HomeMy WebLinkAboutResolution_Prospectus_NThorpHwyYakimaRiverBridgeKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: March 1, 2022 ACTION REQUESTED: Request to Approve a Resolution Authorizing the Chair's signature on the Local Agency Federal Aid Project Prospectus for the North Thorp Highway -Yakima River Bridge CRP 302- 20. BACKGROUND: On December 30, 2019, Kittitas County Public Works was advised by Washington State Department of Transportation (WSDOT) that the North Thorp Highway -Yakima River Bridge Project was selected to receive funding through the Local Bridge Program. This project requires a 13.5 (13.5%) percent match in local funds for the Construction phase if it is not obligated for construction by December 2022. This project will be eligible for one hundred percent (100%) federal funding for eligible costs if it is obligated ahead of the December 2022 deadline. The Board approved contract award to KPFF, Inc. for design and environmental permitting May 4, 2021. The design and environmental permitting are nearing completion. This Project Prospectus covers the Federal Funding for the construction phase and requires approval by WSDOT Local Programs prior to solicitation for bids. Public Works is preparing to solicit for construction in Spring 2022. This requires the Local Agency Federal Aid Project Prospectus to be signed and approved by the Chair of the BOCC prior to submitting to WSDOT for approval. INTERACTION: Public Works RECOMMENDATION: Approve the Resolution Authorizing the Chair's signature on the Local Agency Federal Aid Project Prospectus for the North Thorp Highway -Yakima River Bridge CRP 302-20. HANDLING: Return two (2) originals to Public Works ATTACHMENTS: Resolution, Local Agency Federal Aid Project Prospectus LEAD STAFF: Mark Cook, Director BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2022 - AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL AID PROJECT PROSPECTUS CONSTRUCTION PHASE FOR NORTH THORP HIGHWAY-YAKIMA RIVER BRIDGE CRP 302-20. WHEREAS: The North Thorp Highway -Yakima River Bridge was awarded Federal Funding that will be used for preventative maintenance to extend the life of the structure; and WHEREAS: The existing paint system has failed throughout much of the bridge truss's bottom chord, floor beams, stringers, and bearings. Joint repairs will include strip seals at the ends of the truss and silicon sealant at the floor beams. The truss portal members that have been damaged by traffic impacts will be repaired by heat straightening or replacing members. The concrete spalls at the piers will be repaired and the bridge will be painted; and WHEREAS: In preparation to advertise the project for construction in the Spring of 2022 Public Works is requesting the Washington State Department of Transportation to release the Federal Funds for construction; and WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair acknowledging the project has been reviewed and is consistent with the agency's comprehensive plan for community development; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby approve the Chair's signature on the Local Agency Federal Aid Project Prospectus for North Thorp Highway -Yakima River Bridge CRP 302-20. DATED on this I" day of March 2022, at Ellensburg, Washington. Attest: ❑ Clerk of the Board- Julie Kjorsvik BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Laura Osiadacz, Chairman Cory Wright, Vice -Chairman ❑ Deputy Clerk of the Board- Mandy Buchholz Brett Wachsmith, Commissioner Washington State �AP Department of Transportation Local Agency Federal Aid Project Prospectus „0,T mini iry-ivi Pagel Revised 04/2015 Previous Editions Obsolete Prefix Route ( ) Date 2/1/2022 Federal Aid Project Number BHS J191 (� 004 DUNS Number 01-020-2547 Local Agency Project Number CRP 302-20 / RC2092-HP r WSDOT 1 ` Use Only J Federal Employer Tax ID Number 91-601349 Agency Kittitas County Public Works CAAgency Yes [:]No Federal Program Title Z20.205 ❑Other Project Title N. Thorp Hwy -Yakima River Bridge Start Latitude N 47 6'3.34" End Latitude N47 6'3.34" Start Longitude W 120 42'8.48" End Longitude W 120 42'8.48" Project Termini From -To 9.56 9.56 Nearest City Name Ellensburg Project Zip Code (+4) 98946-9561 Begin Mile Post 9.56 End Mile Post 9.56 Length of Project 0.00 Award Type ❑✓ Loral ❑ Local Forces ❑ State ❑ Railroad Route ID Begin Mile Point 9.56 End Mile Point City Number County Number 19 County Name Kittitas WSDOT Region South Central Region Legislative District(s) 13 Congressional District(s) 8 Urb an Area Number Phase Total Estimated Cost Nearest Hundred Dollar Local Agency Funding Nearest Hundred Dollar Federal Funds Nearest Hundred Dollar Phase Start Date Month Year P. E. 387,500.00 387,500.00 10/2020 WIN Const. 1,880,100.00 1,880,100.00 04/2022 Total 2,267,600.00 2,267,600.00 Description of Existing Facility (Existing Design and Present Condition) Roadway Width 20' Number of Lanes 2 Paint system failure, pack rust, failing rubber joints, truss portal damage and concrete spalling of piers. Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary) see attached Local Agency Contact Person Darren Case Title Construction Manager Phone 509-962-7019 Mailing Address 411 North Ruby, Suite 1 City Ellensburg State WA Zip Code 98926 Project Prospectus By�'— Approving Authority Title County Engineer Date��Fe� „0,T mini iry-ivi Pagel Revised 04/2015 Previous Editions Obsolete Agency Project Title Date Kittitas County Public Works N. Thorp Hwy -Yakima River Bridge 2/1/2022 Type of Proposed Work Project Type (Check all that Apply) Roadway Width Number of Lanes ❑ New Construction ❑ Path / Trail ❑ 3-R 20 2 ❑✓ Reconstruction ❑ Pedestrian / Facilities ❑ 2-R ❑ Railroad ❑ Parking ❑ Other ✓Z Bridge Geometric Design Data Description Through Route Crossroad ❑ Principal Arterial ❑ Principal Arterial Federal ❑ Urban ❑ Minor Arterial ❑ Urban ❑ Minor Arterial Functional Z✓ Rural ❑ Collector E] Rural ❑ Collector Classification ❑ NHS ❑✓ Major Collector ❑ NHS ❑ Major Collector ❑ Minor Collector ❑ Minor Collector ❑ Local Access ❑ Local Access Terrain ❑✓ Flat ❑ Roll ❑ Mountain ❑ Fiat ❑ Roll ❑ Mountain Posted Speed 50 Design Speed 50 Existing ADT 423 Design Year ADT Design Year Design Hourly Volume (DHV) Performance of Work Preliminary Engineering Will Be Performed By Others Agency Consultant 100 Construction Will Be Performed By Contract Agency Contractor 100 Environmental Classification ❑ Class I - Environmental Impact Statement (EIS)✓❑ Class II - Categorically Excluded (CE) ❑ Project Involves NEPA/SEPA Section 404 ❑✓ Projects Requiring Documentation Interagency Agreement (Documented CE) ❑ Class III - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreements Environmental Considerations Protection measures need to be taken to keep all material from landing, blowing or draining int o the Yakima River. DOT Form 140-101 Page 2 Revised 04/2015 Previous Editions Obsolete Agency Project Title Date Kittitas County Public Works N. Thorp Hwy -Yakima River Bridge 2/1/2022 Right of Way ❑✓ No Right of Way Needed ❑ Right of Way Needed All construction required by the ❑ No Relocation ❑ Relocation Required contract can be accomplished within the exiting right of way. Utilities Railroad ❑✓ No railroad work required ❑ No utility work required All utility work will be completed prior to the start ❑ All railroad work will be completed prior to the start of of the construction contract the construction contract F-1 All utility work will be completed in coordination E] All the railroad work will be completed in coordination with the construction contract I with the construction contract Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project If utilities are identified to be in conflict with the scope of work, they will be temporarily relocated prior to construction by the utility owners. FAA Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes ❑✓ No Remarks This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development. Agency Kittitas County Date By Mayor/Chairperson DOT Form 140-101 Page 3 Revised 04/2015 Previous Editions Obsolete