Loading...
HomeMy WebLinkAboutResolution_CRP Vantage Hwy Bridge ReplacementKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: December 21. 2021 ACTION REQUESTED: Request to Approve a Resolution to establish County Road Project (CRP) number supporting the replacement of Bridge # 89342 Vantage Highway over Cascade Canal BACKGROUND: Kittitas County Public Works has been awarded American Rescue Plan funds in the amount of $656,000 and has applied for (award pending) WSDOT's Surface Transportation Block Grant (STBG) funds in the amount of $870,000. These funds along with an estimated $138,000 of local road funds will be used to replace the aging, damaged, load restricted structure on Vantage Highway over the Cascade Canal. The work will include replacing the existing bridge, guardrail, approaches, and shoulders to meet current WSDOT safety specifications and requirements. INTERACTION: Public Works RECOMMENDATION: Approve the Resolution to establish County Road Project (CRP) number supporting the replacement of Bridge # 89342 Vantage Highway over Cascade Canal. HANDLING: Return one (1) original to Public Works ATTACHMENTS: Resolution LEAD STAFF: Mark Cook, Director RESOLUTION NO. BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter of initiating a county road project designated as: CRP NO: 310-21 JOB NO: RC2292-G1 IT IS HEREBY RESOLVED Vantage Highway over Cascade Canal (89342) Bridge Replacement The project will replace bridge #89342 on Vantage Highway crossing the Cascade Canal at Milepost 5.25. The bridge is currently load restricted and was recently damaged in a vehicle accident. The project will include replacing the existing bridge, guardrail, approaches, and shoulders to meet current WSDOT safety specifications and requirements. ARTERIAL ACCESS This project is hereby declared to be a public necessity and the Director of Public Works is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County Engineers estimate, is hereby made in the amounts and for the purposes shown: PURPOSE AMOUNT TOTALS PRELMINARY ENGINEERING $ 304,000 CONSTRUCTION ENGINEERING $ 90,000 RIGHT-OF-WAY ACQUISITION $ SUB -TOTAL $ 394,000 County Forces CONSTRUCTION $ CONTRACT CONSTRUCTION $ 1,270,000 SUB -TOTAL $ 1,270,000 TOTAL PROJECT COST $ 1,664,000 GRANT OR OTHER FUNDS $ 1,526,000 Grant source: STBG / American Rescue Plan TOTAL COUNTY ROAD FUND ALLOCATION $ 138,000 • V ham--' � i� Mark Cook, P.E. Public Works Director ❑ THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2021 ANNUAL ROAD PROGRAM AS ITEM NO. ® THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM PROJECT 13 IN ACCORDANCE WITH RCW 36.81.130 IT IS FURTHER RESOLVED THAT: ® THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEO. ❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND WA(, 13R-111 ADOPTED this day of BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Brett Wachsmith, Chair 2021. Attest: Clerk of the Board Laura Osiadacz, Vice -Chair Cory Wright, Commissioner g:\base\forms\eng\crp-fm 12/15/2021