Loading...
HomeMy WebLinkAboutResolution Establish CRP_Swauk Creek BridgeKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: January 18, 2022 ACTION REQUESTED: Request to Approve a Resolution to establish County Road Project (CRP) number supporting the Replacement of the Swauk Creek Bridge, Bridge No. 07101. BACKGROUND: Kittitas County has been selected to receive $2,463,000.00 from the Federal Lands Access Program for the Swauk Creek Bridge replacement project. This grant funding, along with an estimated local match of $484,000 from the Road Fund, will be used to replace the load restricted structure on Liberty Road over Swauk Creek. The work includes removal of the existing bridge, design, and construction of a new bridge meeting current WSDOT safety specifications and requirements. Public Works RECOMMENDATION: Approve the Resolution to establish County Road Project (CRP) number for the Replacement of the Swank Creek Bridge, Bridge No. 07101. HANDLING: Return one (1) original to Public Works ATTACHMENTS: Resolution LEAD STAFF: Joshua Fredrickson, County Engineer RESOLUTION NO. BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter of initiating a county road project designated as: CRP NO: 306-21 JOB NO: RC2193 IT IS HEREBY RESOLVED that the Liberty Road over Swauk Creek (07101) Bridge Replacement The project will replace bridge #07101 on Liberty Road crossing Swauk Creek at Milepost 0.02. The bridge is currently load restricted limiting vehicles from accessing the Town of Liberty and nearby public lands. The project will include replacing the existing bridge, guardrail, approaches and shoulders to meet current Washington State Department of Transportation safety specifications and requirements. ARTERIAL ACCESS This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County Engineers estimate, is hereby made in the amounts and for the purposes shown: PURPOSE AMOUNT TOTALS PRELMINARY ENGINEERING s 440,000 CONSTRUCTION ENGINEERING s 150,000 RIGHT-OF-WAY ACQUISITION s 50,000 SUB -TOTAL s 640,000 County Forces CONSTRUCTION $ CONTRACT CONSTRUCTION s 2,307,000 SUB -TOTAL s 2,307,000 TOTAL PROJECT COST s 2,947,000 GRANT OR OTHER FUNDS s 2,463,000 Grant source: STBG / American Rescue Plan As TOTAL COUNTY ROAD FUND ALLOCATION 484,000 oshua Fredrickson,75.E. County Engineer ® THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2022 ANNUAL ROAD PROGRAM AS ITEM NO. 04 ❑ THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM PROJECT 04 IN ACCORDANCE WITH RCW 36.81.130 IT IS FURTHER RESOLVED THAT: ® THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ. ❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND WAC 136-18. ADOPTED this day of , 2022. Attest: BOARD OF COUNTY COMMISSIONERS Clerk of the Board KITTITAS COUNTY. WASHINGTON Laura Osiadacz, Chair Cory Wright, Vice -Chair Brett Wachsmith, Commissioner g:\base\forms\eng\crp-frm 111112022