Loading...
HomeMy WebLinkAboutRes-2022-033BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON 071RESOLUTION NO. 2022 - AUTHORIZING THE CHAIROS SIGNATURE ON THE LOCAL AGENCY FEDERAL AID PROJECT PROSPECTUS FOR THE INTERSECTION CORRIDOR SAFETY IMPROVEMENTS PROJECT, CRP 313-21. WHEREAS: Public Works has received Highway Safety Improvement Program funding for intersection safety improvements at various locations including along Kittitas and Vantage Highways; and WHEREAS: The federal funding will be used for the preliminary engineering phase to design, develop and prepare construction plans and specifications for these improvements; and WHEREAS: In preparation to begin work in the Spring of 2022 Kittitas County Public Works is requesting the Washington State Department of Transportation release the federal funds for preliminary engineering; and WHEREAS:A Local Agency Federal Aid Project Prospectus must be executed by the Chair acknowledging the project has been reviewed and is consistent with the County's comprehensive plan for community development; and NOW' THEREFORE BE IT RDSOLVED that the Board of County Commissioners, in the best interest ofthe public, does hereby approve the Chair's signature on the Local Agency Federal Aid Project Prospectus for the Intersection Coruidor Safety Improvements Project, CRP 313-21. DATED on this 1st day of February 2022, at Ellensburg, Washington. BOARD OF COUNTY COMMISSIONERS KITTITAS COLINTY , WASHINGTON Wright, -l--l =t, )3 rtrJ) oard- Julie Kjorsvik W{"rrr, Clerk of the Board- Mandy Buchholz Commissioner ^-.w Washington State Department of Transportation Local Agency Federal Aid Project Prospectus Date u2412022 DUNS Number 0t-020-2s47 FederalEmployer Tax lD Number 9r-60t349(,H:b?[,) Prefix Route () FederalAid Proiect Number HSIP 000s Local Agency Project Number cRP 3 t3-2tlRC2l96 Agency Kittitas County Public Works CAAgency M ves No Federal Program Title 20.205 n otfrer Project Title Intersection Corridor Safety Improvements Start Latitude N VARIES End Latitude N VARIES Start Longitude W VARIES End Lonqitude W VARIES Prolect Termin i From-To VARIES VARIES Nearest City Name Ellensburg, WA Project Zip Code (+4) 98926-7r29 Begin Mile Post VARIES End Mile Post VARIES Length of Project N/A Award Type Z tocat ! locat Forces ! State ! Raitroad Route lD Begin Mile Point VARIES End Mile Point VARIES City Number County Number 19 County Name Kittitas WSDOT Region South Central Region Legislative District(s) t3 Congressional District(s) 8 Urban Area Number Phase Total Estimated Cost (Nearest Hundred Dollar) Local Agency Funding (Nearest Hundred Dollar) Federal Funds (Nearest Hundred Dollar) Phase Start Date Month Year P.E 34,000 34,000 02 I 2022 R/W Const.382,000 382,000 09 I 2022 Total 416,000 416,000 Description of Existing Facilit1r (Existing Design and present Condition) Roadway Width VARIES Number of Lanes VARIES Multiple all-way and T-intersections have been identified with high accident frequency, low visibility, high ADT as well as outdated and failing equipment throughout the County. Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary) Add/upgrade signing with LED's for intersections and school zones, also includes associated ADA and utility work as needed. 40-1 01 Local Agency Contact Person Darren Case Construction Manager Title Phone 509-962-1019 Mailing Address 411 N. Ruby, Suite 1 City Ellensburg State WA Zip Code 98926 By Approving AuthorityProject Prospectus 1;119 County Engineer o^fu^/2o4. Revised 0412015 Previous Editions 0bsolete Agency Kittitas County Public Works Project Title Intersection Corridor Safety Improvements Date u2412022 Type of Proposed Work Project Type (Check all that Apply) ! ruew Construction n Path / Trail n s-n ! Reconstruction ! PeOestrian / Facilities n Z-n ! Raitroad n Parking Z ottrer ! arioge Roadway Width VARIES Number of Lanes VARIES Geometric Design Data Description Through Route Crossroad Federal Functional Classification ! uroan fl Rural ! lrns ! PrincipalArterial Z Minor Arterial {Collector f tilalor Collector fl fVinor Collector Z Locat Access ! uruan f, Rural ! rrrHs ! erincipalArterial f winor Arterial M Collector Z tvtajor Collector Z Minor Collector f Local Access Terrain n rt"t n nott n Mountain n rtrt n nott Mountain Posted Speed Varies Design Speed Varies Existing ADT Varies Design YearADT Varies Design Year 2022 Design Hourly Volume (DHV)N/A Performance of Work Preliminary Engineering Will Be Performed By Kittitas County Public Works Others o/to Agency 100 % Construction Will Be Performed By Contractor Conkact 100 o/to Agency ot/o Environmental Classification flCtass I - Environmental lmpact Statement (ElS) Project lnvolves NEPA/SEPA Section 404 lnteragency Agreement flCtass lll - EnvironmentalAssessment (EA) ! Project lnvolves NEPA/SEPA Section 404 ncyAgreements fl Ctass ll - Categorically Excluded (CE) M Projects Requiring Documentation (Documented CE) Environmental Considerations None Anticipated 2 Revised 0412015 Previous Editions Obsolete Agency Kittitas County Public Works Project Title Intersection Corridor Safety Improvements Date 112412022 Right of Way Z ruo Right of Way Needed * All construction required by the contract can be accomplished within the exiting right of way. Right of Way Needed n ruo Relocation ! Relocation Required Utilities Railroad n f,lo utility work required Z ntt utility work will be completed prior to the start of the construction contract Enff utility work will be completed in coordination with the construction contract Z tlo railroad work required Entt railroad work will be completed prior to the start of the construction contract nnf f the railroad work will be completed in coordination with the construction contract Description of Utility Relocation orAdjustments and Existing Major Structures lnvolved in the Project No anticipated or known utility conflicts FAA lnvolvement ls any airport located within 3.2 kilometers (2 miles) of the proposed project? E yes M ruo Remarks This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development. Agency Kittitas Date rpers0n DOT Form 140-101 Revised 0412015 By Previous Editions 0bsolete Page 3