HomeMy WebLinkAbout2022-02-28-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS Public Works Study Session Regular Meeting Monday February 28, 2022 -1:30 PM Commissioners' Auditorium and Webex 205 West 5th Room 109 - Ellensburg/Webex 1. Call to Order 2. Deputy Director/County Engineer Expenditure Authorization 3. North Thorp Highway/Yakima River Bridge Outreach Discussion 4. Construction Management Support 5. Ten -Year Transportation Asset Management Plan 6. Other business 7. Adjourn Created on 2/24/2022 8:39.39 AM KITTITAS COUNTY PUBLIC WORKS STUDY SESSION MINUTES In -Person and Webex Regular Meeting MONDAY 1:32 PM February 28, 2022 Board Members Present: Chairman Laura Osiadacz, Vice -Chairman Cory Wright, and Commissioner Brett Wachsmith. Others In -Person: Mark Cook, Rebecca Cruse, Public Works. Others Virtual: Candie Leader, Public Works;(3) Members of the Public. At 1:32 pm Chairman Laura Osiadacz opened the Public Works Study Session. DEPUTY DIRECTOR/COUNTY ENGINEER EXPENDITURE AUTHORIZATION Mark Cook is requesting that the Board of County Commissioners give expenditure authority to the Deputy Director/County Engineer. The Board of County Commissioners supports the authorization and staff is directed to prepare enabling documents. NORTH THORP HIGHWAY/ YAKIMA RIVER BRIDGE OUTREACH DISCUSSION Mark Cook informed the Board of County Commissioners of anticipated construction in Summer of 2022 on North Thorp Hwy - Yakima River Bridge. Mark Cook stated that the work will require the bridge to be encapsulated resulting in periodic closure of the bridge. Mark Cook added that Public Works recognizes the inconvenience to commuters to use alternative routes and staff will begin public outreach and informational meetings with the community. Staff was directed to move forward with outreach as presented. CONSTRUCTION MANAGEMENT SUPPORT Mark Cook proposes the creation of a new job description, this is including shuffling duties to provide additional construction management support in the Public Works office. The new delegation of work eliminates the need for Project Manager position. The previous Project Manager duties will be split between Administrative Supervisor and Finance Manager. BOCC supports the creation of the new job description. TEN-YEAR TRANSPORTATION ASSET MANAGEMENT PLAN Mark Cook is requesting the Board of County Commissioners for support of a public outreach campaign to propose a $0.15/$1000 Road Levy rate lift on the upcoming 2022 election. Discussion was held about how 2022-02-28 Minutes quickly county residents would see decline in the current service levels of county roads due to lack of funding. Chairman Laura Osiadacz requests to set-up a brainstorming meeting to plan the public outreach methods. OTHER BUSINESS Mark Cook announced the retirement Venter after 41 years of service to accomplishments, and history of the County Commissioners would like to service to the county. Meeting adjourned at 2:45 pm. &)u - Rebecca Cruse, Administrative Assistant 2022-02-28 Minutes of Maintenance Manager- Jim Van De Kittitas County. Mark Cook shared exemplary employee. The Board of recognize Jim for his years of KITTITAS COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Laura Osiadacz, Chairman KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMP STUDY SESSION STAFF REPORT STUDY SESSION DATE: February 28, 2022 TOPIC: Deputy Director/County Engineer Expenditure Authorization ACTION REQUESTED: Direct Staff Prepare Enabling Legislation LEAD STAFF: Mark R. Cook RECOMMENDATION: Direct staff prepare enabling legislation authorizing $50,000 in allowable expense authorization. BRIEFING SUMMARY: • Currently, the Public Works Director has $50,000 expenditure authority. • Public Works (PW) desires the Deputy Director/County Engineer (DD/CE) to have the same expenditure authority. BACKGROUND: The Public Works Director currently has $50,000 in expenditure authority supporting task order and professional service contract authorizations. PW is unaware of any similar authorization for the DD/CE. DISCUSSION: PW is requesting a similar authorization in authority for the DD/CE. The request allows the DD/CE to keep projects moving on tight timelines in the absence of the Director. FISCAL IMPACTS: None. ATTACHMENTS: None. Page 1 of 1 Public Works "Work Session Staff Report", 2022 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: February 28, 2022 TOPIC: North Thorp Highway -Yakima River Bridge CRP 302-20 ACTION REQUESTED: Informational Only LEAD STAFF: Mark R. Cook RECOMMENDATION: Informational briefing — no action required by the Board. BRIEFING SUMMARY: • On December 30, 2019, Washington State Department of Transportation (WSDOT) notified Public Works of selection of the North Thorp Highway -Yakima River Bridge selection to receive funding for repairs. • Design work and environmental permitting is nearing completion. • Anticipate construction summer 2022. • Work requires closure of the bridge. • Public Works proposes to host an informational meeting for the residents and adjacent property owners. BACKGROUND: The North Thorp Highway -Yakima River Bridge requires preventive maintenance to extend the life of the structure. This steel truss structure, constructed in 1936 has two lanes for traffic. The existing paint system has failed throughout much of the bridge truss. This project will rehabilitate the bridge by removing the existing paint system and repainting, repairing bottom chord panel points, joints, and repair damaged truss portal members. Federal Funding has been secured through WSDOT Local Bridge Program for the needed construction work on the bridge. Construction is planned for this summer. DISCUSSION: Paint systems are replaced under warm weather conditions. To protect the surrounding environment the bridge will be encapsulated while removing the existing paint and applying new paint. The roadway width across the bridge is not sufficient to safely carry traffic and provide for the painting to occur at the same time. Public Works proposes to host an informational meeting for stakeholders including, property owners and emergency services, to share about the project and provide updated project information. This informational meeting will be held March 30, 2022, at 2:00 p.m. at the conference room in the Upper County Shop. FISCAL IMPACTS: None are identified at this time. ATTACHMENTS: None Page 1 of 1 Public Works "Work Session Staff Report" 2022 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: February 28, 2022 TOPIC: Construction Management Support ACTION REQUESTED: Direct Staff Work with Human Resources Preparing a Proposal for Board Consideration LEAD STAFF: Mark R. Cook RECOMMENDATION: Prepare appropriate adjustments to the Administrative Supervisor and Finance Manager job descriptions and associated personnel action forms. BRIEFING SUMMARY: • Resignation of the department's Project Manager creates an additional support need in Design Construction. • In December 2021, staff worked creating a position in Public Works (Project Administrator) migrating Project Manager duties to the new position. • The duties provide administrative and financial support to the Construction Manager, allowing more focus on construction issues. • Added construction support is needed ensuring federal project audit performance. • Public Works believes the support can occur by adjusting duties within the department. BACKGROUND: Public Works (PW) has budgeted a full time Project Manager position in the 2022 personnel budget. The incumbent resigned in January 2022 at the conclusion of Upper County Maintenance Shop construction. Recognizing the need for ongoing administrative and financial support for the Construction Manager, PW created a new job description (Project Administrator— attached as EXHIBIT 1). DISCUSSION: For the past several months, PW has been evaluating the need for added administrative and financial support for the Design Construction Division of PW. Staff now believes that the added support can be best managed by incumbents in the Administrative Supervisor and Finance Manager roles and duties. The proposal is to move some of the administrative duties of the proposed Project Administrator to the Administrative Supervisor and some to the Finance Manager. The added duties will result in a transfer from right of way permitting responsibilities from the Administrative Supervisor to the Administrative Assistant and some Finance Manager duties to the "Lead Fiscal Analyst". Page 1 of 5 Public Works "Work Session Staff Report", 2022 The Board of County Commissioners may recall direct to PW to work with Human Resources developing the job description for possible Courthouse Union inclusion. The Lead Fiscal Analyst job description is now complete for HR consideration (EXHIBIT 2). By shuffling around duties amongst management and line staff, PW believes the necessary additional construction support can be managed with significant cost savings to the department. FISCAL IMPACTS: PW proposes applying the savings from the budgeted Project Manager 2022 personnel budget, towards a five percent increase in the 2022 budgeted 2022 for Administrative Supervisor and Finance Manager. A similar five percent increase is proposed for the Lead Fiscal Analyst position. 2022 budgeted costs and associated increased costs of the proposal are tabulated below for Board consideration. Position 2022 budgeted 2022 budgeted Proposed five Increase hourly rate cost percent increase beyond 2022 in hourly rate budget Administrative $33.96 $70,632 $35.66 $3,537 Su ervisor Finance $45.15 $93,912 $47.41 $4,701 Manager Fiscal Analyst $36.08 $75,042 $37.88 $3,748 Total $11,986 Salary savings from the budgeted Project Manager in 2022 = $95,472. Net saving to 2022 personnel resulting from the proposal equals $95,472 - $11,986 = $83,486. ATTACHMENTS: Exhibit 1: PROPOSED PROJECT ADMINISTRATOR JOB DESCRIPTION Exhibit 2: PROPOSED LEAD FISCAL ANALYST JOB DESCRIPTION Exhibit 3: PROPOSED ADDED DUTIES FOR THE ADMINISTRATIVE SUPERVISOR AND FINANCE MANAGER Page 2 of 5 Public Works "Work Session Staff Report", 2022 EXHIBIT 1: PROPOSED PROJECT ADMINISTRATOR JOB DESCRIPTION Page 3 of 5 Public Works "Work Session Staff Report", 2022 Job Description Kittitas County, Washington TBTLE: Project Administrator CREATED 11/29/2021 REPORTS TO: PUBLIC WORKS CONSTRUCTION MANAGER DEPARTMENT: PUBLIC WORKS JOB SUMMARY: The Project Administrator is responsible for representing the interest of the Public Works Department during design and construction of Public Works Projects. The ability to communicate clearly and build/maintain cooperative working relationships with County personnel, contractors, engineers, architects, and public agencies is a must. The Project Administrator may be asked to participate in public meetings and/or forums regarding County projects and must be able to speak to a diverse population. All County employees work under the guidance of Local/State/Federal regulations and must abide by County policies/procedures. CATEGORY: Project/Full Time OCCUPATION CODE: 4890 UNION AFFILIATION: None HRS/WEEK 40 FLSA STATUS: Exempt DRS ELIGIBILITY: PERS ESSENTIAL FUNCTIONS • Track any "force account" work. • Verify all contractor compliance with Labor and Industries Public Works contracting requirements. • Manage all construction contracts for required state and federal reporting requirements. • Represent the Department on all Washington State Department of Transportation project audits. • Ensure contract compliance for all federal aid work. • Coordinate with Department construction inspectors ensuring proper and adequate construction record keeping occurs on all County construction projects. • Coordinate all requests for information from contractors in close coordination with construction inspectors. • Coordinate all contractor submittals for contract compliance with close coordination with the Construction Manager. • Prepare monthly progress payments for Construction Manager review. • Coordinate with Finance on all required state and federal grant progress reports and lead the preparation of all required grant reports for Construction Manager review. • Coordinate with resource agency permitting staff ensuring compliance with environmental permit requirements. • Coordinate with Department construction inspectors and prepare draft change orders for Construction Manager review and consideration. • Prepare and manage all project documentation for state and federal audits. • Provide project support services to construction inspectors as directed by the Construction Manager. • Perform project management duties as directed by the Construction Manager. This job description is a summary of the primary functions and expectations for this position. Additional department- related duties may be assigned as required. PROJECT MANAGER - PUBLIC WORKS MINIMUM QUALIFICATIONS • High School Diploma or GED equivalent. • Valid Washington State Driver's License. • Two (2) years of experience in construction or building inspection. • A criminal history background check will be performed on qualified candidates. Convictions may preclude candidates from employment in certain circumstances. Factors such as relativity to the position, age and time of the offense, seriousness and nature of the violation, and rehabilitation will be taken into account. REQUIRED KNOWLEDGE, SKILLS & ABILITIES • Ability to read, analyze and interpret policies, contracts, blueprints, engineering plans and specifications, codes, laws and other trade publications. • Ability to demonstrate effective verbal and written communication skills. • Ability to present information to management, staff, contractors, stakeholders, and/or the Board of County Commissioners and/or other groups. • Proficient with the use of computers, programs and applications including Microsoft Office Suite; must be able to quickly become proficient in programs specific to the County and/or department. • Proficient document organization and management skills. WORKING CONDITIONS Work is performed in a variety of environments including the job site, and a standard office setting. Exposure to inclement weather including temperature extremes and windy/dusty conditions will occur. Work may occasionally be performed in close proximity to moving mechanical parts and equipment that causes vibration. The noise level can be loud in the field and moderately quiet in the office. Must have the ability to sit, stand, walk, climb, stoop, kneel, crouch, crawl, twist, grasp, and reach with arms and legs; lift, push, pull, or move up to 50 lbs. and occasionally higher with assistance. Must be physically capable of moving about constructions sites and traversing uneven and/or rugged terrain. Must have close, distance, color, and peripheral vision, depth perception, ability to adjust focus, and the ability to read printed materials, computer screens, and monitors. Must also have hearing and speech to communicate clearly in person, over the telephone, and by radio. Safety rules and regulations must be adhered to at all times; PPE must be worn when required for employee safety. The work schedule is generally maintained during normal office hours, however, exempt positions are expected to work the number of hours required to complete the duties of the position, which includes evenings and weekends. Regular attendance and punctuality are required. Travel throughout the County is required to perform many of the essential functions; occasional travel outside the County may be required to attend meetings or other events. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions. PREPARED & REVIEWED BY: Must be completed with all revisions of the job description. A copy will be returned to supervisor. Supervisor Name & Title HR Representative Name & Title EMPLOYEE ACKNOWLEDGEMENT: Date Date PROJECT MANAGER - PUBLIC WORKS 2 I understand the job duties and responsibilities contained within this position description and as described by the immediate supervisor. Employee Name Date PROJECT MANAGER - PUBLIC WORKS 3 EXHIBIT 2: PROPOSED LEAD FISCAL ANALYST JOB DESCRIPTION Page 4 of 5 Public Works "Work Session Staff Report", 2022 Job Description Kittitas County, Washington TITLE: LEAD FISCAL ANALYST CREATED: 1.031 W 02/18/2022 REPORTSTO: FINANCE MANAGER DEPARTMENT: PUBLIC WORKS JOBSUMMARY: Under the general supervision of the Finance Manager, this position leads the work of the Fiscal Analysts by scheduling and overseeing the daily workload. The Lead Fiscal Analyst monitors and evaluates the work of the Fiscal Analysts; resolves minor work or personnel problems; and makes recommendations to the Finance Manager regarding performance, evaluations, discipline, training, and recruitment. The Lead Fiscal Analyst also performs complex accounting functions following the principles of accounting and financial reporting as set forth in the State of Washington Budgeting, Accounting and Reporting System (BARS), Governmental Accounting Standards Board's (GASB), Generally Accepted Accounting Principles (GAAP) and County policies and procedures. This position must maintain courteous and cooperative working relationships with administrative and other personnel, outside agencies, and the general public, and works under the guidance of Local/State/Federal regulations, and Department/County policies and procedures. SUPERVISORY DUTIES: Oversees the work of the Public Works Fiscal Analysts. CATEGORY: Full -Time OCCUPATION CODE xxxx UNION AFFILIATION: Courthouse (Local 792CH) HRS/WEEK: 40 FLSA STATUS: Non -Exempt DRS ELIGIBLITY: PERS ESSENTIAL FUNCTIONS: Personnel Management • Coordinate and lead the work of the Fiscal Analysts. • Provide Fiscal Analysts with coaching, training, and assistance; monitor work quality and performance; provide input on and participate in performance evaluations. • Ensure friendly, comprehensive, accurate, and efficient service is provided in response to requests and inquiries. Auditing & Accounting • Analyze and reconcile complex financial transactions. • Update general ledger postings in the integrated financial system. • Research and assist in preparing accounting policies. • Analyze and prepare annual financial reports from the integrated accounting system. • Assist in the development and maintenance of the department's annual budget. • Analyze and Prepare Monthly Aszrstin-prepa nnanagement reports for division managers. { Formatted: Indent: Left: 0.25" No buffets or numlxdrq Job Cost System Fiscal Analyst — Public Works Page 1 Setup new projects in the job cost integrated accounting system. Maintain job area/general ledger cross reference controls. Accounts Payable • Monitor vendor contracts and annual supply bids to ensure compliance with state bid laws and county policies. • Monitor payments for compliance with county small works and small purchase roster policies. • Audit invoices for accuracy, job cost coding, budget coding, and compliance with county, state, and federal requirements a�np, • Audit invoices for accuracy, compliance with vendor contracts, and bids, • Update vendor , '!,; and notify management of pending completion dates on contracts • Audit and assignjob cost codes foraWnvoices as needed. R�lanee q. WIN and sales tax, file electFap 6 �epaFt w in state, prepare vewelhaF EaF qwaraeFl� payaneRt Oversee the balancing of use and sales tax as well as the electronic filing Payroll • Auditjob codes, earning codes .related to time entry. f1 Prepare mechanics shop 10139F Past.Ag hatehES: Prepare Monthly iournal entries and Post for benefits and in -direct CSA) costto jobs Prepare Monthly and YTD analysis for Payroll Inventory • SeEORE IF FROFIR Y GOR 0; gOOGS 6919i PFePaF@ meRTawy assee area general !eager eatF • Coordinate scheduled physical inventory counts. • Reconcile inventory physical counts to the county's financial inventory sub -system. • Assist with annual inventory bids. Asset Management - County Road Infrastructure, E.R. & R. Fund Property, and other Public Works property, plant, equipment and assets • Maintain the automated system for county assets: o Ensure the integrity of the software and data o Assign classes of each asset o Assign function of each department o Assign categoriesfor each assettype Fiscal Analyst — Public Works Page 2 [Formatted Font: Bold Formatted: Font: Bold o Establish equipment files • Track assets: additions, deletions, transfers, and surplus. • Maintain depreciation schedules for all assets in accordance with IRS. • Reconcile subsidiary ledgers to county financial accounting system. • Maintain equipment database including profit/loss records. �r , • Assist with development of equipment rental rates. • Reconcile and prepare annual financial statements pertaining to infrastructure. Accounts Receivable •-- : Monthly review Public Work's Accounts Receivable and coordinate any actions needed. s— • Prepare year-end report for outstanding receivables Grants and Programs • Assist in maintaining grant contract documents and supporting records. • Monitor grant costs for state and federal eligibility requirements. • Assist in preparing grant reimbursement requests from grant agencies. • Assist in Notifiigy County Treasurer of electronic payments. Purchasing and Contracting • Prepare Small Purchases and Small Works reports for the County Auditor. • Monitor project contract payments for bidding requirements. • Monitor public works project contract payments to ensure compliance with all state and federal requirements. • Assist with annual bidding and solicitations through the Small Purchases and Small Works procedures • Prepare bid evaluation spreadsheets. Other Duties • Prepare monthly general ledger postings for input into the integrated accounting system. • Perform other department -related duties as assigned by the supervisor. This job description is a summary of the primary functions and expectations for this position. Additional department -related duties may be assigned as required. MINIMUM QUALIFICATIONS: • High School diploma or GED certificate. • Bachelor's Degree in Accounting or related field OR four (4) years of experience as an accounting assistant or Fiscal Analyst—Public Works Page equivalent in public sector, AND 30 quarter hours of college level accounting. • Equivalent education/experience may substitute for qualifications stated above as determined by the Finance Manager and/or Public Works Director. • Current and valid driver's license. • A criminal history background check will be performed on qualified candidates. Convictions may preclude candidates from employment in certain circumstances. Factors such as relativity to the position, age and time of the offense, seriousness and nature of the violation, and rehabilitation will be taken into account. REQUIRED KNOWLEDGE, SKILLS AND ABILITIES • Ability to train, coach, and oversee activities of Fiscal Analysts; plan, schedule, and assign work; provide constructive criticism and handle conflicts that may arise; provide input on performance to management. • Experience with fund accounting. • Proficient in the use of modern office equipment. • Experience with procedures and practices applicable to accounting, Formatted: Font: Fold • l: statement, balance sheet and cash flow • Abilityto maintain confidentiality of all sensitive information and records; especially employee records. • Experienced in application of basic accounting functions. • Knowledge of Budgeting Accounting and Reporting System (BARS) as prescribed by the State Auditor and General Accepted Accounting Principles (GAAP). • Proficient in the use of computers, including Microsoft Outlook, Word, Excel and specialized software applications (QuickBooks): must have the ability to learn programs specific to the department and/or County quickly. • Ability to establish and maintain effective interpersonal relationships at all organizational levels and with the public. • Abilityto work effectively under pressure,meetdeadlines, and adjust quicklyto sudden changes and priorities. • Abilityto exercise independent judgment to assist in developing methods, techniques, and processes for evaluation of work assignments and obtaining quality results. • Abilityto produce accurate work in an open environment with frequent interruptions and constant office -level noise. PREFERRED QUALIFICATIONS: • Experience in cost accounting, inventory control, vehicle repair shop or governmental accounting. • Supervisory experience. Work is primarily performed in an office setting with occasional need to work in outdoor or non -office environments. Office space is limited and requires employees to work in close proximity of each other. The position requires the ability to sit for extended periods of time, stand, walk, ascend/descend stairs or small ladders/stepstoois, stoop, kneel, crouch, twist, grasp, and reach with arms and legs. Must have ability to lift, push,pull, or carry up to 25 lbs. and occasionally higher with assistance. Must be able to read printed materials and a computer screen, and have sufficient hearing and speech to communicate clearly via telephone and in person. Safety policies and procedures must be adhered to at all times. Work hours are standard with some weekend and evening work as needed. Vacation requests may not be granted during payroll processing dates. Reliable attendance and punctuality are required. Must be able to safely operate a motor vehicle in varied weather conditions and levels of daylight. Periodic travel will be required for ongoing training opportunities and attendance of meetings. Fiscal Analyst —Public Works Page 4 Reasonable accommodations maybe made to enable individuals with disabilities to perform the essential functions. PREPARED & REVIEWED BY: Must be completed with all revisions ofthe job description. Acopy will be returned to supervisor. Supervisor Name & Title Date HR Representative Name & Title Date EMPLOYEE ACKNOWLEDGEMENT: I understand the job duties and responsibilities contained within this position description and as described by the immediate supervisor. Date Fiscal Analyst —Public Works Page 5 EXHIBIT 3: PROPOSED ADDED DUTIES FOR THE ADMINISTRATIVE SUPERVISOR AND FINANCE MANAGER Page 5 of 5 Public Works "Work Session Staff Report", 2022 ADMINISTRATIVE SUPERVISOR ADDED DUTIES • Verify all contractor compliance with Labor and Industries Public Works contracting requirements. • Manage all construction contracts for required state and federal reporting requirements. • Ensure contract compliance for all federal aid work. • Prepare and manage all project documentation for state and federal audits. Provide project support services to construction inspectors as directed by the Construction Manager • Compile "as -constructed" documents and file in appropriate road or bridge file • Coordinate all contractor submittals for contract compliance with close coordination with the Construction Manager. FINANCE MANAGER ADDED DUTIES • Track any "force account' work. • Prepare monthly progress payments for Construction Manager review. • Coordinate with Finance on all required state and federal grant progress reports and lead the preparation of all required grant reports for Construction Manager review. • Perform project management duties as directed by the Construction Manager. KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: February 28, 2022 TOPIC: Ten -Year Transportation Asset Management Plan ACTION REQUESTED: Direct Staff LEAD STAFF: Mark R. Cook RECOMMENDATION: Direct staff prepare a public outreach campaign for 2022. BRIEFING SUMMARY: • Road Fund cash reserves will meet programmed expenses until 2024 • Public Works (PW) recently competed a ten-year asset management plan • Meeting programmed system improvements (next ten years) will require a Road Levy lift of $0.15/$1,000 of assessed value beyond 2024 • Public Works (PW) desires placing the proposed Road Levy lift on the 2022 fall election • PW believes a public outreach campaign is needed ahead of the election BACKGROUND: The 2018 twenty-year Transportation Plan evaluated PW financing needs for the first time in PW's operating history. Rough costing analysis supporting the twenty-year planning effort identified a necessary Road Levy lift of $0.98/$1,000 of assessed value. At the time, the Road Levy was $0.99/$1,000 of assessed value. This equates to a near doubling of the levy rate. State law caps Road Levy rates in the state at $2.25/$1,000. Currently, Kittitas County Road Levy is set at $1.108 per $1,000 of assessed value. The recently completed ten-year Transportation Asset Management Plan (EXHIBIT 1) identifies a necessary Road Fund Levy increase of $0.15/$1,000 of assessed value meeting financial demands through 2031. DISCUSSION: During 2021, staff gathered extensive cost data on PW infrastructure (roads, bridges, buildings, equipment, and personnel). A similar effort was focused on revenue streams. Engineering, planning, finance and maintenance all participated in the effort. Significant effort was expended identifying critical PW asset needs for the next ten years (2031). Unknowns such as motor vehicle fuel tax, along with the uncertainty of federal and state funding grants, drove staffs consideration of the inability maintaining the current asset inventory without significant supplemental revenue. Page 1 of 6 Public Works "Work Session Staff Report", 2022 Our current reality is insufficient financial capability maintaining current service levels of PW assets. PW is providing the Board of County Commissioners, and ultimately County rate payers, with two primary choices: maintain current service levels or reduce current assets. Reducing current assets allows the current Road Fund levy to minimally increase (at allowable levels in state law) over the next ten years without voting an increase. PW proposes divesting in local roadway maintenance as the means of generation necessary capital supporting primary transportation network needs. The proposed reduction in local roadway service level allows PW to maintain the primary road and bridge network until 2031. In the absence of supplemental revenue by 2031, it may become necessary to further divest of PW infrastructure assets. It is not reasonable to presume PW can continue to maintain existing service levels with current inflation demand at 6.4 percent annually with a one percent annual increase in Road Levy rate. Difficult decisions are pending for rate payers. A crushing urbanization rate is accelerating decline of PW infrastructure (increase usage) while revenue streams are fixed or in decline. It is easy for rate payers to look at PW financial performance these past seven years and ask "what's the problem"? The truth is that PW has been fortunate securing nearly $30 million in supplemental revenue in the past seven years — a performance that is not likely to continue. Key senior members of the management are slated to retire in the next two years. Less experienced staff will likely not have the experience in grant writing necessary to match the program's experience these past seven years resulting in reduced grant funding. Kittitas County is currently the 9th lowest Road Levy rate in the state. PW management successfully implemented "banked capacity' in the fund the past couple of years in an attempt to delay the pending decision being faced by rate payers. Our financial reserves supporting capital construction will run out in 2024. Only Chelan County operates with a lower Road Fund levy than all of our neighbors (EXHIBIT 2). Without the requested increase, PW will not keep up with expanding population and associated wear and tear on County roads and bridges. Lack of PW infrastructure investment since 2000 results in severe deferred maintenance demand on all assets. In 2021, PW completed construction of a new Upper County Maintenance facility replacing the World War II era facility. A similar problem exists with the Lower County Maintenance Facility. Rate Payers have not been asked to adequately fund their PW infrastructure until now. A lack of experienced professional PW management structure has allowed deferred maintenance to become systemic across the entire road and bridge network. While the thought of allowing local paved roads to return to gravel seems harsh, the reality is that in addition to the 24 load rated bridges since 2015 (EXHIBIT 3), we are facing numerous additional load ratings in the coming years. Some bridges will be closed forcing farm to market impacts in lower County. We continue being a community proud of our low taxation rates. PW has done its best mitigating fixed revenues with increasing wear and tear on PW infrastructure owing to unpresented population increase since the mid 90s. The time is coming for rate payers to define how their standard of living will suffer in the absence of investing in existing PW assets. PW is requesting that a Road Fund Levy increase of $0.15/$1,000 of assessed value be put to vote in fall of 2022. Supporting this election, PW is suggesting a public outreach campaign begin summer of 2022. It is important to get this issue before voters ahead of Page 2 of 6 Public Works "Work Session Staff Report", 2022 2024 when capital project reserves are exhausted. The rate of decline on the road and bridge network will not be linear. Decline will be exponential. When you fail to maintain your pickup engine — you wind up replacing it prematurely. PW assets are no different. Failing to take action now will result in larger costs the longer rate payers wait. FISCAL IMPACTS: Deferred investment in PW assets necessitates a Road Fund levy increase of $0.15/$1,000 of assessed value in the next several years. ATTACHMENTS: EXHIBIT 1: Ten-year TAMP (2022-2031) EXHIBIT 2: Road Fund levy rates statewide EXHIBIT 3: Current Bridge Load Ratings Page 3 of 6 Public Works "Work Session Staff Report", 2022 EXHIBIT 1: TEN-YEAR TAMP (2022-2031) Page 4 of 6 Public Works "Work Session Staff Report", 2022 Kittitas County Department of Public Works 2022 — 2032 Transportation Asset Management Plan Prepared on: January 20, 2022 Prepared by: Liz Remeto, Finance Manager Mark R. Cook, Public Works Director Executive Summary The Kittitas County Board of County Commissioners adopted Public Works' twenty-year Transportation Improvement Plan with Resolution 2018-165. The plan identifies a funding shortfall of approximately $100 million dollars financing necessary improvements to the County's aging Public Works infrastructure. The plan evaluates all funding mechanisms in state law and inventories strategies for funding the shortfall. In 2018, Public Works identified a significant Road Fund Levy increase of approximately 98 cents per thousand dollars of assessed property value as the necessary increase meeting identified plan improvements. The identified funding shortfall was approximately $50 million. Recognizing the likelihood of not raising the Road Levy by $0.98/$1,000; Public Works spent the bulk of 2021 re-evaluating critical infrastructure needs and completed an intensive review of existing programs and improvement strategies. The project costs estimate in 2018 were planning level estimates. The project estimates in the ten-year plan are significantly refined. A much more intensive engineering evaluation accompanies projects selected for the ten-year plan. This refined approach reduces the funding shortfall to approximately $10 million. This ten-year Transportation Asset Management Plan provides the County a specific path forward addressing critical transportation asset investments. The plan advances two key scenarios: PRESERVATION and REHABILITATION/REPLACEMENT. PRESERVATION assumes current revenue streams will continue with additional Road Fund Levy. This course of action maintains existing road maintenance service levels and replaces critical bridges and key road upgrades for the next ten years. The cost of this service level is estimated to require an increase of the Road Fund levy of $0.15/$1,000 of assessed value. REHABILITATION/REPLACEMENT allows for the existing road and bridge network to remain but does not fund critical bridge replacements nor support significant road network upgrades. Currently, the Road Levy is $1.04/$1,000 of assessed property value. Management will have the option to divest from Public Works assets (roads, bridges, and facilities) creating fund savings that will then go in a prioritized fashion to keeping a backbone system in place. This service level necessitates allowing the local roadway network to decline in order to preserve funding for more important routes on the public roadway system. By divesting from local road maintenance, the savings will then be applied to prioritized bridge replacements and key road upgrades. The longer the County delays acting on a Road Levy increase, the greater the impact from deferred maintenance and the larger the decline in public works infrastructure leading to increased costs. Current cash reserves will carry the PRESERVATION program another two years — after that — management will need to begin divesting of Public Works assets. Kittitas County Department of Public Works 2022-2032 Transportation Asset Management Plan Janaury 2022: Page 2 TABLE OF CONTENTS CHAPTER ONE: PURPOSE...................................................................................4 CHAPTER TWO: OBJECTIVES.............................................................................4 CHAPTER THREE: LEVELS OF SERVICE..........................................................5 CHAPTER FOUR: PLAN METHODOLOGY........................................................6 CHAPTER FIVE: EXPENSES.................................................................................6 ExpenseForecasting...............................................................................................6 Expenses.................................................................................................................7 CHAPTER SIX: REVENUES..................................................................................8 Road Fund Levy 2011 to 2021...............................................................................8 TAMP Revenue Forecast Assumptions..................................................................8 CHAPTER SEVEN: LEVELS OF SERVICE AND RISK ......................................8 APPENDIX 1: 2018 TAMP FINANCIAL PLAN.................................................10 APPENDIX 2: EXPENDITURE DETAIL INCLUDING PROJECT EXPENSES ..................................................................................................................................11 APPENDIX 3: ROAD LEVY HISTORIC DATA.................................................12 APPENDIX 4: REVENUE FORECAST...............................................................13 Kittitas County Department of Public Works 2022-2032 Transportation Asset Management Plan Janaury 2022: Page 3 CHAPTER ONE: PURPOSE The Department of Public Works (PW) created the department's first Transportation Asset Management Plan (TAMP) in 2018. Previous "long-range" transportation plans did not contemplate the necessity to financially plan for long term management of transportation assets. The 2018 plan was adopted by the Board of County Commissioners with Resolution 2018-165. The 2018 document provides a financial plan for project implementation that was produced by evaluating all current transportation funding mechanisms in state law against a list of necessary twenty-year transportation improvement projects. The adopted plan advances five goals for implementation and puts in place project review criteria that the department utilizes annually when producing the annual and six-year construction programs. The plan can be found on our website at: https://www co.kittitas wa us/uploads/documents/public-works/consti-uction/2020-20-Year Transportation-Plan.pdf. A funding shortfall of approximately $100,000,000 dictates significant community investment over the twenty-year planning period. At the heart of plan funding is an anticipated Road Fund levy tax rate increase of approximately 85 percent from 2018 levels. The 2018 TAMP does not provide alternatives to rate payers, other than the financial plan addressing the list of network deficiencies contained in the twenty-year project listing. PW is updating the 2018 planning effort and reducing the study period from twenty years to ten years. This focused effort allows for greater accuracy in predictive analysis and offers a more paced approach to financing asset management. A copy of the 2018 TAMP financial plan appears as APPENDIX 1 to this plan. CHAPTER TWO: OBJECTIVES The Department of Public Works is providing the Board of County Commissioners and Kittitas County Road Fund rate payers a frank discussion about the current state of Public Works' infrastructure. The recent (ongoing) global pandemic has strained financial resources for many public works organizations. Unemployment, the rising cost of living in Kittitas County and rapid urbanization of rural Kittitas County is stressing the Department's ability to adequately maintain transportation assets at the current level of funding. While the Department has been successful securing supplemental finances allowing significant bridge replacements the past several years, that history is unlikely to continue much further into the future. The Department desires meeting critical asset management essentials while minimally raising the Road Levy tax. This 10 -year TAMP provides the rationale for supporting PRESERVATION efforts and the reality of moving to REHABILITATION/REPLACEMENT of critical transportation infrastructure. Maintaining income sources at current levels will likely necessitate a reduction of overall assets in Public Works inventory. Said another way, it will become necessary to close roads and bridges as labor and material costs escalate in the absence of additional tax revenue. Finding the balance that rate payers are willing to pay against ease of traversing the County, will require definition in relatively short order as the amount of deferred maintenance on County roads and bridges is beginning to impact PW cash reserves. The time is approaching for difficult community decisions regarding the operation of the County's transportation system. Kittitas County Department of Public Works 2022-2032 Transportation Asset Management Plan Janaury 2022: Page 4 CHAPTER THREE: LEVELS OF SERVICE Recognizing the significance of voting a near doubling of Road Fund levy from property tax increases, PW has prepared this ten-year TAMP. This ten-year plan is expected to set transportation service levels and associated expectations for service, at reduced financial impact as forecast in the twenty-year plan. Maintaining current levels of service (2021) with associated revenue increases (PRESERVATION) and reducing assets consistent with no levy increase (REHABILITATION/REPLACEMENT) - provide the two options for funding consideration. The ten-year plan evaluates bridge overall sufficiency ratings and specifically looks at deck element ratings to forecast probable maintenance, PRESERVATION, and replacement costing. Roads are now evaluated for PRESERVATION or REHABILITATION/REPLACEMENT. The two levels of asset condition are directly related to cost. Typically, preserving an asset is the most cost-effective approach followed by REHABILITATION/REPLACEMENT. The often -used analogy is changing your oil in your car or buying a new motor. What is critical to recognize is that failure in meeting PRESERVATION targets for roads and bridges results in exponential increases in costs as the asset tend towards replacement. Federal and State transportation guidelines dictate closure actions of bridges by local government — directly tied to asset decline. Any level of service discussion necessitates assigning priorities for asset protection. Public transportation road networks are assigned significance using the Federal Highway Administration designation system: Federal Functional Classification. Roads are identified as increasingly important based on frequency of use: travel demand and associated average daily traffic. Rural systems (county) are assigned in order of importance to travelers as: Local Access (neighborhood roads), Minor Collectors (multiple neighborhoods), Major Collectors (regional areas) and Minor Arterials (multiple areas). Specific road examples of classification are Cooke Canyon Road (Local), Cabin Creek Road (Minor Collector), and Cove Road (Major Collector). The County has no Minor Arterials on the existing County Road network (not surprising given current County population). The Public Works Department maintains a "County Road Log" of every road owned or maintained by the -County. The log is updated annually reflecting changes in average daily traffic and/or new road construction. A robust traffic counting system enables the annual amendment. What we do not have is a community driven system for prioritizing local roadways for preservation. Pursuing a level of service REHABILITATION/REPLACEMENT necessitates prioritizing local roadways for PRESERVATION. Implementing the REHABILITATION/REPLACEMENT service level will require a reduction of local roadway maintenance. This plan does not address this future need, should County residents elect to adopt a declining level of service on its road network moving away from PRESERVATION towards REHABILITATION/REPLACEMENT. Kittitas County Department of Public Works 2022-2032 Transportation Asset Management Plan Janaury 2022: Page 5 CHAPTER FOUR: PLAN METHODOLOGY PW Finance updated historic cost records from the 2018 effort. The cost look back includes years 2011 — 2020. Annual budget line items (BARS Codes) were queried and compiled by each year to inform cost treads. A companion effort was conducted for all revenue sources available in state law in 2018. PW Equipment, Rental and Replacement vehicles are evaluated for probable replacement during the ten-year analysis period (2022 — 2032). Bridge files are evaluated for two classes of county owned bridges: National Bridge Inventory System (NBIS) bridges (over twenty feet in length) and non-NBIS bridges (under twenty feet in length). Bridge sufficiency ratings (an indicator of bridge health) were reviewed and any raring below 50 was noted. This rating system is prescribed by the federal government and used by the County in annual bridge evaluations. In addition, bridge files were evaluated for bridge deck coding below (5) five (an indicator of the degree of deck deterioration — again as prescribed by the National Bridge Inspection System). Roads are evaluated based on current PRESERVATION standards (chip sealed every seven years). An assumed service level of today's current standard utilizes the existing PRESERVATION standard for cost forecasting (70 miles of chip seal a year). As an alternative to continuing the service level of PRESERVATION, PW evaluated local roads on the existing network for removal with the understanding that gravel road maintenance costs will likely increase in the final three years of the ten-year TAMP. The inventory reduction is an iterative process matching available revenue with cost forecast during the evaluation period (2022 — 2032). The reduction is necessary for allowing replacement of critical assets related to road classification and/or critical bridge crossing. Reducing maintenance of local roadways over a ten-year period is forecast to retain approximately $7.8 million in Road Fund reserves. It is anticipated that the Board of County Commissioners will determine the final list of asset reductions for both bridge, road, and equipment necessary to provide balanced PW budgets for the next ten years of operation assuming an adoption of level of service REHABILITATION/REPLACEMENT. CHAPTER FIVE: EXPENSES Expense Forecasting Kittitas County PW is a certified Washington State Department of Transportation (WSDOT) local program agency. This certification allows PW to manage federal aid projects without reliance on the state. WSDOT estimates bridge replacement projects by assigning a value to the square footage of the bridge structure. PW bid and purchasing history indicates that a value of $330 per square foot is a reasonable current value. This price does not include all project costs. Including all project costs, our cost history indicates an average square footage price of $930 is more appropriate. For this ten-year plan, we utilize the $930 per square foot value to best forecast impacts to rate payers. Oil prices have been particularly volatile during the 2020-2021 pandemic. Adding to the challenge of forecasting crude oil prices for a ten-year period, is the reality of supply and demand. The Kittitas County Department of Public Works 2022-2032 Transportation Asset Management Plan Janaury 2022: Page 6 electrification of the automobile industry is expected to slow the demand on crude oil for fuel. While reductions are anticipated in the passenger vehicle arena, transportation of goods across the transportation system is expected to increase demand as electrification of heavy haul trucks is expected to lag behind passenger vehicles. Given the uncertainty of ten -years of crude oil demand, this ten-year TAMP averages the cost per mile of bituminous surface treatment (chip seal) over the previous ten years and applies the cost at an annual increase of two percent for the planning period. Labor costs are anticipated to continue increasing during the study period. Historically, the County has granted payroll increases in the two to three percent range allowing employees to keep up with the cost of inflation. 2021 has seen the rise of inflation into the six percent range for fiscal year 2021. Best available financial forecasting suggests a moderation of inflation in 2022 returning to pre-COVID 19 levels in 2023. This plan takes 2022 payroll and increases at a rate of two percent per year over the study period. Equipment costs are highly variable compared from one five-year period to the next. PW manages the heavy construction fleet by placing new equipment into an Equipment Rental and Replacement fund. We essentially rent our equipment back as we use it depositing the rental revenue into a replacement account. Our PRESERVATION practices on heavy equipment allow us to keep older equipment in service well beyond an assumed industry standard life term. Owing to our maintenance practice, equipment costs for the study period are specific to individual equipment that we expect to replace during the study period. Expenses Expenses are derived from the following sources: • Bridge inspection records • Road maintenance records • Equipment costs • Facility costs • Labor costs Detailed costing analysis (and associated project expenses) are provided as an APPENDIX 2 for line -item review. In summary, the following ten-year expenditures by category of expense are summarized below in Table 1. Table 1: 10 -year Forecast Expenditures by Expense Category Period PRESERVATION Maintenance Admin/Operations Other (Equipment capital expense) 2022-2031 1 $23,047,891 $48,685,986 $21,844,282 1 $2,189,944 Combined planning period (2022 — 203 1) expenditures total: $95,768,103. Kittitas County Department of Public Works 2022-2032 Transportation Asset Management Plan Janaury 2022: Page 7 CHAPTER SIX: REVENUES Road Fund Levy 2011 to 2021 The Road Fund was significantly impacted financially from 2015 to 2019 owing to Levy Shifts authorized by the Board of County Commissioners. From 2013 through 2019, $5.6 million dollars were shifted out of the Road Fund and utilized for other purposes. In 2020, Public Works Administration successfully restored (utilizing banked capacity in the Road Fund) significant funding beginning in 2020 and continuing in 2021. This action is expected to reduce future Levy lift requests meeting selected levels of service. Road Levy revenue history (2012 — 2021) appears as APPENDIX 3 to this plan. TAMP Revenue Forecast Assumptions Local government in the State of Washington may increase tax revenue annually with a cap at one percent per year without taking a larger increase to a vote by county residents. This ten-year TAMP uses 2022 Road Fund Levy revenue and increases it by one percent per year for each year of the study period. 2021 — 2031 Revenue Forecasts appear as APPENDIX 4 of this plan. PW has been extremely successful generating supplemental funding for asset replacement during the previous six years. This ten-year TAMP utilizes our previous ten-year revenue history in supplemental funding and imposes professional judgement to forecast likely supplemental funding during the study period. This forecast is subjective but not without performance experience and incorporates informed decision making based on that experience. The risk of over predicting supplemental revenue, is that PW fails to meet PRESERVATION funding levels and additional REHABILITATION costs require assignment to the plan — reducing service levels. Individual funding sources have been evaluated for continued program performance during the study period. While much discussion has been recently occurring around infrastructure funding, the reality for local government is that a minimal amount of federal spending will make it to the local level. CHAPTER SEVEN: LEVELS OF SERVICE AND RISK 10 Year Service Levels — PRESERVATION versus REHABILITATION/REPLACEMENT Currently, Public Works utilizes pavement management techniques that essentially places a surface wearing course on all paved roads every seven years. This "chip seat' practice results in resurfacing of the roadway wearing course of approximately 70 miles of roadway every year. This is a standard pavement preservation technique utilized by Public Works organizations across the country. Prior to surfacing, the selected roadways are "crack sealed" and "pre -leveled" to reduce roadbed and road subgrade failure. These business practices are consistent with PRESERVATION of the road asset. Maintenance of County roads also includes additional PRESERVATION efforts such as vegetation and drainage maintenance. These activities manage vegetation growth and Kittitas County Department of Public Works 2022-2032 Transportation Asset Management Plan Janaury 2022: Page 8 sedimentation in County roadside ditches. These combined efforts allow PW to keep the current paved roadway network from slipping back to gravel (REHABILITATION/REPLACEMENT). Decreasing PRESERVATION efforts will annually place more roads into "rehabilitation" status and ultimate decline leads to "replacement" status. PRESERVATION is essentially maintaining the status quo. It is important to note, that this ten-year TAMP contemplates very little capacity building of new infrastructure and focuses on maintaining what we have currently on the road and bridge network. For the ten-year TAMP the PRESERVATION service level presumes all bridges remain in asset inventory. PRESERVATION will necessitate a voter lift of the Road Levy. Insufficient funding of PRESERVATION efforts necessitates divesting of assets. In the case of Public Works' infrastructure, this means closing bridges and allowing paved roads to deteriorate back to gravel (REHABILITATION/REPLACEMENT). As a means of controlling the loss of inventory, Public Works recommends the public identify a critical roadway network that manages the inevitable decline of assets and reduction of paved road inventory — in the absence of additional revenue. The reduction of road inventory scenario maintains functional class prioritization of arterials and collectors. Local access is assumed to be expendable as a paved road asset. Network wide roadway service levels will decrease as efforts are made to stabilize the prioritized paved road network. As decisions are made to abandon duplicative roads (north -south and east -west), associated bridges will drop off the County's asset inventory associated with those abandoned roads. Bridges represent the largest one-time expenditures to the Road Fund. The asset reduction scenario (REHABILITATION/REPLACEMENT) removes those bridges associated with local roadways slated to return to gravel. Local road pavement reductions generate the retained tax funding needed to preserve the priority road network of arterials and collector roadways. Kittitas County Department of Public Works 2022-2032 Transportation Asset Management Plan Janaury 2022: Page 9 APPENDIX 1: 2018 TAMP FINANCIAL PLAN Kittitas County Department of Public Works 2022-2032 Transportation Asset Management Plan Janaury 2022: Page 10 20 -Year TAMP (May 2018) I oiai Mevenue 206,512,000 Portion of Total Revenue Restricted to Construction (Grant Related) 76,700,400 Net Revenues Available for Operating, Maintenance & Preservation Costs 129,811,600 Administration and Overhead Facility Operations Other Operations Planning Engineering Parks and Trails Maintenance 20,412,000 1,688,000 31,637,000 4,029,000 15,565,000 133,000 Total Operating Expenditures 73,464,000 Maintenance and Preservation Expenditures 97,000,000 Total Operating, Maintenance & Preservation Costs 170,464,000 Projected Operating Expenditure Deficit over 20 years (40,652,400) Original 20 Year Capital Project list based on need Total Revenue Restricted to Construction (Grant Related) 76,700,400 Total Estimated Expenditures based on 20 year Capital Project list 127,000,000 Projected Capital Needs Deficit over 20 years (50,299,600) APPENDIX 2: EXPENDITURE DETAIL INCLUDING PROJECT EXPENSES Kittitas County Department of Public Works 2022-2032 Transportation Asset Management Plan Janaury 2022: Page 11 FUTURE PROGRAMMATIC EXPENDITURES, 2022-2031 Growth Factor: 2% YEAR 2022 PRESERVATION 2,104,883.92 MAINTENANCE ADMIN/OPERATIONS 4,446,322.15 1,994,962.44 OTHER 200,000.00 CONSTRUCTION 7,386,000.00 TOTAL 16,132,168.51 Revenue 18,091,215.04 2023 2,146,981.60 4,535,248.59 2,034,861.69 204,000.00 6,521,000.00 15,442,091.88 13,389,843.69 2024 2,189,921.23 4,625,953.56 2,075,558.92 208,080.00 6,884,000.00 15,983,513.72 15,369,153.12 2025 2,233,719.66 4,718,472.63 2,117,070.10 212,241.60 4,350,000.00 13,631,503.99 14,355,405.06 2026 2,278,394.05 4,812,842.09 2,159,411.50 216,486.43 7,754,000.00 17,221,134.07 13,923,662.13 2027 2,323,961.93 4,909,098.93 2,202,599.73 220,816.16 10,798,000.00 20,454,476.76 14,366,987.83 2028 2,370,441.17 5,007,280.91 2,246,651.73 225,232.48 4,612,000.00 14,461,606.29 15,685,446.57 2029 2,417,850.00 5,107,426.52 2,291,584.76 229,737.13 9,298,000.00 19,344,598.42 15,269,103.67 2030 2,466,207.00 5,209,575.05 2,337,416.46 234,331.88 3,840,000.00 14,087,530.38 15,748,025.40 2031 TOTAL 2,515,531.14 23,047,891.70 5,313,766.56 48,685,986.99 2,384,164.79 21,844,282.13 239,018.51 2,189,944.20 7,000,000.00 68,443,000.00 17,452,480.99 164,211,105.02 17,082,278.95 153,281,121.44 14.U% 29.6% 13.3% 1.3% 41.7% 10,929,983.58 needed over 10 yrs 1,092,998.36 Per Year 10 -Year TAMP (Jan 2022) Total Revenue ,« oo, ,o, Portion of Total Revenue Restricted to Construction (Grant Related) 29.204.470 Net Revenues Available for Operating, Maintenance & Preservation Costs 124,076,651 Administration and Overhead Preservation Maintenance Other including Capital purchases (Equipment) 21,844,282 23,047,891 48,685,986 2,189,944 Total Operating, Maintenance & Preservation Costs 95,768,103 Projected Operating Expenditure Surplus over 10 years 28,308,548 30 year Capital Project list based on need Total Revenue Restricted to Construction (Grant Related) 29,204,470 Total Estimated Expenditures based on 10 year Capital Project list 68,443,000 Projected Capital Needs Deficit over 10 years (39,238,530) Projected Total Deficit (Operating and Capital) over 30 years (10,929,982) TEN YEAR PROJECT LIST Project Cost $on tip Est. Date PE Cr4 On TIP project Revenue Outlet Total Roadway Investments Bender Road- Widening and Pedestrian Improvements 3,30D,000 2,100,000 251 26Yes-2025 RC1585 2,100 Sanders Road Widening and Pedestrian Improvements 2,500,000 3,050,000 261 27 Yes - 2025 3,050 Manastash Road Creek Bank Stabilization and Snow Park Imp 1,468,851 1,578,000 22 Yes -2021 RC3573 FLAP $1,333M 1,578 Denmark Road Safety Improvements mp.5-3.08 2,500,000 2,980,000 Yes -2025 Badger Ph2 RAP 2,980 Denmark Road Safety Improvements mp 3.084.35 1,750,000 471,000 27 Yes -2025 1,750 Payne Road Safety Improvements mp 0 t mp 2,500,000 1,625,000 Yes -2022 Badger Phi 1,625 Dodge Road Safety Improvements mp 0 to mp 2,500,000 1,625,000 Yes -2022 Badger Phl 1,625 Bowers Road Extension 2,450,000 2,450,000 24 25 Yes -2021 K1505 2,450 Kittitas Highway &No 6 Road- signalized intersection 750,000 4th Parallel Road at Gravity Ditch 2026 No 750 Vantage Highway & Na 6 Road - signalized intersection 750,000 1,250 2026 No 750 I-90 Widening Easton to Cie Elum 5001000 100,000 Ves-2022 500 Hungry Junction Road widening 5,000,000 4,351,000 23 24 Ves-2023 RC2093 RAP 4,351 Intersection and Corridor Safety Improvements 416,000 416,000 22 23Yes-2022 IRC2196 IHSIP 1 416 Brick Mill Road Bridge over Naneum Creek mp.10 East Naneu 1,500,000 2028 1 1,500 Vantage Highway at Cascade Canal 2,500,000 1,650,000 Yes -2022 RC2292 ARP 1,650 Reecer Creek Bridge over Ellensburg Water Company canal 2,500,000 Bridge Rail Retrofits for short span bridges 2028 No 2,500 Cooke Canyon Road at Highline Canal 1,750,000 3,664 2029 No 1,750 Kittitas Highway at Cascade Canal 1,7500000 2029 No 1,750 Tjossem at Caribou Creek 1,250,000 27 Yes -202] 2030 No 1,250 S Ferguson Road at Cooke Creek 1,250,000 2030 No 1,250 4th Parallel Road at Gravity Ditch 10250,000 2031 No 1,250 Hungrylunction at Cascade Canal 1,250,000 731,4342028 2031 No 1,250 Lyon Road at Wilson Creek 1,250,000 Lake Road- Culvert Replacement mp 2.5 2032 No 185 Teanaway Road at Dickey Creek 1,500,000 1,000,000 Yellowstone Road Culvert Replacement mp.70 Yes -2022 $500spent2021 1,000 Cove Road over Manastash Creek mp.37 2,000,000 STBG? 2028 No 2,000 N. Thorp Highway over Mill Ditch mp.51 2,000,000 26 27 Yes -2023 2028 No 2,000 liberty Rtl Swauk Creek Bridge 2,9470000 1 2,9470000 2022 IYes-2022 1 IFIAP 52463k 1 2947 Necessary Maintenance/Rehabilitation Thorp Cemetery Road -inadequate railing and curves that nee 585,150E3,664,000 2028 No 585 Teanaway Road fill stabilization at HWY 97 1,500,0002025 No 1,500 Bridge Rail Retrofits for short span bridges 305000000 2031 No HSIP? 3,664 Tjossem Road over Wilson Creek added girder 1,876,000202fi No 1,876 Airport Road Cie Elum- replace irrigation culverts crossing ro 1,500,000 27 Yes -202] 1,500 MCManamy Road Bridge over Dry Creek mp.21 SR 97 250,0002032 No 38 Lambert Road Bridge mp.67-7.00 maintenance 500,0002028 No 500 Reecer Creek Road & Robbins Road Intersection 731,4342028 No RC1587 local 731Kachess Lake Road- Culvert Replacement mp 2.5 1,000,000 22 Yes -2021 moving to 2023? 1,329 Yellowstone Road Culvert Replacement mp.70 2,766,387 25 26 Yes -2022 RC2092 STBG? 860 Parke Creek Road turnaround 250,000 1,100,000 26 27 Yes -2023 1,100 Pheasant Lane Road turnaround 2500000 15,000 27 Yes -2027 250 Airport Road sidewalk repair120,000 65,000 22 22 Yes -2022 65 Micheletto Road improvements 120,000 40,000 22 22 Yes -2022 40 Bar 14 Road turnaround 120,0001 200,000 23 24Yes-2023 200 N. Thorp Highway Bridge over Yakima River - Joint Repair/Pair3,000,000 1,951,000 22Yes-2022 1951 APPENDIX 3: ROAD LEVY HISTORIC DATA Kittitas County Department of Public Works 2022-2032 Transportation Asset Management Plan Janaury 2022: Page 12 ROAD FUND LEVY DATA FROM 2012 TO 2022 Estimated Dlv. 0 11/19/2021 7,827,%9.40 Tax Increase 5.07% 2021 6,722,411,723 Road D.003078570 7,250,591.61 Valuation Increase 9.62% 1.08 perthousand General.94 perthousand Div. 0.000029751 199,998.47 7,450,590.08 Taxlncreace 17.89% 2020 6,132,189,532 Road 0.000994732 6,099,885.16 Valuation Increase 17.04% 0.99 perthousand Genera1.99 per thousand Div. 0.000035876 219,998.43 6,319,883.59 Tax Increase 38.53% 2019 5,239,366,479 Road 0.000828730 4,343,020.18 Valuation Increase 16.404 0.83 perthousand Gene.1.22 perthousand Div. 0.000041989 219,995.76 1.02 beforeshift Shift of Value to General Fund 4,562,035.94 Tax Increase 4.20% Net Shift $1,000,000 2018 4,501,291,504 Road 0.000920225 4,170,211.31 Valuation Increase 2.68% 0.93 perthousand General 1.35 perthousand Div. 0.000044431 199,996.88 1.15 before shift Shift of Value to General Fund 4,378,208.19 Tax increase 4.84% Net Shift $1,000,000 2017 4,383,738,708 Road 0.000907016 3,976,121.15 Valuation increase 1.24% 0.91 perthousand General 1.40 perthousand Div. 0.000045623 199,999.31 1.14 before shift Shift of Value to General Fund 4,176,120AG Tax Increase 3.21% Net Shift$1,000,m 2016 4,329,898,002 Road 0.000888275 3,846,140.15 Valuation Increase 5.02% 0.89 perthousand General 1,37 per thousand Div. 0.000046190 199,997.99 1.12 before shift Shift of Value to General Fund 4,046,138.14 Tax Increase 3.88% Net Sldk $1,000,000 2015 4,123,007,160 Road 0.000896227 3,695,186.19 Valuation Increase 3.28% 0.90 perthousand General 1.39 perthousand Div. 0.00048509 200,005.31 1.14 before shift Shift of Value to General Fund 3,895,191.49 Tax Increase -20.44% Net Wit$1,000,G00 2014 3,992,232,185 Road 0.001176264 4,695,919.00 Valuation Increase -6.30% 1.18 perthousand General 1.21 perthousand Div. 0.000050097 199,998.86 4,895,91795 Tax Increase 2.72% 2013 4,260,687,630 Road 0.001071687 4,566,123.54 Valuation Increase -12.24% 1.07 perthousand General 1.12 per thousand Div. 0.000046940 199,996.68 1.14 before shift Shift of Value to General Fund 4,766,120.22 Tax Increase 9.57% Net Shift $G1,00,001) 2012 4,855,095,807 Road 0.000854770 4,149,990.24 0.85 perthousand General 1.W perthousand Div. 0.000041193 199,995.96 0.91 before shift Shift of Value to General Fund 4,349,%6.20 Net AN $300,000 APPENDIX 4: REVENUE FORECAST Kittitas County Department of Public Works 2022-2032 Transportation Asset Management Plan Janaury 2022: Page 13 FUTURE YROSMMMATKREVENUE,3032-3031 ¢wwnhmo is EXHIBIT 2: ROAD FUND LEVY RATES STATEWIDE Page 5 of 6 Public Works "Work Session Staff Report", 2022 2021 Road Fund 2021 Road Fund County Levy Rate County Levy Rate Adams $ 1.309 San Juan $ 0.602 Asotin $ 0.990 Island $ 0.651 Benton $ 1.338 Wahkiakum $ 0.667 Chelan $ 1.058 Franklin $ 0.818 Clallam $ 1.113 Asotin $ 0.990 Clark $ 1.299 Snohomish $ 1.054 Columbia $ 2.211 Chelan $ 1.058 Cowlitz $ 1.285 Jefferson $ 1.063 Douglas $ 1.480 Kittitas $ 1.108 Ferry $ 2.250 Thurston $ 1.108 Franklin $ 0.818 Clallam $ 1.113 Garfield $ 1.898 Kitsap $ 1.155 Grant $ 1.702 Mason $ 1.160 Grays Harbor $ 1.893 Pacific $ 1.179 Island $ 0.651 Whatcom $ 1.191 Jefferson $ 1.063 Yakima $ 1.212 King $ 1.826 Cowlitz $ 1.285 Kitsap $ 1.155 Skamania $ 1.285 Kittitas $ 1.108 Clark $ 1.299 Klicitat $ 1.591 Adams $ 1.309 Lewis $ 1.720 Spokane $ 1.309 Lincoln $ 1.728 Pierce $ 1.310 Mason $ 1.160 Benton $ 1.338 Okanogan $ 1.412 Pend Oreille $ 1.342 Pacific $ 1.179 Okanogan $ 1.412 Pend Oreille $ 1.342 Douglas $ 1.480 Pierce $ 1.310 Skagit $ 1.532 San Juan $ 0.602 Stevens $ 1.556 Skagit $ 1.532 Klicitat $ 1.591 Skamania $ 1.285 Grant $ 1.702 Snohomish $ 1.054 Lewis $ 1.720 Spokane $ 1.309 Lincoln $ 1.728 Stevens $ 1.556 King $ 1.826 Thurston $ 1.108 Grays Harbor $ 1.893 Wahkiakum $ 0.667 Garfield $ 1.898 Walla Walla $ 1.984 Walla Walla $ 1.984 Whatcom $ 1.191 Columbia $ 2.211 Whitman $ 2.245 Whitman $ 2.245 Yakima $ 1.212 Ferry $ 2.250 EXHIBIT 3: CURRENT BRIDGE LOAD RATINGS Page 6 of 6 Public Works "Work Session Staff Report", 2022 \/ { { Lo §)))}}})})))/}))}})}))}) 4;; 1- a»; a m 2®m }9:52§5§535Rlz5!!§/f5=§5K, 2 \\\�\);f\�}\\;;;!/)k\]\)/\} \\1\2})�)\\/{))t§! -