HomeMy WebLinkAboutResolution_CRP Vantage Hwy Bridge ReplacementKITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
AGENDA STAFF REPORT
AGENDA DATE: December 21. 2021
ACTION REQUESTED: Request to Approve a Resolution to establish
County Road Project (CRP) number supporting the
replacement of Bridge # 89342 Vantage Highway
over Cascade Canal
BACKGROUND: Kittitas County Public Works has been awarded
American Rescue Plan funds in the amount of
$656,000 and has applied for (award pending)
WSDOT's Surface Transportation Block Grant
(STBG) funds in the amount of $870,000. These
funds along with an estimated $138,000 of local
road funds will be used to replace the aging,
damaged, load restricted structure on Vantage
Highway over the Cascade Canal. The work will
include replacing the existing bridge, guardrail,
approaches, and shoulders to meet current
WSDOT safety specifications and requirements.
INTERACTION: Public Works
RECOMMENDATION: Approve the Resolution to establish County Road
Project (CRP) number supporting the replacement
of Bridge # 89342 Vantage Highway over Cascade
Canal.
HANDLING: Return one (1) original to Public Works
ATTACHMENTS: Resolution
LEAD STAFF: Mark Cook, Director
RESOLUTION NO.
BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter
of initiating a county road project designated as:
CRP NO: 310-21 JOB NO: RC2292-G1
IT IS HEREBY RESOLVED Vantage Highway over Cascade Canal (89342) Bridge Replacement
The project will replace bridge #89342 on Vantage Highway crossing the Cascade Canal at Milepost 5.25. The bridge is
currently load restricted and was recently damaged in a vehicle accident. The project will include replacing the existing
bridge, guardrail, approaches, and shoulders to meet current WSDOT safety specifications and requirements.
ARTERIAL
ACCESS
This project is hereby declared to be a public necessity and the Director of Public Works is hereby ordered and authorized to report and
proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070).
IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County
Engineers estimate, is hereby made in the amounts and for the purposes shown:
PURPOSE
AMOUNT
TOTALS
PRELMINARY ENGINEERING
$ 304,000
CONSTRUCTION ENGINEERING
$ 90,000
RIGHT-OF-WAY ACQUISITION
$
SUB -TOTAL
$ 394,000
County Forces CONSTRUCTION
$
CONTRACT CONSTRUCTION
$ 1,270,000
SUB -TOTAL
$ 1,270,000
TOTAL PROJECT COST
$ 1,664,000
GRANT OR OTHER FUNDS
$ 1,526,000
Grant source: STBG / American Rescue Plan
TOTAL COUNTY ROAD FUND ALLOCATION
$ 138,000
• V ham--' � i�
Mark Cook, P.E.
Public Works Director
❑ THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2021 ANNUAL ROAD PROGRAM AS
ITEM NO.
® THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM PROJECT 13
IN ACCORDANCE WITH RCW 36.81.130
IT IS FURTHER RESOLVED THAT:
® THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEO.
❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND
WA(, 13R-111
ADOPTED this day of
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Brett Wachsmith, Chair
2021. Attest:
Clerk of the Board
Laura Osiadacz, Vice -Chair Cory Wright, Commissioner
g:\base\forms\eng\crp-fm 12/15/2021