HomeMy WebLinkAbout2021-12-13-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS
Public Works Study Session
Regular Meeting
Monday December 13, 2021 -1:30 PM
Webex
4. Call to Order
2. CARES Funding Swap
3. Public Works Electronic Bidding
4. Diamond Parking Hyak Parking Consulting Project Report
5. Other business
6. Adjourn
Created on 12/9/2021 1:24:48 PM
KITTITAS COUNTY
PUBLIC WORKS STUDY SESSION MINUTES
Webex
Regular Meeting
MONDAY 1:30 PM December 13, 2021
Board members: Chairman Brett Wachsmith, and Commissioner Cory
Wright.
Others: Josh Fredrickson, Rebecca Cruse, Public Works; Dan Carlson,
Jessica Miller, Community Development Services; (1) One Member of the
Public.
At 1:30 pm Chairman Brett Wachsmith opened the Public Works Study
Session.
CARES FUNDING SWAP
Josh Fredrickson briefed the Board of County Commissioners on sources
of funding for local projects. Josh Fredrickson stated that Public
Works is asking for Board approval to use CARES Funding to move
forward a project replacing a load limited bridge on vantage Highway,
Discussion was held. Staff was directed to move funding as
requested.
PUBLIC WORKS ELECTRONIC BIDDING
Josh Fredrickson stated that Public Works is requesting support from
the Board of County Commissioner's lobbyists to implement changes to
RCW Chapter 36. Josh Fredrickson continued that the changes would
support small county electronic submittal of public works bids and
currently due to Kittitas Counties population the code only allows
for sealed hardcopy bids. Commissioner Cory Wright requested
background documentation on the topic so a discussion can be held at
a future meeting with lobbyists.
DIAMOND PARKING HYAK PARKING CONSULTING PROJECT REPORT
Josh Fredrickson gave background on the report provided by Diamond
Parking Services regarding illegal parking issues at Hyak and the
surrounding area. Josh Fredrickson stated that staff is requesting
direction on the formulation of a regional task force to address the
parking issues and concerns involving stakeholders in the area.
Discussion was held. Staff was directed to Public Works to set up a
meeting with Diamond Parking to discuss further_
Meeting adjourned at 1:48 pm.
2021-12-13 Minutes
Lkb&lSL-'Rebecca Cruse, Administrative
Assistant
2021-12-13 Minutes
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Brett Wachsmith, Chairman
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: December 13, 2021
TOPIC: CARES Funding Swap
ACTION REQUESTED: Move CARES Funding from Kachess Culvert
Replacement to Vantage Highway Cascade Canal Bridge
Replacement
LEAD STAFF:
Mark R. Cook and Josh Fredrickson.
RECOMMENDATION:
Swap CARES funding of Kachess Road Culvert replacement to Vantage Highway
Cascade Canal Bridge Replacement.
BRIEFING SUMMARY:
• Public Works {PW} desires swapping the Board's CARES funding of Kachess
culvert replacement for funding the Vantage Highway Cascade Canal Bridge
replacement.
e The proposal accelerates replacement of the Cascade Canal Bridge by one year.
• The load limited bridge is just east of ACX, a hay press facility.
• Heavy loads continue utilizing Vantage Highway in disregard of the posted load
rating.
• The companion action is a request to solicit for design consultant support meeting
federal procurement requirements.
BACKGROUND:
Recently, PW was noticed by the Board of County Commissioners of 5656,900 in
CARES funding for the culvert replacement at Kachess Road. PW has utilized local
money in design, and we now believe using federal money for construction will not be
supported by Washington State Department of Transportation Local Programs. PW's
Manastash Road bank stabilization project is experiences environmental permitting
delays that necessitate pushing the project to 2023 construction.
DISCUSSION:
It appears that PW's decision to jump start Kachess design with local money now makes
use of federal money in construction unlikely. PW believes it has the capacity to move
the Vantage Highway Cascade Canal bridge replacement ahead on the six-year plan
construction schedule. PW will require consultant support in moving the project ahead
one year. The $656,900 in CARES funding is likely insufficient offsetting anticipated
total project costs. PW will allocate additional Surface Transportation Block Grant
Page 1 of 3
Public Works "Work Session Staff Report", 2021
funding to the project in 2022. Moving rapidly to replace the load limited highly utilized
bridge is expected to limit risk the traveling public owing the high average daily traffic
count on Vantage Highway. Proceeding with complete federal procurement from design
through construction assures maximum grant compliance.
FISCAL IMPACTS:
Kachess Culvert replacement will continue being funded by PW Road Fund reserves.
ATTACHMENTS:
Exhibit 1: ADOPTED SIX YEAR PLAN
Page 2 of 3
Public Works "Work Session Staff Report", 2021
EXHIBIT 1: ADOPTED SIX YEAR PLAN
Page 3 of 3
Public Works "Work Session Staff Report", 2021
(331
i
jagwnu
6ZET
TSO
6LST
L66I
OOOL
009
OOTI
ISED
OSOE
SOLE
O65I
9T4
699
0545
Ut
OSK
MIT 096
OMn
St.?
SOIT
SLS
054
d
g
o
u
ny
fV
N
N
n
ei
y
pp
o
�
4
q
N
N
pOo
N
YO1
ei
4
0
N
N
P
rppl
Q
m
rl
p
m
N
po
I
oOo
ei
O
~
I
S
A
N
m
1
�8
N
spNpy
N
N
a
n
T
e
�
N
m
N
m
e
d
2N
-
-
-
-
-
-
-
a
rc
c
s
eue
c
�
��
k
eue
c
c
I
C
O
Y
6
11.
8
E
gg
i;
g
YE
LL
i�
�nl
6g
.67
6
n
e n
6
6
E
�
�
n
�
$
Y
-
i
¢
N
e
d
ti
Y i
^ d
d a
a
E
a
=
�
Y
E
u
e
p@
8EE
Y
8
4� o
R 6
%
lsagg
c
�
�Mn
n (°�ddS'
�
=dNa
�
E 5
a�
5
G
N
4i�1
O
u
JL
OR1
.R.
L
O
d
C
�;
y
V
Y
p
NI
C
r1
O
C
C
N
aryQ C
y
7 M
=
p
M
p
Ci .gni
S
V
E
a
y
m:>;
h>a
=?84
a
-
m
n
imM
S
m
n
m
N
ro
r�
n
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: December 13, 2021
TOPIC: Public Works Electronic Bidding
ACTION REQUESTED: Docket with the Board's Legislative Lobbyist for 2022
Work Program
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Request support from the Board's legislative lobbyist as an item for his 2022 Kittitas
County work program.
BRIEFING SUMMARY:
• State agencies are allowed to solicit electronic public works (PW) bids.
• Counties with greater than 400,000 population may solicit electronic bids.
• Currently, small counties must receive all bids under "sealed cover".
• Multiple changes in Chapter 36 are required to support small county electronic
submittal of public works bids.
BACKGROUND:
The Washington State legislature authorized electronic submittal of Public Works bids
with Substitute House Bill (SHB) 1841 in 2014 (EXHIBIT 1). Revised Code of
Washington (RCW) at 36.32.235 (5) allows electronic bid submittal for counties that
have more than 400,000 population (EXHIBIT 2). RCW 36.77.020 requires small
counties accept "...all bids under sealed cover..." (EXHIBIT 3). All sealed bids require
bid deposit that is presumed to be hard copy format.
DISCUSSION:
The COVID 19 pandemic nearly disabled FW's delivery of the 2U20 Capital Facility
Plan. Ingenuity prevailed and PW was able to deliver the Brian Abbott Fish Barrier
Removal project at Vantage Highway across Coleman Creek. As we bid just as the
Governor issued his initial stay at home order, PW could not receive bids. A single
bridge supplier requested electronic submittal and we had to decline. Having received no
bids at all, PW sought sole source approval from the Board with support from the
Prosecuting Attorney's Office. Ultimately, we were able to secure the bridge
procurement and the project was delivered on time. A subsequent audit by the state
found that declared emergency (COVID 19) was insufficient rationale allowing our sole
source action. PW disagrees with the Auditor's Office and has not provided any
subsequent justification for our procurement actions.
Page 1 of 5
Public Works "Work Session Staff Report", 2021
The need for electronic bidding supporting Public Works construction cannot be
overstated. Today's dependency on electronic data sharing has not recognized in the
state's County Public Works bidding statues. It is quite likely that at some time in the
future, a similar preclusion against delivery under "sealed cover" is reasonably likely to
occur. PW desires no further friction with the State Auditor's Office regarding project
delivery.
PW has not contacted the Washington Association of Counties to determine the level of
interest statewide in legislative change. The need is clear to PW, and as such, we
encourage the Board to engage the Board's legislative lobbyist for beginning work on the
issue in 2022.
FISCAL IMPACTS:
Undetermined at this time.
ATTACHMENTS:
EXHIBIT 1: CERTIFICATION OF ENROLLMENT SUBSTITUTE HOUSE BILL 1841
EXHIBIT 2: RCW 36.32.235
10.14 UM I I
Page 2 of 5
Public Works "Work Session Staff Report", 2021
EXHIBIT 1: CERTIFICATION OF ENROLLMENT SUBSTITUTE HOUSE BILL
1841
Page 3 of 5
Public Works "Work Session Staff Report", 2021
CERTIFICATION OF ENROLLMENT
SUBSTITUTE HOUSE BILL 1841
Chapter 151, Laws of 2014
63rd Legislature
2014 Regular Session
PUBLIC WORKS CONTRACTING --ELECTRONIC COMPETITIVE BIDDING
EFFECTIVE DATE: 06/12/14
Passed by the House February 17, 2014
Yeas 97 Nays 0
FRANK CHOPP
Speaker of the House of Representatives
Passed by the Senate March 5, 2014
Yeas 49 Nays 0
BRAD OWEN
President of the Senate
Approved March 31, 2014, 2:41 p.m.
JAY INSLEE
Governor of the State of Washington
CERTIFICATE
I, Barbara Baker, Chief Clerk of
the House of Representatives of
the State of Washington, do hereby
certify that the attached is
SUBSTITUTE HOUSE BILL 1841 as
passed by the House of
Representatives and the Senate on
the dates hereon set forth.
BARBARA BAKER
Chief Clerk
FILED
March 31, 2014
Secretary of State
State of Washington
1
2
SUBSTITUTE HOUSE BILL 1841
Passed Leqislature - 2014 Regular Session
State of Washington 63rd Legislature 2013 Regular Session
By House Capital Budget (originally sponsored by Representatives
Stonier, Wa-rnick, Dunshee, Morrell, Ryu, and Freeman; by request of
Department of Enterprise Services)
READ FIRST TIME 02/28/13.
AN ACT Relating to electronic competitive bidding for state public
works contracting; and adding a new section to chapter 39.04 RCW,
3 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
NEW SECTION. Sec. 1. A new section is added to chapter 39-04 RCW
to read as follows:
(1) Any state agency authorized to conduct public works contracting
and competitive bidding under this chapter may do so electronically and
may use or accept electronic signatures in these processes. Such
signatures are deemed presumptively valid and enforceable.
(2) For purposes of this section:
(a) "Electronic signature" means a signature in electronic form
attached to or logically associated with an electronic record.
(b) "State agency" means any state office or activity of the
executive and judicial branches of state government, including state
departments, offices, divisions, boards, commissions, institutions of
higher education as defined in RCW 28B.10.016, and correctional and
other types of institutions.
(3) The office of chief information officer, in coordination with
the department of enterprise services and all state agencies with
p. 1 SHB 1841.SL
contracting authority under this chapter, must establish standards and
2 policies for the electronic submittal of bids and electronic signatures
3 in public works contracting and competitive bidding processes.
Passed by the House February 17, 2014.
Passed by the Senate March 5, 2014.
Approved by the Governor March 31, 2014.
Filed in office of Secretary of State March 31, 2014.
SHB 1841.SL p. 2
EXHIBIT 2: RCW 36.32.235
Page 4 of 5
Public Works "Work Session Staff Report", 2021
11129121, 4:35 PM RCW 36.32.235: Competitive bids—Purchasing department—Counties with a population of four hundred thousand or more—Pu...
RCW .% 3.
Competitive bids—Purchasing department—Counties with a population of four
hundred thousand or more—Public works procedures—Riverine and stormwater
projects—Exceptions.
(1) In each county which by resolution establishes a county purchasing department, the
purchasing department shall enter into leases of personal property on a competitive basis and purchase
all supplies, materials, and equipment on a competitive basis, for all departments of the county, as
provided in this chapter and chapter 39."l� RCW, except that the county purchasing department is not
required to make purchases that are paid from the county road fund or equipment rental and revolving
fund.
(2) As used in this section:
(a) "Public works" has the same definition as in RCW
(b) "Riverine project" means a project of construction, alteration, repair, replacement, or
improvement other than ordinary maintenance, executed at the cost of the state or of any municipality, or
which is by law a lien or charge on any property, carried out on a river or stream and its tributaries and
associated floodplains, beds, banks, and waters for the purpose of improving aquatic habitat, improving
water quality, restoring floodplain function, or providing flood protection.
(c) "Stormwater project" means a project of construction, alteration, repair, replacement, or
improvement other than ordinary maintenance, executed at the cost of the state or of any municipality, or
which is by law a lien or charge on any property, carried out on a municipal separate storm sewer
system, and any connections to the system, that is regulated under a state -issued national pollutant
discharge elimination system general municipal stormwater permit for the purpose of improving control of
stormwater runoff quantity and quality from developed land, safely conveying stormwater runoff, or
reducing erosion or other water quality impacts caused by municipal separate storm sewer system
discharges.
(3) Except as otherwise specified in this chapter or in chapter W-.77 RCW, all counties subject to
these provisions shall contract on a competitive basis for all public works after bids have been submitted
to the county upon specifications therefor. Such specifications shall be in writing and shall be filed with
the clerk of the county legislative authority for public inspection.
(4) An advertisement shall be published in the county official newspaper stating the time and
place where bids will be opened, the time after which bids will not be received, the character of the work
to be done, the materials and equipment to be furnished, and that specifications therefor may be seen at
the office of the clerk of the county legislative authority. An advertisement shall also be published in a
legal newspaper of general circulation in or as near as possible to that part of the county in which such
work is to be done. If the county official newspaper is a newspaper of general circulation covering at
least forty percent of the residences in that part of the county in which such public works are to be done,
then the publication of an advertisement of the applicable specifications in the county official newspaper
is sufficient. Such advertisements shall be published at least once at least thirteen days prior to the last
date upon which bids will be received.
(5) The bids shall be in writing, may be in either hard copy or electronic form as specified by the
county, shall be filed with the clerk, shall be opened and read in public at the time and place named
therefor in the advertisements, and, after being opened, shall be filed for public inspection. No bid may
be considered for public work unless it is accompanied by a bid deposit in the form of a surety bond,
postal money order, cash, cashier's check, or certified check in an amount equal to five percent of the
amount of the bid proposed.
(6) The contract for the public work shall be awarded to the lowest responsible bidder. Any or all
bids may be rejected for good cause. The county legislative authority shall require from the successful
bidder for such public work a contractor's bond in the amount and with the conditions imposed by law.
https://app.leg.wa_gov/RCW/default.aspx?cite=36.32.235 1114
11129121, 4:35 PM RCW 36.32.235: Competitive bids—Purchasing department—Counties with a population of four hundred thousand or more Pu...
(7) If the bidder to whom the contract is awarded fails to enter into the contract and furnish the
contractor's bond as required within ten days after notice of the award, exclusive of the day of notice, the
amount of the bid deposit shall be forfeited to the county and the contract awarded to the next lowest
and best bidder. The bid deposit of all unsuccessful bidders shall be returned after the contract is
awarded and the required contractor's bond given by the successful bidder is accepted by the county
legislative authority. Immediately after the award is made, the bid quotations obtained shall be recorded
and open to public inspection and shall be available by telephone inquiry.
(8) As limited by subsection (11) of this section, a county subject to these provisions may have
public works performed by county employees in any annual or biennial budget period equal to a dollar
value not exceeding ten percent of the public works construction budget, including any amount in a
supplemental public works construction budget, over the budget period.
Whenever a county subject to these provisions has had public works performed in any budget
period up to the maximum permitted amount for that budget period, all remaining public works except
emergency work under subsection (13) of this section within that budget period shall be done by contract
pursuant to public notice and call for competitive bids as specified in subsection (3) of this section. The
state auditor shall report to the state treasurer any county subject to these provisions that exceeds this
amount and the extent to which the county has or has not reduced the amount of public works it has
performed by public employees in subsequent years.
(9) A county may procure public works with a unit priced contract under this section for the
purpose of completing anticipated types of work based on hourly rates or unit pricing for one or more
categories of work or trades.
(a) For the purposes of this section, "unit priced contract" means a competitively bid contract in
which public works are anticipated on a recurring basis to meet the business or operational needs of the
county, under which the contractor agrees to a fixed period indefinite quantity delivery of work, at a
defined unit price for each category of work.
(b) Unit priced contracts must be executed for an initial contract term not to exceed one year, with
the county having the option of extending or renewing the unit priced contract for one additional year.
(c) Invitations for unit price bids shall include, for purposes of the bid evaluation, estimated
quantities of the anticipated types of work or trades, and specify how the county will issue or release
work assignments, work orders, or task authorizations pursuant to a unit priced contract for projects,
tasks, or other work based on the hourly rates or unit prices bid by the contractor. The contract must be
awarded to the lowest responsible bidder as defined under RCW 39XV-..O': ). Whenever possible, the
county must invite at least one bid from a certified minority or woman contractor who otherwise qualifies
under this section.
(d) Unit price contractors shall pay prevailing wages for all work that would otherwise be subject
to the requirements of chapter ? RCW. Prevailing wages for all work performed pursuant to each
work order must be the prevailing wage rates in effect at the beginning date for each contract year. Unit
priced contracts must have prevailing wage rates updated annually. Intents and affidavits for prevailing
wages paid must be submitted annually for all work completed within the previous twelve-month period
of the unit priced contract.
(1 Q) If a county subject to these provisions has public works performed by public employees in
any budget period that are in excess of this ten percent limitation, the amount in excess of the permitted
amount shall be reduced from the otherwise permitted amount of public works that may be performed by
public employees for that county in its next budget period. Ten percent of the motor vehicle fuel tax
distributions to that county shall be withheld if two years after the year in which the excess amount of
work occurred, the county has failed to so reduce the amount of public works that it has performed by
public employees. The amount withheld shall be distributed to the county when it has demonstrated in its
reports to the state auditor that the amount of public works it has performed by public employees has
been reduced as required.
(11) In addition to the percentage limitation provided in subsection (8) of this section, counties
subject to these provisions containing a population of four hundred thousand or more shall not have
https:llapp.leg.wa.gov/RCW/default.aspx?cite=36.32.235 214
11/29121, 4:35 PM RCW 36.32.235: Competitive bids—Purchasing department—Counties with a population of four hundred thousand or more Pu...
public employees perform: A public works project in excess of ninety thousand dollars if more than a
single craft or trade is involved with the public works project, a riverine project or stormwater project in
excess of two hundred fifty thousand dollars if more than a single craft or trade is involved with the
riverine project or stormwater project, a public works project in excess of forty-five thousand dollars if
only a single craft or trade is involved with the public works project, or a riverine project or stormwater
project in excess of one hundred twenty-five thousand dollars if only a single craft or trade is involved
with the riverine project or stormwater project. A public works project, a riverine project, and a
stormwater project means a complete project. The restrictions in this subsection do not permit the
division of the project into units of work or classes of work to avoid the restriction on work that may be
performed by public employees on a single project.
The cost of a separate public works project shall be the costs of materials, supplies, equipment,
and labor on the construction of that project. The value of the public works budget shall be the value of
all the separate public works projects within the budget.
(12) In addition to the accounting and recordkeeping requirements contained in chapter a�.w
RCW, any county which uses public employees to perform public works projects under RCW
shall prepare a year-end report to be submitted to the state auditor indicating the total
dollar amount of the county's public works construction budget and the total dollar amount for public
works projects performed by public employees for that year.
The year-end report submitted pursuant to this subsection to the state auditor shall be in
accordance with the standard form required by RCW
(13) Notwithstanding any other provision in this section, counties may use public employees
without any limitation for emergency work performed under an emergency declared pursuant to RCW
26.:
11/29121, 4:35 PM RCW 36.32.235: Competitive bids—Purchasing department—Counties with a population of four hundred thousand or mare—Pu...
Intent -2016 c 96: See note following RCW
Intent -2016 c 19: See note following RCW M.337.1 21"
Purpose --Part headings not law -2000 c 138: See notes following RCW4-'C-'-.D-7J 51".
Referendum—Other legislation limited—Legislators' personal intent not indicated—
Reimbursements for election—Voters' pamphlet, election requirements --1997 c 220: See RCW
through
https:llapp.leg.wa.gov/RCW/defaull.aspX?cite=36.32.235 414
EXHIBIT 3: 36.77.020 AND 030
Page 5 of 5
Public Works "Work Session Staff Report", 2021
11!29!21, 4:14 PM
RCW
Approval—Call for bids.
RCW 36.77.020: Approval --Call for bids.
Upon approval of such maps, plans, and specifications and the filing thereof the board shall, if it
determines that the work shall be done by contract, advertise a call for bids upon such construction work
by publication in the official county paper and also one trade paper of general circulation in the county, in
one issue of each such paper at least once in each week for two consecutive weeks prior to the time set
in the call for bids for the opening of bids. All bids shall be submitted under sealed cover before the time
set for the opening of bids.
C. C. Prior: Ml. -03 c S7 3; prior: 1937 c 187 § 32, part; RRS § 6450-32, part.]
https:llapp.leg.wa.gov/RCWidefault.aspx?cite=36.77.020 1!1
11129121, 4:15 PM
RCW• ... f .k!v'J
Opening of bids ---Deposit.
RCW 36.77.030: Opening of bids—Deposit.
At the time and place fixed in the call for bids, such bids as have been submitted shall be publicly
opened and read. No bid may be considered unless it is accompanied by a bid deposit in the form of a
surety bond, cash, cashier's check, or certified check in an amount equal to five percent of the amount of
the bid proposed.
[ 6 c 3E3 C.3; ', : ' "° c : & 33.77., W. Prior: 'i � c 6-7§4-V. prior: 1337 c 187 § 32, part; RRS § 6460-
32, part.]
https:llapp.leg.wa.gov/RCW/default.aspx?cite=36.77.030 111
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: December 13, 2021
TOPIC: Diamond Parking Hyak Parking Consulting Project Report
ACTION REQUESTED: Direct Staff
LEAD STAFF:
Mark R. Cook
V%KKO-18 V51010I t : erM
Direct staff implementing actions identified by Diamond Parking contained in the
recently received "Hyak Parking Consulting Project Report".
BRIEFING SUMMARY:
• Public Works (PW) recently received the project report from Diamond Parking
evaluating parking issues in Hyak.
• Strategies and alternatives along with policy actions are contained in the report.
• Short term actions for immediate consideration and long-term actions for
additional evaluation make up the recommendations of the report.
• Diamond Parking interviewed numerous stakeholders developing the report.
• Public Works has already begun implementation of recommended short-term
actions.
BACKGROUND:
Responding to persistent illegal parking problems in Hyak, PW sought out the services of
Diamond Parking, the nation' oldest parking consultant. PW prepared the project scope
of work and supporting Diamond throughout the project. Key to finding the scale and
scope of the project, the following stakeholders were interviewed for their perspectives
on the problem:
• United States Forest Service (USFS)
• Washington State Parks (WSP)
• Kittitas County Sheriff's Office (KSO)
• Snoqualmie Pass Public Utility District (SPUD)
• Snoqualmie Pass Fire and Rescue (SPF&R)
• The Summit at Snoqualmie
• Kittitas County Department of Public Works
Page 1 of 3
Public Works "Work Session Staff Report", 2021
DISCUSSION:
Illegal parking at Snoqualmie .Pass continues challenging PW, KSO, SPUD and WSP
resources. During the past several years, PW has sponsored code amendments (County
Code) providing increased dis-incentives for those illegally parking in Hyak. This most
recent code cycle resulted in a favorable amendment increasing illegal parking fees to
$200 and adding a new definition (traveled way) to the list of illegal parking areas.
The ongoing impacts to area residents and service providers create unsafe conditions for
any level of emergency response. The severity of the problem mandates a regional
approach to resolution. Strategies, alternatives and long-term recommendations are
summarized for Board consideration and listed below.
Immediate actions include the following:
• Increased signage along Hyak Drive East and Keechelus Drive on both sides of
the road (underway).
• Specific verbage on signage such as "No Parking Anytime" and "No Loading or
Unloading of Vehicle" (underway — signage blank supply issue currently).
• Minimum fee set at $200 (complete).
• Continue deployment of message sign at the entrance and place an additional sign
at the intersection of Hyak Drive East and Rampart Drive (underway).
• Assign a Deputy (7 AM to 5 PM) on Friday -Sunday) during winter ski season.
• Once per weekend position a tow truck at the Hyak entrance near the message
board.
Potential future implementation:
• Create a regional task force.
• Expand stakeholders to include Department of Transportation and Washington
State Patrol.
• Consider a vehicle immobilization device as a supplement to law enforcement
efforts.
• Expand the area of impact.
• Create a website addressing all things recreational in the greater Hyak area.
• Link the website to other stakeholder websites.
• Acquire land for additional parking.
• Evaluate a "third party" service provider for parking enforcement.
• Evaluate PW two fleet and impound yard.
Should the Board desire a direct discussion with Diamond Parking representatives, Task
number 5 allocates budget for a meeting with decision makers.
FISCAL IMPACTS:
The evaluate cost PW $41,000.
ATTACHMENTS:
Exhibit 1: DIAMOND PARKING "HYAK PARKING CONSULTING PROJECT"
Page 2 of 3
Public Works "Work Session Staff Report", 2021
EXHIBIT 1: DIAMOND PARKING "HYAK PARKING CONSULTING PROJECT"
REPORT
Page 3 of 3
Public Works "Work Session Staff Report", 2021
�.4c
.lk -
a
PARKING
MON�w
SERVICE
SINCE 1922.'
I
HYAK PARKING CONSULTING PROJECT
Prepared for Mark R. Cook, PE
Public Works Director,
Kittitas County Public Works
PARKING
IAM
?SERVICE
SlNCE''�_ NN
1922
"qam4 Oawred s 1powAt'
IDEAR MR. COOK,
Please review the enclosed report covering the Scope of Work delineated in the agreement between
Kittitas County Public Works and Diamond Parking Services in the fall of 2021.
This is a comprehensive assessment of the parking environment as it exists in the Hyak area with a
specific examination of the Hyak Dr East and Keecheius Drive roadways. Enclosed you will find an
explanation of our findings, potential liabilities associated with those findings, solutions that can be
quickly implemented to help mitigate that liability as well as strategic long-term suggestions for a more
comprehensive approach to the parking management within the greater Hyak area. We have also
included some suggestions for potential technologies that could be utilized or used as a baseline for
further "needs based" sourcing specifications.
We look forward to your review of these findings and we will be available to answer questions regarding
the information provided in this report. We will also be available for presentation purposes as needed.
PATRICK SEWARD, MBA, CPP
Regional Manager I Diamond Parking Services
2050112th Ave NE, Suite 110 1 Bellevue WA 98004
O: 425.462.42081 C: 425.971.7144 Patrick.seward@diamondparking.com
�!J PA��p�R/j�KING
G IRi N 1k>
SERVICE
SINCE '1922
PARKING
4AMON
SERVICE
SINCE 1922
"a1a.�tgR P1�d � Pt®d"
ITABLE OF CONTENTS
EXECUTIVE SUMMARY I Page 06
INTRODUCTION I Page 09
BACKGROUND I Page 11
EXISTING CONDITIONS I Page 13
STRATEGIES & ALTERNATIVES Page 16
POLICY ACTIONS I Page 22
COST FOR IMPLEMENTATION Page 27
CONCLUSIONS I Page 29
SCOPE OF WORK E Page 32
ADDENDA I Page 35
PARKING
IAI_ I
SERVICE
SINCE 1922
PARKING
n'IAMON
SERVICE
SINCE 1922
D
EXECUTIVE SUMMARY
Page One of Two
Kittitas County Public Works, In response to increasing complaints and pressure from numerous
residents and stakeholders, commissioned a report from Diamond Parking Services (DPS) who is one
of the preeminent parking and municipal consultative services in the Pacific Northwest. DPS was
tasked with helping to determine and quantify the scope of any potential illegal parking issues within
the Hyak community as it specifically pertains to Hyak Dr East and Keechelus Drive while also
developing a sense of the potential issues as they may apply to the surrounding greater Hyak area.
After conducting a thorough review of the area specified, interviewing as many stakeholders as
possible, touring the location numerous times and researching relevant vehicle trip metrics, DPS was
able to determine that a significant illegal parking issue does exist. The illegal parking issues are
described in detail in the attached report, but it is important to highlight that these issues are
sufficient to warrant a high degree of attention from the County. The elevated level of risk
associated to visitors, residents, employees, and the greater public in general indicates a high
priority need for solutions to help mitigate these issues. This risk applies to all stakeholders within
the greater Hyak area and as such a regionalized approach to a solution is warranted.
As part of this report, a series of strategies as been outlined to help provide guidance to the County
as to how to potentially mitigate the delineated illegal parking issues. Some of these strategies can
be immediately implemented (or are suitable for implementation in the near term) while the other
strategies are more suitable for future implementation and these solutions are meant to provide a
general understanding of what may be possible for the County to implement in the future.
Increasing the existing number of signs posted, improving the visibility of said signage, allowing for
alteration of the County Code to include an expanded set of "No Parking" regulations for better
enforcement, increasing the "fee" associated with illegal parking, and the dedication of a Kittitas
County Sheriff's Deputy to the allocated area during the peak winter month periods (mainly winter
weekends) are some of the strategies that are recommended for immediate implementation.
<KING
SERVICE
SINCE 1922
ei6je..,4
8r orB3Q&tl
EXECUTIVE SUMMARY
Page Two of Two
There are several strategies, which could help further mitigate the delineated risk identified, but
these strategies would require further investigation to determine potential viability. Creating a
"Regional Committee or Taskforce" encompassing all the stakeholders in the greater Hyak area
would be the most thorough and advisable approach. Evaluating the "Vision" for the greater Hyak
area and then creating a consistent system of management to achieve that vision would be one
recommended item for that group to consider. Further, utilizing suitable technologies (some options
appended to this report) to help manage that process as well as to provide consistent, relevant
communication to the public and all stakeholders would also be recommended.
It is apparent that a significant problem exists stemming from the lack of parking available in the
greater Hyak area. All stakeholders interviewed during this evaluation have acknowledged an on-
going parking issue within the greater Hyak area and have indicated a willingness to work to solve
these issues. Each stakeholder has certain steps they could take to help mitigate the parking issues
within the greater Hyak area and they should be encouraged to do so. The best result will come from
a symbiotic approach as it is exceedingly difficult to separate one set of roadways from another just
as it is difficult to ascertain how much of an illegal parking issue in any one section is due to the use
of one amenity i.e., how much traffic/parking is due to snow shoeing or tubing vs skiing. Thus, a
coordinated approach would manifest the best results however, if the creation of a "Regional
Committee or Taskforce" would lead to a significant delay then it is advised that each stakeholder
should take those steps immediately available to them to limit the safety concerns as quickly as
possible. A coordinated communication system could be implemented at a later date. To the extent
that the County is exposed to enhanced risk resulting from the associated illegal parking problems on
Hyak Dr East and Keechelus Drive, it would be advisable for the County to take immediate steps to
limit the associated liability inherent to those issues.
PARKING
SERVECE
SINCE 1922
-4-419-9 a 8P -4-t„
j 1��iU�iilr�lf-
sEIIvice
SING1922
INTRODUCTION
Page One of One
Diamond Parking Services (DPS), herein after referred to as CONSULTANT, was retained by the
Kittitas County Public Works Department to assess the Hyak area parking program. CONSULTANT
was specifically tasked to complete the following: help identify existing structure and issues,
inventory potential strategies and identify a preferred alternative solution, identify potential policy
actions required to implement the preferred alternative solution as well as identify potential costs
associated with the implementation of the alternative solutions (the complete scope of work is
attached as an exhibit in this report) regarding the potential parking issues in the greater Hyak area.
During this process the CONSULTANT independently toured the entire greater Hyak community
area, as well as the specific roadways delineated (Hyak Dr East and Keechelus Drive -see map I
attached), on multiple occasions at different times/days and toured the location with a
representative of the Kittitas County Sheriffs office.
These tours allowed CONSULTANT to gain additional knowledge and to further understand the
parking zones, restrictions, potential issues associated with increased parking demand within the
area as well as how the surrounding areas would impact these specific roadways especially in the
winter months.
CONSULTANT then scheduled interviews with as many stakeholders associated with this area as
possible. CONSULTANT was able to complete interviews with representatives of the Kittitas County
Sheriff's office, Snoqualmie Pass Fire and Rescue, Snoqualmie Pass Utility District, Washington State
Department of Parks, the US Forest Service, Kittitas County Public Works, and the management of
the Summit at Snoqualmie Ski Area. This process further helped to define and clarify the scope of the
issue in the greater Hyak area as well as to specifically identify the immediate issues associated with
seasonal parking on Hyak Dr East and Keechelus Drive. Potential short-term solutions for immediate
implementation as well as potential longer-term implementation strategies are identified in this
report.
##PARKING
J��4 _
SERVICE
SINCE 4 i 922
PPAnnR��KING���!
PAMO Y
SERVICE
y� �f 1922
rr� Vf.a a op..&r
BACKGROUND
Page One of One
The community of Hyak has been seeing on-going development with an increase in population,
especially during the winter months. In addition, the popularity of the outdoor recreational services
offered in the area has been increasing commensurate with the additional development and
population increase in the nearby communities as well as in the greater Seattle Metro/Puget Sound
Area. In conjunction with the increase in population and popularity of outdoor recreation, there has
been a correlated increase in vehicle traffic on 1-90 at Snoqualmie Pass. The 2015 Washington State
Department of Transportation Annual Traffic Report showed 29,000 vehicles traversed the 1-90 pass
daily (M -Fri). The latest estimate from 2019 shows 31,000 vehicles making this trip daily (M -Fri) with
that number doubling on holidays and weekends. Further, they estimate that the daily vehicle count
will increase to more than 39,000 by 2040. Given the increase in parking related issues within the
greater Hyak area, especially on weekends during the winter months, this is strong evidence of
correlation regarding the increased parking issues.
1-90 Snoqualmie Pass Daily Vehicle Traffic 9 M -Fri a Weekend/Holiday
100,000
80,000
60,000
40,000
20,000 0
0
I-J0Sroq.ahiePaz VehdeTraffic-2015 ADSnoquatnlePass Veh'deTraffr-2C29 ACSnocualm'.ePass VehideTrafft2043
Increased demand for parking within the greater Hyak area is invariably linked to the population
growth of the region, the increased popularity of the outdoor recreation available in the greater
Hyak area, the rapid growth in vehicle traffic, particularly single/double occupancy vehicles due to
COVID-19 fears, and the effects from the COVID-19 restrictions or closures placed on other forms of
entertainment and popular indoor activities. While the effects of the COVID-19 restrictions may be
waning as the rate of transmission slows, it is far from certain what the net effect will be regarding
transportation and people's behavioral patterns.
+""" PARKING
A1.101
SERVICE..W
SINCE 1922
N 0--d a 6P -"J*'
eFARKING
SERVICE
SINCE 7922
.,qam4 &mod 6�'�
Agencies & Representatives
Joe Rausch
District Ranger, USFS
Pam McConkey
Manager, Washington State Parks Dept
Mark Rickey
Deputy sheriff, Kittitas County Sheriff's Dept
Tom Hastings
General Manager, snoqualmie Pass Utility Dist
Mark Cook
Public Works Director, Kittitas County Dept Public
Works
Jason Goeman
Deputy, Kittitas County Sheriffs Dept
Jay Wiseman
Fire Chief, Snocivaimie Pass Fire and Rescue
Guy Lawrence
President and GM, The Summit at Snoclua mle
N
When conducting the assessment of the current
parking environment and existing conditions within
the Hyak area and specifically on Hyak Dr East and
Keechelus Drive, CONSULTANT conducted interviews
with the agencies and their representatives listed to
the left.
The feedback provided from these groups was
invaluable in assessing the situation and provided
some guidance to help begin to quantify the scope of
the problem(s). It should be noted that all individuals
interviewed were aware of a parking management
issue within the greater Hyak area and all were
supportive of finding a solution that would assist with
mitigating these issues. All participants were helpful
and provided insight into their viewpoint of the
issue(s) as it pertained to their scopes of
responsibility. This is significant to note as it indicates
the overall issues are not only serious enough to
register across this diverse spectrum of agencies but
that the issue(s) have increased in severity enough to
warrant the support of a "Regional' solution across
these agencies. As such, the potential longer-term
solutions presented later in this report stand a better
chance of implementation based upon the higher
level of attention to these issues as well as the
willingness to cooperate exhibited during the
interviews with each of these representatives.
LARKING
JAMOKI
SERVICE
SINCE 1922
The increased demand for parking in the Hyak area in conjunction with the severely limited supply of
parking spaces available has resulted in the proliferation of "Illegal parking" along the sides of Hyak Dr
East and Keechelus Dr in particular, as well as, in other areas of the roads connected to exit 54. (Neither
Hyak Dr East or Keechelus Dr are wide enough to accommodate this parking without the potential for
partially blocking the roadway and have been deemed "No Parking" Zones by Kittitas County. The
amount of vehicles parking illegally along the shoulders of these roads has increased to the point that it
has become a public safety issue for the community, and the parkers themselves, as these roadways are
only 22 feet wide with a 1 -2 -foot average shoulder width. The proliferation of parking along these
roadways, especially in the winter months, has led to these vehicles blocking access to residents'
property, blocking access to fire hydrants necessary for emergency use, blocking access to snowplows and
emergency vehicles needed to respond to emergent situations in the area and blocking the egress for
residents and workers in the greater Hyak area.
Further, many of these visitors are exiting their vehicles to change into/out of their snow gear,
collect/unload equipment or other passengers and are thus blocking the flow of traffic by being physically
in the roadway. These individuals then walk down the road itself, while navigating traffic, to reach their
intended destination: Sledding Park, Snowshoe area, Ski area etc. These issues have resulted in increased
calls from angry constituents to the Kittitas County Sheriff's office, to the Kittitas County Public Works
Department and other agencies to complain about the parking situation and misuse of roadways. The
increased risk associated with these issues is significant for all entities and agencies involved. Given the
vastly increased flow of traffic, the high rate of "illegal parking" and unauthorized activities, the
associated environmental and structural factors, and the rapid growth of pedestrian traffic resulting from
these factors, it is estimated that the odds of an "emergent" event are high.
PARKING
SERVICE
$IIfNCE I1 ,,ff 1922
L�l
})PARKiNPARKINGI ii O
SER��b
VECE
ANCe C1922
The strategies and alternatives presented will be broken down into different categories based upon
solutions that can potentially be implemented immediately/short term and those that would need to be
implemented in the future based upon several factors, such as: Policy agreement on implementation,
equipment acquisition needs and requisite purchasing processes, potential code additions and/or
alterations, coordination with other agencies/stake holder's, sourcing of manpower necessary to complete
work, potential community discussion and involvement etc.
Strategies for potential immediate implementation include:
Increased frequency of signage along Hyak Dr East and Keecnelus Drive on both sides of the road. This
will increase visibility, reduce the ability of the parker to claim that a sign was not seen, and limit the
illegal parking in front of fire hydrants and residents' driveways.
• More specific verbiage on the existing signs and added signage to reflect "No Parking Anytime" as well
as "No Loading or Unloading of Vehicle". These signs should also include the delineated fine
amount/penalty for this activity. It is recommended that the language for the fee be attached as a
separate sign under the main "No Parking Anytime" and "No Loading or Unloading of Vehicle" sign to
allow this rate to be altered as necessary without the need to completely replace the entire sign thus
limiting the future cost of replacement signage.
• The parking notice fee issued for violating these codes and parking along the side of these roads should
remain a minimum of $200 for the first occurrence and have an escalating fee amount for future
occurrences as code allows. These signs should also reflect the $200 monetary fee and/or vehicle
impound for violating this code.
PARKING
SERVICE
v
SINCE 1922
.,q-4
Strategies for potential immediate implementation [continued]:
• The signs used to display the "No Parking Anytime" and'No Loading and Unloading of Vehicle" should
utilize reflective paint and where possible a "color" border around the exterior edges of the signage.
This will allow for greater visibility both at night and when snow is present.
• Continue to utilize the "Digital Reader Sign" at the entrance to Hyak Dr East and positioned between
the "Gravel lot -North of Hyak Dr" and the "Gravel lot -South of Hyak Dr" prior to Hyak Dr turning
East/South-East. This sign is highly visible and is an excellent source to communicate to potential
parkers that there is no parking along Hyak Dr East and Keechelus Drive. This sign should display the
"No Parking Anytime on these Roadways" and direct them to use the gravel lots to turn around. This
will help to prevent congestion on Hyak Dr East and Keechelus Drive as well as to limit the temptation
for these parkers to traverse these roads and park on the side of the road. This sign should also display
the penalty for illegal parking; $200 Fine and/or Vehicle Impound.
• An additional "Digital Reader Sign" should be positioned facing north on Hyak Dr East at the
intersection of Hyak Dr East and Rampart Drive once again reiterating the same message as the first
reader board sign and directing vehicle to turn up Keechelus Drive to circle back out to the exit of the
Hyak area. This will not only help deter parking along both roadways, but it will also help to ease
congestion by providing clear direction to steer vehicle traffic out of the neighborhood in an orderly
manner. The placement of this second sign will also help to limit the abuse of the shoulder parking on
Hyak Dr East in front of the Snoqualmie-KC Shared Facility.
PARKING
iAMON
SERVICE
SINCE I1 .I4 1922EE
1f�6I Vu+Weii � VFB7RlHW"
Strategies for potential immediate implementation (continued):
• Assign a Deputy from the Kittitas County Sheriff's Department to patrol these roads on Friday, Saturday,
and Sunday from 7:00 AM until 5:00 PM during the winter ski season. The increased visibility of this
officer will help to create a mitigating effect on the illegal parking and allow for prompt enforcement of
the parking codes.
Once per weekend (Saturdays if possible) partner with a towing company to station a tow truck in the
entrance to the Hyak community. This tow truck should be parked with its safety'ights flashing, near the
first digital reader board on Hyak Dr East. This will draw increased attention to the reader board sign and
emphasize the serious nature of violating the posted parking rules. This will also allow for the prompt
impounding of vehicles that are scofflaws (multiple time parking violators) and those vehicles that are
parked creating more severe safety issues.
PARKING
L
f SERVICE
SINCE // +I 192b2
"q-4iJf[d a Op" -44W
Strategies for potential implementation in the future:
• Work to create a "Regional Committee" or "Transportation Taskforce" made up of all existing
stakeholders in the greater Hyak area to coordinate and create an organized, strategic long-term plan
for the management of the greater Hyak area including public and private properties.
Attempt to engage the Department of Transportation, the Washington State Patrol and a community
representative in the solution seeking process.
Evaluate utilizing a vehicle "Immobilization" device to supplement enforcement activities and allow for
immediate enforcement of a graduated penalty system for repeat offender vehicles (Scofflaws). See
page 39
Expand the pertinent scope of work to include the Gold Creek Sno-Park, Lake Mardee Road, SR 906,
Hyak-Snoqualmie Tunnel Parking area, the neighborhood roadways feeding into Hyak Dr East and the
three (3) large gravel parking lots owned by The Summit at Snoqualmie. See page 36
• Create a website and an "app" containing "all things" recreational in the greater Hyak area and use this
to provide real time communication to the public regarding events happening in the Hyak area
including weather conditions, road work, parking availability (or lack thereof), directions to legal
parking etc.
PARKING
SERV CE
SINCE1922
//
Strategies for potential implementation in the future (continued):
• Link this website and "app" to existing website's traversed by the public such as, the Washington State
Parks website, The Summit at Snoqualmie site, the Washington Department of Transportation (WADOT)
site and the USDA/US Forest Service site. It should also be linked to applicable social media sites such as
Facebook, Instagram, and Twitter for wider public dissemination.
Consider purchasing land for additional parking or building upon existing land to add additional parking
to accommodate for the growing demand.
• Evaluate utilizing a third -party service provider to help enforce the parking regulations, manage the
website and social media communications as well as to act as general management for the overall
"Regional Operation" as delineated by the "Regional Committee" or "Transportation Taskforce". if this is
not feasible then individual stakeholders should evaluate utilizing a third -party to manage their
segments and coordinate with each other to ensure a consistent level of integrated enforcement and
management experience to the public across all properties and stakeholders.
• County to assess efficacy of operating a municipally operated tow yard and operation to support
enforcement and public safety efforts in the greater Hyak area.
PARKING
I Iil�i
11
11W
SERVICE
SINCE 9922
••4-41x1 6��
?PARKING
SERVICE
$INCE 1922
-4 d B & Off,
Regarding Policy Actions necessary to move forward with the implementation of the "immediate
strategies" proposed, it is CONSULTANTS understanding that KCC 10.06.050 has already been amended to
read as follows:
"Any vehicle parking in any county parking area in violation of this chapter shall be towed and impounded
at the owner's expense as provided in Ch. 46.55 RCW. Vehicles parked in violation of this code section are
subject to a $200 fine payable and appealable as provided in Ch. 46.63 RCW. Said fines and impoundment
shall be effective upon installation of appropriate signs."
Insofar as KCC 10.06.050 appears to refer to the specified parking areas defined in KCC 10.07.010 and as
delineated in CONSULTANTS scope of work to include Hyak Dr East and Keechelus Drive, CONSULTANT
recommends that County review whether the addition of "No Loading and Unloading" verbiage to the
posted signage and pursuant to the same penalty fee, should be governed in this (or any other) Code
Chapter within County Ordinances. Further CONSULTANT recommends discussion as to whether
additional verbiage should be added to current County Code to encompass the "Immobilization" of a
vehicle and whether or not that constitutes the Counties legal definition of "Impounding" of a vehicle.
While this strategy recommendation would be more applicable to potential future implementation, it may
behoove County to consider this question concurrently while evaluating the addition of the "No Loading
or Unloading" verbiage to County Code thus saving time for the Commissioners and all members involved.
Please see City of Olympia Washington Municipal Code referencing these items on the following pages.
PAR00�KING
is N
SERVICE
SINCE 1822
" duvr®d & �Jpaeut®d°,
' 10.16.290 Immobilization
A. If the owner of a vehicle to whom notice has been sent pursuant to OMC 10.16.280.0 fails to
respond to the notice within the deadline therein specified by paying all fines, fees, towing, storage
and administrative charges then due, including but not limited to the amount(s) specified in
OMC 4.60.020 "Vehicle Immobilization and Impoundment Costs, Fees, and Civil Penalties" so that
the vehicle can be removed from the scofflaw list under OMC 10.16.280. F, then, at the discretion of
a Parking Services Field Representative of the Community Planning and Development Department
or a police officer, such vehicle may be immobilized by installing on such vehicle a device known as
a "boot immobilization device," which immobilizes the vehicle either by damps and locks on to a
wheel of the vehicle and impedes movement of such vehicle, or by attaching to the vehicle's
windshield in such a manner to obscure the view of the driver, thereby preventing legal operation
of the vehicle.
B. The person installing the immobilization device shall leave under the windshield wiper or
otherwise attach to such vehicle a notice advising the owner that such vehicle has been
immobilized by the City of Olympia far failure to pay three (3) or more uncontested parking tickets
within thirty (30) days of their issuance, that release of the immobilization device may be obtained
by paying the fines, fees and civil penalties due, that unless such payments are made within two (2)
business days of the date of the notice, the vehicle will be impounded, and that it is unlawful for
any person to remove or attempt to remove the immobilization device, to damage the
immobilization device, or to move the vehicle with the immobilization device attached.
C. No parking restriction otherwise applicable to the vehicle applies while the vehicle is
immobilized by an immobilization device installed under the provisions of this section.
D. Before the vehicle maybe released from immobilization, the vehicle owner or an agent of the
owner shall pay all fines and fees then due, including but not limited to the amounts specified in
OMC Section 4.60.020 "Vehicle Immobilization and impoundment Costs, Fees, and Civil Penalties."
Upon such payment the vehicle shall be removed from the scofflaw list and the Supervisor or
designee shall authorize the removal of the immobilization device from the vehicle. if any parking
ticket not included on the scofflaw list for which the owner is liable becomes overdue before the
owner or agent pays, such subsequent tickets shall also be paid before the vehicle may be removed
from the scofflaw list or released from immobilization.
(Ord. 7230 §1, 2020 Ord. 6932 §2, 2014; Ord. 6882 §1, 2013; Ord. 6450 §3, 2006)
PARKING __
NIO1
SERVICE
SINCE 1922
"4-,w4 Oavwd a lJpou"'
' 10.16.300 Impoundment
A. At the discretion of a Parking Services Field Representative of the Community Planning and
Development Department or a police officer, the following vehicles may be impounded.
1. A vehicle that was involved in five (5) or more parking tickets that are unpaid thirty (30) or more
days after the date of their issuance, where the registered owner of the vehicle was sent a notice
pursuant to OMC 10.16.280.0 and the owner fails to respond to the notice within the deadline therein
specified by paying all fines, fees, towing, storage and administrative charges so that the vehicle con
be removed from the scofflaw list under OMC 10.16.280.F; or
2. A vehicle that was immobilized pursuant to OMC Section 10.16.290 and the vehicle's owner failed
to pay all fines, fees, and administrative charges within two (2) business days of the date the vehicle
was immobilized so that the vehicle can be removed from the scofflaw list under OMC 10.16.280. F; or
3. A vehicle that has received three citations for parking in violation of OMC 10. 16.030 "Recreational
Vehicles..." within any one calendar year and for which notice of impoundment has been securely
attached to and conspicuously displayed on the vehicle twenty-four (24) hours prior to such
impoundment; or
4. A vehicle that has received three (3) consecutive citations for parking in violation of OMC Section
10.16.055.D.3, "Residential Parking Program... " andfor which notice of impoundment has been
securely attached to and conspicuously displayed on the vehicle twenty-four (24) hours prior to such
impoundment; or
5. A vehicle that has received three (3) consecutive citations for parking in violation of OMC
Section 10.16.160.F, "City Parking Lots..." and for which notice of impoundment has been securely
attached to and conspicuously displayed on the vehicle twenty-four (24) hours prior to such
impoundment;
6. As otherwise authorized by the Model Traffic Code as adopted by reference in the Olympia
Municipal Code;
Z A vehicle that has received three (3) consecutive restricted citations and/or is deemed a hazard to
motorists or pedestrians,
S. A vehicle that has occupied a metered parking space twelve (12) hours after the meter/s have
been hooded/barricaded/sandwich boarded far reservation; or
9. A vehicle that has occupied a load zone for twenty-four (24) hours and has received three (3)
consecutive load zone violation citations.
P:>1922
JA
SINCE //� //
J
' 10.16.300 Impoundment (continued)
B. The Parking Services Field Representative or police officer, as applicable, shall use the uniform
impound authorization and inventoryform provided for by administrative rule by the Washington
State Patrol pursuant to RCW 46.55.075.
C. If a vehicle has been impounded pursuant to OMC 10.16.290, before the vehicle maybe
released from impound, the vehicle owner or an agent of the owner shall pay all fines and fees then
owing, including but not limited to the amounts specified in OMC 4.60.020 "Vehicle Immobilization
and Impoundment Costs, Fees, and Civil Penalties", and all towing and vehicle storage charges.
Upon such payment, the vehicle shall be removed from the scofflaw list. If any parking ticket not
included on the scofflow list far which the owner is liable becomes overdue before the owner or
agent pays, such subsequent tickets shall also be paid before the vehicle may be removed from the
scofflaw list or released from impoundment.
D. If a vehicle has been impounded for o violation of OMC 10.16.030, 10.16.055, or 10.16.160 the
vehicle may be immediately released from impound upon payment of oll impound, tow and any
other charges due the tow company.
(Ord 7230 0, 2020; Ord. 6932 §2, 2014; Ord. 6882 §1, 2013; Ord. 6566 §3, 2008; Ord. 6450 §4,
2006).
NOTE: It may be necessary to evaluate KCC Chapter 10.04 Uniform Standards for Road Signs and
Traffic -Control Devices to ensure that CONSULTANT recommendations regarding the addition of a
colored border and reflective quality to the "No Parking Anytime" and "No Loading and Unloading"
signage is compliant with these standards.
Finally, potential Policy Actions regarding the formation of a "Regional Committee" or
"Transportation Taskforce" and/or any potential collaboration with other stakeholders within the
great Hyak area (public or private) could be discussed with further review and within the scope of
a follow-on project.
PARKING
I IM b
SERVICE
SINCE 1922
PARKING
aAMON
SERVICE
SINCE 1522
The cost associated with the items recommended for immediate implementation span both internally
(County) sourced and externally (third party) sourced work. It is CONSULTANTS understanding that County
Parking signage is internally sourced and created via existing suppHer agreements and as such this cost
estimate would be best estimated by the County. In CONSULTANTS experience, and as a comparison,
signage cost for the type of signs recommended in 'cask 2 should be in the $175-$225 range per sign
package (not including installation). The County has already sourced a "Digital Reader Sign" for utilization as
vehicles enter Hyak Dr East and it is recommended that County utilize existing relationships to procure an
additional "Digital Reader Sign" for implementation as delineated in Task 2.
The potential cost of assigning a Deputy from the Kittitas County Sheriff's Department to the Hyak area
from 7:00 AM -5:00 PM Friday -Sunday, during the winter months, is indeterminate. This would be best
estimated by the Kittitas County Sheriff's Department and based upon staffing availability may be impacted
by other factors such as overtime pay policies. It is recommended that an estimate be obtained from them
to help clarify this cost.
CONSULTANT had recommended partnering with a local tow company to provide an on-site/on-call tow
vehicle to post at the entrance to the Hyak area during peak weekends during the winter months.
CONSULTANT was able to determine that Cascade Towing & Repair had previously provided a similar service
to The Summit at Snoqualmie several years ago. As such, they have a general understanding of the
procedures CONSULTANT is recommending and would be a good fit for this partnership. Further sourcing
for comparison services and prices may be warranted. Initial estimated cost to implement this suggestion
is approximately $125.00 per hour.
All other recommendations for immediate or potential future implementation entail staff labor cost
incurred internally by existing County staff and/or would be potentially variable third -party costs based
upon an indeterminate scope of work. As such, CONSULTANT would need to further evaluate in a follow-on
project designed to address the specific scope of those strategies.
0AMI
�/Q9
SERVICE/
SINCE 1922
"42"4 0p04&ted,•
pI ppK��
�IAMON
SERVICE
SINCE 4422
"46m4 ala vwd & '��
CONCLUSIONS
Page One of Two
After careful examination of the layout of the area delineated in the scope of work in conjunction
with the information gathered from the stakeholder interviews, it is clear that a major illegal parking
issue exists on the roadways delineated in the scope of work.
Further examination of the historical trip data and vehicle counts provided within the Washington
State Department of Transportations Annual Traffic Report, the trip data from the US Department of
Transportation Bureau of Transportation Statistics, the correlating forecast data for cor" ----
population and vehicle traffic growth in the Greater Puget Sound Area and the Seattle/Eastside in
specific indicates that the volume of traffic and the subsequent usage of the Hyak area recreation
amenities will continue to increase in the years to come.
The essence of the inter -related transportation and parking issues within the greater Hyak Area,
which show direct causation to the illegal parking issues on Hyak Dr E and Keecheius Drive, can be
traced to a traditional "supply and demand" curve. There is simply more demand for parking within
this area than currently exists. This demand is not likely to abate in any significant way in the future
and in fact, it is highly likely that it will increase annually for the next few years.
In addition, given the increased popularity of the area, the heightened public awareness of this area
and its world-class outdoor recreation opportunities by newly exposed outdoor enthusiasts and the
planned expansion of "summertime" activities by some of the relevant stakeholders, it seems likely
that the parking supply and demand issue will become a year-round problem if left unaddressed.
S
PARKING
1O
SERVICE
SINCE 1922
CONCLUSIONS
Page Two of Two
The specific illegal parking issues resulting from the increased parking demand/lack of parking supply
have created an extremely unsafe situation for the public with a high potential for liability (shared
or otherwise) for the stakeholders involved. There is a high rate of probability for pedestrian/vehicle
accidents on Hyak Dr E, Keechelus Drive and/or the surrounding roads in the greater Hyak area.
Given the increased vehicle volume and the adverse driving conditions often encountered in the
winter months it is probable that there will also be an increased occurrence of vehicular accidents
on these roads as well.
The public safety of the visitors, employees, and residents of the Hyak area is being impaired by the
illegal parking activity on these roads. CONSULTANT would recommend a vigorous analysis of the
potential liability associated with the current situation in that area by Counties Risk Management
personnel to provide context to CONSULTANTS views.
CONSULTANT would recommend the implementation of as many of the "immediate recommended
strategies" listed as quickly as possible with the follow-on examination of the "potential future
implementation strategies" to help mitigate these issues. Given the long lead time for projects of
this scope, engagement with County personnel or with potential third -party providers as quickly as
possible is recommended for budgeting and planning purposes.
Finally, coordination and communication with the related stakeholders is also recommended and a
regionalized approach to solutions for the greater Hyak area would be a desirable outcome. It is
CONSULTANTS recommendation that Kittitas County place a high level of importance and
attention on providing solutions to the issues identified in this report.
�PARKING
I O
��SE
SINCE
RVICE
' &..da�"
PARKING
�AMON
SERVICE
SINCE 1922
1,4MM4 Opawiktl
SCOPE OF WORK
Page One of Two
DIAMOND PARKING PROFESSIONAL SERVICES CONTRACT E Hyak No Parking Support
Draft Scope of Work, April 27, 2021 1 Revised September 08, 2021
TASK 1: Existing Conditions: Diamond Parking Services (CONSULTANT) will review existing
information provided by COUNTY including: Hyak parcel map, Hyak road network map and COUNTY
no parking regulations in conjunction with an initial site visit learning the "lay of the land" in its
current configuration. COUNTY will produce a map specifically identifying problem parking areas for
targeting remedial actions as recommended by CONSULTANT.
DELIVERABLE. Review of provided initial information and memorandum detailing CONSULTANT'S
understanding of the parking problem and desired COUNTY outcome.
TASK 2: Inventory strategies and identify a preferred alternative: CONSULTANT will prepare a letter
report documenting various strategies that CONSULTANT is using in other recreational areas
controlling illegal parking activity. In the absence of recreational area support, CONSULTANT will
inform the COUNTY of strategies that may assist in curbing illegal parking in Hyak. CONSULTANT will
identify a preferred strategy for COUNTY consideration.
DELIVERABLE, Letter report identifying existing strategies that CONSULTANT is using in other
similar recreational communities or in the absence or existing support then proposed strategies
that may assist in curbing illegal parking. The report will identify a preferred alternative for
COUNTY consideration.
rr **PAkkR��>1922
IAM
SERSINCE
SCOPE OF WORK
Page Two of Two
TASK 3: Identify policy actions likely required to implement the preferred alternative:
CONSULTANT will work with COUNTY staff identifying policy implications and/or conflicts tied to
implementation. COUNTY staff wi!I work with CONSULTANT identifying necessary policy actions
resolving identified conflicts.
DELIVERABLE. Letter report identifying any policy conflicts associated with the selected preferred
alternative parking solution. The report will also Identify necessary policy actions required to fully
Implement the preferred alternative.
TASK 4: Identify costs associated with the preferred alternative from TASK 2: CONSULTANT will
identify personnel and equipment costs associated with implementing the preferred alternative.
Planning level costs are expected to inform the COUNTY on necessary changes to County Code
Chapter 10, providing a fully supported fee program offsetting preferred alternative costs.
DELIVERABLE. Memorandum Identifying personnel and providing equipment and planning level
cost estimates associated with implementation of the preferred alternative.
TASK 5: Board of County Commissioner presentation support.
CONSULTANT will -support a staff presentation detailing the results of the parking evaluation
performed by CONSULTANT. Attendance may be virtual depending on pandemic conditions at the
time. COUNTY will lead the presentation with support materials as necessary provided by
CONSULTANT.
DELIVERABLE. Attendance and support at the Commissioner meeting.
PARKING
a-.�iON
SERVICE
SINCE 1922
„
,a:PARKING
I A ma,%,
5ERVICE�
SINCE a 1922
n� &wmd x 6p-wAkN
3§
IMAP TWO
tl PARKENG
1 _ N
SERVICE
SINCE 1922
"4-4 &,--salsa"
39,
�
IEXISTING NO PARKING SIGNS
PARKING
JIAMON
5£RVICE
SINCE 1922
RECOMMENDED NO PARKING SIGNAGE
Ej
NO PARKING
ANYTIME
:1 A A r%% A I A lkirft
rUPTr0$2 FINE AND
POUND
k
NO PARKING
ANYTIME
ALL ROADWAYS
HYAK ESTATE'S
I
PARKING
J1iAMON
SERVICEE 9922
" fam4 (r)amwd & l$p�
kfff
CASE STUDY9
L
Y OF BERWYN POLICE DEPARTMENT i BERWYN, IL P Ic ,
The Somaole Is o much safer method, a Ivt quicker baa
ane of those Darner 1a00U. AngthIng that plogs Into sofexrg
a somisthing I'm In favor of.
*We ore 00111ecting quicker with the Barnacle than w1th the
haat, for every 10 daployrnents oMy I le c tow now!
"The Ba€name le grwt because the CSO doesrti t hurt their y •".
knees and bock when putting Tha So rnocis on. Ike Ing up
standing an my two (W. to rrwtsch quIcker and easier.
v
the CAPS and aisrts ate great which help~ us man ego the
"ces in the field.
TRADITIONAL BOOT : 'T
• - , .. ..,• In Deco rnbeir sof /2019. the oPty� collected
a a •. over $38.000 7Rf the Barnacle.
This was during out mond morrtli
• of uging the Sornacis dowke.
- 1 �
4
BA# h#Aal-EPARKING.COM - SALES@BARNA LEPARK1NG,C0M
Barrett F. Pedersen Michael Witz
President Director of Police
FRANKLIN PARK POLICE DEPARTMENT
9451 W Belmont
Franklin Park IL, 60131
"The Village of Franklin Park has struggled in the past to bring a scofflaw collections
system that is effective. When the Police Department found Barnacle, we knew this
could be a game changer to help with this issue. The Barnacle team showed us this
device was going to be safer for our officers and motorists, easier to immobilize, and
more efficient to collect the scofflaw revenue. Currently we do not utilize the motorist -
release functionality and was happy to know that Barnacle is flexible that way. Barnacle
is in the process of integrating with our enforcement software to make the system even
more efficient. This smart technology has pushed our immobilization program into the
21 g century to not only create a better environment for our department but for our
community too."
Dir&tgk of PolicO&ke Witz
Villa* of Frankliee-Bartment
THF INTELLIGENT
-PARKING E NFOR EME,I T )'ST"
Effective parking enforcement is critical to providing safe and convenient streets
in every community.
CHALLENGES
• Officer safety.
• Lost revenue - Low percentage of parking ticket collection.
High loss rate for boots.
Booting and towing often have a negative public perception.
High equipment costs.
Inefficient operations and duplications of effort.
• Rising fuel costs.
Supplement your existing operation with a no cost, Smart city" solution.
THE BARNACLE PROVIDES
NolICERBIEIINmammENTIN
• Highly visible to deter other drivers.
PA WNG aENWORs IN 24 WEEKS
• Deploys from the safety of the curb - Officer Safety.
DEPUM IN SECONDS
• GPS tracked devices- deal time tamper alerts.
Mr. 11WMBEUASE-5MWUIEs
• Integrates with existing technology platforms.
6000+DEPLOYMENTS
BarnacleQ Barking Enforcement was formed to modernize enforcement operations
and drive new revenue opportunities for municipal authorities and private parking
operators globally. The Company has developed a patented solution that embeds
mobile connectivity and online payment processing within consumer and enforcement
friendly immobilization. The Company leverages technology to improve process
efficiencies and provide unmatched standards in terms of deployment, cost savings,
and motorist satisfaction in the municipal and private parking enforcement industry.
The Barnacle platform is a fully integrated end-to-end solution for vehicle
immobilization, payment processing and remote motorist release. Services include:
Barnacle Immobilization Devices
Merchant Account with Credit/Debit Card Processing
Branded Interactive Voice Response (IVR) System
Web App mobile payment portal
Revenue Tracking and Reporting Dashboard
2417 Tier 2 Call Center & Support
( Geoiocation Mapping
Device Deposit & Recovery Program
Real Time Alerts
BARNACLE" raw, t: ,,,..i...,
Our goal at Barnacle is to generate new revenue opportunities for our partners
and clients. Our philosophy is to simplify the process and systems related to
parking operations. So we keep the pricing simpie.
PREMIER PLUS (P+). PARTNER PROGRAM
0 Per Device
�+ • Wireless immobilization unit
Hardware Cost • Remote motorist release
• GPS, tamper alerts, status reports
I
• Local 2417 release line
$0Integration Setup
• Comprehensive Dashboard Setup
Setup Fee Training
• Per Device 1 Per Month
�5 • Barnacle replacements included*
• Hardware and software upgrades included
Licensing Fee - Additional technology features
$55
Release Fee
• Charged for each deployment upon release
BARNACLE"
[ 4J
ADD-ON FEATURES AND UPGRADES
BARNACLE ' . 2417 real-time virtual LPR
• Historical mapping
T LPR Query Database
• Ask your rep for more info!
Tow Holds
4 • Feature for holding vehicles for Tow
[ • Charged for each deployment upon release
i • Ask your rep for more info!
Custom Signs
• $20-$120 per sign
➢ Does not include shipping
L J
Dropbox Wood or Metal
1 $1500 or $150 per month (Not
including shipping)
BBARNACLE' Privat^ and C.orifidential
• Each Barnacle device ordered is free
• 90 -day commitment required
* Payment Processing Fee: 3% for all fines collected
Operators will be granted a revocable license to use and operate the Barnacle
Any failure for payment will result in cancellation of the service
• Upon cancellation all Barnacles will be disabled and must be returned within 30 days.
Any unit not returned within 30 days will be considered lost and subject to the
schedule below.
Warranty
All Barnacles will be warrantied against failures and defects in the operation
Any unit that breaks will be replaced upon return and inspection for misuse
* Replacement Program (Premier Plus Program)
• For every deployment of a Barnacle the customer shall create a Deployment Record
which includes, at minimum, vehicle make, model, pictures, and license plate, This
shall be logged in the Barnacle Enforcer Application or Dashboard.
• Barnacle Parking Enforcement will replace up to 4 last, damaged, or stolen, devices
per calendar year at no cost to the customer if an accurate deployment record has
been created. Customer acknowledges that no replacements shall be provided if
Customer has any invoices that are more than thirty (30) days past due.
Any devices lost, destroyed, or damaged without available deployment record, good
faith effort to recover device shall be subject to $750 replacement fee.
• A $750 replacement fee will be charged for replacements after 4 devices in a
calendar year have been lost, destroyed, or damaged; resets beginning of every year.
Deposits
• The Company may, in most instances, collect deposits from motorist for the safe
return of devices. In the event a device is not returned or is returned damaged, the
Company may capture the deposit and shall retain that deposit to offset the cost of
replacement device.
BBARNACLE" Private and Confidential
Cleverciti 3"'ensor�
Disruptive and Innovative
Smart Parking Technology
Cleverciti is the only intelligent parking management solution that harnesses the power of sophisticated edge computing, artificial intelligence
and deep learning to deliver a wealth of data. This information assists leaders in both the public and private sectors in streamlining parking
management, better serving customers and the general public, and helping solve some of the most urgent challenges facing organizations today.
ClevercitiSensor has streamlined pafkinq operations for clients across the globe. The sensor solution can cover up to 100 parking spaces and
are easily installed on existing infrastructure, such as lamp posts, buildings or masts. The plug -and -play architecture can easily be relocated
as needs change With a range of up to 400 meters and up to 320 degrees, ClevercitiSensars measure tate exact GPS position and the size of
open parking spaces. Purpose-built for parking operations, the sensors are fully compliant with privacy regulations — no video leaves the
sensors and all image processing occurs at the edge
I4`I +III
Rapid data capture
Each sensor can monita, 12 to 30
parking spaces and data is
updated every three seconds.
Ur
Edge -based architecture
Onboard octa-core processing
powers data analysis and data
processing inside the sensor.
;_"T Sensor
High reliability Secure transmission
Optimizes jideo capture in Sensor supports Mi or
extreme weather m low -light Celluar data transmission
condGions for high reliability.
Circ 360
M��
Clevemiti
An Intuitive and Simplified Parking
Management Solution
W. -AZ j.3- t q T VA)_6-
Valuable Data
Jr. xa.r its
Increased Revenue
-milt" ' of 0, , w- *. Ar.! I ks �W.4 1 " ."fr
Optimized Enforcement
Th Cut CKgi, , li&!q
zj,1,4St-drw, A A *4W M,:kJbKTfidCW-,.L
PATRICK SEWARD, MBA, CPP
Regional Manager I Diamond Parking Services
2050 112th Ave NE, Suite 110 1 Bellevue WA 98004
0:425.462.42081 C: 425.971.7144 1 patrick.seward@diamondparking.com
PAAR�KING
ON
SERV0 ""I'j
ICE
SINCE 7 g2p
"46x4�Jm Lha„