HomeMy WebLinkAboutRES-2022-109-Swauk Creek BridgeBOARD OF' COUNTY COMMISSIONERS
COUNTY OF KTTTITAS
STATE OF'WASHINGTON
RESOLUTION NO. 2022 -l0q
AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL
AID PROJECT PROSPECTUS F'OR THE LIBERTY ROAD SWAUK CREEK BRIDGE
REPLACEMENT, CRP 306-21
WHEREAS: Public Works has received funding through the FFY 2022WA Federal Lands
Access Program (FLAP) for replacement of the Liberty Road Swauk Creek
Bridge; and
WHEREAS: The federal funding will be used for the preliminary engineering phase to design,
develop and prepare construction plans and specifications for these
improvements; and
WHEREAS: In preparation to begin work Kittitas County Public Works is requesting the
Washington State Department of Transportation release the federal funds for
preliminary engineering; and
WHEREAS:A Local Agency Federal Aid Project Prospectus must be executed by the Chair
acknowledging the project has been reviewed and is consistent with the County's
comprehensive plan for community development; and
NOW' THEREF'ORE BE IT RESOLVED that the Board of County Commissioners, in the best
interest of the public, does hereby approve the Chair's signature on the Local
Agency Federal Aid Project Prospectus for the Liberty Road Swauk Creek
Bridge Replacement, CRP 306-21.
DATED on this 3rd day of May 2022, at Ellensburg, Washington.
BOARD OF COLTNTY
COMMISSIONERS
KITTITAS COUNTY, WASHTNGTON
Board- Julie Kjorsvik
V
n Deputy Clerk of the Board- Mandy Buchholz
Brett Commissioner
^-.w Washington State
Department of Transportation Local Agency Federal Aid
Project Prospectus
Date 412612022
DUNS Number 0t-020-2s47
FederalEmployer
Tax lD Number 9r-601349(WSDOT
Use Only
Prefix Route ()
FederalAid
Project Number WFL 19BJ
Local Agency
Project Number RC2l93, CRP 306-21
Agency
Kittitas County Public Works
CAAgency
[7lves I t'to
Federal Program Title
Zzo.zos Z otrer 20.224
Project Title
Liberty Road Swauk Creek Bridge Replacement
Start Latitude N41 14'35.21
End Latitude N47 14'36.32
StartLongitude W I20 4l'5I'20
End Lonqitude W 120 4l'47.84
Project Termi ni From-To
MP 0.02 MP 0.07
Nearest City Name
Cle Elum
Project Zip Code (+4)
98922-9r18
Begin Mile Post
0.02
End Mile Post
0.07
Length of Project
0.05 M tocat ! tocat Forces ! state !
Award Type
Railroad
Route lD
38350
Begin Mile Point
0.02
End Mile Point
0.07
City Number
N/A
County Number
t9
County Name
Kittitas
WSDOT Region
North Central Region
Legislative District(s)
t3
Congressional District(s)
8
Urban Area Number
N/A
Phase
Total
Estimated Gost
(Nearest Hundred Dollar)
Local Agency
Funding
(Nearest Hundred Dollar)
Federal Funds
(Nearest Hundred Dollar)
Phase Start
Date
Month Year
P.E 440,900 59,500 381,300 0512022
R/W
Const.2,506,200 424,300 2,081,900 0612024
Total 2,947,000 483,800 2,463,200
Description of Existing Facility lexlsting Design and Present Gondition)
Roadway Width
26'
Number of Lanes
2
Swauk Creek bridge # 07101 on Liberty Road is currently load restricted and needs to be replaced. The current
structure is 40' long x 30' wide and was originally built in 1955 and rebuilt in 1977.
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
Replacement of bridge 07101 with new structure, realign stream and roadway
Form 140-101
Revised 0112022
Local Agency Contact Person
Darren Case
Title
Construction Manager
Phone
509-962-7019
Mailing Address
411 N. Ruby, Suite 1
City
Ellensburg
State
WA
Zip Code
98926
Approving
By
Project Prospectus
I1;s County Engineer
Previous Editions Obsolete
Agency
Kittitas County Public Works
Project Title
Liberty Road Swauk Creek Bridge Replacq
Date
412612022
Type of Proposed Work
Project Type (Check all that Apply)
E ruew Construction n Path / Trail E g-n
! Reconstruction ! PeOestrian / Facilities n Z-n
I Raitroad
M grioge
! Parking I otner
Roadway Width
32' ,36' at bridge
Number of Lanes
2
Geometric Design Data
Description Through Route Grossroad
Federal
Functional
Classification
! PrincipalArterial
! Vinornrterial
! Collector
E wajor Collector
f, Vinor Collector
! tocat Access
Urban
Rural
NHS
{
! frincipalArterial
! urnan
! nurat
! runs
MinorArterial
Collector
I valor Collector
! tiltinor Collector
! Local Access
Terrain l-l rtrt 17 Rott [l Mountain Flat Roll Mountain
Posted Speed 35 N/A
Design Speed 35 N/A
Existing ADT 153 - Existing <400 N/A
Design YearADT 400 N/A
Design Year 2022 N/A
Design Hourly Volume (DHV)N/A N/R
Performance of Work
Preliminary Engineering Will Be Performed By
Agency and Consultant
Others
75 o/to
Agency
25 o/to
Construction Will Be Performed By
Contractor
Contract
100 o//o
Agency
o/o
Environmental Classification
Class I - Environmental lmpact Statement (ElS)
n Project lnvolves NEPA/SEPA Section 404
lnteragency Agreement
Class lll - EnvironmentalAssessment (EA)
f] Project lnvolves NEPA/SEPA Section 404
I nteragency Agreements
Z Ctass ll - Categorically Excluded (CE)
fl Projects Requiring Documentation
(Documented CE)
Environmental Considerations
The project will be required to submit a Joint Aquatic Resources Permit Application (JARPA) Package to US
Army Corps of Engineers (USACE), Washington Department of Fish and Wildlife and Washington
Department of Ecology. After submittal of the JARPA package coordination will be provided with federal
and or state agencies to obtain a Corps 404 permrt from the USACE, a Hydraulic Approval from WDFW, and
an Ecology 401 permit from Ecology. Because of the federal nexus, Endangered Species Act (ESA) Section 7
and National Historic Preservation Act (NHPA) Section 106 consultation must be completed. A biological
assessment, formal consultation and cultural assessment will be completed.
rm 10
Revised 0112022 Previous Editions 0bsolete
Page 2
Agency
Kittitas County Public Works
Project Title
Liberty Road Swauk Creek Bridge Replacqg
Date
412612022
t of Way
n ruo Right of Way Needed
* All construction required by the
contract can be accomplished
within the existing right of way.
fl night of Way Needed
Z No Relocation I Relocation Required
Utilities Railroad
E ttto utility work required
M rut utility work will be completed prior to the start
of the construction contract
All utility work will be completed in coordination
with the construction contract
Z ruo railroad work required
nrut railroad work will be completed prior to the start of
the construction contract
nnlt the railroad work will be completed in coordination
with the construction contract
Description of Utility Relocation orAdjustments and Existing Major Skuctures lnvolved in the Project
All utility relocations will be performed by the utility owners.
FM lnvolvement
ls any airport located within 3,2 kilometers (2 miles) of the proposed project? ! Ves M ruo
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the rehensive plan for community development.
Agency
oate l'ftW,v6 b,
^|a'^BY
Mayor/Chairperson
DOT Form 140-101
Revised 0112022 Previous Editions Obsolete
Page 3