Loading...
HomeMy WebLinkAboutRES-2022-109-Swauk Creek BridgeBOARD OF' COUNTY COMMISSIONERS COUNTY OF KTTTITAS STATE OF'WASHINGTON RESOLUTION NO. 2022 -l0q AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL AID PROJECT PROSPECTUS F'OR THE LIBERTY ROAD SWAUK CREEK BRIDGE REPLACEMENT, CRP 306-21 WHEREAS: Public Works has received funding through the FFY 2022WA Federal Lands Access Program (FLAP) for replacement of the Liberty Road Swauk Creek Bridge; and WHEREAS: The federal funding will be used for the preliminary engineering phase to design, develop and prepare construction plans and specifications for these improvements; and WHEREAS: In preparation to begin work Kittitas County Public Works is requesting the Washington State Department of Transportation release the federal funds for preliminary engineering; and WHEREAS:A Local Agency Federal Aid Project Prospectus must be executed by the Chair acknowledging the project has been reviewed and is consistent with the County's comprehensive plan for community development; and NOW' THEREF'ORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby approve the Chair's signature on the Local Agency Federal Aid Project Prospectus for the Liberty Road Swauk Creek Bridge Replacement, CRP 306-21. DATED on this 3rd day of May 2022, at Ellensburg, Washington. BOARD OF COLTNTY COMMISSIONERS KITTITAS COUNTY, WASHTNGTON Board- Julie Kjorsvik V n Deputy Clerk of the Board- Mandy Buchholz Brett Commissioner ^-.w Washington State Department of Transportation Local Agency Federal Aid Project Prospectus Date 412612022 DUNS Number 0t-020-2s47 FederalEmployer Tax lD Number 9r-601349(WSDOT Use Only Prefix Route () FederalAid Project Number WFL 19BJ Local Agency Project Number RC2l93, CRP 306-21 Agency Kittitas County Public Works CAAgency [7lves I t'to Federal Program Title Zzo.zos Z otrer 20.224 Project Title Liberty Road Swauk Creek Bridge Replacement Start Latitude N41 14'35.21 End Latitude N47 14'36.32 StartLongitude W I20 4l'5I'20 End Lonqitude W 120 4l'47.84 Project Termi ni From-To MP 0.02 MP 0.07 Nearest City Name Cle Elum Project Zip Code (+4) 98922-9r18 Begin Mile Post 0.02 End Mile Post 0.07 Length of Project 0.05 M tocat ! tocat Forces ! state ! Award Type Railroad Route lD 38350 Begin Mile Point 0.02 End Mile Point 0.07 City Number N/A County Number t9 County Name Kittitas WSDOT Region North Central Region Legislative District(s) t3 Congressional District(s) 8 Urban Area Number N/A Phase Total Estimated Gost (Nearest Hundred Dollar) Local Agency Funding (Nearest Hundred Dollar) Federal Funds (Nearest Hundred Dollar) Phase Start Date Month Year P.E 440,900 59,500 381,300 0512022 R/W Const.2,506,200 424,300 2,081,900 0612024 Total 2,947,000 483,800 2,463,200 Description of Existing Facility lexlsting Design and Present Gondition) Roadway Width 26' Number of Lanes 2 Swauk Creek bridge # 07101 on Liberty Road is currently load restricted and needs to be replaced. The current structure is 40' long x 30' wide and was originally built in 1955 and rebuilt in 1977. Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary) Replacement of bridge 07101 with new structure, realign stream and roadway Form 140-101 Revised 0112022 Local Agency Contact Person Darren Case Title Construction Manager Phone 509-962-7019 Mailing Address 411 N. Ruby, Suite 1 City Ellensburg State WA Zip Code 98926 Approving By Project Prospectus I1;s County Engineer Previous Editions Obsolete Agency Kittitas County Public Works Project Title Liberty Road Swauk Creek Bridge Replacq Date 412612022 Type of Proposed Work Project Type (Check all that Apply) E ruew Construction n Path / Trail E g-n ! Reconstruction ! PeOestrian / Facilities n Z-n I Raitroad M grioge ! Parking I otner Roadway Width 32' ,36' at bridge Number of Lanes 2 Geometric Design Data Description Through Route Grossroad Federal Functional Classification ! PrincipalArterial ! Vinornrterial ! Collector E wajor Collector f, Vinor Collector ! tocat Access Urban Rural NHS { ! frincipalArterial ! urnan ! nurat ! runs MinorArterial Collector I valor Collector ! tiltinor Collector ! Local Access Terrain l-l rtrt 17 Rott [l Mountain Flat Roll Mountain Posted Speed 35 N/A Design Speed 35 N/A Existing ADT 153 - Existing <400 N/A Design YearADT 400 N/A Design Year 2022 N/A Design Hourly Volume (DHV)N/A N/R Performance of Work Preliminary Engineering Will Be Performed By Agency and Consultant Others 75 o/to Agency 25 o/to Construction Will Be Performed By Contractor Contract 100 o//o Agency o/o Environmental Classification Class I - Environmental lmpact Statement (ElS) n Project lnvolves NEPA/SEPA Section 404 lnteragency Agreement Class lll - EnvironmentalAssessment (EA) f] Project lnvolves NEPA/SEPA Section 404 I nteragency Agreements Z Ctass ll - Categorically Excluded (CE) fl Projects Requiring Documentation (Documented CE) Environmental Considerations The project will be required to submit a Joint Aquatic Resources Permit Application (JARPA) Package to US Army Corps of Engineers (USACE), Washington Department of Fish and Wildlife and Washington Department of Ecology. After submittal of the JARPA package coordination will be provided with federal and or state agencies to obtain a Corps 404 permrt from the USACE, a Hydraulic Approval from WDFW, and an Ecology 401 permit from Ecology. Because of the federal nexus, Endangered Species Act (ESA) Section 7 and National Historic Preservation Act (NHPA) Section 106 consultation must be completed. A biological assessment, formal consultation and cultural assessment will be completed. rm 10 Revised 0112022 Previous Editions 0bsolete Page 2 Agency Kittitas County Public Works Project Title Liberty Road Swauk Creek Bridge Replacqg Date 412612022 t of Way n ruo Right of Way Needed * All construction required by the contract can be accomplished within the existing right of way. fl night of Way Needed Z No Relocation I Relocation Required Utilities Railroad E ttto utility work required M rut utility work will be completed prior to the start of the construction contract All utility work will be completed in coordination with the construction contract Z ruo railroad work required nrut railroad work will be completed prior to the start of the construction contract nnlt the railroad work will be completed in coordination with the construction contract Description of Utility Relocation orAdjustments and Existing Major Skuctures lnvolved in the Project All utility relocations will be performed by the utility owners. FM lnvolvement ls any airport located within 3,2 kilometers (2 miles) of the proposed project? ! Ves M ruo Remarks This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the rehensive plan for community development. Agency oate l'ftW,v6 b, ^|a'^BY Mayor/Chairperson DOT Form 140-101 Revised 0112022 Previous Editions Obsolete Page 3