AGENDA STAFF REPORT
AGENDA DATE: January 18, 2022
ACTION REQUESTED: Request to Approve a Resolution to establish
County Road Project (CRP) number supporting
Bridge Rail Improvements.
BACKGROUND: Kittitas County has been selected to receive
$664,000 from the Highway Safety Improvement
Program (HSIP) for Bridge Rail Improvements,
Phase 1, in Kittitas County Road Maintenance
Districts A -F.
This project will install bridge rail, approaches, and
terminals on bridges with wooden non-standard
bridge rail and/or no existing bridge rail at
locations. This project is the first phase to address
this type of non-standard rail. HSIP funding is
through the Washington State Department of
Transportation (WSDOT). The award does not
require matching local funds if the project is
obligated by September of 2022. By beginning now,
we anticipate being able to meet the requirements
for obligating federal funds.
INTERACTION: Public Works
RECOMMENDATION: Approve the Resolution to establish County Road
Project (CRP) number supporting Bridge Rail
Improvements.
HANDLING: Return one (1) original to Public Works
ATTACHMENTS: Resolution
LEAD STAFF: Joshua Fredrickson, County Engineer
RESOLUTION NO.
BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter
of initiating a county road project designated as:
CRP NO: 314-21 JOB NO: RC2199
IT IS HEREBY RESOLVED that the Bridge Rail Improvements Phase 1
The project will install bridge rail, approaches, and terminals on bridges with wooden non-standard bridge rail and/or no
existing bridge rail at various locations within Kittitas County road maintenance district A -F.
ARTERIAL
ACCESS
This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report and
proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070).
IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County
Engineers estimate, is hereby made in the amounts and for the purposes shown:
o
3
PURPOSE
AMOUNT
TOTALS
PRELMINARY ENGINEERING
$
63,000
CONSTRUCTION ENGINEERING
$
60,000
RIGHT-OF-WAY ACQUISITION
$
SUB -TOTAL
Is
$ 123,000
County Forces CONSTRUCTION
$
CONTRACT CONSTRUCTION
541,000
SUB -TOTAL
$ 541,000
TOTAL PROJECT COST
$ 664,000
GRANT OR OTHER FUNDS
$ 664,000
Is
Grant source: STBG / American Rescue Plan
TOTAL COUNTY ROAD FUND ALLOCATION
0
Joshua Fredrickson, P.E.
County Engineer
THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2022 ANNUAL ROAD PROGRAM AS
ITEM NO. 10
THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM PROJECT 10
IN ACCORDANCE WITH RCW 36.81.130
IT IS FURTHER RESOLVED THAT:
THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ.
❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND
WAC 136-18.
ADOPTED this day of . 2022. Attest:
BOARD OF COUNTY COMMISSIONERS Clerk of the Board
KITTITAS COUNTY, WASHINGTON
Laura Osiadacz, Chair
Cory Wright, Vice -Chair
Brett Wachsmith, Commissioner
g:\base\forms\eng\crp-fm 1/11/2022