct staff to proceed with acquisition and installation of Yakima River Access Wayfinding signs at two locations BRIEFING SUMMARY: • Kittitas County awarded a 2020 Tourism Related, Small -Scale Municipality - Owned Capital Project grant to Kittitas County Public Lands Advisory Committee for the Yakima River Access Wayfinding Signs • Grant award amount was $47,618.00 • Sign design has been developed by Beckwith Consulting Group (Beckwith) • Yakima River Access Subcommittee of the Public Lands Advisory Committee has offered support for installation at two initial locations BACKGROUND: Through the Board of County Commissioners and recommended by the Lodging Tax Advisory Committee a grant was awarded to the Kittitas County Public Lands Advisory Committee. The grant award was for the design and development of Yakima River Water Trail Wayfinding signs in support of access to the Yakima River. A contract for the design was signed with Beckwith Consulting Group. Beckwith has provided a sign design (EXHIBIT 1) to be implemented as the River Water Trail. DISCUSSION: The Public Lands Advisory Committee desires to improve signage to motoring public informing them of opportunities to access the Yakima River. The 2018 Yakima River Public Access Plan identifies existing and proposed future river access locations (EXHIBIT 2). To begin implementation there is interest to install signs at two initial locations. The first site proposed is along SR 821 at mile post 10 (EXHIBIT 3). The second location is Teanaway Junction, near the intersection of SR 970 and SR 10. Both river access locations are Washington State Department of Fish and Wildlife (WDFW) parcels adjacent to the State routes. Permits are being sought from both WDFW and WSDOT for the installation of the signs. Three additional sites for sign installation are recommended after the first round of sign installation. Page 1 of 5 Public Works "Work Session Staff Report" 2022 Initial Sign Installation Locations: 1. SR 821 mile post 10 2. Teanaway Junction Second Round of Sign Installation Locations: 1. Memorial/Fireman Park — Cie Elum 2. SR 821 mile post 8 3. King Horn Slough-Hundley Rd. Final specifications and maintenance agreement are being developed to meet the request of WSDOT for installation of the signs. Signs at the initial location will be installed in each direction of travel along the roadway. FISCAL IMPACTS: Costs for initial sign fabrication and installation is included in Public Works annual budget. Funding for fabrication and installation of additional locations would need to be considered. ATTACHMENTS: Exhibit 1: Water Trail Wayfinding Sign Design Exhibit 2: Existing and Proposed Public Access Sites Exhibit 3: Yakima River Mile 83, Mile Post 10 Site Map Page 2 of 5 Public Works "Work Session Staff Report" 2022 EXHIBIT l: WATER TRAIL WAYFINDING SIGN DESIGN Page 3 of 5 Public Works "Work Session Staff Report" 2022 Kittitas County / Mile Post 10 Left Arrow Yakima Diver Water Trail Waysign Specifications Arch -Cut Top 3" Dia. Corners .25 .25 30"x 5" Destination Bl 3" Cap Height Letters Type Font: Myriad Regular (Condensed 80%) 30" 40" T 5" <Pantone 2725C C=77% M=68% Y=0% K=0% 0E—Pantone 2718C C=67% M=41% Y=0% K=0% Pantone Pantone Pantone Pantone 282C 2725C Black 4C 466C C=100% C=77% C=0% C=12% M=68% M=68% M=22% M=22% Y=0% Y=0% Y=100% Y=43% K=54% K=0% K=89% K=0% Prints to 3/8" Diebond or equivalent. EXHIBIT 2: EXISTING AND PROPOSED PUBLIC ACCESS SITES Page 4 of 5 Public Works "Work Session Staff Report" 2022 i I I Q 0 n S 0 n •E T A 3 m ro a 3 9 8 0 '^ co ^O o �� •� A, �., m '00 I Aa 3 UQ »1 1 .CL .:y ddyy n 0 0 OC _ cn m a> O 5e N � T6S O 0e8 F N 4 o rD r� En I s O 3 a N a E/1 d� ILI ry ` Gl cNit `TL aha 2 2 v q} ,Z '07 I y 9 54 I i � o 3 I I � m o s EXHIBIT 3: YAKIMA RIVER MILE 83, MILE POST 10 Page 5 of 5 Public Works "Work Session Staff Report" 2022 C3 Yakima River Canyon in, Mile Post 10 Boal : r i L df YAKIMA K'veR GNAT E R T RAI L Mile Post 10 �1'+1Tfa IRAQI SII _i'r��rl:.i 1.'• YAKIMA RIveR WATER TRAIL 4- Mile Post 10 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: May 23, 2022 TOPIC: Silverton Road Vacation Request ACTION REQUESTED: Direct Staff LEAD STAFF: Joshua Fredrickson RECOMMENDATION: Schedule a public hearing regarding the proposed vacation of a portion of Silverton Road to the adjacent owners from 0.34 (end of pavement) to the end of right-of-way. BRIEFING SUMMARY: • Plat and recorded documents dedicated public right-of-way for Silverton Road • A portion of Silverton Road was not constructed in area being requested for vacation Adjacent property owner desires clearing title and having full use of the property Public Works (PW) supports the requested vacation with no value for the vacated right-of-way BACKGROUND: Right -of -Way for Silverton Road was dedicated to the County in Book E of Short Plats page 134 (EXHIBIT 1). Silverton Road was then built in 1996. Additional right-of-way was granted in 2006 through dedication deed 200606070016 and the Weaver Road Short Plat SP -06-77 (EXHIBIT 2). The constructed section of Silverton Road extended 0.34 miles south from the intersection with Robinson Canyon Road. Right-of-way extends an additional 0.43 miles south of the current end of pavement location. DISCUSSION: Public Works received an application to vacate the right-of-way for the unconstructed portion of Silverton Road (EXHIBIT 3). Parcels adjacent to the unconstructed portion of Silverton Road right-of-way are served through private access easements. The action allows parcels to be joined and the property owners are no longer burdened by the right- of-way. PW is proposing that no value be assigned to the right-of-way as no improvements have been created impacting any Road Fund expenditure. A subsequent record of survey by the property owners will be needed to clear title and allow full use of the proponent's property. Silverton Road currently ends without an appropriately sized emergency vehicle turnaround. An easement for a full access turnaround is being requested from the adjoining property owners associated with the vacation. PW supports the requested vacation of a portion of Silverton Road right-of-way. Page 1 of 5 Public Works "Work Session Staff Report" 2022 FISCAL IMPACTS: The applicants have paid PW's vacation application fee of $3,888.00 ATTACHMENTS: Exhibit 1: Book E of Short Plats page 134 Exhibit 2: Weaver Road Short Plat SP -06-77 Exhibit 3: Road vacation request location map Page 2 of 5 Public Works "Work Session Staff Report" 2022 EXHIBIT 1: BOOK E OF SHORT PLATS PAGE 134 Page 3 of 5 Public Works "Work Session Staff Report" 2022 C 14 MiZ Ss 6 S'r F wNr rw xer-mJv aue vl[Fm rwrtrs u sJw ai§ ice gr .5 o � • mss, , � Xaa p0 t J Nl r G ns O 1. N'�I'• � Pm� e8 ssz YPN: dC9YR � D Yk�gN7YL �.tl 8 I, 1: [5 F rN 6�Y� re�sarxarr�Pi.[rt �' ■�+ �L ntrT L --^-N nasi [ Y.�,ss�4�>.'14 RiT � F�•F .D Yr NN@[I'[ ♦Pb � MY31' � SniIV y 8 ����f p��� m�FlorwraoxollPort ��gycai° �0.f1�A� M=ILU I IXL M y EXHIBIT 2: WEAVER ROAD SHORT PLAT SP -06-77 Page 4 of 5 Public Works "Work Session Staff Report" 2022 o�^�$"¢:�; y s e x- a x x x s w= F-1 '� e � � � �ma�p�€Fad C'1 € L tltl pp as slw �• S� � $Y� � ��€fig R m °i _ - P !S �++' b u ttr f= .Ti z coop o�N M o oFN w _ 7'E rn m N 00'49'3Y E 134.76' w z 1 c m — N 0.92 AC S g m u o6 00'4913 W M.39•Tie 4 is J l ZI FPy l/ Nw� m�w'muw r'Goomv uw u�r'..kr-.: 6.riw y .0 �m 'S G �// i ,0 _ ~] Z 2NZNNNNNNNNNNNNNNZZN �w mY» 86d" &NW wwwmww�o 4 N m o c w,: aUmti ujduaw>ld'm,s 4a�m�a I s w ,o. _ V] O C+y m� Saw"wu ol"nuH mmu ni NN�NDy i ^N u rC] r Mr O W u rma,S�Yiu g"' �"up4ro,wiemv='mm �wm ma ro � il>7, ��r i \F G x Z � u'um-m 'u°m�8mmouw"' >I:mon A,�• I +' " i QI �] f•'� II D ~ I w �y S zF M o 9t. w I r 2 N OU 0a> Me13 A lad I e '!M NN m y N V gQm Dm wo AM 4�VmY I 1 ` p 1-3 R v'+i Q N i u r,\ Q. 4m p I„�c 'mSE�ZZ� _ ,4 �•',J�m r1 G O QSw6"O Pnzml D _ V zi oos GN? m \N N + a. I O = c`�•y aida SH s m O � �� � & @ 6 LI oN 9�. J ;J �irAn 3'j �"m• og � C WO m ^�. NOIV3V6'EW' a o o r A Z= 4: is .� A o A ," a rn o! tow EXHIBIT 3: ROAD VACATION REQUEST LOCATION MAP Page 5 of 5 Public Works "Work Session Staff Report" 2022 15076 1371 -1 1759233 15fr7 1370`, Silverton Road Section _r, ._ —Secnnn 35 Robinson Canyon.Rd M (1, Vi u� 10749 269233 Vacation Map ROBINSON ..p:.:.r. CANYON SP 07-84 -. -. FAaj..l..- Ht'.irl•.i;i._ Ll, 11748 117$9 C 11 74FN — PIAtN BEAUTIFUL SP 10-00612 11 r •i. 1__.. - 11751 V� 11752 11753 ner 11751 N " 5 Silverton Road to Remain 0.070.04 0 0.07 0.15 0.22 0.3 Silverton Road to be Vacated + Miles 1, 55?542 ■ It'�;3 1111.= 16748 ■ ■ I 1 n,, ■ I I'i.i, 1175911758 11757 12•25i111 ■ '3 ■ GALAXY SP ■ 07.139 ■ 955757 1 _ 958758 7a,; : ■ ■ ■ HILL TOP WEST SP 10-00010 ■ 'p ■ `.`7394 1ig51 0'1 ■ 10.52 CO ■ 9573% 1, 957390 557390 on N■ V) Environmental Systems Research Institute, Inc. (ESRD, S. Geological Survey (US r U.S. Geological Survey - U.S. oard on G P6Mc 4t, SE Names (BGN), National Geos$ n e igence GA), NAVTEO MDA (Naystreets), Information ystems (USGS, NASA), Oregon Metro 5533(4 N " 5 Silverton Road to Remain 0.070.04 0 0.07 0.15 0.22 0.3 Silverton Road to be Vacated + Miles KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: May 23, 2022 TOPIC: Water Mitigation Refund Policy ACTION REQUESTED: Direction to Staff LEAD STAFF: Arden Thomas RECOMMENDATION: Direct staff to implement proposed refund policy BRIEFING SUMMARY: • Kittitas County code requires those who mitigate through the Kittitas County water bank to submit an application for a residential building permit within two (2) years of issuance of the mitigation certificate (KCC 13.40.010(b)). • If a building permit is not obtained within two years, the issued mitigation certificate is no longer valid. • Kittitas County's current business practice is to refund the full fee (minus $3 charged by the auditor) for the water mitigation upon request by the current parcel owner for mitigation certificates that are no longer valid because the building permit requirement has not been met. • Kittitas County incurs staff costs associated with issuing the mitigation certificate, in addition to general program administration for the mitigation program. We propose to withhold a portion, about 25%, of the original permit fee to cover these costs. BACKGROUND: Kittitas County code requires those who mitigate through the Kittitas County water bank to submit an application for a residential building permit within two (2) years of issuance of the mitigation certificate (KCC 13.40.010(b)). For those who wish to purchase water without immediate plans to build a residence, acquiring water through a private bank is an option. When water bank customers apply for a water mitigation certificate, they must attest that they understand that they are required to apply for a building permit within two years. Issued water mitigation certificates also identify that a building permit must be applied for within two years. If a building permit is not obtained within two years, the issued mitigation certificate is no longer valid. Kittitas County's current business practice is to refund the full fee (minus $3 charged by the auditor) for the water mitigation upon request for mitigation certificates that are no longer valid because the building permit requirement has not yet been met. Pagel of 3 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT The water mitigation fee is broken out into cost recovery, an in -lieu fee, program administration fee, pre -payment of the first annual metering fee, and the auditor / finance fee. These fees are detailed in Exhibit 1. Public Works staff proposes to continue to retain the auditor / finance fee and to start retaining most of the program administration fee when refunds are issued. Public Works proposes to start retaining $1,125 per refunded mitigation certificate, which is about 25% of the water mitigation package fee (with the exception of water mitigation for cisterns, which is currently discounted because the water mitigation program does not currently support groundwater well use in these areas). DISCUSSION: In addition to the direct staff time required to process mitigation certificates, the program administration fee covers staffing costs to provide technical assistance to landowners to help them understand mitigation requirements and options. This educational aspect is an important component of our annual work program. Public works would refund the portion of the program administration fee that covers water meter inspections, since this service has not been provided for refunded mitigation certificates. Kittitas County uses the same fee schedule for both County -held water rights and private bank water rights administered through our mitigation program. Private bankers are paid the cost recovery component of the water mitigation fee and are deducted the cost recovery fee for refunded mitigation certificates issued through their banks. Water associated with mitigation certificates that are no longer valid is tracked and can be re -distributed for a new use. FISCAL IMPACTS: In 2021 Kittitas County issued refunds for 12 certificates. By retaining the proposed program administration fee, Public Works would have retained $13,500 to help cover staff costs. ATTACHMENTS: Exhibit 1: Water Mitigation Fee Breakout and Proposed Refund Amounts Page 2 of 3 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT EXHIBIT 1: Water Mitigation Fee Breakout and Proposed Refund Amounts Page 3 of 3 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT | 3 mlq KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: May 23, 2022 TOPIC: Floodplain Development Community Assistance Visit ACTION REQUESTED: Support Staff Efforts to Address Items Identified in Community Assistance Visit Letter LEAD STAFF: Arden Thomas RECOMMENDATION: Support Staff Efforts to Address Items Identified in Community Assistance Visit Letter BRIEFING SUMMARY: • Staff from the Department of Ecology and/or the Federal Emergency Management Agency periodically conduct a "Community Assistance Visit' (CAV) to ensure local jurisdictions are meeting federal and state requirements for floodplain development. • Enforcement of our floodplain management ordinance is required for federally backed flood insurance available to County property owners and for Kittitas County to be eligible for flood disaster relief. • To remain in good standing, we need to address seven (7) items identified by Ecology. We also need to continue to work with Ecology on permitting for the McElroy Road bridge. • The most challenging item to resolve will be compliance issues identified for the Fire District No. 7 Station, which was permitted in 2014 and constructed shortly after. Kittitas County has a meeting scheduled to discuss these issues with Ecology and FEMA on June 15, 2022 BACKGROUND: Staff from the Department of Ecology and/or the Federal Emergency Management Agency periodically conduct a "Community Assistance Visit' (CAV) to ensure that local jurisdictions are meeting federal and state minimum requirements for floodplain development. The Department of Ecology recently initiated a CAV with Kittitas County. The last CAV occurred in 2011 and was conducted by Ecology. Through the CAV, Ecology is checking to make sure that we are meeting federal and state requirements for floodplain development. Kittitas County must enforce our our floodplain management ordinance (KCC 14.08) for County residents to have access to Page 1 of 3 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT federally backed flood insurance and for Kittitas County to be eligible for flood disaster relief. On May 13, 2022, Ecology provided Kittitas County with a letter documenting the current status of the CAV. DISCUSSION: Ecology staff conducted a floodplain tour, which included a review of aerial photography to identify new structures within the floodplain. From this review, four (4) unpermitted structures were identified. These structures have been referred to code enforcement and will need to either be shown to meet county code requirements or removed in order for the County to complete the CAV. Two other items identified, obtaining a Final Elevation Certificate for a permitted structure, and permitting storage of materials in the floodplain should be straight -forward to address. The most challenging item on the CAV report to resolve will be the compliance issues identified with the Fire District No. 7 station on Chepoda Road in upper Kittitas County. Kittitas County has a meeting scheduled to discuss these issues with Ecology and FEMA on June 15, 2022. Staff has also submitted a request for assistance from the Prosecutor's Office. The CAV letter also identifies that further engineering analysis is required for the McElroy Road bridge. The Flood Control Zone District has committed to conducting hydraulic analysis with Flood Control Assistance Account Program (FCAPP) funding. Kittitas County staff will coordinate closely with Ecology and FEMA staff on this effort. FISCAL IMPACTS: Not currently known due to uncertainty about requirements to address Fire District No. 7 compliance issues. ATTACHMENTS: Exhibit 1: Department of Ecology Letter Dated May 13, 2022 Page 2 of 3 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT EXHIBIT 1: Department of Ecology Letter Dated May 13, 2022 Page 3 of 3 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT �,y 6T4'tg e C / �. r AY �d �pP STATE OF WASHINGTON DEPARTMENT OF ECOLOGY Central Region Office 1250 West Alder St., Union Gap, WA 98903-0009 • 509-575-2490 May 13, 2022 The Honorable Laura Osiadacz Kittitas County Commissioners 205 W 5th Ave, STE 108 Ellensburg, WA 98926 SENT VIA ELECTRONIC MAIL RE: Community Assistance Visit (CAV) Dear Chair Osiadacz: I appreciated the opportunity to meet with the Water Resources Manager, Arden Thomas; Water Resources Specialist, Samantha Cox; Building Official, Jeremy Larson; and Code Enforcement Officer, Toni Berkshire, to discuss the County's participation in the National Flood Insurance Program (NFIP) on April 14, 2022, during a Community Assistance Visit (CAV). As the State NFIP coordinating agency, the Department of Ecology (ECY) regularly performs CAVs for participating communities in the NFIP. The primary purpose of the CAN is to provide an assessment of the community procedures for administering and enforcing your local floodplain management program. A CAV is also intended to provide the community with current information regarding the NFIP and to provide an opportunity to discuss items of concern the community may have with the administration of the local ordinance and floodplain management program. Continued enforcement of the floodplain management ordinance allows the Federal Emergency Management Agency (FEMA) to continue to make federally backed flood insurance available to property owners and ensures the community remains eligible for flood disaster relief. The CAV is comprised of the following elements: floodplain tour; review of the community's floodplain management regulations; meeting with local officials; review of the local permitting process; examination of the floodplain permit, variance, and subdivision files; and a summary of the information gathered and issues identified. This is the fifth time a CAV has been conducted in Kittitas County. FEMA performed a CAV in 1992, followed by ECY in 2000, 2006, and 2011. Currently there are 365 flood insurance policies within the County. There has been 205 closed paid losses for flood damage valued at $2,329,588. A copy of the County's NFIP Chair Osiadacz Kittitas County May 13, 2022 Page 2 of 4 community profile was provided with my visit. At that time the number of insurance policies was 382. Important Dates and Facts Kittitas County CID # 530095 Entered Emergency Program February 5, 1974 Entered Regular Program May 5, 1981 Initial Flood Insurance Rate Map (FIRM) May 5, 1981 Current Flood Insurance Rate Map (FIRM) September 24, 2021 Community Rating System Class 6 Floodplain Tour A field tour of the City's Special Flood Hazard Areas (SFHA) was conducted on September 14, 2021. Historical aerial imagery was also reviewed as part of this tour. The following outstanding items were identified and require the stated action for resolution: A. 341 McKee Lane, Cle Elum: Final Elevation Certificate (EC) missing from file. o County sent letter to property owner 5/9/22 requesting final EC. o Action Required: Submit copy of final EC to ECY upon receipt. B. 241 Shady Glen Drive, Easton: Construction of 600 square foot structure in floodway with no permit. o County sent letter to property owner 4/14/22 requesting compliance. o Action Required: Demolition of unpermitted structure in floodway. C. 100 Shady Glen Drive, Easton: Unpermitted construction. o County sent letter to property owner 4/14/22 requesting compliance. o Action Required: Submit copy of permit(s) and supporting application documentation to ECY upon receipt. D. 450 Elk Meadows Road, Cle Elum: Unpermitted construction. o County sent letter to property owner 4/14/22 requesting compliance. o Action Required: Submit copy of permit(s) and supporting application documentation to ECY upon receipt. E. 300 Heron Drive, Cle Elum: Unpermitted construction. o County sent letter to property owner 4/14/22 requesting compliance. o Action Required: Submit copy of permit(s) and supporting application documentation to ECY upon receipt. Chair Osiadacz Kittitas County May 13, 2022 Page 3 of 4 F. Kittitas Co Fire District #7, Chepoda Road, Cie Elum: Fire station constructed below Base Flood Elevation. o Action Required: There is a meeting scheduled with FEMA, ECY, & the County for further discussion. G. 6934 S. Canyon Road, Ellensburg: Unpermitted storage of materials. o County sent letter to property owner 5/9/22 requesting compliance. o Action Required: Submit copy of permit(s) and supporting application documentation to ECY upon receipt. Floodplain Damage Prevention Ordinance Review The County's Flood Damage Prevention Ordinance, #2021-010, was revised August 17, 2021 and is compliant with ECY and FEMA. Review of Permitting Process A preliminary site analysis is conducted for any activity that requires a building permit. A site plan is then submitted with a description of the proposed project. This is dispersed amongst multiple departments for review. The applicant is notified of what permits are needed. If the project is in a Special Flood Hazard Area (SFHA) a Floodplain Development Permit (FDP) application is submitted and the building department doesn't process the application until the FDP is issued. A pre -application meeting is scheduled, which is mandatory for all residential structures, or other structures required to elevate. Three elevation certificates are obtained: (Ist) prior to construction; (2nd) at framing; (3rd) final. Elevation Certificate inspections are listed in the County permitting system, SmartGov, and when the framing and final elevation certificates are required the building inspectors will not schedule subsequent inspections until the ECs have been reviewed and approved. The BFE must be located on the plans and everything below must be floodproofed. During plan review, submittal is cross-checked with the preliminary site analysis and elevation certificate. A red sticker is placed on plans that include a FDP to alert the field inspector. Propane tanks are flagged for specific review. A FDP is processed for all structures, even those under 200 square feet. Floodplains are required to be shown on plats and BFEs are obtained prior to final plat approval for Zone A where there is 50 lots or 5 acres, whichever is lesser. Letter of map changes are recommended when and where appropriate. Examination of Permits & Files Upon request, ECY was provided with a list of permits dating back five years from the date of the CAV meeting, April 14th, and chose a sample from this list to review. This selection of permits were reviewed in person on April 19th at the County Public Works Department. All permits reviewed have been confirmed compliant except the following item that requires resolution: Chair Osiadacz Kittitas County May 13, 2022 Page 4 of 4 A. McElroy Road bridge, Cle Elum: This temporary bridge permit requires additional engineering analysis, identification of all insurable structures affected by any increase in the Base Flood Elevation during a I% chance flood event, and written notification to the applicant that they may be liable for any damages resulting from the temporary structure. o Action Required: A meeting will be scheduled between FEMA, ECY, & the County for further discussion. Training Regular training should be incorporated to ensure that staff continue to be aware of Kittitas County's floodplain management responsibilities as a participant in the National Flood Insurance Program. Webinars as well as updates with FEMA Region 10 training can be found on the STARR website at: httos://www.starr-team.com/starr/Pages/default.aspxx or by subscribing to the Region 10 newsletter. If you would like to subscribe, please email: RXNewsletter&starr- team.com Summary To summarize, there are several follow-up items needed in order to close this CAV as listed under the floodplain tour and examination of permit sections. Ecology will work with staff to accomplish these tasks. Arden Thomas and Samantha Cox are working closely with Ecology and we appreciate their communication and continued efforts. Thank you for your willingness to improve Kittitas County's floodplain management program as part of the community's participation in the NFIP. Should you have any questions regarding my report or any other floodplain issues, please do not hesitate to contact me. Sincerely, d4401� �1 d Sandy I. Floyd, Central Region I4FIP Coordinator Shorelands and Environmental Assistance Program Central Regional Office — Union Gap ec: Arden Thomas, Kittitas County Samantha Cox, Kittitas County Dennis Jeney, Jr., FEMA David Radabaugh, Ecology