HomeMy WebLinkAboutResolution Establish CRP_Bridge Rail ImprovementsKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: January 18, 2022 ACTION REQUESTED: Request to Approve a Resolution to establish County Road Project (CRP) number supporting Bridge Rail Improvements. BACKGROUND: Kittitas County has been selected to receive $664,000 from the Highway Safety Improvement Program (HSIP) for Bridge Rail Improvements, Phase 1, in Kittitas County Road Maintenance Districts A -F. This project will install bridge rail, approaches, and terminals on bridges with wooden non-standard bridge rail and/or no existing bridge rail at locations. This project is the first phase to address this type of non-standard rail. HSIP funding is through the Washington State Department of Transportation (WSDOT). The award does not require matching local funds if the project is obligated by September of 2022. By beginning now, we anticipate being able to meet the requirements for obligating federal funds. INTERACTION: Public Works RECOMMENDATION: Approve the Resolution to establish County Road Project (CRP) number supporting Bridge Rail Improvements. HANDLING: Return one (1) original to Public Works ATTACHMENTS: Resolution LEAD STAFF: Joshua Fredrickson, County Engineer RESOLUTION NO. BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter of initiating a county road project designated as: CRP NO: 314-21 JOB NO: RC2199 IT IS HEREBY RESOLVED that the Bridge Rail Improvements Phase 1 The project will install bridge rail, approaches, and terminals on bridges with wooden non-standard bridge rail and/or no existing bridge rail at various locations within Kittitas County road maintenance district A -F. ARTERIAL ACCESS This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County Engineers estimate, is hereby made in the amounts and for the purposes shown: o 3 PURPOSE AMOUNT TOTALS PRELMINARY ENGINEERING $ 63,000 CONSTRUCTION ENGINEERING $ 60,000 RIGHT-OF-WAY ACQUISITION $ SUB -TOTAL Is $ 123,000 County Forces CONSTRUCTION $ CONTRACT CONSTRUCTION 541,000 SUB -TOTAL $ 541,000 TOTAL PROJECT COST $ 664,000 GRANT OR OTHER FUNDS $ 664,000 Is Grant source: STBG / American Rescue Plan TOTAL COUNTY ROAD FUND ALLOCATION 0 Joshua Fredrickson, P.E. County Engineer THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2022 ANNUAL ROAD PROGRAM AS ITEM NO. 10 THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM PROJECT 10 IN ACCORDANCE WITH RCW 36.81.130 IT IS FURTHER RESOLVED THAT: THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ. ❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND WAC 136-18. ADOPTED this day of . 2022. Attest: BOARD OF COUNTY COMMISSIONERS Clerk of the Board KITTITAS COUNTY, WASHINGTON Laura Osiadacz, Chair Cory Wright, Vice -Chair Brett Wachsmith, Commissioner g:\base\forms\eng\crp-fm 1/11/2022