Laserfiche WebLink
REsoLUnoN No. SzAA- cLG <br />BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter <br />of initiating a county road project designated as: <br />GRP NO: 306-21 JOB NO: RC2193 <br />lT lS HEREBY RESOLVED that the Liberty Road over Swauk Creek (07101) Bridge Replacement <br />The project will replace bridge #07101on Liberty Road crossing Swauk Creek at Milepost 0.02. The bridge is currenfly <br />load restricted limiting vehicles from accessing the Town of Liberty and nearby public lands. The project will include <br />replacing the existing bridge, guardrail, approaches and shoulders to meet current Washington State Department of <br />Transportation safety specifi cations and req u irements. <br />ARTERIAL <br />ACCESS <br />This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report and <br />proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). <br />lT lS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County <br />Engineers estimate, is hereby made in the amounts and for the purposes shown: <br />X <br />e <br />X <br />ua Fred rickson,E. <br />County Engineer <br />THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2022 ANNUAL ROAD PROGRAM AS <br />ITEM NO. 04 <br />THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM PROJECT 04 <br />IN ACCORDANCE WTH RCW36.81.130 <br />IT IS FURTHER RESOLVED THAT: <br />THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN RCW36.77.020 ET.SEQ <br />THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY <br />wAc 136-18. <br />N RCW 36.77.065 AND <br />2022 <br />>a-1 <br />.-{ADoPTED t i" l8'h day of <br />ii) <br />BOARD OF COUNTY COMMISSIONERS <br />WASHINGTON <br />, Chair issioner <br />1tl1t2022 <br />PURPOSE AMOUNT TOTALS <br />PRELMINARY ENGINEERING $000 <br />CONSTRUCTION ENGINEERING $ 150,000 <br />RIGHT-OF-WAY ACQUISITION $ 50.000 <br />SUB-TOTAL $ 640,000 <br />County Forces coNsrRucloN $ <br />CONTRACT CONSTRUCTION $ 2.307,000 <br />SUB-TOTAL $ 2,307,000 <br />TOTAL PROJECT COST $ 2.947.000 <br />GRANT OR OTHER FUNDS $ 2.463,000 <br />Grant Source: STBG / American Rescue Plan <br />TOTAL COUNW ROAD FUND 000 <br />g : \base\forms\en g\crp-f rm <br />Cory Wright, Vice-Chair