HomeMy WebLinkAboutResolution_Prospectus_Intersection Safety ImprovementsKITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
AGENDA SESSION STAFF REPORT
AGENDA SESSION DATE: February 1, 2022
ACTION REQUESTED: Request to Approve a Resolution Authorizing the
Chair’s signature on the Local Agency Federal Aid
Project Prospectus for the Intersection Corridor Safety
Improvements Project, CRP 313-21.
___________________________________________________________________________
BACKGROUND: Kittitas County has been selected to receive
$416,000.00 through the Federal Highway Safety
Improvement Program (HSIP) to use for the
Intersection Corridor Safety Improvements Project.
This project will install solar powered LED embedded
signs to enhance driver awareness of intersections and
promote safety, and upgrade outdated and obsolete
signs currently in use. Example of signs to be included
are “Stop” and “Stop Ahead” signs. Intersections have
been selected based on criteria including traffic
volume and crash history. HSIP funding is
administered through the Washington State
Department of Transportation (WSDOT) Local
Programs Office and requires approval for each phase
of the project.
This Project Prospectus covers the Federal Funding
for the preliminary engineering phase which is
estimated at $34,000.00.
Public Works is preparing to perform this work with
County Forces in the Spring of 2022. This requires the
Local Agency Federal Aid Project Prospectus to be
signed and approved by the Chair of the BOCC.
INTERACTION: Public Works
RECOMMENDATION: Approve the Resolution Authorizing the Chair’s
signature on the Local Agency Federal Aid Project
Prospectus for the Intersection Corridor Safety
Improvements, CRP 313-21.
HANDLING: Return two (2) originals to Public Works
ATTACHMENTS: Resolution, Local Agency Federal Aid Project
Prospectus
LEAD STAFF: Josh Fredrickson, County Engineer
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2022 -
AUTHORIZING THE CHAIR’S SIGNATURE ON THE LOCAL AGENCY FEDERAL
AID PROJECT PROSPECTUS FOR THE INTERSECTION CORRIDOR SAFETY
IMPROVEMENTS PROJECT, CRP 313-21.
WHEREAS: Public Works has received Highway Safety Improvement Program funding for
intersection safety improvements at various locations including along Kittitas and
Vantage Highways; and
WHEREAS: The federal funding will be used for the preliminary engineering phase to design,
develop and prepare construction plans and specifications for these
improvements; and
WHEREAS: In preparation to begin work in the Spring of 2022 Kittitas County Public Works
is requesting the Washington State Department of Transportation release the
federal funds for preliminary engineering; and
WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair
acknowledging the project has been reviewed and is consistent with the County’s
comprehensive plan for community development; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best
interest of the public, does hereby approve the Chair’s signature on the Local
Agency Federal Aid Project Prospectus for the Intersection Corridor Safety
Improvements Project, CRP 313-21.
DATED on this 1st day of February 2022, at Ellensburg, Washington.
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
__________________________
Laura Osiadacz, Chairman
Attest:
☐ Clerk of the Board- Julie Kjorsvik __________________________
Cory Wright, Vice-Chairman
☐ Deputy Clerk of the Board- Mandy Buchholz ___________________________
Brett Wachsmith, Commissioner
______________________________
Washington State
Adftk
MDepartment of Transportation
Local Agency Federal Aid
Project Prospectus
DOT Form 140-101 Page 1
Revised 04/2015 Previous Editions Obsolete
Prefix
Route
( )
Date
1/24/2022
Federal Aid
Project Number
HSIP
OOOS
DUNSNumber
01-020-2547
Lo I Agency
CRP 313-21/ RC2196
( WSDOT
Federal Employer
91-601349
Project Number
\ Use Only/
Tax ID Number
Agency
CAAgency
Federal Program Title
Kittitas County Public Works
Yes ❑ No
✓❑ 20.205 ❑Other
Project Title
Start Latitude N VARIES
Start Longitude W VARIES
Intersection Corridor Safety Improvements
End Latitude N VARIES
End Longitude W VARIES
Project Termini From -To
Nearest City Name
Project Zip Code (+4)
VARIES VARIES
Ellensburg, WA
98926-7129
Begin Mile Post
End Mile Post
Length of Project
Award Type
VARIES
VARIES
N/A
0✓ Local ❑ Local Forces ❑ State ❑ Railroad
Route ID
Begin Mile Point
End Mile Point
City Number
County Number
County Name
VARIES
VARIES
19
Kittitas
WSDOT Region
Legislative District(s)
Congressional District(s)
Urban Area Number
South Central Region
13
8
Total
Local Agency
Phase Start
Phase
Estimated Cost
Funding
Federal Funds
Date
Nearest Hundred Dollar
Nearest Hundred Dollar
Nearest Hundred Dollar
Month Year
P.E.
34,000
34,000
02/2022
R/W
Const.
382,000
382,000
09/2022
Total
416,000
416,000
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width
Number of Lanes
VARIES
VARIES
Multiple all -way and T -intersections have been identified with high accident frequency, low visibility, high
ADT as well as outdated and failing equipment throughout the County.
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
Add/upgrade signing with LED's for intersections and school zones, also includes associated ADA and utility
work as needed.
Local Agency Contact Person
Title
Phone
Darren Case
Construction Manager
509-962-7019
Mailing Address
City
State
Zip Code
411 N. Ruby, Suite 1
Ellensburg
WA
98926
By
Approving Authority
Project Prospectus
Title County Engineer
DateZg Sqv ZoZZ
DOT Form 140-101 Page 1
Revised 04/2015 Previous Editions Obsolete
Agency
Project Title
Date
Kittitas County Public Works
Intersection Corridor Safety Improvements
1/24/2022
Type of Proposed Work
Project Type (Check all that Apply)
Roadway Width
Number of Lanes
❑ New Construction ❑ Path / Trail
❑ 3-R
VARIES
VARIES
❑ Reconstruction ❑ Pedestrian / Facilities
❑ 2-R
❑ Railroad ❑ Parking
❑✓ Other
❑ Bridge
Geometric Design Data
Description
Through Route
Crossroad
❑ Principal Arterial
❑ Principal Arterial
Federal
❑ Urban
Minor Arterial
❑ Urban
❑✓ Minor Arterial
Functional
L Rural
� Collector
� Rural
Z Collector
Classification
❑ NHS
W1 Major Collector
❑ NHS
Major Collector
0 Minor Collector
Minor Collector
0 Local Access
Local Access
Terrain
❑ Flat ❑ Roll ❑ Mountain
❑ Fiat ❑ Roll ❑ Mountain
Posted Speed
Varies
Design Speed
Varies
Existing ADT
Varies
Design Year ADT
Varies
Design Year
2022
Design Hourly Volume (DHV)
N/A
Performance of Work
Preliminary Engineering Will Be Performed By
Others
Agency
Kittitas County Public Works
%
100
Construction Will Be Performed By
Contract
Agency
Contractor
100
Environmental Classification
❑ Class I - Environmental Impact Statement (EIS)✓❑
Class II - Categorically Excluded (CE)
❑ Project Involves NEPA/SEPA Section 404✓❑
Projects Requiring Documentation
Interagency Agreement
(Documented CE)
❑ Class III - Environmental Assessment (EA)
❑ Project Involves N EPA/SEPA Section 404
Interagency Agreements
Environmental Considerations
None Anticipated
DOT Form 140-101 Page 2
Revised 04/2015 Previous Editions Obsolete
Agency
Project Title
Date
Kittitas County Public Works
Intersection Corridor Safety Improvements
1/24/2022
Right of Way
❑✓ No Right of Way Needed ❑ Right of Way Needed
`AII construction required by the ❑ No Relocation ❑ Relocation Required
contract can be accomplished
within the exiting right of way.
Utilities Railroad
❑ No utility work required
❑✓ No railroad work required
❑✓ All utility work will be completed prior to the start
E] All railroad work will be completed prior to the start of
of the construction contract
the construction contract
F-1 All utility work will be completed in coordination
All the railroad work will be completed in coordination
with the construction contract
with the construction contract
Description of Utility Relocation orAdjustments and Existing Major Structures Involved in the Project
No anticipated or known utility conflicts
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? [:]Yes 0 No
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Agency Kittitas County
Date By
Mayor/Chairperson
DOT Form 140-101 Page 3