DEPARTMENT OF PUBLIC WORKS
AGENDA STAFF REPORT
AGENDA DATE: January 18, 2022
ACTION REQUESTED: Request to Approve a Resolution to establish
County Road Project (CRP) number supporting
Intersection Safety Improvements at various
locations including Kittitas and Vantage Highways
BACKGROUND: Kittitas County has been selected to receive
$416,000 from the Highway Safety Improvement
Program (HSIP) for intersection safety
improvements at various locations, including along
Kittitas and Vantage Highways.
INTERACTION:
This project will install solar powered LED
embedded signs to enhance driver awareness of
intersections and promote safety. Example of signs
to be included are "Stop" and "Stop Ahead" signs.
Intersections have been selected based on criteria
including traffic volume and crash history. HSIP
funding is through the Washington State
Department of Transportation (WSDOT). The
award does not require matching local funds if the
project is obligated by September of 2022. By
beginning now, we anticipate being able to meet the
requirements for obligating federal funds.
Public Works
RECOMMENDATION: Approve the Resolution to establish County Road
Project (CRP) number for various Intersection
Safety Improvements.
HANDLING: Return one (1) original to Public Works
ATTACHMENTS: Resolution
LEAD STAFF: Joshua Fredrickson, County Engineer
RESOLUTION NO.
BEFORE THE BOARD OF COUNTY C
of initiating a county road project designated as:
CRP NO: 313-21 JOB NO: RC2196
OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter
IT IS HEREBY RESOLVED that the Intersection Corridor Safety Improvements
The project will install solar powered LED embedded signs including "Stop Ahead", "Stop", "School Zone", "Cross Traffic
Does Not Stop" and "Intersection Ahead" including new breakaway posts at multiple intersections along Vantage Highway
and Kittitas Highway. Installation will be done at intersections identified by traffic data and crash history.
ARTERIAL X
ACCESS
This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report and
proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070).
IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County
Engineers estimate, is hereby made in the amounts and for the purposes shown:
0'
u
D
PURPOSE
AMOUNT
TOTALS
PRELIMINARY ENGINEERING
$ 34,000
CONSTRUCTION ENGINEERING
$ 30,000
RIGHT-OF-WAY ACQUISITION
$
SUB -TOTAL
$ 64,000
County Forces CONSTRUCTION
$
CONTRACT CONSTRUCTION
$ 352,000
SUB -TOTAL
$ 352,000
TOTAL PROJECT COST
$ 416,000
GRANT OR OTHER FUNDS
Is 416,000
Grant source: STBG / American Rescue Plan
TOTAL COUNTY ROAD FUND ALLOCATION
$ 0
oshua Fredrickson, P.E.
County Engineer
THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2022 ANNUAL ROAD PROGRAM AS
ITEM NO. 09
THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM PROJECT 09
IN ACCORDANCE WITH RCW 36.81.130
IT IS FURTHER RESOLVED THAT:
THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ.
❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND
WAC 136-18.
ADOPTED this day of , 2022 Attest:
BOARD OF COUNTY COMMISSIONERS Clerk of the Board
KITTITAS COUNTY. WASHINGTON
Laura Osiadacz, Chair
Cory Wright, Vice -Chair
Brett Wachsmith, Commissioner
g:\base\forms\eng\crp-f" 1/11/2022