Loading...
HomeMy WebLinkAboutResolution for Adopting CDS Fees 1-18-22BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2022-____ A RESOLUTION AMENDING THE SERVICE FEES BY COMMUNITY DEVELOPMENT SERVICES CHARGED FOR BUILDING AND LAND USE SERVICES WHEREAS, Kittitas County Code 4.10.010 authorizes Community Development Services fees to be set by resolution approved by the Board of County Commissioners; and WHEREAS, In 2014, the County contracted the services of FCS Group to determine adequate fees to cover the cost of services provided to process a land use or building permit; and WHEREAS, In 2015, the consultant monitored activities of personnel when processing the permits and made a determination of the actual cost for providing the service to process land use and building permits; and WHEREAS, The consultant developed a fee model for Planning Services and Building Fixture permits that calculated the amount of direct and indirect costs associated with each development activity; and WHEREAS, The consultant also developed a fee multiplier model for new construction designed to determine a construction fee which could be adjusted based upon the amount of new construction activity occurring in a single year; and WHERAS, The Board of County Commissioners have annually adopted resolutions since 2015 requiring that fees charged by Community Development Services for land use and building permit services be re-evaluated annually for consideration and adjustment by the Board of County Commissioners for each fiscal year; and WHEREAS, The Board of County Commissioners on December 7, 2021 set a date for public hearing to hear comments and consider potential Community Development Services fee changes; and WHEREAS, Public notice for such hearing was provided in the Daily Record and North Kittitas County Tribune on December 9, 2021 and December 16, 2021; and WHEREAS, The Board of County Commissioners conducted a public hearing to consider the Community Development Services Fee Schedule on January 4, 2022; and WHEREAS, Community Development Services staff recommended fees to the Board of County Commissioners at the public hearing based on the consultant’s fee models for full cost recovery to provide the building and planning services; and WHEREAS, No public testimony was received at the January 4, 2022 public hearing. NOW, THEREFORE, BE IT RESOLVED AND IT IS HEREBY ORDERED, that the following fees are adopted for Community Development Services in Kittitas County: 1. Fees for Building Fixtures and Planning Services as shown in the attached Exhibit A. 2. The August 2021 Building Valuation Data table of the International Building Safety Journal for the purposes of calculating fees for new construction. 3. A multiplier for building permits for new construction of .0074. 4. A five percent (5%) technology and equipment surcharge for building permits to cover cost of repair and replacement of vehicles and equipment used to process the permits; and BE IT FURTHER RESOLVED AND HEREBY ORDERED, that service monitoring be continued, and that fees charged by CDS for land use and building permit services be re-evaluated annually based upon such monitoring for consideration and adjustment by the Board of County Commissioners for each fiscal year. ADOPTED this __18th____day of ____January______________, 2022 BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON _____________________________ Laura Osiadacz, Chairman _______________________________ Cory Wright, Vice-Chairman _______________________________ Brett Wachsmith, Commissioner ATTEST CLERK OF THE BOARD ☐Clerk of the Board- Julie Kjorsvik ☐ Deputy Clerk of the Board- Mandy Buchholz APPROVED AS TO FORM: __________________________ Neil Caulkins, Deputy Prosecuting Attorney Exhibit A 2022 Land Use and Building Fees Community Development Services 2022 Fees for Building Fixtures 2022 Fee [Bldg] Permit Issuance Fee $140.00 [Bldg] One-Time Application / Permit Extension Fee $70.00 [Bldg] Misc - Foundation Only Permits $730.00 [Bldg] Misc - Fences over 7-foot high $500.00 [Bldg] Misc - Woodstove/Fireplace/Free Standing Stove $150.00 [Bldg] Misc - Modular Buildings (per sq. ft.) (Based on 2300 sq ft) $1,150.00 [Bldg] Misc - Manufactured Homes (per sq. ft.) (Based on 1800 sq ft) $710.00 [Bldg] Misc - Demolition $280.00 [Bldg] Misc - Move Structure (per sq. ft.) (Based on 1800 sq ft) $870.00 [Mech/Plum] Furnaces - Forced-air $280.00 [Mech/Plum] Suspended heater, recessed wall heater or floor- mounted unit heater $280.00 [Mech/Plum] Appliance Vents $30.00 [Mech/Plum] Plenum Repairs or Additions $280.00 [Mech/Plum] Boiler $280.00 [Mech/Plum] Air handling unit $210.00 [Mech/Plum] Air Conditioning Unit – or Mini-Split System $280.00 [Mech/Plum] Ventilation fan connected to a single duct (each) $30.00 [Mech/Plum] Ventilation system which is not a portion of any heating or air-conditioning system $70.00 [Mech/Plum] Hood which is served by mechanical exhaust, including the ducts for such hood $420.00 [Mech/Plum] Incinerators - Domestic-type $280.00 [Mech/Plum] Incinerators - Commercial or Industrial-type $420.00 [Mech/Plum] Misc - For each appliance or piece of equipment regulated by the Mechanical Code but not classed in other appliance categories, or for which no other fee is listed in the table $70.00 [Mech/Plum] Misc - Each plumbing fixture on one trap or a set of fixtures on one trap $70.00 [Mech/Plum] Misc - Each Hot Water Heater-Electric $70.00 [Mech/Plum] Misc - Each Hot Water Heater-Gas $140.00 [Mech/Plum] Misc - Orifice change outs (each) $140.00 [Mech/Plum] Misc - Gas Piping System of one to five outlets $140.00 [Mech/Plum] Misc - Additional gas piping system outlet (each) $70.00 Agricultural Building $800.00 Re-roofing $260.00 In ground Pool/Spas & Hot Tub Permit $670.00 Above ground Pool/Spas & Hot Tub Permit $110.00 Residential Solar Panel Building Permit per roof face or rack. $280.00 Commercial Solar Panel Building Permit per roof face or rack system. $530.00 Residential Wind Turbine $260.00 Commercial Wind Turbine $350.00 Lifting of Stop Work Order $280.00 Lifting of Notice to Title $460.00 For any permit fee which is not listed above fees may be determined by an hourly basis of $140.00 per hour review and inspection, by square foot valuation or by bid amount, determined by Community Development Services. *Fees for printing shall be by fee recovery schedule set by CDS. 2022 Fees for Planning Services 2022 Fee Pre Application or Pre Submission (Per Meeting) $600.00 Accessory Dwelling Unit $1,460.00 Binding Site Plan $1,920.00 Boundary Line Adjustment $760.00 Comp. Plan Amendment (Text) $3,240.00 Comp. Plan Amendment (Map) $3,530.00 Large Lot $1,950.00 Parcel Combination $560.00 Cluster Plat - 5 or more lots $2,910.00 Cluster Plat - 4 or less lots $2,160.00 Plat Extension $560.00 Short Plat $2,160.00 Preliminary Plat $2,960.00 Final Plat $970.00 Final Short Plat $780.00 Short Plat Amendment $2,360.00 Plat Amendment $2,960.00 Public Benefit Rating System Application $2,300.00 Public Facilities $2,150.00 Planned Unit Development $4,330.00 or Dev. Agreement Rezone $3,420.00 *SEPA $600.00 SEPA Optional $600.00 Shoreline Setback Variance $3,710.00 Shoreline Substantial Development $2,210.00 Shoreline Conditional Use $3,710.00 *Shoreline Exemption $560.00 Sign $150.00 Small Wind Energy Bldg. Fee Transfer of Development Rights $200.00 Wind Farm Siting Dev. Agreement Zoning Variance $1,850.00 Administrative Conditional Use Permit $2,660.00 Administrative Conditional Use Permit Amendment $2,460.00 Administrative Determination $740.00 Appeal $1,550.00 Conditional Use Permit $3,170.00 or Dev. Agreement Conditional Use Permit Amendment $3,060.00 Development Agreement $790.00 Title Elimination $130.00 Preliminary Site Analysis $150.00 Pre-application Conference Waiver $120.00 Reasonable Use Exception $1,850.00 *Shoreline Exemption and SEPA review fees not required for fish habitat projects developed and implemented through the Voluntary Stewardship Program (VSP).