Loading...
HomeMy WebLinkAboutResolution Establish CRP_Intersection Safety ImprovementsKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: January 18, 2022 ACTION REQUESTED: Request to Approve a Resolution to establish County Road Project (CRP) number supporting Intersection Safety Improvements at various locations including Kittitas and Vantage Highways BACKGROUND: Kittitas County has been selected to receive $416,000 from the Highway Safety Improvement Program (HSIP) for intersection safety improvements at various locations, including along Kittitas and Vantage Highways. INTERACTION: This project will install solar powered LED embedded signs to enhance driver awareness of intersections and promote safety. Example of signs to be included are "Stop" and "Stop Ahead" signs. Intersections have been selected based on criteria including traffic volume and crash history. HSIP funding is through the Washington State Department of Transportation (WSDOT). The award does not require matching local funds if the project is obligated by September of 2022. By beginning now, we anticipate being able to meet the requirements for obligating federal funds. Public Works RECOMMENDATION: Approve the Resolution to establish County Road Project (CRP) number for various Intersection Safety Improvements. HANDLING: Return one (1) original to Public Works ATTACHMENTS: Resolution LEAD STAFF: Joshua Fredrickson, County Engineer RESOLUTION NO. BEFORE THE BOARD OF COUNTY C of initiating a county road project designated as: CRP NO: 313-21 JOB NO: RC2196 OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter IT IS HEREBY RESOLVED that the Intersection Corridor Safety Improvements The project will install solar powered LED embedded signs including "Stop Ahead", "Stop", "School Zone", "Cross Traffic Does Not Stop" and "Intersection Ahead" including new breakaway posts at multiple intersections along Vantage Highway and Kittitas Highway. Installation will be done at intersections identified by traffic data and crash history. ARTERIAL X ACCESS This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County Engineers estimate, is hereby made in the amounts and for the purposes shown: 0' u D PURPOSE AMOUNT TOTALS PRELIMINARY ENGINEERING $ 34,000 CONSTRUCTION ENGINEERING $ 30,000 RIGHT-OF-WAY ACQUISITION $ SUB -TOTAL $ 64,000 County Forces CONSTRUCTION $ CONTRACT CONSTRUCTION $ 352,000 SUB -TOTAL $ 352,000 TOTAL PROJECT COST $ 416,000 GRANT OR OTHER FUNDS Is 416,000 Grant source: STBG / American Rescue Plan TOTAL COUNTY ROAD FUND ALLOCATION $ 0 oshua Fredrickson, P.E. County Engineer THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2022 ANNUAL ROAD PROGRAM AS ITEM NO. 09 THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM PROJECT 09 IN ACCORDANCE WITH RCW 36.81.130 IT IS FURTHER RESOLVED THAT: THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ. ❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND WAC 136-18. ADOPTED this day of , 2022 Attest: BOARD OF COUNTY COMMISSIONERS Clerk of the Board KITTITAS COUNTY. WASHINGTON Laura Osiadacz, Chair Cory Wright, Vice -Chair Brett Wachsmith, Commissioner g:\base\forms\eng\crp-f" 1/11/2022