Loading...
HomeMy WebLinkAboutBOCC Ordinance - 2022-2027 Six-Year Capital Improvement PlanCapital Improvement Plan 2022-2027 December 7, 2021 Page | 1 BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON Ordinance NO. _________ ADOPTION OF THE KITTITAS COUNTY CAPITAL IMPROVEMENT PROGRAM FOR THE PLANNING PERIOD 2022-2027 WHEREAS: Kittitas County opted into the Growth Management Act, RCW 36.70A, voluntarily on December 27, 1990, through Resolution 90-138; and WHEREAS: Kittitas County adopted the Kittitas County Comprehensive Plan in August of 1996, and the Capital Facilities Plan was adopted as part of the Comprehensive Plan; and WHEREAS: Kittitas County amended the Comprehensive Plan in 2001 to adopt the six-year Capital Improvement Program through a process separate from the annual comprehensive plan amendment process and any changes made are adopted by reference to the Kittitas County Comprehensive Plan at adoption; and WHEREAS: The Kittitas County Commissioners conducted a public hearing on November 29, 2021, to consider the six-year Capital Improvement Program for the planning period 2022-2027; and WHEREAS: The Kittitas County Commissioners considered public testimony at said public hearing and approved the Capital Improvement Program for the planning period 2022-2027. NOW, THEREFORE BE IT ORDAINED That the Board of County Commissioners after due deliberation and in the best interest of the public, does hereby approve the six-year Capital Improvement Program for the planning period 2022-2027 as attached hereto. ADOPTED this 7th day of December, 2021 BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON _______________________________ Brett Wachsmith, Chairman _______________________________ Laura Osiadacz, Vice-Chairman _______________________________ Cory Wright, Commissioner Capital Improvement Plan 2022-2027 December 7, 2021 Page | 2 ATTEST: APPROVED AS TO FORM: ☐ Clerk of the Board- Julie Kjorsvik ☐ Deputy Clerk of the Board- Mandy Buchholz ________________________ __________________________ Neil Caulkins, Deputy Prosecuting Attorney From the Cascades … to the Columbia Adopted __________ by the Board of County Commissioners ● Ordinance No. _________ Kittitas County Capital Improvement Program 2022-2027 Six Year Plan Kittitas County Capital Improvement Program December 7, 2021 Table of Contents Page i Table of Contents 0BSix-Year Plan .................................................................................... 1 Introduction ....................................................................................... 1 Accomplishments .............................................................................. 1 2022-2027 Summary ........................................................................ 2 1. 2BAirport Facilities ................................................................... 13 2. Kittitas County Administrative Offices .................................. 22 3. Kittitas Valley Event Center / Fairgrounds ............................ 29 4. 5BKittitas County Maintenance Shops, Storage, & Parking ..... 36 5. 6BKittitas County Roads .......................................................... 38 6. 7BRegional Parks and Trails .................................................... 39 7. 8BSolid Waste .......................................................................... 40 8. 9BLibrary Services ................................................................... 43 9. 10BEmergency Services ............................................................ 44 10. Education ............................................................................. 54 11. 12BWater - Group A Systems .................................................... 72 12. 13BSanitary Sewer ..................................................................... 75 13. 6BKittitas County Flood Control Zone District .......................... 76 14BFrequently Asked Questions ........................................................... 77 Kittitas County Capital Improvement Program December 7, 2021 Six-Year Plan Page 1 0BSix-Year Plan Introduction The Six-Year Plan shows capital improvements that are needed to provide adequate public facilities in Kittitas County. The County either directly provides these capital improvements or coordinates with other agencies to provide them. The Six-Year Plan is reviewed and updated annually. Annual updates are made to correct or modify project costs, revenue sources, and dates of construction. Accomplishments Kittitas County completed several capital improvements during the 2020 to 2021 period. These accomplishments included: • Fire District 2 (Kittitas Valley Fire Rescue) Station 2-1 Kittitas County Capital Improvement Program December 7, 2021 Six-Year Plan Page 2 2022-2027 Summary The following table summarizes the 2022-2027 Six-Year Plan. Table 1 - Six-Year Plan Summary 2022-2027 Summary Kittitas County Public Facility Projects 1. Airport Facilities Project Name Location & Description Funding Source Schedule Total Cost Wetland Mitigation for EA Projects Bowers Field Airport. Following the Environmental Assessment and Advanced Design, the airport will undergo a wetland mitigation project. FAA GA Entitlement and Local Match 2022-2026 $2,585,000 Runway 11/29 Parallel Taxiway and Taxiway Lighting Project Bowers Field Airport. Construct runway new taxiway including pavement, lighting, and marking installation FAA GA Entitlement and other funding and Local Match 2022-2026 $5,555,000 Rehabilitate Runway 11/29 including AGIS, Runway Lighting, and Runway Width Reduction Bowers Field Airport. Rehabilitate Runway 11/29 including completing an AGIS survey, reducing the runway width from 150 feet to 75 feet (per FAA requirements), drainage improvements, and replacing the runway lighting system. FAA GA Entitlement and Local Match 2022-2026 $550,000 East Apron Utilities Extension Bowers Field Airport. Extension of utilities to 13 additional lots. WSDOT CARB Loan and Local Match 2022-2026 $105,000 Runway 7/25 Rehabilitation Bowers Field Airport. Rehabilitating and reducing Runway 7/25 length and width to 3,700 feet x 60 feet. FAA GA Entitlement and Local Match 2022-2026 $1,320,000 Airport Maintenance Facility Bowers Field. The design and construction of a 60’ x 80’ Airport Maintenance Facility for airport equipment. County General Funds Request 2022 $425,000 Fire Wise Program for Agricultural Lands Bowers Field. Agricultural Land Fire Wise Program with DNR DNR Grant Program 2022 $50,000 Industrial Park Building Development Bowers Field. The design and construction of two new industrial TBD 2022-2027 TBD Kittitas County Capital Improvement Program December 7, 2021 Six-Year Plan Page 3 buildings in the Bowers Field Industrial Park. Table 1 continued - Six-Year Plan Summary 2022-2027 Summary Kittitas County Public Facility Projects 2. Kittitas County Administrative Offices Project Name Location & Description Funding Source Schedule Total Cost County Administration Building N of Courthouse. Office space is needed for all county functions. Consolidating administrative offices. This includes Commissioner’s Office, Auditors Office, Assessors’ Office, Treasurers Office, Fire Marshal, Community Development Services, and Public Works Administrative Office. The Courts and related offices would remain in the existing Courthouse. REET 2022-2026 $120,000 Public Safety Building Improvements 205 W. 5th. Various improvements to include new siding for old portion of jail and replace ceiling in hallways. General Fund and 1/0th Sales Tax 2022-2027 $3,680,000 Permit Center Building Improvements 411 N Ruby, Ellensburg. This project is needed to upgrade outdated facilities for CDS, PWD, and Fire Marshal offices. This building was constructed in 1959 and the County purchased the building in 2002. General Obligation Bonds 2022-2026 $250,000 Juvenile Detention Holding Facility 205 W. 5th, Ellensburg. Building remodel to provide a temporary holding cell for juvenile detention. Law & Justice Sales Tax 2022-2026 $30,000 Expansion of Prosecutor’s Office Expansion of Prosecutors Office to consolidate offices to one location. General Fund 2022-2027 TBD New Courthouse Construction of new Courthouse Commissioner approved Bond 2022-2027 $56,000,000 Kittitas County Capital Improvement Program December 7, 2021 Six-Year Plan Page 4 Table 1 continued - Six-Year Plan Summary 2022-2027 Summary Kittitas County Public Facility Projects 3. Kittitas Valley Event Center/Fairgrounds Project Name Location & Description Funding Source Schedule Total Cost Rodeo arena bleachers and box seats Replace section KK-MM and Section AA Revenue Bonds 2022-2027 $2,670,000 Multi-Purpose Addition to Bloom Pavilion Southwest corner of Fairgrounds in Ellensburg, new multi- purpose addition intended for various events and livestock housing Gen. Obligation Bonds 2022-2027 $1,300,000 Bloom Pavilion Upgrades Southwest corner of Fairgrounds in Ellensburg, replace windows and footing, and install protective materials for multi- purpose uses. Install retractable bleachers. Gen. Obligation Bonds 2022-2027 $600,000 Barn Expansion 901 E. 7th Ave, add space for various types of livestock Gen. Obligation Bonds 2022-2027 $1,500,000 Emergency Animal Shelter Kittitas Valley Event Center / Fairgrounds General Fund 2022-2027 $500,000 Armory Parking Lot Paving 901 E. 7th Ave, pave the gravel parking lot and handicap space surrounding the Armory building. Gen. Obligation Bonds 2022-2027 $300,000 4. Kittitas County Maintenance Shops, Storage, Parking, & Pits/Quarries Project Name Location & Description Funding Source Schedule Total Cost Upper County Maintenance Shop Automated wash bay design and construction. 2027 $400,000 Lower County Maintenance Shop Potential land acquisition and shop relocation ER&R Fund 501 2022-2026 $8,650,000 Hyak Joint Maintenance Facility with SPUD Ongoing operations, On capital improvements planned. TBD TBD TBD Hansen Pit Potential Advanced Environmental Mitigation site. Airport Fund 107, Flood Control Fund 107, Federal Aviation Admin Grant 2022-2023 $1,750,000 Other Pits and Quarries Ongoing operations, On capital improvements planned. TBD TBD TBD Kittitas County Capital Improvement Program December 7, 2021 Six-Year Plan Page 5 Table 1 continued - Six-Year Plan Summary 2022-2027 Summary Kittitas County Public Facility Projects 5. Roads – County Owned (capital improvements scheduled for construction) Project Name Location & Description Funding Source Schedule Total Cost Kachess Lake Road Culvert Replacement MP 2.50, Kachess area. Flow improvement, fish barrier correction. Local funds 2022 $1,329,000 N. Thorp Highway – Yakima River Bridge MP 9.36-MP 7.76, Thorp. Bridge repairs. Planned BRAC funds, local funds 2022 $1,951,000 Manastash Road Creek Bank Stab, and Snow Park Improvements MP 10.65-MP 11.01 Roadway safety, repair and improvements Planned FLAP/FHWA funds, local funds 2022 $1,578,000 Liberty Road Swauk Creek Bridge MP 0.2 Liberty Road Bridge replacement – safety Planned FLAP/FHWA funds, local funds 2022-2024 $2,947,000 Dickey Creek Bridge (16203) Replacement FHWA Teanaway Road Bridge replacement Planned FLAP/FHWA funds, local funds 2022 $1,000,000 I-90 Widening (State Project) Cle Elum to Easton Improve capacity and safety Local funds 2022 $100,000 Bender Road Widening and Pedestrian Improvements MP 0.0-MP 0.68, Ellensburg New construction and improvements TBD 2025-2026 $2,100,000 Hungry Junction Road Widening MP 0-MP 1.74, Hungry Junction Road, Ellensburg Reconstruction and safety Planned RAP funds, local funds 2022-2024 $4,351,000 Sanders Road Improvements Ellensburg Safety, stormwater drainage, roadway improvement TBD 2026-2027 $3,050,000 Badger Pocket Area Road Improvements, Phase 1 Various Safety, rehabilitation, and improvements TBD 2022-2023 $3,700,000 Badger Pocket Area Road Improvements, Phase 2 Various. Safety, rehabilitation, and improvements TBD 2025-2026 $2,980,000 Intersection and Corridor Safety Improvements Various Safety improvements and countermeasures HSIP 2022-2023 $416,000 Bridge Rail Improvements Code 3, Phase 1 (MD A-F) Various. Safety improvements and countermeasures HSIP 2022-2023 $664,000 Vantage Highway over Cascade Canal (89342) Replacement MP 5.17-5.33, Ellensburg TBD 2022-2023 $1,650,000 Kittitas County Capital Improvement Program December 7, 2021 Six-Year Plan Page 6 Safety improvements and countermeasures Table 1 continued - Six-Year Plan Summary 2022-2027 Summary Kittitas County Public Facility Projects Project Name Location & Description Funding Source Schedule Total Cost Denmark Road Improvements MP 3.08-4.35 Safety, bridge replacement, and other improvements TBD 2027 $471,000 Bowers Road Extension Bowers Road, Ellensburg Network connection TBD 2024-2025 $2,450,000 HSIP 2023 Awarded Project Various, TBD TBD 2024-2025 $1,150,000 Yellowstone Culvert Replacement Snowqualmie Pass Safety Planned STBG 2025-2026 $860,000 Short Span Bridge Replacement, Phase 1 Snowqualmie Pass Safety Planned STBG 2026-2027 $1,400,000 Airport Road Culvert Replacement MP 2.25-2.4, Cle Elum Drainage improvement and flood reduction TBD 2027 $275,000 Badger Pocket Road HMA MP 0.0-0.57, Ellensburg Rehabilitation and maintenance TBD 2026-2027 $1,205,000 Lambert Road Br 06345 Maintenance Teanaway Maintenance and repairs Planned BRAC funds, local funds 2027 $175,000 HSIP 2025 Awarded Project Various, TBD Safety HSIP 2026-2027 $450,000 Parke Creek Road Turnaround MP 5.7-11.64, Parke Creek Road, Ellensburg Improvements and increased drainage Local funds 2026-2027 $1,100,000 Pheasant Lane Turnaround MP 0.0-2.04, Pheasant Lane, Ellensburg Road and access improvements Local funds 2027 $15,000 Airport Road Sidewalk Replacement MP 1.35-1.85, Bowers Road, Ellensburg Improvements and increased drainage Local funds 2022 $65,000 Bar 14 Turnaround MP 1.11-1.21 Bar 14 Road, Ellensburg Repair flood damage and school bus turnaround Local funds 2023-2024 $200,000 Micheletto Road Improvements MP 1.11-1.21 Micheletto Road, Ellesnburg Improvements Local funds 2022 $40,000 6. Regional Parks and Trails Project Name Location & Description Funding Source Schedule Total Cost Highway 10 County Park (UC) Upper County. Construct BNSF Actuated Crossing; Build 2022-2025 $3,950,000 Kittitas County Capital Improvement Program December 7, 2021 Six-Year Plan Page 7 road network and camp sites; build boat ramp. Table 1 continued - Six-Year Plan Summary 2022-2027 Summary Kittitas County Public Facility Projects Project Name Location & Description Funding Source Schedule Total Cost Vantage Boat Ramp Overflow Parking (LC) Lower County. Build overflow parking lot. 2022 $200,000 Gladmar Park (MC) Mid County. Design and construct bridge access; construct island improvements. 2022-2024 $750,000 Upper County ATV Trail (UC) Upper County. Build trails. 2022-2023 $400,000 Trailhead Parking (UC) Upper County. Towns to Teanaway Trailhead improvements. 2022 $120,000 Ellensburg Rotary Indoor Soccer (LC) Lower County. 2023 $4,000,000 Vantage River Walk (LC) Lower County. 2026-2027 $1,000,000 7. Solid Waste Project Name Location & Description Funding Source Schedule Total Cost Relocate Ellensburg Transfer Station and Compost Facility 925 Industrial Way, Ellesnburg.. Build a new Transfer Station and Compost Facility. Solid Waste Fund/Grant/Loa n 2022-2027 $23,000,000 Cle Elum Transfer Station Entrance Cle Elum Transfer Station 50 No. 5 Mine Road. Construct a new entrance to allow for better queuing for the scales. Solid Waste Fees and Grants 2022-2027 $400,000 8. Library Services - No projects planned for 2022-2027 period 9. Emergency Services Project Name Location & Description Funding Source Schedule Total Cost Station 26 Replacement Fairview and Brickmill Road. Relocate and replace volunteer station. Property Tax (existing) 2022-2027 $950,000 Upper County Search and Rescue/Emergency Management Base Airport Road off Cle Elum Airport Access Road. Base of operations for county SAR and Emergency Management; also SAR and EM training facility and Emergency Operations Center. General Fund 2022-2027 $4,000,000 Kittitas County Capital Improvement Program December 7, 2021 Six-Year Plan Page 8 Table 1 continued - Six-Year Plan Summary 2022-2027 Summary Kittitas County Public Facility Projects Project Name Location & Description Funding Source Schedule Total Cost Sheriff’s Office Upper County Precinct Cle Elum Area. Base for convenient law enforcement services to upper county including dedicated patrol, investigations, records and other front office services General Fund 2023-2027 $3,100,000 Kittitas Valley Hospital Materials Management and Radiology Expansion 603 S. Chestnut, Ellensburg. Remodel of existing space in surgery and an expansion of 4000 square feet that will serve surgery, materials management and radiology. The expansion will add a 2nd CT to radiology, add an operating room, and expand central sterile and materials management. The expansion will displace parking so new parking on north end of property is proposed. This project under design now and projected to be 2022 and 23 project. Commissioner Approved Bond 2022 $9,517,609 Kittitas Valley Hospital Dietary Renovation 603 S. Chestnut, Ellensburg. Goal is to add seating area, create better flow through serving area, add food options in serving area, and a general refresh of finishes. Also to provide more options for visitors at night with vending and seating options. Commissioner Approved Bond 2022 $777,195 Kittitas Valley Hospital Grounds Improvement 603 S. Chestnut, Ellensburg. Goal is to minimize confusion in traffic flow, remove physical barriers for site, add some parking, reduce maintenance needs, reduce water use, and Commissioner Approved Bond 2022 TBD Kittitas County Capital Improvement Program December 7, 2021 Six-Year Plan Page 9 needed face lift on the building. Table 1 continued - Six-Year Plan Summary 2022-2027 Summary Kittitas County Public Facility Projects 10. Education Project Name Location & Description Funding Source Schedule Total Cost Central Washington University, Health Education Parcel # 313534, E Dean Nicholson Blvd, CWU campus, Ellensburg, WA 98926. Renovation and expansion of existing Nicholson Pavilion for academic programs supporting Health Education. State OFM Capital 2022-2027 $55,505,000 Central Washington University, 1200 Ton Chiller Addition 205 E 11th, CWU campus, Ellensburg, WA 98926. The addition of a 1200- ton chiller at the Central Energy plant that promotes the reliability and securing of institutional cooling. State OFM Capital 2022 $3,189,000 Ellensburg School District, Ida Nason Aronica School 2100 North Cora Street. Construct fourth elementary school. Commissioner Approved Bond, State Match, ESSER, Other. 2021-2027 $8,459,057 Ellensburg School District, New Mt. Stuart Elementary 1701 North Cora Street. New building, replacement school. State Match 2021-2022 $4,176,716 Ellensburg School District, New Mt. Stuart Elementary Early Learning Center 705 West 15th Avenue. Remodel building and portable. Commissioner Approved Bond, Other. 2021-2022 $297,065 Ellensburg School District, Tennis Courts (Joint with the City of Ellensburg) Mountain View Park. Construct tennis courts. General Fund 2022-2027 $250,000 Ellensburg School District, TVF Support to Increased Student Grown/30-Year Bus Replacement Transportation Department: 1300 E. Third Avenue. 30-year bus replacement. General Fund Transfers 2022-2027 $683,552 Ellensburg School District, Valley View Elementary Parking Lot Improvements 1508 East Third Avenue. Improve parking lots to the north, south and west sides of Valley View Elementary. General Funds 2022-2027 $286,663 Ellensburg School District, Valley View Elementary Bus Loading/Unloading 1508 East Third Avenue. Dedicated bus General funds 2021-2022 $50,000 Kittitas County Capital Improvement Program December 7, 2021 Six-Year Plan Page 10 loading/unloading area fencing. Table 1 continued - Six-Year Plan Summary 2022-2027 Summary Kittitas County Public Facility Projects Project Name Location & Description Funding Source Schedule Total Cost Ellensburg School District, Lincoln Elementary Remodel/Addition 200 South Sampson Street. Remodel/addition Commissioner Approved Bond, State Match, Other. 2021-2027 $18,004,295 Ellensburg School District, Valley View Elementary Building Resurfacing 1508 East Third Avenue. Valley View building resurfacing General funds 2022-2027 $300,000 Ellensburg School District, Maintenance Warehouse 1300 East Third Avenue. Construct maintenance/grounds equipment warehouse. General funds 2022-2027 $300,000 Ellensburg School District, New Ellensburg High School Portable Location 1203 East Capitol Avenue. Relocate two portables to high school campus to house Special Programs. Commissioner Approved Bonds, General Fund Transfer 2021-202 $215,000 Ellensburg School District, New IT Mitigation Plan 1300 East Third. IT Mitigation. Tech Levy 2021-2027 $5,838,927 Ellensburg School District, Central office HVAC 1300 E. Third Ave. Replace HVAC. ESSER 2022-2027 $300,000 Ellensburg School District, Mt. Stuart Elementary Parking Lot Resurfacing 705 W. 15th Avenue. Mt. Stuart Elementary resurfacing General Fund Transfer 2022-2027 $150,000 11. Water – Group A Systems - No projects planned for 2022-2027 period 12. Sanitary Sewer - No projects planned for 2022-2027 period 13. Flood Control Zone District Project Name Location & Description Funding Source Schedule Total Cost Flood Hazard Risk and Repetitive Loss Program Yakima River. Comprehensive Flood Planning and Repetitive Loss Hazard Assessment FCAAP, FCZD, future phases by grant 2022-2027 $460,000 Ringer Loop Property Improvements Ringer Reach. Control for invasive species, riparian buffer plantings, and building decommissioning at County-owned properties. Yakima Basin Integrated Plan 2022-2023 $400,000 Hanson Levee and Private Berm Removal Ringer Reach. Implementation of preferred alternative from Hanson Pits Restoration Plan and Yakima River Basin Integrated Plan (potential), Salmon Recovery 2023-2025 $1,300,000 Kittitas County Capital Improvement Program December 7, 2021 Six-Year Plan Page 11 Design. 2023 SRFB design only grant. Funding Board (potential) Table 1 continued - Six-Year Plan Summary 2022-2027 Summary Kittitas County Public Facility Projects Project Name Location & Description Funding Source Schedule Total Cost Reecer Creek Dolarway to University WNC. Flood Control Zone District Cost share in support of City of Ellensburg Project to purchase property, construct setback levees and construct second bridge along Dolarway Rd. FCZD Levy 2022 $890,000 Stream Gaging and Early Warning System County-wide. 2022: Cove Road, McElroy Road. 2022: Naneum Creek. FCZD Levy 2022-2027 $210,000 CTP Flood Studies General. Continued funding through FEMA's Cooperating Technical Partnership (CTP) program to improve flood models and channel migration zone mapping. Community Technical Partnership Program (potential), FCZD Levy 2022-2027 $480,000 Whisky Creek at EWC Siphon WNC. Increase flood conveyance, eliminate canal / creek intermingling, and address fish passage barrier by replacing current EWC crossing at Whiskey Creek with a siphon. KCCD managed project, with FCZD cost- share. FCZD Levy, Grant or partner support for construction 2022-2023 $1,000,000 Wilson-Naneum-Cherry – Phase 2 Whisky Reroute Feasibility Study WNC. Hydrologic analysis with existing 2-d model to evaluate Whiskey Creek tie-in at Reecer Creek project. Evaluate effects of Mercer Creek flow routing north of the airport on hydrologic regime, design specification needed at proposed railroad crossing, and within Reecer Creek floodplain FCZD Levy 2023 $100,000 Kittitas County Capital Improvement Program December 7, 2021 Six-Year Plan Page 12 site, and water needs downstream of proposed reroute site Table 1 continued - Six-Year Plan Summary 2022-2027 Summary Kittitas County Public Facility Projects Project Name Location & Description Funding Source Schedule Total Cost Wilson-Naneum-Cherry – Phase 3 Whisky Reroute Design WNC. Implement capital recommendations from Phase 2 Feasibility Study FCZD Levy, Flood Control Assistance Account Program (potential) 2025-2027 $600,000 Reach Assessment (Elk Meadows) Yakima River. Assessment to identify and prioritize flood alleviation and habitat restoration actions within the Elk Meadows area along the Yakima River. Request SRFB funding in 2022 round for implementation in 2023/2024. FCZD Levy, Salmon Recovery Funding Board (potential) 2022-2024 $204,000 Flow Conveyance Restoration – Site 2 WNC. Implementation of project similar to Mercer at Helena flow conveyance project, site TBD FCZD Levy, Ecology Centennial Clean Water grant (potential) 2022-2023 $360,000 Flow Conveyance Restoration – Site 3 TBD. Implementation of project similar to Mercer at Helena flow conveyance project, site TBD FCZD Levy, Ecology Centennial Clean Water grant (potential) 2025-2026 $392,000 Crystal Creek Conveyance Project Crystal Creek. Implement project identified through Crystal Creek CTP study. Grant funding TBD 2022-2024 $120,000 Manastash – Cove Road Replacement Manastash. Replace existing Cove Road bridge with bridge of sufficient freeboard and span to pass sediment and flood flows. 2026: Design and Permitting. FCZD Levy, Flood Control Assistance Account Program (potential) 2026-2027 $1,200,000 Hazard Mitigation Plan Update County-wide. The Multi-jurisdictional Hazard Mitigation Plan needs to be updated every 5-years. FCZD Levy, Washington State Department of Military (potential) 2023 $120,000 Kittitas County Capital Improvement Program December 7, 2021 Kittitas County Airport Facilities Page 13 1. 2BAirport Facilities This section includes an inventory of the existing airport facilities in Kittitas County and a detailed description of each airport facility improvement that is included in the six-year plan. The inventory of facilities in Table 2 below also describes each facility’s size in order to determine if it addresses the County’s long-term community needs. Table 2 Existing Public Facilities and Services Airport Facilities Facility Provider Description Size Bowers Field Airport Kittitas County Asphalt, 11/29 Runway, 4,300’x150’, asphalt. 1,300 acres Bowers Field Hanger Bldg 404 Kittitas County Built 1997. 20,000 sq. ft. Bowers Field T- Hanger Kittitas County Built 1960. 12,500 sq. ft. Cle Elum Municipal Airport City of Cle Elum 50,000 sq. ft. parking apron area, 07/25 Runway, 2,552’x40’, asphalt, 1,000 aircraft usage per year. 135 acres De Vere Field Jim De Vere (private owner) 08/26 Runway, 2,055’x30’, asphalt, 6 single engine aircraft based. 50 acres Easton State Airfield WSDOT 09/27 Runway, 2,640’x100’, turf, 30 aircraft usage per month, built in 1930’s. 15 acres Kittitas County Capital Improvement Program December 7, 2021 Kittitas County Airport Facilities Page 14 Airport Facilities – Wetland Mitigation for EA Projects Project Information and Selection Criteria Location Bowers Field Airport, Ellensburg Links to Other Projects or Facilities N/A Description Following the Environmental Assessment and Advanced Design, the airport will undergo a wetland mitigation project. Justification (Need/Demand) This project allows for the construction of the parallel taxiway and other facility needs at Bowers Field. It also mitigates flooding and other wetland concerns for the county. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Design and Environmental Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2022 2023-2026 Total Design and Engineering $385,000 $385,000 Construction $2,200,000 $2,200,000 TOTAL $2,585,000 $2,585,000 Funding Sources 2022 2023-2026 Total FAA GA Entitlement TBD – Based on Permitting Approval $2,350,000 $2,350,000 Local Match $235,000 $235,000 TOTAL $2,585,000 $2,585,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Airport Department Kittitas County Capital Improvement Program December 7, 2021 Kittitas County Airport Facilities Page 15 Airport Facilities – Runway 11/29 Parallel Taxiway and Taxiway Lighting Project Project Information and Selection Criteria Location Bowers Field Airport, Ellensburg Links to Other Projects or Facilities N/A Description Construct runway new taxiway including pavement, lighting, and marking installation Justification (Need/Demand) This project is needed to provide adequate facilities for projected airplane operations. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: New facility construction Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2022 2023-2026 Total Design and Engineering $495,000 $495,000 Construction $5,060,000 $5,060,000 TOTAL $5,555,000 $5,555,000 Funding Sources 2022 2023-2026 Total FAA GA Entitlement & Other Funding $495,000 $4,555,000 $5,050,000 Local Match $505,000 $505,000 TOTAL $5,555,000 $5,555,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Airport Department Kittitas County Capital Improvement Program December 7, 2021 Kittitas County Airport Facilities Page 16 Airport Facilities – Rehabilitate Runway 11/29 including AGIS, Runway Lighting, and Runway Width Reduction Project Information and Selection Criteria Location Bowers Field Airport, Ellensburg Links to Other Projects or Facilities N/A Description Rehabilitate Runway 11/29 including completing an AGIS survey, reducing the runway width from 150 feet to 75 feet (per FAA requirements), drainage improvements, and replacing the runway lighting system. Justification (Need/Demand) This project removes the outer 75 feet of failed asphalt pavement and replaces the runway lighting system that has outlived its useful life. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Facility repair and renovation Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2022 2023-2027 Total Design and Engineering $165,000 $165,000 Construction $385,000 $385,000 TOTAL $550,000 $550,000 Funding Sources 2022 2023-2027 Total FAA GA Entitlement $500,000 $500,000 Local Match $50,000 $50,000 TOTAL $550,000 $550,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Airport Department Kittitas County Capital Improvement Program December 7, 2021 Kittitas County Airport Facilities Page 17 Airport Facilities – East Apron Utilities Extension Project Information and Selection Criteria Location Bowers Field Airport, Ellensburg Links to Other Projects or Facilities N/A Description Extension of utilities to 13 additional lots. Justification (Need/Demand) This project allows for the design and construction of infrastructure to meet the need for hangar development. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Design and Construction Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2022 2023-2027 Total Design and Engineering $10,000 $10,000 Construction $95,000 $95,000 TOTAL $105,000 $105,000 Funding Sources 2022 2023-2027 Total WSDOT CARB Loan $105,000 $105,000 Local Match $0 $0 TOTAL $105,000 $105,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for utility improvements. Estimated Revenues $20,000 annually for new hangar leases. Anticipated Savings Due to Project None Department Responsible for Operations Airport Department Kittitas County Capital Improvement Program December 7, 2021 Kittitas County Airport Facilities Page 18 Airport Facilities – Runway 7/25 Rehabilitation Project Information and Selection Criteria Location Bowers Field Airport, Ellensburg Links to Other Projects or Facilities N/A Description Rehabilitating and reducing Runway 7/25 length and width to 3,700 feet X 60 feet. Justification (Need/Demand) The runway was closed due to age and deterioration. A design was completed in 2020 and the project will help to reduce aircraft congestion. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Construction Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2022 2023-2027 Total Design and Engineering $0 $0 Construction $1,320,000 $1,320,000 TOTAL $1,320,000 $1,320,000 Funding Sources 2022 2023-2027 Total FAA GA Entitlement $0 $0 Local Match $1,320,000 $1,320,000 TOTAL $1,320,000 $1,320,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Airport Department Kittitas County Capital Improvement Program December 7, 2021 Kittitas County Airport Facilities Page 19 Airport Facilities – Airport Maintenance Facility Project Information and Selection Criteria Location Bowers Field Links to Other Projects or Facilities Description The design and construction of a 60’ x 80’ Airport Maintenance Facility for airport equipment. Justification (Need/Demand) Currently there is no such facility at the airport and is expense to move some of the equipment for necessary maintenance due its size. Also having airport specific equipment, internal maintenance knowledge is best utilized and less expensive than contract maintenance. Level of Service (LOS) / Project Type LOS: N/A. Project Type: New Facility Comprehensive Plan Citations LU-P19 – LU-P25, Specifically LU-P22 Capital Cost 2022 2023-2027 Total Design and Engineering $90,000 $90,000 Construction $335,000 $335,000 TOTAL $425,000 $425,000 Funding Sources 2022 2023-2027 Total County General Funds Request $425,000 $425,000 TOTAL $425,000 Annual Operations and Maintenance Estimated Costs $3000 Annually Estimated Revenues None Anticipated Savings Due to Project $30,000 per year in lease payments Department Responsible for Operations Airport Department Kittitas County Capital Improvement Program December 7, 2021 Kittitas County Airport Facilities Page 20 Airport Facilities– Industrial Park Building Development Project Information and Selection Criteria Location Bowers Field Links to Other Projects or Facilities Centerfuse Initial Development Concept for EBDA at Bowers Field. Description The design and construction of two new industrial buildings in the Bowers Field Industrial Park. Justification (Need/Demand) The Kittitas County Airport has significant land to manage and under FAA recommendations the airport should work to be self-sufficient with support of the Sponsoring Agency, (Kittitas County) to relieve the financial burden on the local municipality. In an attempt to move towards this FAA goal, these buildings would be a highly positive initial step. Level of Service (LOS) / Project Type LOS: N/A. Project Type: New Facility Comprehensive Plan Citations Capital Cost 2022 2023-2027 Total Design and Engineering TBD TBD TBD Construction 2,500,000 $2,500,000 TOTAL TBD Funding Sources 2022 2023-2027 Total County Funding Options TBD TBD TBD TBD TOTAL Annual Operations and Maintenance Estimated Costs $12,000 Annually Estimated Revenues $200,000 Annually Anticipated Savings Due to Project Department Responsible for Operations Airport Department Example Purposes Only Kittitas County Capital Improvement Program December 7, 2021 Kittitas County Airport Facilities Page 21 Airport Facilities – Fire Wise Program for Agricultural Lands Project Information and Selection Criteria Location Bowers Field Links to Other Projects or Facilities Description Agricultural Land Fire Wise Program with DNR Justification (Need/Demand) Excessive brush and woody debris on the eastern portion of the airports agricultural lands has created a wildland fire risk Level of Service (LOS) / Project Type LOS: N/A. Project Type: Construction Comprehensive Plan Citations Capital Cost 2022 2023-2027 Total Design and Engineering Construction $50,000 $50,000 TOTAL Funding Sources 2022 2023-2027 Total DNR Grant Program $50,000 $50,000 TOTAL $50,000 Annual Operations and Maintenance Estimated Costs Costs of the project are reimbursed by the DNR up to a predetermined amount, approximately $400 per acre. We have cut the estimated project area to 120 acres and are pending the report on reimbursable costs from the Department of Natural Resources Fire Wise assessment. Initial Cost will be estimated at $50,000. Estimated Revenues None Anticipated Savings Due to Project $50,000 Department Responsible for Operations Airport Department Vicinity Map Kittitas County Capital Improvement Program December 7, 2021 Kittitas County Administrative Offices Page 22 2. Kittitas County Administrative Offices This section includes an inventory of Kittitas County Administrative Offices and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 3 below also describes each facility’s size in order to determine if it addresses the County’s long-term community needs. Table 3 Existing Public Facilities and Services Kittitas County Administrative Offices Facility Department Description Size Armory Building Extension, Noxious Weed, and Kittitas Valley Event Center 901 E. 7th, built 1950. Remodel completed in 2014 13,140 sq. ft. Cle Elum Public Health Public Health 415 E. First Ave., Cle Elum, leased building 2,400 sq. ft. County Courthouse Assessor, Auditor, Clerk, Commissioners, Lower District Court, Human Resources, Information Services, Juvenile Probation, Maintenance, Prosecutor, Superior Court, Treasurer 205 W. 5th, built 1958. 47,691 sq. ft. Permit Center Public Works, Community Development Services, and Fire Marshal 411 N. Ruby, built 1959 13,625 sq. ft. Public Safety Building Sheriff/Corrections 205 W. 5th, built 1985. Remodeled 2010 to 2012. 33,209 sq. ft. Sheriff Administration Office Sheriff 307 Umptanum Rd., built 2009 11,880 sq. ft. Sorenson Building Public Health and Misdemeanant Probation 507 Nanum, built 1942. 17,648 sq. ft. Upper District Court Building Upper District Court 700 E. 1st, Cle Elum, remodeled in 2013 6,000 sq. ft. Vantage Marine Storage Building Sheriff Vantage Boat Launch, built in 2014 1,024 sq. ft. Kittitas County Capital Improvement Program December 7, 2021 Kittitas County Administrative Offices Page 23 Kittitas County Administrative Offices – Permit Center Building Improvements Project Information and Selection Criteria Location 411 N Ruby, Ellensburg– see existing facility inventory Links to Other Projects or Facilities N/A Description Remodel building Justification (Need/Demand) This project is needed to upgrade outdated facilities for CDS, PWD, and Fire Marshal offices. This building was constructed in 1959 and the County purchased the building in 2002. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Facility repair, remodel, and renovation Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2022-2026 Total Design and Engineering To Be Determined To Be Determined Construction $250,000 $250,000 TOTAL $250,000 $250,000 Funding Sources 2022-2026 Total General Obligation Bonds $250,000 $250,000 TOTAL $250,000 $250,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Facilities and Maintenance Office Kittitas County Capital Improvement Program December 7, 2021 Kittitas County Administrative Offices Page 24 Kittitas County Administrative Offices – County Administration Building Project Information and Selection Criteria Location North of the Courthouse Links to Other Projects or Facilities Courthouse, Permit Center, and Morris Sorenson bldg. Description New County Administration Building Justification (Need/Demand) Office space is needed for all county functions. Consolidating administrative offices. This includes Commissioner’s Office, Auditors Office, Assessors’ Office, Treasurers Office, Fire Marshal, Community Development Services, and Public Works Administrative Office. The Courts and related offices would remain in the existing Courthouse. Level of Service (LOS) / Project Type Established LOS: N/A. Project Type: New facility Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2021 2022-2026 Total Master Plan / Conceptual Site Plan $120,000 $250,000 $370,000 Design and Engineering $1,500,000 $1,500,000 Construction 55,000,000 55,000,000 TOTAL $120,000 $56,750,000 $56,870,000 Funding Sources 2021 2022-2026 Total Real Estate Excise Tax (REET) $120,000 Undetermined $120,000 TOTAL $120,000 $0 $120,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Facilities and Maintenance Office Kittitas County Capital Improvement Program December 7, 2021 Kittitas County Administrative Offices Page 25 Kittitas County Administrative Offices – Public Safety Building Improvements Project Information and Selection Criteria Location 205 W. 5th, Ellensburg – see existing facility inventory Public Safety Building Links to Other Projects or Facilities N/A Description Various improvements to include new siding for old portion of jail and replace ceiling in hallways. Justification (Need/Demand) This project is needed to provide safe and adequate facilities for inmates and correctional officers. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Facility remodel and renovation Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2021 2022-2026 Total Design and Engineering $50,000 $0 $50,000 Construction $130,000 $3,500,000 $3,630,000 TOTAL $180,000 $3,500,000 $3,680,000 Funding Sources 2021 2022-2026 Total General Fund & 1/10th sales tax $180,000 $3,500,000 $3,680,000 TOTAL $180,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Sheriff Office Kittitas County Capital Improvement Program December 7, 2021 Kittitas County Administrative Offices Page 26 Kittitas County Administrative Offices – Juvenile Detention Holding Facility Project Information and Selection Criteria Location 205 W. 5th, Ellensburg – see existing facility inventory County Courthouse Links to Other Projects or Facilities N/A Description Building remodel to provide a temporary holding cell for juvenile detention. Justification (Need/Demand) This project is needed to provide a secure area for temporarily holding juveniles at the Courthouse. Permanent detention facilities are rented by Yakima County and juveniles are transported as needed. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Facility remodel and renovation Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2022-2026 Total Design and Engineering To Be Determined To Be Determined Construction $30,000 $30,000 TOTAL $30,000 $30,000 Funding Sources 2022-2026 Total Law & Justice sales tax $30,000 $30,000 TOTAL $30,000 $30,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Facilities and Maintenance Office Kittitas County Capital Improvement Program December 7, 2021 Kittitas County Administrative Offices Page 27 Kittitas County Administrative Offices – Expansion of Prosecutor’s Office Project Information and Selection Criteria Location To be determined Links to Other Projects or Facilities Sheriff’s Administrative building and Courthouse Description Expansion of Prosecutors Office to consolidate offices to one location. Justification (Need/Demand) The Prosecutors Office needs additional office space to consolidate offices located in different buildings to one primary location. This is to be part of the new courthouse project. Level of Service (LOS) / Project Type Established LOS: N/A. Project Type: Facility repair, remodel, & renovation Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2022-2026 Total Design and Engineering Construction To Be Determined To Be Determined TOTAL To Be Determined To Be Determined Funding Sources 2022-2026 Total General Fund To Be Determined To Be Determined TOTAL To Be Determined To Be Determined Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Facilities and Maintenance Office Kittitas County Capital Improvement Program December 7, 2021 Kittitas County Administrative Offices Page 28 Kittitas County Administrative Offices – New Courthouse Project Information and Selection Criteria Location To be Determined Links to Other Projects or Facilities Courthouse, Permit Center, and Morris Sorenson building Description Construction of New Courthouse Justification (Need/Demand) Office space is needed for all county functions. Consolidating administrative office, which includes, Commissioners Office, Auditors Office, Assessors’ Office, Treasurers Office, Fire Marshal, Community Development Services, and Public Works Administration office. The Courts and related offices may remain in the existing Courthouse. Further review to take place on the existing facility and cost to remodel Level of Service (LOS) / Project Type New Facility Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2022-2026 Total Design and Engineering $4,000,000 $4,000,000 Construction $52,000,000 $52,000,000 TOTAL $56,000,000 $56,000,000 Funding Sources 2022-2026 Total Commissioner approved bond $56,000,000 $56,000,000 TOTAL $56,000,000 $56,000,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Facilities and Maintenance Office Kittitas County Capital Improvement Program December 7, 2021 Kittitas Valley Event Center / Fairgrounds Page 29 3. Kittitas Valley Event Center / Fairgrounds This section includes an inventory of Kittitas Valley Event Center/Fairgrounds facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 4 below also describes each facility’s size in order to determine if it addresses the County’s long-term community needs. Table 4 Existing Public Facilities and Services Kittitas Valley Event Center / Fairgrounds Facility Built date Size Facility Built date Size Frontier Village Buildings 1890's Unknown Restrooms / R.A. (1) 1960's 2,035 sq. ft. Grandstand - Main/Heritage Bldg. 1925 18,965 sq. ft. Fair Office and Restrooms 1974 3,954 sq. ft. 8th Street Ticket Office 1930’s 1,568 sq. ft. Behind the Chutes 1976 1,000 sq. ft. Souvenir Booth 2004 Unknown Bloom Pavilion 1980 26,400 sq. ft. Posse Barn (1) 1940’s 3,000 sq. ft. Restrooms / R.A. (2) 1982 645 sq. ft. Posse Barn (2) 1940’s 4,800 sq. ft. Maintenance Shop 1986 1,500 sq. ft. Light Horse Barn 1940’s 3,200 sq. ft. Gazebo 1989 450 sq. ft. Cattle and Swine Barn 1940's 12,000 sq. ft. Buckaroo's Stands & Pens 1991 5,984 sq. ft. Draft Horse Barn 1940's 10,450 sq. ft. Gold Buckle Building 2001 2,400 sq. ft. Teanaway/Umtanum Building 1940's 17,556 sq. ft. Western Village 2004 3,140 sq. ft. First Rodeo Director’s Barn 1940's 3,250 sq. ft. Fair Storage Shed 2004 600 sq. ft. Second Rodeo Director’s Barn 1940 3,250 sq. ft. East Rodeo Concession 2005 600 sq. ft. Dog Barn 1940 1,200 sq. ft. Bronze Pig Statue 2007 N/A Ellensburg Armory 1950 13,920 sq. ft. Rodeo Arena Bleachers 2007 3,950 sq. ft. Bleachers W. (Covered) 1960's 10,756 sq. ft. Fair shed (Fuel) 2008 100 sq. ft. Bleachers E. (Uncovered) 1960's 10,000 sq ft West Rodeo Concession Unknown Unknown Kittitas County Capital Improvement Program December 7, 2021 Kittitas Valley Event Center / Fairgrounds Page 30 Kittitas Valley Event Center / Fairgrounds – Rodeo Arena Bleachers/Box Seats Project Information and Selection Criteria Location 901 E. 7th, Ellensburg Links to Other Projects or Facilities N/A Description Replace old rodeo seating bleachers and box seats Justification (Need/Demand) Phase 1 of this project is the replacement of section KK-MM and phase 2 is the replacement of section AA-JJ. The cost to the County for phase 1 is $630,000 and the cost for phase 2 is $2,040,000. Work includes removing existing structures and foundation, site work, new foundations and walls, seating structure and assembly, interior finishing for the skyboxes, fees, and taxes. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Facility renovation Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2022-2026 Total Design and Engineering Construction $2,670,000 $2,670,000 TOTAL $2,670,000 $2,670,000 Funding Sources 2022-2026 Total Revenue Bonds $2,670,000 $2,670,000 TOTAL $2,670,000 $2,670,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Kittitas Valley Event Center and Ellensburg Rodeo Kittitas County Capital Improvement Program December 7, 2021 Kittitas Valley Event Center / Fairgrounds Page 31 Kittitas Valley Event Center / Fairgrounds – Multi-Purpose Addition to Bloom Pavilion Project Information and Selection Criteria Location Southwest corner of Fairgrounds in Ellensburg Links to Other Projects or Facilities N/A Description Add a new multi-purpose addition to existing Bloom Pavilion at the Kittitas Valley Event Center to be used for various events and livestock housing. Justification (Need/Demand) Equestrian activities and other events take place throughout the year and create demand for additional facilities. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: New Facility Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2022-2026 Total Design and Engineering Construction $1,300,000 $1,300,000 TOTAL $1,300,000 $1,300,000 Funding Sources 2022-2026 Total General Obligation Bonds $1,300,000 $1,300,000 TOTAL $1,300,000 $1,300,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Kittitas Valley Event Center Kittitas County Capital Improvement Program December 7, 2021 Kittitas Valley Event Center / Fairgrounds Page 32 Kittitas Valley Event Center / Fairgrounds – Bloom Pavilion Upgrades Project Information and Selection Criteria Location Southwest corner of Fairgrounds in Ellensburg Links to Other Projects or Facilities N/A Description Replace windows and footing in Pavilion and install new protective materials in order to improve multi-purpose usage. Install retractable bleachers along West wall. Justification (Need/Demand) Non-equestrian events have created demand for large indoor facilities. Proper equestrian arenas also require footing replacement to maintain safe use. There is an increased demand for spectating at indoor events, but also need to store seating away for certain events. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Facility Renovation Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2022-2026 Total Design and Engineering Construction $600,000 $600,000 TOTAL $600,000 $600,000 Funding Sources 2022-2026 Total General Obligation Bonds $600,000 $600,000 TOTAL $600,000 $600,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues Increased use and type of use will increase revenue Anticipated Savings Due to Project None Department Responsible for Operations Kittitas Valley Event Center Kittitas County Capital Improvement Program December 7, 2021 Kittitas Valley Event Center / Fairgrounds Page 33 Kittitas Valley Event Center / Fairgrounds – Barn Expansion Project Information and Selection Criteria Location 901 E. 7th, Ellensburg Links to Other Projects or Facilities N/A Description Add additional barn space and replace current barn facilities for various types of livestock at the Kittitas Valley Event Center. This upgrade will allow for facilities to be used as emergency animal shelter during an emergency. Justification (Need/Demand) Equestrian activities and other livestock events take place throughout the year and create demand for additional facilities. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Facility renovation Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2022-2026 Total Design and Engineering Construction $1,500,000 $1,500,000 TOTAL $1,500,000 $1,500,000 Funding Sources 2022-2026 Total General Obligation Bonds $1,500,000 $1,500,000 TOTAL $1,500,000 $1,500,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues Increased use will generate more revenue. Anticipated Savings Due to Project Maintenance and painting costs lowered. Department Responsible for Operations Kittitas Valley Event Center Kittitas County Capital Improvement Program December 7, 2021 Kittitas Valley Event Center / Fairgrounds Page 34 Kittitas Valley Event Center / Fairgrounds – Emergency Animal Shelter Project Information and Selection Criteria Location 901 E. 7th Avenue, Ellensburg Links to Other Projects or Facilities N/A Description Upgrade existing barn facilities to allow for different types of animal shelter at the Kittitas Valley Event Center. Currently the barn facilities are built for specific animal species and are difficult to alter when being used as an emergency animal shelter during an emergency. Justification (Need/Demand) The Kittitas Valley Event Center was used to house animals that were evacuated during the August 2012 fire and the inflexible design made it difficult to provide appropriate shelter for various animals. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Facility renovation Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2022-2026 Total Design and Engineering Construction $500,000 $500,000 TOTAL $500,000 $500,000 Funding Sources 2022-2026 Total General Fund $500,000 $500,000 TOTAL $500,000 $500,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Facilities and Maintenance Kittitas County Capital Improvement Program December 7, 2021 Kittitas Valley Event Center / Fairgrounds Page 35 Kittitas Valley Event Center / Fairgrounds – Armory Parking Lot Paving Project Information and Selection Criteria Location 901 E 7th Ave, Ellensburg – Armory Building Links to Other Projects or Facilities N/A Description Pave the gravel parking lot and handicap spaces surrounding the Armory building. Justification (Need/Demand) As the highest-tech and most recently remolded facility available, it’s become one of the most frequently rented at the fairgrounds. However, event attendees struggle with holding formal events in the building due to multiple year- round issues caused by a dirt parking lot and no safe handicap spaces. It also causes issue during the Kittitas County Fair as one of the epicenters of the carnival. Rides could be placed much more efficiently if the proper ground was available. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Facility Renovation Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2022-2026 Total Design and Engineering $0 $0 Construction $300,000 $300,000 TOTAL $300,000 $300,000 Funding Sources 2022-2026 Total General Obligation Bonds $300,000 $300,000 TOTAL $300,000 $300,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Kittitas Valley Event Center Kittitas County Capital Improvement Program December 7, 2021 Kittitas County Maintenance Shops, Storage, and Parking Page 36 4. 5BKittitas County Maintenance Shops, Storage, & Parking This section includes an inventory of Kittitas County Maintenance shops, storage, and parking facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 5 below also describes facility’s size in order to determine if it addresses the County’s long-term community needs. The proposed projects for Kittitas County Maintenance Shops, Storage, and Parking are detailed in Appendix A. Table 5 Existing Public Facilities and Services Kittitas County Maintenance Shop, Storage, and Parking Facility Department Description Size Lower County PWD Heavy Equipment Storage West Shed Public Works 15th & Okanagon, built 1951 4,875 sq. ft. Lower County PWD Heavy Equipment Storage East Shed Public Works 15th & Okanagon, built 1951 4,875 sq. ft. Lower County PWD Main Heavy Equipment Shop Public Works 15th & Okanagon, built 1951 6,240 sq. ft. Sheriff Central Storage Sheriff 307 Umptanum Rd., built 2009 2,160 sq. ft. Upper County PWD Repair Shop Public Works Third & Short, Cle Elum, built in 1951, remodeled in 2011 3,200 sq. ft. Upper County PWD Heavy Equipment Storage Public Works Third & Short, Cle Elum, built in 1990, remodeled in 2010 2,800 sq. ft. Vantage Boat Launch Parking Lot Public Works Vantage Boat Launch built approx. 1990. Includes large stalls for boats 62 stalls Armory Parking Lot Ext, Weed, & Event Ctr Gravel parking area, not striped 20 stalls S Courthouse Parking Lot Courthouse Offices Off-street parking adjacent to Courthouse 21 stalls W Courthouse Parking Lot Courthouse Offices Off-street parking adjacent to Courthouse 7 stalls SW 6th Ave. & Water Street Courthouse Offices Improved parking lot 44 stalls NW 6th Ave. & Water Street Courthouse Offices Improved parking lot in 2010 58 stalls NE 6th Ave. & Water Street Courthouse Offices Semi-improved parking lot 18 stalls N Permit Center Public Works Improved off-street parking next to bldg. 14 stalls Kittitas County Capital Improvement Program December 7, 2021 Kittitas County Maintenance Shops, Storage, and Parking Page 37 Table 5 – Continued Existing Public Facilities and Services Kittitas County Maintenance Shop, Storage, and Parking Facility Department Description Size S Permit Center CDS Improved off-street parking next to bldg. 10 stalls Sheriff Administration Office Parking Lot Sheriff and Prosecutors Improved off-street parking next to bldg. 51 stalls SW Sorenson Building Parking Lot Public Health Improved off-street parking next to bldg. 24 stalls W Upper District Court Building Parking Lot Upper District Court Improved off-street parking next to bldg., 700 1st St., Cle Elum 22 (shared) Cle Elum Centennial Center - Parking Lot for Public Health services by appointment Public Health Improved off-street parking next to bldg., 719 E. 3rd St, Cle Elum. Building space and parking are provided for Upper County Public Health services 30 (shared) Suncadia / Upper County Sheriff Office Parking Lot Sheriff Improved off-street parking next to bldg., 4240 Bullfrog Rd, Suite 1, Cle Elum 22 (shared) Kittitas Valley Event Center/Fairgrounds Parking Lots KV Event Center Does not include the unimproved parking areas used for large events 136 Lower County PWD Shop Parking Lot Public Works Unimproved off-street parking next to bldg. 20(approx.) E UPS Store Courthouse Improved off-street parking 35 Kittitas County Capital Improvement Program December 7, 2021 Kittitas County Roads Page 38 5. 6BKittitas County Roads The Kittitas County’s Six-Year Transportation Improvement Plan provides further detail of the facility improvements that were indicated in Table 1. The Six-Year Transportation Improvement Plan is adopted once a year in the fall and amended as needed throughout the first year of the program. Appendix B provides a detailed description of the proposed projects, mapping of the projects, and the funding plan. To obtain the latest version of this plan go to: Six-Year Transportation Improvement Plan Kittitas County Capital Improvement Program December 7, 2021 Regional Parks and Trails Page 39 6. 7BRegional Parks and Trails This section includes an inventory of Regional Parks and Trails facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 6 below also describes each facility’s size in order to determine if it addresses the County’s long-term community needs according to level of service standards. Appendix C provides a detailed description of the proposed projects, mapping of the projects, and the funding plan. Table 6 Existing Public Facilities and Services Regional Parks and Trails Facility Provider Description Size Coal Mines Trail Coal Mines Trail Commission, Cle Elum, Roslyn, and Kittitas County From Cle Elum to Ronald, Northern Pacific Railway bed 10.4 mi John Wayne Trail / Iron Horse State Park Washington State Parks Department From North Bend to Vantage, Chicago-Milwaukee-St. Paul-Pacific Railroad bed. 100 mi Vantage Boat Launch and Restrooms Kittitas County Vantage Boat Launch, built 1990 342 sq ft The Cove Recreation Area Grant County PUD and Washington State Parks West of Huntzinger Road near Wanapum Dam. Public access is for day use from Thursdays through Mondays. 20 acres Kittitas County Outdoor Recreation Inventory Varies All other Parks and Trails are listed in the comprehensive inventory of recreation facilities adopted by reference in the Comprehensive Plan. varies Evergreen Sno-Park 1 mile east of Snoqualmie Summit. A trail system comprised of 23 miles. Kittitas County Capital Improvement Program December 7, 2021 Solid Waste Page 40 7. 8BSolid Waste This section includes an inventory of Solid Waste facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 7 below also describes each facility’s size in order to determine if it addresses the County’s long- term community needs. Table 7 Existing Public Facilities and Services Kittitas County Solid Waste Facility Built date Size Facility Built date Size Ellensburg Scale House (Storage), 801 Industrial Way 1981 160 sq. ft. Transfer Station - Cle Elum, 50 #5 Mine Rd., Cle Elum 2003 9,000 sq. ft. Cle Elum Scale House, Hwy 903 Cle Elum 1981 160 sq. ft. MRW - Cle Elum, 50 #5 Mine Rd., Cle Elum 2003 2,000 sq. ft. Cle Elum Bunker Building, Hwy. 903 Cle Elum 1981 3,000 sq. ft. MRW - Ellensburg, 50 #5 Mine Rd., Cle Elum 2001 3,000 sq. ft. Cle Elum Storage, Hwy. 903 Cle Elum 1981 925 sq. ft. Office/Admin Bldg., 50 #5 Mine Rd., Cle Elum 2003 120 sq. ft. Transfer Station Building, 1001 Industrial Way 2000 9,078 sq. ft. Cle Elum Scale House - new, 50 #5 Mine Rd., Cle Elum 2003 284 sq. ft. Scale House Bldg., 1001 Industrial Way 2000 1,000 sq. ft. Ryegrass Equipment Storage, 25900 Vantage Hwy. 1980 1,620 sq. ft. Transfer Station Office, 925 Industrial Way 1963 1,980 sq. ft. SW 400 sq. ft. building, 25900 Vantage Hwy. 2008 400 sq. ft. Transfer Station Shop, 925 Industrial Way 1963 1,680 sq. ft. Kittitas County Capital Improvement Program December 7, 2021 Solid Waste Page 41 Solid Waste – Relocate Ellensburg Transfer Station and Compost Facility Project Information and Selection Criteria Location 925 Industrial Way, Ellensburg – 50-acre site on Highway 97 Links to Other Projects or Facilities N/A Description Build a new Transfer Station and Compost Facility in the Ellensburg vicinity. Justification (Need/Demand) The current transfer station has inadequate access and space. It is also in an environmentally sensitive location. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: New Facility Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2022 2023-2027 Total Design and Engineering 2,000,000 $2,000,000 $3,000,000 Construction $3,000,000 $17,000,000 $20,000,000 TOTAL $5,000,000 $19,000,000 $23,000,000 Funding Sources 2022 2023-2027 Total Solid Waste Fund/Grant/Loan $5,000,000 $19,000,000 $23,000,000 TOTAL $5,000,000 $19,000,000 $23,000,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Solid Waste Kittitas County Capital Improvement Program December 7, 2021 Solid Waste Page 42 Solid Waste – Cle Elum Transfer Station Entrance Project Information and Selection Criteria Location Cle Elum Transfer Station 50 No. 5 Mine Rd. Links to Other Projects or Facilities N/A Description Construct a new entrance to allow for better queuing for the scales. Justification (Need/Demand) Eliminate a traffic hazard on Highway 903 Level of Service (LOS) / Project Type Comprehensive Plan Citations Capital Cost 2022 2023-2027 Total Design and Engineering $50,000 $50,000 Construction $350,000 $350,000 TOTAL $50,000 $350,000 $400,000 Funding Sources 2022 2023-2027 Total Solid Waste Fees and Grants $50,000 $350,000 $400,000 TOTAL Annual Operations and Maintenance Estimated Costs $5,000 per year to maintain Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Solid Waste Kittitas County Capital Improvement Program December 7, 2021 Library Services Page 43 8. 9BLibrary Services This section includes an inventory of Library Services facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 8 below also describes facility’s size in order to determine if it addresses the County’s long-term community needs. Table 8 Existing Public Facilities and Services Library Services Facility Provider Description Size Gilmour Memorial Library (Kittitas) Kittitas 2nd & Pierce Streets, Kittitas Carpenter Memorial Library (Cle Elum) Cle Elum 302 Pennsylvania Ave., Cle Elum Ellensburg Public Library Ellensburg 209 N. Ruby St, Ellensburg, founded in 1910, recently expanded in 2003. Roslyn Public Library Roslyn 201 S. First St., Roslyn, $3 million remodel began in 2009 to repair and update Kittitas County Capital Improvement Program December 7, 2021 Emergency Services Page 44 9. 10BEmergency Services This section includes an inventory of Emergency Services facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 9 below also describes each facility’s size in order to determine if it addresses the County’s long-term community needs. Table 9 Existing Public Facilities and Services Emergency Services Facility Provider Description Size Station #11 Thorp Fire District No. 1 Thorp – 10700 N. Thorp Hwy., all District 43.5 sq. mi. and serves 2,500 residences, built in 2000, remodeled in 2005, 2 engines, 1 Tender, 2 brush trucks, 1 aid unit, and 1 rescue. 6,400 sq. ft. Station #12 Clark Flats Fire District No. 1 Thorp - 10941 SR 10, 2 buildings at site, 1 tender, 1 brush truck, and 1 engine 2,300 sq. ft. for both bldgs. Station #13 Elk Heights Fire District No. 1 Elk Heights – 1 building at site, and 1 engine. Station #21 Fire District 2 (Kittitas Valley Fire and Rescue) 280 sq. mi. for all Dist 2, 2020 Vantage Highway B-211, E-211, T-211, B-212, M-211, M-212, M-213 - Living Quarters – 2020’s, Bay – updated 2020, maintenance and training - 2020 Station #22 Fire District 2 2672 Tjossem E-221 – 2018 Station 22S – 3301 Denmark Road –2015 Station #24 Fire District 2 4901 4th Parallel Road: B-241, E-241, B-242, T-241 - 2004 Station #23 Fire District 2 Main St, Kittitas – E-231, B-231, A-231 - 2010 Station 23 S Fire District 2 890 Cleman Road, Kittitas – E-232, B- 232, T-231 - 2010 Station #26 Fire District 2 6651 Brick Mill Road – E-261, B-261 – 1940’s – anticipate replacing in 2024 Station #26 Satellite Fire District 2 2380 Game Farm Road – E-262 – 1950’s – anticipate decommission and sale 2022 Station #27 Fire District 2 8800 Reecer Cr. Rd – E-271 – 1950’s Station #28 Fire District 2 5640 Cove Road – B-281, E-281, T-281 – 2002 Kittitas County Capital Improvement Program December 7, 2021 Emergency Services Page 45 Table 10 - Continued Existing Public Facilities and Services Emergency Services Station #28 Satellite Fire District 2 51 Barnes Road – E-282 – 1960’s Facility Provider Description Size Station #29 Fire District 2 400 E. Mountainview Ave – M-291, M- 292, M-293, R-291, B-291, E-291, L- 291, E-292 - 2018 Easton Station Fire District No. 3 (Easton) 180 Cabin Creek Easton WA. 98925, PO Box 52, 12 sq. mi. for all Dist. 33182 sq. ft., built in 1992, 1- aid car, 1-engine, 2- tankers, 1-rescue truck 3,182 sq. ft. Vantage Station Fire District No. 4 (Vantage) Information Not Available Snoq. Pass Station Fire District No. 5/King FPD No. 51 (Snoqualmie Pass) 1211 SR 906 E. of I 90 Exit 53, houses E291, E292, A291, A292, B291, Brush291, and Snow291 (snowmobile trailer), built in 2011. 16,551 sq. ft. Station #61 KCFP District No. 6 (Ronald/Lk. Cle Elum) Serves south end of district / 7 sq. mi. for all Dist. 6. Station #62 KCFP District No. 6 (Ronald/Lk. Cle Elum) 14030 Salmon La Sac Road, Ronald, WA 98940. Serves north end of district / 7 sq. mi. for all Dist. 6, 1 engine, 1 brush truck, 1 tender, and 1 aid unit. South Cle Elum Fire Station South Cle Elum 523 Lincoln Ave., South Cle Elum, 1 pumper, 1 utility truck, and serves 0.5 mile area with 580 people. Can handle twice the size area. 1,200 sq. ft. Station #1 Peoh Point Rd. Fire District No. 7 (Upper County Area) 80 sq. mi. for all Dist. 7,1 fire engine, 1 wild land brush truck, 1 water tender, 1 aid unit, and ambulance Station #2 SR 970 and Airport Rd. Fire District No. 7 Information Not Available Station #3 off I-90 at Golf Course Exit 77 Fire District No. 7 Information Not Available Station #4 Ballard Hill Rd. Fire District No. 7 Information Not Available Station #5 Teanaway Valley at Middle Fork Rd. Fire District No. 7 Information Not Available Kittitas County Capital Improvement Program December 7, 2021 Emergency Services Page 46 Table 10 - Continued Existing Public Facilities and Services Emergency Services Facility Provider Description Size Station #81 Fire District No. 8 (Kachess) 13 sq. mi. for all Dist. 8, Located in Kachess Village, 1 engine 811, 1 command vehicle, 1 aid car, and 1 brush truck Station #82 Fire District No. 8 (Kachess) Located at intersection of Kachess Lake and Via Kachess Roads, 1 wild land engine, 1 tender/pumper, and rescue snowmobiles & trailer Station #83 Fire District No. 8 (Kachess) Located at intersection of Stampede Pass and Lost Lake Roads, 1 pumper/rescue truck, 1 tender, 1 brush truck, 1 aid car, and 1 support car Kittitas Valley Community Hospital Hospital District No. 1 Located at 603 S. Chestnut. Level IV trauma service & 24-hr emergency care, S. Chestnut St. & E. Manitoba, Ellensburg 81,000 Cle Elum Medical Center Hospital District No. 2 Located at 201 Alpha Way, Cle Elum. Family Medicine of Cle Elum. No urgent care services provided. 13,500 Cle Elum Urgent Care Hospital District No. 1 Located at 214 W. 1st St., Cle Elum. 2,864 New Cle Elum Ambulance Garage Hospital District No. 2 Exact address undetermined. Adjacent to 201 Alpha Way, Cle Elum. Approximate completion date 2021. 8,500 Medical Arts Building Hospital District No. 1 Located at 100 E. Jackson, Ellensburg. No urgent care services provided at this building. KVH clinics include Pediatrics, Women’s Health, Lab, and Family Medicine of Ellensburg. Some space also currently leased to other non-KVH clinical services. TI completed February 2020. 33,671 KVH Physical Therapy Hospital District No. 1 Located at 301 Mountainview, Ellensburg. Entire building dedicated to physical therapy services. No urgent care services provided. Leased property. 6,912 KVH Occupational Therapy and Speech Hospital District No. 1 Located at 309 Mountain, Ellensburg. Also houses KVH IT Services. No urgent services provided. Leased property. 6,631 Ellensburg Clinic Hospital District No. 1 Located at 700 Manitoba, Ellensburg. Houses Internal Medicine, KVH Quality Department, and soon to house 9,434 Kittitas County Capital Improvement Program December 7, 2021 Emergency Services Page 47 Neurology Clinic. No urgent care services provided. Table 10 - Continued Existing Public Facilities and Services Emergency Services Facility Provider Description Size Valley Clinic Hospital District No. 1 Located at 716 Manitoba, Ellensburg. Formally Family Medicine of Ellensburg. This facility is now a pop-up clinic for COVID-19, and Lab annex. No urgent care services provided. Leased property. 7,230 Empty Building Hospital District No. 1 Located at 708 Manitoba, Ellensburg. This building is currently vacant but will most likely only be used for office space. 1,000 Mediplex Hospital District No. 1 Located at 611 S. Chestnut, Ellensburg. This has suites A-E and are all clinical use. No urgent care services provided by KVH or tenants. 10,291 Work Place Health Hospital District No. 1 Located at 702-B Mountainview, Ellensburg. No urgent care services provided. Leased suite. 1,710 Radio Hill Annex Hospital District No. 1 Located at 1506 Radio Road, Ellensburg. Currently half office space and half storage. Office space for accounting, Home Care, and Hospice. Will most likely never be clinical space. No urgent care services provided. 21,082 Hospice Friends Friends of Hospice Located at 302 E. 2nd Ave, Ellensburg. Non-KVH office space for Friends of Hospice. KVH owned. 2,325 Kittitas County Capital Improvement Program December 7, 2021 Emergency Services Page 48 Emergency Services – Station 26 Replacement Project Information and Selection Criteria Location Fairview and Brickmill Road Links to Other Projects or Facilities N/A Description Relocate and replace volunteer station Justification (Need/Demand) This project is needed due to property inadequate for current use. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Facility renovation Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2022 2023-2027 Total Design and Engineering - property $250,000 $0 $250,000 Construction $0 $700,000 $700,000 TOTAL $250,000 $700,000 $950,000 Funding Sources 2022 2023-2027 Total Property Tax – existing $250,000 $700,000 $950,000 TOTAL $250,000 $700,000 $950,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Project None Department Responsible for Operations Kittitas Valley Fire and Rescue Kittitas County Capital Improvement Program December 7, 2021 Emergency Services Page 49 Emergency Services – Upper County Search and Rescue/Emergency Management Base Project Information and Selection Criteria Location Airport Rd off Cle Elum Airport Access Rd Links to Other Projects or Facilities Replaces leased SAR Bldg in Ellensburg; location from proposed land/facility swap with City of Cle Elum. Description Base of operations for county SAR and Emergency Management; also SAR and EM training facility and Emergency Operations Center. Justification (Need/Demand) Current SAR bldg. is dilapidated and inadequate; a west county location is better for SAR response. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: New facility Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2022 2023-2027 Total Design and Engineering $50,000 Construction $600,000 $3,350,000 TOTAL $650,000 $3,350,000 $4,000,000 Funding Sources 2022 2023-2027 Total General Fund $650,000 $3,350,000 $4,000,000 TOTAL $4,000,000 Annual Operations and Maintenance Estimated Costs Currently the county does not track maintenance costs for these improvements Estimated Revenues n/a Anticipated Savings Due to Project n/a Department Responsible for Operations Sheriff’s Office Kittitas County Capital Improvement Program December 7, 2021 Emergency Services Page 50 Emergency Services – Sheriff’s Office Upper County Precinct Project Information and Selection Criteria Location Cle Elum area Links to Other Projects or Facilities Possibly a shared facility with Cle Elum PD Description Base for convenient law enforcement services to upper county including dedicated patrol, investigations, records and other front office services Justification (Need/Demand) Growth and development of the upper county create increased need for focused law enforcement presence. A shared facility would create efficiencies, avoid duplication and make a one-stop-cop-shop for the upper county. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: New facility Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2022 2023-2027 Total Design and Engineering $100,000 $100,000 Construction $3,000,000 $3,000,000 TOTAL $3,100,000 $3,100,000 Funding Sources 2022 2023-2027 Total General Fund $3,100,000 $3,100,000 TOTAL Annual Operations and Maintenance Estimated Costs Currently the county does not track maintenance costs for these improvements Estimated Revenues n/a Anticipated Savings Due to Project n/a Department Responsible for Operations Sheriff’s Office Kittitas County Capital Improvement Program December 7, 2021 Emergency Services Page 51 Emergency Services – Kittitas Valley Hospital Materials Management and Radiology Expansion Project Information and Selection Criteria Location 603 S Chestnut Links to Other Projects or Facilities Description Remodel of existing space in surgery and an expansion of 4000 square feet that will serve surgery, materials management and radiology. The expansion will add a 2nd CT to radiology, add an operating room, and expand central sterile and materials management. The expansion will displace parking so new parking on north end of property is proposed. This project under design now and projected to be 2022 and 23 project. Justification (Need/Demand) Kittitas county has grown so the hospital has increased its outpatient surgeries and is now requiring more OR space. Materials management is also in need of expansion to support all the supplies for the higher surgical load and patient count in general. The radiology addition will add a 2nd CT needed for patient volume and provide redundancy. Level of Service (LOS) / Project Type Expansion and renovation. Comprehensive Plan Citations Capital Cost 2022 2023-2027 Total Design and Engineering $1,075,254 $1,075,254 Construction $8,442,355 $8,442,355 TOTAL $9,517,609 $9,517,609 Funding Sources 2022 2023-2027 Total Commissioner approved bond TOTAL Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Capital Improvement Program December 7, 2021 Emergency Services Page 52 Emergency Services – Kittitas Valley Hospital Dietary Renovation Project Information and Selection Criteria Location 603 S Chestnut Links to Other Projects or Facilities Description Remodel café and add new square footage in courtyard. Justification (Need/Demand) Goal is to add seating area, create better flow through serving area, add food options in serving area, and a general refresh of finishes. Also to provide more options for visitors at night with vending and seating options. Level of Service (LOS) / Project Type Renovation Comprehensive Plan Citations Capital Cost 2022 2023-2027 Total Design and Engineering $141,010 $141,010 Construction $636,185 $636,185 TOTAL $777,195 $777,195 Funding Sources 2022 2023-2027 Total Commissioner approved bond TOTAL Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Capital Improvement Program December 7, 2021 Emergency Services Page 53 Emergency Services – Kittitas Valley Hospital Grounds Improvement Project Information and Selection Criteria Location 603 S Chestnut Links to Other Projects or Facilities Description Hospital grounds renovation, exterior building improvements, and traffic flow improvements. Justification (Need/Demand) Goal is to minimize confusion in traffic flow, remove physical barriers for site, add some parking, reduce maintenance needs, reduce water use, and needed face lift on the building. Level of Service (LOS) / Project Type Renovation Comprehensive Plan Citations Capital Cost 2022 2023-2027 Total Design and Engineering $224,700 $224,700 Construction TBD TOTAL Funding Sources 2022 2023-2027 Total Commissioner approved bond TOTAL TBD Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Capital Improvement Program December 7, 2021 Education Page 54 10. Education This section includes an inventory of education facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 10 below also describes each facility’s size in order to determine if it addresses the County’s long- term community needs. Table 10 Existing Public Facilities and Services Education Facility Provider Description Size Central Washington University Washington State Comprehensive public university main campus, 1500 employees, 94 buildings 11,110 students statewide (fall 2020) Cle Elum / Roslyn High School Cle Elum/ Roslyn School District 2692 - SR 903, Cle Elum, 9th grade to 12th grade 239 students Cle Elum / Roslyn Elementary School Cle Elum/ Roslyn School District 2696 - SR 903, Cle Elum, pre-school, Kindergarten to 5th grade 348 students Cle Elum / Roslyn Alternative School Cle Elum/ Roslyn School District 200 W. Oakes St., Cle Elum, 3rd grade to 12th grade 38 students Walter Strom Middle School Cle Elum/ Roslyn School District 2694 - SR 903, Cle Elum, 6th grade to 8th grade 221 students Cle Elum/ Roslyn School District Music Building Cle Elum/ Roslyn School District Music Building for Walter Strom Middle School and Cle Elum-Roslyn Middle School Cle Elum/ Roslyn School District Transportation Facility Cle Elum/ Roslyn School District School bus covered parking, maintenance facility, and transportation staff office building. Damman Elementary School Damman School District Kindergarten to 6th grade, 1 school, 2 teachers, 3712 Umptanum Rd. 38 students Easton Elementary, Jr., Sr. High School Easton School District 1893 Railroad St., Easton 127 students Lincoln Elementary School Ellensburg School District 26 classroom teachers, 200 S. Sampson St., Ellensburg 454 students Mount Stuart Elementary School Ellensburg School District 27 classroom teachers, 705 W. 15th Ave., Ellensburg 434 students Valley View Elementary School Ellensburg School District 26 classroom teachers, 1508 E. 3rd Ave., Ellensburg 526 students Kittitas County Capital Improvement Program December 7, 2021 Education Page 55 Morgan Middle School Ellensburg School District 40 classroom teachers, 400 E. 1st Ave., Ellensburg 752 students Table 10 - Continued Existing Public Facilities and Services Education Facility Provider Description Size Ellensburg High School Ellensburg School District 40 classroom teachers of a total 67 professional staff, 1203 E. Capitol Ave., Ellensburg 926 students Kittitas Elementary School Kittitas School District Kindergarten to 5th grade, 7571 Kittitas Hwy, Kittitas 258 students Kittitas High School Kittitas School District 6th grade to 12th grade, 7571 Kittitas Hwy, Kittitas 282 students Parke Creek Treatment Center Kittitas School District 11042 Parke Creek Rd. 15 students Thorp Elementary, Jr., and Sr. High Schools Thorp School District Kindergarten to 12th grade, 10831 N. Thorp Hwy, Thorp 164 students Kittitas County Capital Improvement Program December 7, 2021 Education Page 56 Education – CWU, Health Education, Ellensburg, WA Project Information and Selection Criteria Location Parcel # 313534, E Dean Nicholson Blvd, CWU campus, Ellensburg, WA 98926 Links to Other Projects or Facilities Purser Hall – West adjacent Description Renovation and expansion of existing Nicholson Pavilion for academic programs supporting Health Education. Justification (Need/Demand) The Health Education project modernizes and expands facilities for the Department of Sport and Movement studies (SAMS) and the Bachelor of Science in Physical Education and School Health (PESH) degree program, which is one of the largest providers of public-school health and fitness teachers for Washington State. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Facility Renovation Comprehensive Plan Citations N/A Capital Cost 2022 2023-2027 Total Design and Engineering Construction $55,505,000 Incl. in 2022 $55,505,000 TOTAL $55,505,000 Incl. in 2022 $55,505,000 Funding Sources 2022 2023-2027 Total State OFM Capital $55,505,000 Incl. in 2022 $55,505,000 TOTAL $55,505,000 Incl. in 2022 $55,505,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Office of the Provost serving SAMS & PESH Kittitas County Capital Improvement Program December 7, 2021 Education Page 57 Education – CWU, 1200 Ton Chiller Addition, Ellensburg, WA Project Information and Selection Criteria Location 205 E 11th, CWU campus, Ellensburg, WA 98926 Links to Other Projects or Facilities Purser Hall – West adjacent Description The addition of a 1200-ton chiller at the Central Energy plant that promotes the reliability and securing of institutional cooling. Justification (Need/Demand) CWU will not have enough cooling capacity redundancy when the new Health Science building is completed for occupancy in January 2022. Failure to secure an additional chiller creates significant risk of temperature control for science facilities and critical lab equipment. Level of Service (LOS) / Project Type Established LOS: N/A Project Type: Infrastructure Comprehensive Plan Citations N/A Capital Cost 2022 2023-2027 Total Design and Engineering $367,647 $367,647 Construction $2,821,353 $2,821,353 TOTAL $3,189,000 $3,189,000 Funding Sources 2022 2023-2027 Total State OFM Capital $3,189,000 $3,189,000 TOTAL $3,189,000 $3,189,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Office of Operations Kittitas County Capital Improvement Program December 7, 2021 Education Page 58 Education – Ellensburg School District, Ida Nason Aronica School Project Information and Selection Criteria Location Ida Nason Aronica Elementary, 2100 North Cora Street Links to Other Projects or Facilities Description Construct fourth elementary Justification (Need/Demand) Construct fourth elementary to bring unhoused students into school building from portables Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2021-2022 FYs 2022-2027 Total Design and Engineering $347,021 $1,394 $348,415 Construction $6,932,522 $26,358 $6,958,880 Professional services & FF&E $1,032,151 $4,145 $1,036,296 Other developmental costs $72,470 $291 $72,761 Contingencies $42,534 $171 $42,705 TOTAL $8,426,698 $32,359 $8,459,057 Funding Sources FY 2021-2022 FYs 2022-2027 Total Commissioner approved bond $4,309,885 $4,309,885 State match $2,056,813 $32,359 $2,089,172 ESSER $1,300,000 $1,300,000 Other sources (interest, City, general fund transfer) $760,000 $760,000 TOTAL $8,426,698 $32,359 $8,459,057 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Capital Improvement Program December 7, 2021 Education Page 59 Education – Ellensburg School District, New Mt. Stuart Elementary New-in-Lieu Project Information and Selection Criteria Location Mt. Stuart Elementary, 1701 North Cora Street Links to Other Projects or Facilities Description New building, replacement school Justification (Need/Demand) Replace 1967 building deemed more costly to repair than replace. Remove portables to bring all students into the one building rather than temporary housing. Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2021-2022 FYs 2022-2027 Total Design and Engineering $308,654 $308,654 Construction $2,944,392 $2,944,392 Professional services & FF&E $860,353 $860,353 Other development costs $60,644 $60,644 Contingencies $2,673 $2,673 TOTAL $4,176,716 $4,176,716 Funding Sources FY 2021-2022 FYs 2022-2027 Total State match $4,176,716 $4,176,716 TOTAL $4,176,716 $4,176,716 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Capital Improvement Program December 7, 2021 Education Page 60 Education – Ellensburg School District, Mt. Stuart Elementary Early Learning Center Project Information and Selection Criteria Location Mt. Stuart Elementary Early Learning Center, 705 West 15th Avenue Links to Other Projects or Facilities Description Remodel building and portable Justification (Need/Demand) Remodel existing annex building located at the Mt. Stuart Elementary campus to house the Early Learning Center Preschool. Students are currently housed at CWU in rented space. Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2021-2022 FYs 2022-2027 Total Design and Engineering $15,635 $15,635 Construction $250,670 $250,670 Other development costs $10,000 $10,000 Contingencies $20,760 $20,760 TOTAL $297,065 $297,065 Funding Sources FY 2021-2022 FYs 2022-2027 Total Commissioner approved bond $26,058 $26,058 Other sources (interest, grant) $271,007 $271,007 TOTAL $297,065 $297,065 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Capital Improvement Program December 7, 2021 Education Page 61 Education – Ellensburg School District, Tennis Courts, Joint with City of Ellensburg Project Information and Selection Criteria Location Proposed Mountain View Park Links to Other Projects or Facilities Description Construct tennis courts Justification (Need/Demand) Contribute $250,000 to City of Ellensburg’s tennis court construction project in lieu of future fees for use. Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2021-2022 FYs 2022-2027 Total Design and Engineering $250,000 $250,000 Construction TOTAL $250,000 $250,000 Funding Sources FY 2021-2022 FYs 2022-2027 Total General Fund $250,000 $250,000 TOTAL $250,000 $250,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Capital Improvement Program December 7, 2021 Education Page 62 Education – Ellensburg School District, TVF Support to Increased Student Grown/30-Year Bus Replacement Project Information and Selection Criteria Location Transportation Dept., 1300 East Third Avenue Links to Other Projects or Facilities Description 30-year bus replacement cycle Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2021-2022 FYs 2022-2027 Total Design and Engineering Purchase $683,552 $683,552 TOTAL $683,522 $653,552 Funding Sources FY 2021-2022 FYs 2022-2027 Total General Fund Transfers $683,522 $683,552 TOTAL $683,552 $683,552 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Capital Improvement Program December 7, 2021 Education Page 63 Education – Ellensburg School District, Valley View Elementary Parking Lot Improvements Project Information and Selection Criteria Location Valley View Elementary, 1508 East Third Avenue Links to Other Projects or Facilities Description Improve parking lots to the north, south and west sides of Valley View Elementary. Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2021-2022 FYs 2022-2027 Total Design and Engineering Construction TOTAL $286,663 $286,663 Funding Sources FY 2021-2022 FYs 2022-2027 Total General Fund Transfer $286,663 $286,663 TOTAL $286,663 $286,663 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Capital Improvement Program December 7, 2021 Education Page 64 Education – Ellensburg School District, Valley View Elementary Bus Loading/Unloading Project Information and Selection Criteria Location Valley View Elementary, 1508 East Third Avenue Links to Other Projects or Facilities Description Dedicated bus loading/unloading area fencing Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2021-2022 FYs 2022-2027 Total Design and Engineering Construction $50,000 $50,000 TOTAL $50,000 $50,000 Funding Sources FY 2021-2022 FYs 2022-2027 Total General Fund transfer $50,000 $50,000 TOTAL $50,000 $50,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Capital Improvement Program December 7, 2021 Education Page 65 Education – Ellensburg School District, Lincoln Elementary Remodel/Addition Project Information and Selection Criteria Location Lincoln Elementary, 200 South Sampson Street Links to Other Projects or Facilities Description Remodel/Addition Justification (Need/Demand) Upgrades to seismic, HVAC, addition of gym and elevator, remodel of existing structure, removal of portables to bring all students into the one building rather than temporary housing Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2021-2022 FY 2022-2027 Total Design and Engineering Construction $10,985,235 $5,584,053 $16,569,288 Professional Services & FF&E $648,170 $216,057 $864,227 Contingencies $540,000 $30,780 $570,780 TOTAL $12,173,405 $5,830,890 $18,004,295 Funding Sources FY 2021-2022 FY 2022-2027 Total Commissioner approved bond $9,023,210 $9,023,210 State match $8,531,085 $8,531,085 Other sources (interest) $450,000 $450,000 TOTAL $9,473,210 $8,531,085 $18,004,295 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Capital Improvement Program December 7, 2021 Education Page 66 Education – Ellensburg School District, Valley View Elementary Blvd Resurfacing Project Information and Selection Criteria Location Valley View Elementary, 1508 East Third Avenue Links to Other Projects or Facilities Description Valley View Blvd resurfacing Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2021-2022 FYs 2022-2027 Total Design and Engineering Construction TOTAL $300,000 $300,000 Funding Sources FY 2021-2022 FYs 2022-2027 Total General Fund transfer $300,000 $300,000 TOTAL $300,000 $300,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Capital Improvement Program December 7, 2021 Education Page 67 Education – Ellensburg School District, Maintenance Warehouse Project Information and Selection Criteria Location Maintenance Dept., 1300 East Third Avenue Links to Other Projects or Facilities Description Construct maintenance/grounds equipment warehouse Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2021-2022 FYs 2022-2027 Total Design and Engineering $75,000 $75,000 Construction $225,000 $225,000 TOTAL $300,000 $300,000 Funding Sources FY 2021-2022 FYs 2022-2027 Total General Fund transfers $300,000 $300,000 TOTAL $300,000 $300,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Capital Improvement Program December 7, 2021 Education Page 68 Education – Ellensburg School District, New Ellensburg High School Portable Relocation Project Information and Selection Criteria Location Ellensburg High School, 1203 East Capitol Avenue Links to Other Projects or Facilities Description Relocate two portables to high school campus to house Special Programs Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2021-2022 FY 2023-2027 Total Design and Engineering $200,000 $0 $200,000 Construction $15,000 $0 $15,000 TOTAL $215,000 $0 $215,000 Funding Sources FY 2021-2022 FY 2023-2027 Total Commissioner approved bond $25,000 $0 $25,000 General Fund transfer $190,000 $0 $190,000 TOTAL $215,000 $0 $215,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Capital Improvement Program December 7, 2021 Education Page 69 Education – Ellensburg School District, New IT Mitigation Plan Project Information and Selection Criteria Location Information Technology Dept., 1300 East Third Avenue Links to Other Projects or Facilities Description IT Mitigation Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost FY 2021-2022 FY 2022-2027 Total Purchase $769,500 $5,069,427 $5,838,927 TOTAL $769,500 $5,069,427 $5,838,927 Funding Sources FY 2021-2022 FY 2022-2027 Total Tech Levy $769,500 $5,069,427 $5,838,927 TOTAL $769,500 $5,069,427 $5,838,927 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Capital Improvement Program December 7, 2021 Education Page 70 Education – Ellensburg School District Central Office HVAC Project Information and Selection Criteria Location District Central Office, 1300 East Third Avenue Links to Other Projects or Facilities Description Replace HVAC Justification (Need/Demand) Replace HVAC for More Efficient System Level of Service (LOS) / Project Type Comprehensive Plan Citations Capital Cost FY 2021-2022 FYs 2022-2027 Total Design and Engineering $50,000 $50,000 Construction $250,000 $250,000 TOTAL $300,000 $300,000 Funding Sources FY 2021-2022 FYs 2022-2027 Total ESSER $300,000 $300,000 TOTAL $300,000 $300,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Capital Improvement Program December 7, 2021 Education Page 71 Education – Ellensburg School District Mt. Stuart Elementary Parking Lot Resurfacing Project Information and Selection Criteria Location Mt. Stuart Elementary, 705 West 15th Avenue Links to Other Projects or Facilities Description Mt. Stuart Elementary Resurfacing Justification (Need/Demand) Level of Service (LOS) / Project Type Comprehensive Plan Citations Capital Cost FY 2021-2022 FYs 2022-2027 Total Design and Engineering Construction TOTAL $150,000 $150,000 Funding Sources FY 2021-2022 FYs 2022-2027 Total General Fund transfer $150,000 $150,000 TOTAL $150,000 $150,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Project Department Responsible for Operations Kittitas County Capital Improvement Program December 7, 2021 Water – Group A Systems Page 72 11. 12BWater - Group A Systems This section includes an inventory of Water – Group A Systems facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 11 below also describes facility’s size in order to determine if it addresses the County’s long-term community needs. Table 11 Existing Public Facilities and Services Water (Group A Systems) Facility Provider Description Size Ronald Water System Kittitas County Water District No. 2, Special District Community provider Serves 227 persons with 119 connections, 150 total approved connections. Effective since 1/1/1970. 125,000 gal Thorp Water System Kittitas County Water District No. 4, Special District Community provider Serves 250 persons with 116 connections, 209 total approved connections. Effective since 7/1/1987. 156,000 gal Elk Meadows Water System Kittitas County Water District No. 5, Community provider 141 Swallow Ln, Cle Elum, serves 600 persons with 296 connections, 340 total approved connections. Effective since 1/1/1970. 75,000 gal Easton Water System Easton Water District, Community provider 141 Swallow Ln, Cle Elum, serves 250 residential persons with 211 connections, 405 total approved connections. Effective since 1/1/1970. 195,000 gal Sunlight Waters Water System Kittitas County Water District No. 7, Special District Community provider 1710 Sunlight Dr., Cle Elum, serves 380 residential persons and 169 non-residential persons with 225 connections, 267 total approved connections. Effective since 1/1/1970. 200,000 gal Vantage Water System Vantage Water System, Investor Community provider Serves 73 residential persons with 80 connections, 129 total approved connections. Effective since 1/1/1970. 50,000 gal Evergreen Valley Water System Evergreen Valley Utilities, Investor Community provider Serves 35 residential persons and 5 non- residential persons with 262 connections, 411 total approved connections. Effective since 3/2/2004. 120,000 gal Reservoir Hill Water System Reservoir Hill Maintenance Association, Private Community provider South Cle Elum, serves 33 residential persons with 20 connections, 25 total approved connections. Effective since 2/25/1999. 20,000 gal Kittitas County Capital Improvement Program December 7, 2021 Water – Group A Systems Page 73 Table 11 - Continued Existing Public Facilities and Services Water (Group A Systems) Facility Provider Description Size Central Mobile Home Park Central Mobile Home Park, Private Community provider Wilson Creek Rd. mobile home park, serves 110 residential persons with 52 connections, 52 total approved connections. Effective since 1/1/1970. 2,100 gal Snoqualmie Pass Private - Snoqualmie Pass Utility District Well capacity of 385 gallons per minute and 3 reservoirs storing 565,000 gallons. Serves 500 residential persons with 921 connections and 1053 approved connections. 1,361 acres Pine Loch Sun Beach Club Water System Private Community provider Serves 90 residential persons with 409 calculated connections, 439 total approved connections. Effective date of 1/1/1970 137,000 gal Sky Meadows Ranch Country Club WTR Private Community provider Serves 30 residential persons with 327 calculated connections and 453 total approved connections. Effective system date of 1/1/1970 187,278 gal Sun Country Estates 1-2- 3 Water System Private Community provider Serves 219 residential persons with 217 total calculated connections and 300 total approved connections. Effective date of 1/1/1970. 258,600 gal Swiftwater Trailer Park Swiftwater Trailer Park, Private Community provider S. Cle Elum mobile home park, serves 30 residential persons with 19 total calculated connections and 24 total approved connections. Effective system date of 1/1/1970. 0 gal Wildwood 2 & 3 Water System Private Community Provider Serves 45 residential persons with 51 total calculated connections & 78 total approved connections. Effective system date of 1/1/1970. 45,000 gal Grasslands Park Private Community Provider Serves 29 residential persons with 14 total calculated connections and 14 total approved connections. Effective system date of 12/20/2006. 0 gal Millpond Mobile Manor Investor Community Provider Millpond Mobile Manor Serves 245 residential persons with 105 total calculated connections and 105 total approved connections. Effective system date of 1/1/1970. 0 gal Suncadia Resort Investor Community Provider Serves 726 residential persons 992 active connections and 1501 total approved connections .Effective system date of 5/29/2008. 1,070,000 gal Kittitas County Capital Improvement Program December 7, 2021 Water – Group A Systems Page 74 Table 11 - Continued Existing Public Facilities and Services Water (Group A Systems) Facility Provider Description Size Driftwood Acres Maintenance Corporation Association Community Provider Serves 60 residential persons with 13 total calculated connections and 141 total approved connections. Effective system date of 1/1/1970. 100,000 gal Sun Island Maintenance Assn. Association Community Provider Serves 30 residential persons with 115 total calculated connections and an undetermined number of total connections. Effective system date of 1/1/1970. 0 gal Grasslands Water System Association Community Provider Serves 260 residential persons with 75 total calculated connections and 81 total approved connections. Effective system date of 1/1/1970. 21,000 gal Kittitas County Capital Improvement Program December 7, 2021 Sanitary Sewer Page 75 12. 13BSanitary Sewer This section includes an inventory of Sanitary Sewer facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 12 below also describes each facility’s size in order to determine if it addresses the County’s long- term community needs. Table 12 Existing Public Facilities and Services Sanitary Sewer Facility Provider Description Size Ellensburg treatment facilities Kittitas County Utility District Serves within Ellensburg city limits and has a capacity of 2.5 M – 3.5 M gpd that flows to the Yakima River. Ronald treatment facilities Kittitas County Water District No. 2 Single lift station that conveys wastewater flows from the Water District area to the City of Roslyn sewer system. 37 acres Snoqualmie Pass Utility District Snoqualmie Pass Utility District Average daily flow approximately 170000 mgd., permitted treatment and discharge capacity of 0.368 mgd. and storage of excess flows of about 30 mill. Gal. Serving 638 customers total. Lagoon normal storage is 10.5 MG with an additional 10 MG emergency storage. 1,799 acres Vantage wastewater collection and treatment system Vantage Water District No. 6 Serves Vantage LAMIRD, wastewater collection and treatment system, capacity of about 87,000 gpd. Major upgrades completed in 2013. 80 residences Upper Kittitas County Regional Wastewater Treatment Facility City of Cle Elum Sequential Batch Reactor Facility. Capacity is 3.6 million gpd and can take instantaneous flow of up to 10 million gpd. Kittitas County Capital Improvement Program December 7, 2021 Flood Control Zone District Page 76 13. 6BKittitas County Flood Control Zone District The Kittitas County’s Flood Control Zone District capital improvement plan is further detailed in Appendix D. Appendix C provides a detailed description of the proposed projects, mapping of the projects, and the funding plan. Kittitas County Capital Improvement Program December 7, 2021 Frequently Asked Questions Page 77 14BFrequently Asked Questions Question 1: How does the County determine priorities for the projects listed in the CFP? Answer: This CFP provides general guidance on prioritizing public facility projects. Each project proposal is reviewed by the CFP Task Force using the following criteria: 1. Improvements to obsolete or worn out existing public facilities that achieve or maintain adopted levels of service. 2. New or expanded public facilities that achieve or maintain adopted levels of service. 3. Improvements to existing public facilities or new public facilities that eliminate hazards. 4. New or expanded public facilities that achieve or maintain adopted levels of service as forecasted during the next six-years. 5. Improvements to existing public facilities or new public facilities that reduce the operating cost of providing a public service or facility. 6. New facilities that provide excess capacity that will be needed beyond the next six-years. 7. All other facilities the County is obligated to complete that do not meet the criteria above. 8. Availability of funding. The Board of County Commissioners make the final determination of the priority order of the projects listed in the CFP. Question 2: Are projects automatically given funding in priority order? Answer: No, if grant funds are applied for and received, chances are good that the grant funded project will become a priority. Grant funds awarded become new and additional revenue to the County, above and beyond the County’s current resources. The County continually looks for ways to reduce the reliance on General Fund dollars for capital projects to stretch current resources. Question 3: Will a project that is partially funded be listed in the CFP? Answer: It depends. If the project is still in-progress, but no additional money is needed beyond what has already been appropriated, it will not show up in the CFP in future years. If the project does need additional funds appropriated beyond the current level of funding, it will continue to show up in the CFP. Question 4: Are all projects in the CFP completed within the next 6 years? Answer: No, for several reasons. First, the CFP is annually reviewed and amended to verify that fiscal resources are available. Second, the need for capital facilities is generated by population growth, existing facility deficiencies, major facility maintenance and repair needs, internal operations, and Comprehensive Plan goals and policies. There is a need to continually assess which projects are affected and should be considered a priority. As a result, project estimates and timelines may change. Kittitas County Capital Improvement Program December 7, 2021 Frequently Asked Questions Page 78 Question 5: What does level of service (LOS) mean? Answer: The LOS is a quantifiable measure of the amount of public facilities that is provided, such as acres of park land per capita, vehicle capacity of intersections, or water pressure per square inch available for water system. Question 6: What is concurrency? Answer: All public facilities that are needed to serve new development or a growing service area population, must be in place at the time of initial need. If the facilities are not in place, a financial commitment must have been made to provide the facilities within six-years of the time of the initial need and must have the capacity to serve the new development or a growing service area population without decreasing service levels below locally established minimum standards. Question 7: How do I get involved in the CFP process? Answer: Information on the CFP process will be posted on the County’s website at the following address: https://www.co.kittitas.wa.us/cds/land-use/default.aspx. To receive email updates on when new information is posted, you can subscribe to Kittitas County’s email notification subscription service for “Comprehensive Plan Announcements.” All persons can provide written or verbal comments to the Planning Commission and to the Commissioners, before or during the scheduled public hearings. APPENDIX A Kittitas County Maintenance Shops, Storage, Parking, Pits/Quarries 2022 Equipment Rental & Revolving Preliminary Budget The Director of Public Works manages the Kittitas County Equipment Rental and Revolving (E. R. & R.) Fund. The E. R. & R. The purpose of the fund is to account for the financing of goods and services provided primarily to the road fund. The following Services are Provided by the ER&R Fund: Administration-The Administration division provides financial management and administration for the divisions within the E. R. & R. Fund. Services include asset management, developing rental rates and inventory management. Revenues are provided Pits and Quarries -The Pits & Quarries division manages the pits and stockpiles of rock owned by Kittitas County. The rock stockpiled in these pits is purchased by the County Road Fund for use on county road maintenance and construction projects and winter road sanding operations. In addition to county owned pits, we also solicit bids from private vendors for maintenan ce rock used by the County Road Fund. Revenues are provided through sales of county owned rock primarily to the County Road Mechanic Shop - The Mechanical Shop division is responsible for maintaining the fleet of vehicles utilized by the County Road Fund. This division also maintains the County mechanical shop facilities. The division includes two mechanics and one shop foreman. Kittitas County also sublets light duty vehicle preventive maintenance such as lube and oil changes to local vendors . Central Stores - The Central Stores maintains a supply of culvert pipe and guardrail used by the County Road Fund in the event of unscheduled repairs. For scheduled construction projects culvert pipe and guardrail are purchased direct by the road fund as these materials do not require storage. Revenues are provided thr ough the sales of materials to the County Road Rental Services - The Equipment Rental Services accounts for the maintenance and operation of the vehicles and equipment used primarily by the County Road Fund. Revenues are provided through adopted equipment rental rates. Rates are established to cover the operating costs of the equipment (fuel, insurance, repairs) and a replacement factor to cover inflat ion Sign Fabrication Shop - This functionality is being moved to Road Maintenance. Primary Goal for 2022 - The primary goal for ER&R for 2022 is to complete acquisition of land supporting relocation of the Lower County Shop. Public Works proposes acquiring approximately five acres of land from Solid Waste along SR 907 allowing colocation with the new Lower County Solid Waste Transfer Station. Estimated CostEstimated RevenueEstimated CostEstimated RevenueEstimated CostEstimated RevenueEstimated CostEstimated RevenueEstimated CostEstimated RevenueEstimated CostEstimated RevenueProject TotalER&R Fund 501Airport Fund 101Flood Control Fund 107Federal Aviation Admin GrantBond SaleCAPITAL IMPROVEMENT PROJECT NAME 1 400 2 500 500 250 250 150 150 250 250 8,000 500 7,500 (500)(500) 3 4 250 125 125 1,500 1,500 5 750 0 1750 0 150 0 250 0 8000 -500 400 0 10400 Totals 1150 125 125 1500 7500 - - 1,500 - 150 750 1750 150 150 NET LOCAL FUNDS NEEDED 750 250 OTHER FUNDS (GRANTS,BONDS)(+) 750 1,750 Bond council and bond sale. Final building and site design, Ongoing Operations, On Capital Improvements Planned. ANNUAL CAPITAL IMPROVEMENT TOTALS (-) Other pits and quarries Advanced mitigation evaluation and preliminary design Ongoing Operations, On Capital Improvements Planned. Final mitigation implementation of plan actions. Building and Site construction. Hansen Pit Hyak Joint Maintenance Facility with SPUD Final mitigation design and implementation of Phase 1 Surplus of existing facility. 202720222023 Land acquisition Preliminary design complete supporting permitting and bond sale formulation. Automated wash bay design and construction 2024 2026 Lower County Maintenance Shop Upper County Maintenance Shop 2025 KITTITAS COUNTY 2022-2027 SIX YEAR ROAD MAINTENANCE CAPITAL PLAN 400 250 250 - - - 7,500 7,500 8,650 1,750 - 250 7500 3,200 400 3,200 1 of 1 APPENDIX B Kittitas County Six-Year Transportation Plan Appendix B Kittitas County Department of Public Works Capital Facility Plan 2022-2027 Prepared on September 23, 2021 Revised October 13, 2021 Introduction: Annually Kittitas County Department of Public Works develops a listing of county road and bridge improvements for Board of County Commission consideration. The listing is accompanied by a public outreach effort. Public comments are evaluated, and staff adjusts the original proposal that is then finalized and presented to the Board of County Commissioners during the annual County budget process. Given the complexity of municipal engineering, environmental permitting, right of way acquisition and construction; Public Works schedules projects an additional five years beyond the first budget year. The planning schedule includes programmed funding amounts and sources along with project forecast expenses. The schedule identifies the various projects beginning in the first budget year (2022) extending to the last program year (2027). 2022-2027 Plan: This plan is organized into three components for ease of understanding the various projects contained in the six-year plan: 1 - Map identifying the general location of various projects around the County 2 -The six-year project listing and associated funding plan 3 - Project specific sheets listing specific project information including: County Road Project Number (if assigned at the time of publication), priority number, title, project description, project status, photos and funding sources 0 3.5 7 10.5 141.75 Miles Projects: 1- Kachess Lake Rd Culvert Replacement 2- N. Thorp Hwy - Yakima River Bridge Repairs 3- Manastash Rd Creek Bank Stabilization & SnoPark Improvements 4- Liberty Rd - Swauk Creek Bridge Replacement 5- Teanaway Rd - Dickey Creek Bridge Replacement 6- I-90 Widening - Cle Elum to Easton 7- Bender Rd Widening & Pedestrian Improvements 8- Hungry Junction Road Widening 9- Sanders Rd Improvements 10- Badger Pocket Area Road Improvements - Phase One 11- Badger Pocket Area Road Improvements - Phase Two 12- Highway Safety Improvement Program (HSIP) Projects 13- Vantage Hwy - Cascade Canal Bridge Replacement 14- Denmark Rd Improvements 15- Bowers Rd Extension 16- Highway Safety Improvement Program (HSIP) Projects 17- Yellowstone Rd Culvert Replacement 18- Short Span Bridge Replacement - Phase One 19- Airport Rd (Cle Elum) Culvert Replacement 20- Badger Pocket Rd HMA Overlay 21- Lambert Rd Bridge Maintenance 22- Highway Safety Improvement Program (HSIP) Projects 23- Parke Creek Rd Turnaround 24- Pheasant Ln Turnaround 25- Bowers Rd Sidewalk Replacement 26- Bar 14 Rd Turnaround 27- Micheletto Rd Improvements Kittitas County2022-2027Six Year Transportation Improvement Plan 2 3 Road Legend CLE ELUM ELLENSBURG KITTITAS KITTITAS COUNTY PRIVATE ROSLYN S CLE ELUM STATE PARKS USFS WSDOT Boundary 1 4 5 6 7 8 9 11 10 12 16 18 13 14 15 17 22 19 20 21 23 24 25 26 27 project numberCRP #Res. #designright of wayCashConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructionProject TotalRoad# BMP EMP STIP Advertise CAPITAL IMPROVEMENT PROJECT NAME 1 RC1587-C1 284-18 2018-054 15 70 1244 12650 2.3 2.7 Local 2 RC2091-HP 302-20 2020-131 15 136 1800 95417 9.36 9.76 WA-12683 3 Manastash Rd Creek Bank Stab, and Snow Park Impr.RC1573-E1 273-16 2016-099 108 100 70 1300 95301 10.65 11.01 WA-12576 4 RC2193-FL 306-21 40 400 100 2407 38350 0.07 0.07 WA-14038 5 RC1594-B1 1000 FHWA project 6 100 State Project 7 RC1585-F1 285-18 2018-054 275 300 175 1350 93075 0 0.68 Local 8 RC2093-RP 304-20 2021-071 250 50 254 168 3629 31510 0 1.74 State Funding 9 300 200 300 2250 40315 0.13 0.25 Local 10 RC2291-L1 309-21 250 250 200 3000 VARIOUS Local 11 200 200 80 2500 VARIOUS Local 12 RC2196-HS 313-21 34 50 332 VARIOUS WA-14039 13 RC2199-HS 314-21 63 100 501 VARIOUS WA-14040 14 RC2292-G1 310-21 365 50 182 1053 94001 5.17 5.33 Planned BRAC 15 221 250 63501 3.08 4.35 Local 16 RC1505-F1 226-09 2009-15 300 150 2000 41010 1.93 2.07 Local 17 100 50 100 900 VARIOUS Planned HSIP 18 RC2197-C1 308-21 150 60 650 10360 0.65 0.75 Planned STBG 19 350 160 890 VARIOUS Planned STBG 20 250 25 23010 2.25 2.4 Local 21 100 55 1050 68910 0 0.57 WA-11934/Local no longer on stip 22 175 22512 0.67 0.67 Planned BRAC 23 50 20 30 350 VARIOUS Planned HSIP Construction Jobs preformed by Maintenance Crew (County Force Work) 24 60 65 975 Bowers Road Extension 1578N. Thorp Hwy - Yakima River Bridge 19512023 2024 2025 2027 1329KITTITAS COUNTY 2022-2027 SIX YEAR TRANSPORTATION IMPROVEMENT PLAN 2022 Kachess Lake Rd Culvert Replacemnt 2026 programmed for CN 2024 Full Funding not till 2024 Vantage Hwy over Cascade Canal (89342) Replacement Denmark Road Improvement 2980Badger Pocket Area Road Improvements Phase 2 Liberty Rd Swauk Creek Bridge 2450 1650471Bridge Rail Improvements Code 3 Phase 1 (MD A-F)2947416Lambert Road Br 06345 Maintenance 175Yellowstone Culvert Replacement 860Airport Road Culvert Replacement 275Intersection and Corridor Safety Improvements Dickey Creek Bridge (16203) Replacement FHWA project 1000I-90 Widening (State project)100Bender Road Widening and Pedestrian Improvements 2100Hungry Junction Road Widening 4351Badger Pocket Area Road Improvements Phase 1 3700Sanders Road Improvements 305014001205Parke Creek Road Turnaround Badger Pocket Road HMA 1100Short Span Bridge Replacement - Phase 1 664HSIP 2023 awarded project 1150HSIP 2025 awarded project 4501 of 2 project numberCRP #Res. #designright of wayCashConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructionProject Total2023 2024 2025 2027 KITTITAS COUNTY 2022-2027 SIX YEAR TRANSPORTATION IMPROVEMENT PLAN 2022 2026 69370 5.79 11.64 Local 25 15 10431 0 2.04 Local 26 RC2293-F1 311-21 5 60 94001 1.35 1.85 Local 27 RC1583-G1 286-18 2018-054 10 60 10 120 42512 1.11 1.21 Local 28 RC2294-B1 312-21 5 8 27 23531 0 0.245 Local 1145 450 1100 289 4431 664 60 532 4886 400 50 278 6156 625 500 250 2900 860 220 315 4500 661 275 610 5515 36252 5,895 2,299 Bar 14 Turnaround 15Airport Road Sidewalk Replacement 656,884 4,275 7,061 ANNUAL OTHER FUNDS (GRANTS,RID)(+)3,686 2,638 5,474 2,913 1,719 2026 Pheasant Lane Turnaround Micheletto Road Improvements 40DESIGN/ROW/CONSTRUCTION TOTALS 2022 2023 2024 2025 2027 NET OF GRANTS 3,729 3,504 1,410 1,362 5,342 ANNUAL CAPITAL IMPROVEMENT TOTALS (-) 7,415 6,142 11002003,596 ANNUAL IMPACT TO FUND RESERVES (NO NEW REV)(2,352) (2,190) (177) (227) (4,467) Expected Annual Revenue (Road Fund) Expected Annual Expense (Road Fund) 10,364 8,987 10,691 11,021 11,356 12,037 9,377 9,788 10,221 11,162 TOTAL ROAD FUND BALANCE Beginning of Year 5,400 3,048 858 681 (2,127) TOTAL ROAD FUND BALANCE End of Year 3,048 858 681 454 (6,594) REQUIRED FUNDING TO MAINTAIN RESERVES 1,500 1,500 1,500 1,500 1,500 ADDITIONAL FUNDING NEEDED 1,046 11,694 10,679 (2,581) 454 (2,127) 1,500 3,627 2 of 2 &535&- 5HVROXWLRQ- /RFDWLRQ03.DFKHVVDUHD /DVW8SGDWHG .DFKHVV/DNH5G–&XOYHUW 5HSODFHPHQW %DVLVIRU3URMHFW)ORZLPSURYHPHQWŃVKEDUULHUFRUUHFWLRQ&RQVWUXFWLRQ 3URMHFW'HVFULSWLRQ /DQGVOLGHDFWLYLW\XSVWUHDPKDVFDXVHGVHGLPHQWWRWUDYHODQGDFFXPXODWHGRZQVWUHDPFORJJLQJWKHH[LVWLQJGHŃFLHQWDQG IDLOLQJFXOYHUW7KHFXOYHUWLVFRUURGHGWKURXJKDQGFROODSVLQJIURPWKHWRS5HSODFHPHQWRIWKHFXOYHUWZLWKDODUJHUVWUXF WXUHWKDWPHHWVFXUUHQWGHVLJQVWDQGDUGVDQGLPSURYLQJDOLJQPHQWZLOOUHGXFHDQQXDOPDLQWHQDQFHDQGDOORZIRUDFFRPPR GDWLRQRIKLJKńRZVDQGLPSURYHGŃVKKDELWDW 6WDWXV'HVLJQLVQHDUFRPSOHWLRQ&RQVWUXFWLRQWRRFFXU6XPPHU)DOO 7UDIŃF,PSDFWV$VLQJOHODQHUHVWULFWHGE\SDVVURDGZLOOEHEXLOWWRDFFRPPRGDWHWUDIŃFGXULQJFRQVWUXFWLRQ &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ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ńRRUEHDPV 6WDWXV'HVLJQSKDVHZLWKFRQVWUXFWLRQLQ 7UDIŃF,PSDFWV7REHGHWHUPLQHG &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ 3URMHFW1XPEHU5&-+3 /HQJWK$SSUR[LPDWHO\PLOHV )XQGLQJ6RXUFHV 3ODQQHG %5$&IXQGV  /RFDO)XQGV  7RWDO  17KRUS+Z\%ULGJHRYHU<DNLPD5LYHU 8QGHUEULGJHGXULQJLQVSHFWLRQ  &535&- 5HVROXWLRQ- /RFDWLRQ03–03 /DVW8SGDWHG 0DQDVWDVK5G&UHHN%DQN 6WDELOL]DWLRQ 6QR3DUN ,PSURYHPHQWV %DVLVIRU3URMHFW5RDGZD\VDIHW\UHSDLU LPSURYHPHQWV &RQVWUXFWLRQ 3URMHFW'HVFULSWLRQ (URVLRQFDXVHGE\WKH6RXWK)RUN0DQDVWDVK&UHHNKDVFDXVHGEDQNLQVWDELOLW\XQGHUFXWWLQJWKH&RXQW\URDG7KHURDGLVFXU UHQWO\UHVWULFWHGWRDVLQJOHODQHDWWKLVORFDWLRQ7KHURDGZLOOQHHGWREHUHVWRUHGDQGWKHEDQNVWDELOL]HGWRSURYLGHWZR ODQHVRIWUDIŃF$WXUQDURXQGDQG6QR-3DUNLPSURYHPHQWVZLOODOVREHLQFOXGHGGXULQJFRQVWUXFWLRQ 6WDWXV'HVLJQSKDVHZLWKFRQVWUXFWLRQLQ 7UDIŃF,PSDFWV$WZRODQHGHWRXUURDGZLOOEHFRQVWUXFWHG &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ 3URMHFW1XPEHU5&-( /HQJWK$SSUR[LPDWHO\PLOHV )XQGLQJ6RXUFHV 3ODQQHG )/$3)+:$ IXQGV  /RFDO)XQGV  7RWDO  9LHZGRZQVWUHDPRIHURGHGEDQN 9LHZGRZQVWUHDPRIODQHFORVXUH  &535&- /RFDWLRQ03/LEHUW\5RDG /DVW8SGDWHG /LEHUW\5RDG-6ZDXN&UHHN %ULGJH5HSODFHPHQW %DVLVIRU3URMHFW%ULGJH5HSODFHPHQW–6DIHW\ &RQVWUXFWLRQ 3URMHFW'HVFULSWLRQ 6ZXDN&UHHNEULGJH 1R RQ/LEHUW\5RDGDWPLOHSRVWFURVVHV6ZXDN&UHHN7KLVORDGUHVWULFWHGEULGJHZLOOEH UHSODFHGWRLPSURYHDFFHVVWRWKHWRZQRI/LEHUW\DQGSURYLGHDFFHVVWRWKH2NDQRJDQ-:HQDWFKHH1DWLRQDO)RUHVW$)HGHUDO /DQGV$FFHVV3URJUDPJUDQWKDVEHHQVHFXUHGLQWKHDPRXQWRI 6WDWXV'HVLJQSKDVHZLWKFRQVWUXFWLRQLQ 7UDIŃF,PSDFWV7REHGHWHUPLQHGZLWKGHVLJQ &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ )XQGLQJ6RXUFHV 3ODQQHG )/$3)+:$ IXQGV  /RFDO)XQGV  7RWDO  3URMHFW1XPEHU5&-)/ /HQJWKPLOHV  &535& /RFDWLRQ7HDQDZD\5G  /DVW8SGDWHG )+:$SURMHFW 3URMHFW1XPEHU5&-% /HQJWKPLOHV %DVLVIRU3URMHFW%ULGJH5HSODFHPHQW &RQVWUXFWLRQ 3URMHFW'HVFULSWLRQ 7KLVEULGJHKDVRQHRIWKHORZHVWVXIŃFLHQF\UDWLQJVLQWKH&RXQW\DQGLVFXUUHQWO\ORDGUHVWULFWHG7HDQDZD\5LYHUKDVPL JUDWHGVORZO\DFURVVWKHńRRGSODLQDQGVWDUWHGHURVLRQEHKLQGWKHDEXWPHQWZDOO7KH&RXQW\SODFHGODUJHURFNVWRDUUHVWWKH HURVLRQXQWLODSHUPDQHQWŃ[FRXOGEHLPSOHPHQWHG:RUNZLOOLQFOXGHUHSODFHPHQWRIWKHEULGJHZLWKDPXFKODUJHUVWUXFWXUH WRPHHWFXUUHQWGHVLJQVWDQGDUGVDQGLPSURYHGURDGZD\DOLJQPHQW 6WDWXV'HVLJQXQGHUZD\&RQVWUXFWLRQWREHJLQ6XPPHU)DOO 7UDIŃF,PSDFWV0LQLPDOH[LVWLQJEULGJHZLOOVWD\LQSODFHXQWLOFRQVWUXFWLRQLVFRPSOHWH &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ 'LFNH\&UHHN%ULGJH 5HSODFHPHQW )XQGLQJ6RXUFHV 3ODQQHG )/$3)+:$ IXQGV  /RFDO)XQGV  7RWDO   &535& /RFDWLRQ&OH(OXPWR(DVWRQ /DVW8SGDWHG :6'27SURMHFW 3URMHFW1XPEHU /HQJWK$SSUR[LPDWHO\PLOHV %DVLVIRU3URMHFW,PSURYHFDSDFLW\VDIHW\ &RQVWUXFWLRQ7REHGHWHUPLQHG 3URMHFW'HVFULSWLRQ +LJKE\SDVVWUDIŃFYROXPHVWKURXJKXSSHU&RXQW\LVDFRQFHUQIRUUHVLGHQWVDQGWKHFRQGLWLRQRIURDGV7KLVLQFUHDVHLQWUDI ŃFZKHQ,-LVEXV\UHVXOWVLQGHJUDGHGURDGZD\VDVZHOODVLQFUHDVHGVDIHW\FRQFHUQV,QRUGHUWRSXUVXHIXQGLQJDSURMHFWZLOOQHHGWREHRQWKH6WDWH7UDQVSRUWDWLRQ,PSURYHPHQW3ODQ 67,3 7KLVLVLQLWLDOIXQGLQJWRSODFHWKHSURMHFWRQWKHSODQ DQGDOORZIRUIXWXUHIHGHUDOIXQGLQJ 6WDWXV3ODQQLQJDQGSXEOLFRXWUHDFK 7UDIŃF,PSDFWV7REHGHWHUPLQHG &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ )XQGLQJ6RXUFH /RFDO )XQGV  7RWDO  ,-:LGHQLQJ–(DVWERXQG DQG:HVWERXQG  &535&- 5HVROXWLRQ- /RFDWLRQ03WR03(OOHQVEXUJ /DVW8SGDWHG 3URMHFW1XPEHU5&-) /HQJWKPLOHV %DVLVIRU3URMHFW1HZFRQVWUXFWLRQLPSURYHPHQWV &RQVWUXFWLRQ 3URMHFW'HVFULSWLRQ 7RDFFRPPRGDWHWKHLQFUHDVHLQWUDIŃFDORQJ%HQGHUURDGDQGWROLQNIXWXUHGHYHORSPHQWVWRWKH&LW\%HQGHU5RDGZLOOEH ZLGHQHG:LGHQHGVKRXOGHUVZLOOEHFRQVWUXFWHGIRUELF\FOHXVH:RUNLQFOXGHVVKRXOGHUZLGHQLQJDQGUHVXUIDFLQJWKHURDGFRQVWUXFWLRQRIVLGHZDONDQGLQVWDOODWLRQRIGUDLQDJHVWUXFWXUHV6LGHZDONWREHFRQVWUXFWHGRQQRUWKVLGHRIURDGZD\RQO\ 6WDWXV3ODQQHG 7UDIŃF,PSDFWV7%' &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ %HQGHU5G:LGHQLQJ  3HGHVWULDQ,PSURYHPHQWV )XQGLQJ6RXUFH 7%'  7RWDO   &535&- 5HVROXWLRQ- /RFDWLRQ03-03+-XQFWLRQ5G(OOHQVEXUJ /DVW8SGDWHG +XQJU\-XQFWLRQ5RDG :LGHQLQJ %DVLVIRU3URMHFW5HFRQVWUXFWLRQ6DIHW\  &RQVWUXFWLRQ 3URMHFW'HVFULSWLRQ +XQJU\-XQFWLRQ5GIURP86WR5HHFHU&UHHN5GLVQDUURZDVZHOODVKDYLQJYHUWLFDOFXUYHVWKDWGRQRWSURYLGHDGHTXDWH VLJKWGLVWDQFH7KHURDGKDVPRGHUDWHWUXFNWUDIŃFIURPDORFDOKD\SURFHVVLQJIDFLOLW\7KHZRUNZLOOLQFOXGHFKDQJLQJWKH YHUWLFDOFXUYHSURŃOHWRFRPSO\ZLWK:6'27GHVLJQPDQXDOZLGHQLQJDQGSDYLQJWKHURDGWRLQFUHDVHSDYLQJVWUXFWXUH 6WDWXV'HVLJQDQG5LJKWRI:D\SKDVHV-ZLWKFRQVWUXFWLRQLQ 7UDIŃF,PSDFWV7REHGHWHUPLQHGZLWKGHVLJQ &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ 3URMHFW1XPEHU5&-53 /HQJWKPLOHV )XQGLQJ6RXUFHV 3ODQQHG5$3 IXQGV  /RFDO)XQGV  7RWDO  +XQJU\-XQFWLRQORRNLQJHDVW +XQJU\-XQFWLRQ5G-6LSKRQ  &535& /RFDWLRQ(OOHQVEXUJ /DVW8SGDWHG 3URMHFW1XPEHU /HQJWK %DVLVIRU3URMHFW6DIHW\VWRUPZDWHUGUDLQDJHURDGZD\LPSURYHPHQW &RQVWUXFWLRQ 3URMHFW'HVFULSWLRQ 7RDFFRPPRGDWHWKHLQFUHDVHLQWUDIŃFDORQJ6DQGHUV5RDGDQGWROLQNIXWXUHGHYHORSPHQWVWRWKHFLW\WKHURDGZLOOQHHGWR EHZLGHQHG1RQ-PRWRUL]HGSDWKZD\VZLOOQHHGWREHFRQVWUXFWHGIRUSHGHVWULDQDQGELF\FOHXVH7KLVZLOODOORZIRUDXQLIRUPURDGZD\IURP&RXQW\WRFLW\OLPLWV:RUNZLOOLQFOXGHZLGHQLQJDQGSDYLQJWKHURDGFRQVWUXFWLRQRIVLGHZDONDQGLQVWDOODWLRQ RIGUDLQDJHVWUXFWXUHV 6WDWXV3ODQQHG 7UDIŃF,PSDFWV7%' &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ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ŃF,PSDFWV7%' &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ %DGJHU3RFNHW$UHD5RDG,PSURYHPHQWV –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ŃF,PSDFWV7%' &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ %DGJHU3RFNHW$UHD5RDG,PSURYHPHQWV –3KDVH )XQGLQJ6RXUFH 7%'  7RWDO  2UFKDUG5GDQG3HUU\5G  7KUDOO5GDQG6RUHQVRQ5G &535& /RFDWLRQ9DULRXV /DVW8SGDWHG 3URMHFW1XPEHU5&-+6 /HQJWK7%' %DVLVIRU3URMHFW6DIHW\LPSURYHPHQWVFRXQWHUPHDVXUHV &RQVWUXFWLRQ- 3URMHFW'HVFULSWLRQ 7KLVSURMHFWSURYLGHVFRUULGRUDQGLQWHUVHFWLRQFRXQWHUPHDVXUHVDQGLPSURYHPHQWVDWXQVLJQDOL]HGLQWHUVHFWLRQVDQGURDG VHJPHQWVLGHQWLŃHGDVKDYLQJLQVXIŃFLHQWĴRXWRIGDWHĵRUQRQ-HIIHFWLYHVDIHW\PHDVXUHVEDVHGRQDFFLGHQWGDWDDQDO\VLVDQGVDIHW\VWXGLHV.LWWLWDV&RXQW\UHFRJQL]HVWKDWLPSURYHPHQWVWRWKHVHFRUULGRUVPD\SURYLGHEHQHŃWWRDJUHDWQXPEHURIORFDO UHVLGHQWVUHFUHDWLRQDOWUDYHOHUVDQGIUHLJKWWUDQVLWDQGDQ\LPSURYHPHQWVWKDWFRXOGUHGXFHSRWHQWLDOIXWXUHFUDVKHVDUHEHQHŃFLDO 6WDWXV)XQGVWREHDZDUGHG'HVLJQDQGFRQVWUXFWLRQWRVSDQ- 7UDIŃF,PSDFWV7%' &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ ,QWHUVHFWLRQ &RUULGRU6DIHW\ ,PSURYHPHQWV )XQGLQJ6RXUFH +6,3  7RWDO   'HSLFWLRQRIFXUUHQW&RXQW\UXUDOLQWHUVHFWLRQ OHIW DQGDSURSRVHG&RXQW\UXUDOLQWHUVHFWLRQZLWKLPSURYHPHQWV ULJKW  &535& /RFDWLRQ9DULRXV /DVW8SGDWHG 3URMHFW1XPEHU5&-+6 /HQJWK7%' %DVLVIRU3URMHFW6DIHW\LPSURYHPHQWVFRXQWHUPHDVXUHV &RQVWUXFWLRQ- 3URMHFW'HVFULSWLRQ 7KHUHKDYHEHHQEULGJHVUDWHGDV&RGHWKLVUDWLQJUHńHFWVEULGJHVZLWKWLPEHUUDLOLQJRUQRUDLOLQJDWDOO2IDOOWKH EULGJHVLGHQWLŃHGZLWKVXEVWDQGDUGUDLOWKHVHEULGJHVRUVWUXFWXUHVKDYHWKHKLJKHVWYXOQHUDELOLW\EHFDXVHWKH\SURYLGHQRSURWHFWLRQIRUDQHUUDQWYHKLFOH7KLVSURMHFWZLOOLQVWDOORUUHSODFHEULGJHUDLOQRWPHHWLQJFXUUHQWVSHFLŃFDWLRQV 6WDWXV)XQGVWREHDZDUGHG'HVLJQDQGFRQVWUXFWLRQWRVSDQ- 7UDIŃF,PSDFWV7%' &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ %ULGJH5DLO,PSURYHPHQWV– &RGH0'$-) )XQGLQJ6RXUFH +6,3  7RWDO   &535&- /RFDWLRQ03–(OOHQVEXUJ /DVW8SGDWHG %ULGJH 3URMHFW1XPEHU5&-* /HQJWKPLOHV %DVLVIRU3URMHFW6DIHW\LPSURYHPHQWVFRXQWHUPHDVXUHV &RQVWUXFWLRQ 3URMHFW'HVFULSWLRQ 9DQWDJH+LJKZD\LVDQHVVHQWLDOHDVW-ZHVWURDGZD\VHUYLQJUHVLGHQWLDODJULFXOWXUDODQGFRPPHUFLDOWUDIŃF%ULGJHVWUXFWXUH LVORFDWHGDSSUR[LPDWHO\PLOHVZHVWRI)DLUYLHZ5RDG7KLVVWUXFWXUHFRQVLVWVRIWUHDWHGZRRGVWULQJHUV%DVHGRQFDOFXODWLRQVWKLVZDVUDWHGDVORDGUHVWULFWHGLQ7KLVVWUXFWXUHZDVDOVRGDPDJHGE\DYHKLFOHLPSDFWLQ7KLV SURMHFWZLOOUHSODFHWKHVWUXFWXUHWRUHPRYHWKHORDGUHVWULFWLRQDQGSURYLGHIRUFXUUHQWVWDQGDUG 6WDWXV3ODQQHGIRUGHVLJQDQG52:LQDQGFRQVWUXFWLRQLQ 7UDIŃF,PSDFWV7%' &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ 9DQWDJH+Z\–&DVFDGH&DQDO %ULGJH5HSODFHPHQW )XQGLQJ6RXUFH 7%'  7RWDO   &535& /RFDWLRQ03–03 /DVW8SGDWHG 3URMHFW1XPEHU /HQJWKPLOHV %DVLVIRU3URMHFW6DIHW\EULGJHUHSODFHPHQWRWKHULPSURYHPHQWV &RQVWUXFWLRQ 3URMHFW'HVFULSWLRQ 'HQPDUN5RDGVHUYHVDVDORFDOFRQQHFWRUIURPQHDUE\UHVLGHQWLDOGHYHORSPHQWVDQGDJULFXOWXUDODFWLYLWLHV,PSURYHPHQWV DUHSURSRVHGWR'HQPDUN5RDGIURP7KUDOO5RDGWR)RXUWK3DUDOOHO5RDG,PSURYHPHQWVLQFOXGHZLGHQLQJDQGUHSODFHPHQWRIWKHVWUXFWXUHRYHU&DVFDGH&DQDO&RQVWUXFWLRQIXQGLQJDQWLFLSDWHGSURJUDPPHG 6WDWXV3ODQQHG 7UDIŃF,PSDFWV7%' &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ 'HQPDUN5RDG,PSURYHPHQWV )XQGLQJ6RXUFH 7%'  7RWDO   &535&- 5HVROXWLRQ- /RFDWLRQ%RZHUV5G(OOHQVEXUJ /DVW8SGDWHG 3URMHFW1XPEHU5&-) /HQJWK$SSUR[PLOHV %DVLVIRU3URMHFW1HWZRUNFRQQHFWLRQ &RQVWUXFWLRQ 3URMHFW'HVFULSWLRQ 7RJHWIURP%RZHUV5RDGWR/RRN5RDGUHTXLUHVGULYLQJDWOHDVWPLOHVRIURDG$KDOIPLOHH[WHQVLRQRI%RZHUV5RDGWR /RRN5RDGZLOOFRQQHFWD5XUDO0LQRU&ROOHFWRULQWKHQRUWKHDVWZLWKD5XUDO0DMRU&ROOHFWRULQWKHQRUWKZHVWDW5HHFHU&UHHN5RDG,WZLOODOVRDFFRPPRGDWHLQFUHDVHGFRPPHUFLDOWUDIŃFQHDUWKHDLUSRUW7KLVDUHDKDVEHHQLGHQWLŃHGWREHZLWKLQWKH XUEDQJURZWKDUHDIRU(OOHQVEXUJ 6WDWXV3ODQQHGIRUGHVLJQLQDQGFRQVWUXFWLRQLQ 7UDIŃF,PSDFWV7%' &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ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ŃF,PSDFWV7%' &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ )XQGLQJ6RXUFH +6,3  7RWDO  +LJKZD\6DIHW\,PSURYHPHQW 3URJUDP-$ZDUG  &535&- /RFDWLRQ6QRTXDOPLH3DVV /DVW8SGDWHG 3URMHFW1XPEHU5&-& /HQJWK1$ %DVLVIRU3URMHFW6DIHW\ &RQVWUXFWLRQ 3URMHFW'HVFULSWLRQ 7KH<HOORZVWRQH5RDGFXOYHUWSURMHFWZLOOUHSODFHWKHH[LVWLQJXQGHUVL]HGDQGGHWHULRUDWLQJFXOYHUWZLWKDODUJHUFXOYHUWZLWK WKHFDSDFLW\WRKDQGOHKLJKZDWHUńRZDQGVHGLPHQWWKDWKDVEHHQIRXQGLQWKHŃVKEHDULQJVWUHDP7KLVZLOOSUHYHQWZDVKRXWRIWKHFRXQW\URDGDVZHOODVLPSURYHŃVKSDVVDJH 6WDWXV3ODQQHG 7UDIŃF,PSDFWV7%' &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ )XQGLQJ6RXUFH 3ODQQHG 67%*  7RWDO  <HOORZVWRQH5G&XOYHUW5HSODFHPHQW  &535& /RFDWLRQ6QRTXDOPLH3DVV /DVW8SGDWHG 3URMHFW1XPEHU /HQJWK7%' %DVLVIRU3URMHFW6DIHW\ &RQVWUXFWLRQ 3URMHFW'HVFULSWLRQ .LWWLWDV&RXQW\KDVURXWLQHO\LQVSHFWHGVWUXFWXUHVKDYLQJDOHQJWKXQGHU-IHHW7KHVHVWUXFWXUHVDUHQRWHOLJLEOHIRU%ULGJH5HSODFHPHQW$GYLVRU\&RPPLWWHH %5$& IXQGLQJDVVXFKLWLVWKH&RXQW\IJVUHVSRQVLELOLW\WRPDLQWDLQRUUHSODFHWKHVHVWUXFWXUHVZLWK &RXQW\)XQGV%DVHGRQŃHOGUHYLHZVPDQ\RIWKHVHVWUXFWXUHVQHHGVLJQLŃFDQWUHSDLUVRUWREHUHSODFHG7KLVSKDVHEHJLQVWRDGGUHVVWKHQHHGWRUHSDLURUUHSODFHWKHVHVWUXFWXUHV0XOWLSOHSKDVHVZLOOEHUHTXLUHGWRDGGUHVVDOOVWUXFWXUHV 6WDWXV3ODQQHG 7UDIŃF,PSDFWV7%' &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ )XQGLQJ6RXUFH 3ODQQHG 67%*  7RWDO  6KRUW6SDQ%ULGJH5HSODFHPHQW- 3KDVH  &535& /RFDWLRQ03–03 &OH(OXP /DVW8SGDWHG 3URMHFW1XPEHU /HQJWK %DVLVIRU3URMHFW'UDLQDJHLPSURYHPHQWńRRGUHGXFWLRQ &RQVWUXFWLRQ7%' 3URMHFW'HVFULSWLRQ 8QGHUVL]HGLUULJDWLRQFXOYHUVXQGHU$LUSRUW5RDGLQ&OH(OXPKDYHLQFUHDVHGGUDLQDJHLVVXHVLQWKHDUHD5HSODFHPHQWRIWKHVHXQGHUVL]HGFXOYHUWVZLWKODUJHUDGHTXDWHFXOYHUWVZLOOGHFUHDVHńRRGLQJLVVXHVIRUQHDUE\SURSHUW\RZQHUVZKLOHDOVRSURWHFWLQJWKHURDGZD\ IURPGDPDJH&RQVWUXFWLRQIXQGLQJDQWLFLSDWHGSURJUDPPHG 6WDWXV3ODQQHG 7UDIŃF,PSDFWV7%' &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ )XQGLQJ6RXUFH 7%'  7RWDO  $LUSRUW5RDG &OH(OXP  &XOYHUW5HSODFHPHQW  &535& /RFDWLRQ03–03 (OOHQVEXUJ /DVW8SGDWHG 3URMHFW1XPEHU /HQJWKPLOHV %DVLVIRU3URMHFW5HKDELOLWDWLRQPDLQWHQDQFH &RQVWUXFWLRQ 3URMHFW'HVFULSWLRQ /RFDOKD\SUHVVLQJRSHUDWLRQVKDYHGHWHULRUDWHGH[LVWLQJKRWPL[DVSKDOWURDGZD\UHVXOWLQJLQSDYHPHQWUXWWLQJFRQGLWLRQV$Q+0$RYHUOD\ZLOOUHPHGLDWHWKHUXWWHGFRQGLWLRQDQGUHVWRUHWKHURDGZD\VHJPHQW7KHURDGVHJPHQWZLOOEHZLGHQHGWRDFFRPPRGDWHWKHODUJHU WUXFNORDGVHQWHULQJDQGH[LVWLQJKD\SUHVVIDFLOLW\ 6WDWXV3ODQQHG 7UDIŃF,PSDFWV7%' &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ )XQGLQJ6RXUFH 7%'  7RWDO  %DGJHU3RFNHW5G+0$2YHUOD\  &535& /RFDWLRQ7HDQDZD\ /DVW8SGDWHG %ULGJH 3URMHFW1XPEHU /HQJWKPLOHV %DVLVIRU3URMHFW0DLQWHQDQFHDQGUHSDLUV &RQVWUXFWLRQ7%' 3URMHFW'HVFULSWLRQ 7KH/DPEHUW5G%ULGJHVSDQVWKH7HDQDZD\5LYHUDQGLVQHHGRISUHYHQWDWLYHPDLQWHQDQFHWRH[WHQGWKHOLIHRIWKHEULGJH 7KHRULJLQDOFRQVWUXFWLRQRIWKHSUHFDVW7-JLUGHUVGLGQRWLQFOXGHDQRYHUOD\ZKLFKDOORZVZDWHUWRLQŃOWUDWHEHWZHHQWKHDG MDFHQWńDQJHVUHVXOWLQJLQVSDOOVGHODPLQDWLRQDQGFUDFNVDWWKHZHOGWDEORFDWLRQV$GHFNRYHUOD\ZRXOGLQFOXGHDOORZIRU UHSDLUVEHIRUHDGGLQJGHFNPHPEUDQHDQGPRGLŃHGFRQFUHWHRYHUOD\&RQVWUXFWLRQIXQGLQJDQWLFLSDWHGSURJUDPPHG 6WDWXV3ODQQHG 7UDIŃF,PSDFWV7%' &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ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ŃF,PSDFWV7%' &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ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ŃF,PSDFWV7%' &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ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ŃF,PSDFWV7%' &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ )XQGLQJ6RXUFH /RFDO  7RWDO  3KHDVDQW/DQH7XUQDURXQG  &535&- /RFDWLRQ03–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ŃF,PSDFWV0LQLPDOEXW7%' &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ )XQGLQJ6RXUFH /RFDO  7RWDO  $LUSRUW5RDG6LGHZDON 5HSODFHPHQW  &535&- 5HVROXWLRQ- /RFDWLRQ03-03%DU5G(OOHQVEXUJ /DVW8SGDWHG 3URMHFW1XPEHU5&-* /HQJWKPLOHV %DVLVIRU3URMHFW5HSDLUńRRGGDPDJHVFKRROEXVWXUQDURXQG &RQVWUXFWLRQ 3URMHFW'HVFULSWLRQ ńRRGHYHQWVFDXVHGZDWHUWRRYHUWRS%DU5RDGDW%ULGJH6XEVHTXHQWLQVSHFWLRQIRXQGVLJQLŃFDQWGDPDJH WRRQHRIWKHJLUGHUV7KH&RXQW\GHFLGHGWRUHPRYHWKHEULGJHDQGFRPSOHWHFKDQQHOUHSDLUZRUNWRDOOHYLDWHńRRGSUREOHPV:KLOHWKH&RXQW\SODQVWRSXUVXHIXQGLQJWRUHSODFHWKHEULGJHWKHIXQGLQJLVFRPSHWLWLYHDQG%DU5RDGGRHVQRWVHH PXFKGDLO\WUDIŃF6LQFHWKHOLNHOLKRRGRIREWDLQLQJIXQGVLQWKHQHDUIXWXUHLVUHPRWHWKHFRXQW\ZLOOEXLOGDWXUQDURXQGDWHDFKGHDGHQGXQWLOIXQGLQJLVVHFXUHG:RUNZLOOEHGRQHE\&RXQW\)RUFHV 6WDWXV'HVLJQLQZLWKFRQVWUXFWLRQLQ 7UDIŃF,PSDFWV0LQLPDOEXW7%' &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ )XQGLQJ6RXUFH /RFDO  7RWDO  %DU5RDG 7XUQDURXQG  )ORRGHYHQWRIRYHUWRSSLQJEULGJH %DU5GZLWKEDUULFDGHVDIWHUEULGJHUHPRYHG &535&- /RFDWLRQ03–030LFKHOHWWR5RDG(OOHQVEXUJ /DVW8SGDWHG 3URMHFW1XPEHU5&-% /HQJWK %DVLVIRU3URMHFW,PSURYHPHQWV &RQVWUXFWLRQ 3URMHFW'HVFULSWLRQ 0LFKHOHWWR5RDGZDVUH-HVWDEOLVKHGRQWKH&RXQW\1HWZRUNLQLQFOXGHGREWDLQLQJVWDQGDUGULJKW-RI-ZD\DQGVXIŃFLHQWDUHDIRUDWXUQ-DURXQGDWWKHHQGRIWKHFRXQW\URDG7KLVWXUQ-DURXQGZLOOVXSSRUW3XEOLF:RUNVPDLQWHQDQFHYHKLFOHV3URSRVHGZRUNLQFOXGHV FRQVWUXFWLQJDGGLWLRQDOURDGZD\ZLGWKDQGWXUQ-DURXQGWRPHHWVWDQGDUG:RUNZLOOEHGRQHE\&RXQW\)RUFHV 6WDWXV'HVLJQDQGFRQVWUXFWLRQWRRFFXULQ 7UDIŃF,PSDFWV0LQLPDOEXW7%' &ŽƌŵŽƌĞŝŶĨŽƌŵĂƟŽŶŽŶƚŚŝƐƉƌŽũĞĐƚ͕ĐŽŶƚĂĐƚĂƌƌĞŶĂƐĞΛϱϬϵ-ϵϲϮ-ϳϱϮϯŽƌĂƌƌĞŶ͘ĐĂƐĞΛĐŽ͘ŬŝƫƚĂƐ͘ǁĂ͘ƵƐ )XQGLQJ6RXUFH /RFDO  7RWDO  0LFKHOHWWR5RDG ,PSURYHPHQWV  APPENDIX C Kittitas County Regional Parks and Trails 2022 Parks and Recreation Fund Preliminary Budget Public Works administers the Parks and Recreation Fund 113 on behalf of the Kittitas County Board of County Commissioners. New to the fund in 2022 is the Recreation/Tourism annual (2022) and six-year Capital Facility Plans. The General Fund of County government provides Fund 113 funding for plan implementation. There is no dedicated capital facility implementation funding for recreation or tourism at this time. In addition to implementing the Recreation/Tourism annual (2022) and six-year plans; Public Works provides maintenance of the Vantage Boat Launch restrooms along with management activities for Gladmar and Ryan Thompson parks. General Fund provides the necessary maintenance funding within Fund 113. The six-year Recreation/Tourism plan is annually incorporated into the County’s adopted Capital Facility Plan. Local CostNon‐Local CostLocal CostNon‐Local CostLocal CostNon‐Local CostLocal CostNon‐Local CostLocal CostNon‐Local CostLocal CostNon‐Local CostProject TotalCAPITAL IMPROVEMENT PROJECT NAME 1      150,000    1,700,000    450,000        650,000    1,000,000    2          200,000  3      150,000    350,000        250,000    4          200,000         200,000  5      120,000    6      4,000,000    5      250,000    750,000    820,000    ‐   1,000,000    5,700,000    900,000    ‐   1,000,000    ‐   250,000    ‐   750,000    ‐   6,470,000    ‐                        ‐                        TOTAL ANNUAL INCOME 1,200,000            7,000,200                             1,500,400            1,700,600                1,000,800            2,000,000            GRANT / COST SHARE ‐                       300,000                               200,000               ‐                           1,515,000            TAX REVENUE 1,000,000            1,000,200                             1,000,400            1,000,600                1,000,800            2,000,000            OTHER INCOME ‐                       200,000               5,700,000                             OPERATING COSTS 765,000              312,500              312,500                               655,000               300,000               TOTAL ANNUAL COSTS 7,012,500                            1,132,500            1,555,000            1,675,000               945,000                   ANNUAL CAPITAL IMPROVEMENT TOTALS (‐)750,000               92,000                 900,000              820,000               6,700,000                             SUMMARY: 6‐YEAR PROGRAM REVENUE, COSTS AND ENDING FUND AMOUNTS Gladmar Park (MC) Vantage Boat Ramp Overflow Parking (LC) HWY 10 County Park (UC) Phase 1: Build Trails 2025 KITTITAS COUNTY                                                2022‐2027                                                       SIX YEAR PARKS AND TOURISM CAPITAL PLAN 20272022 2023 Build Overflow Parking Lot 2024 Prepare Development Plan Property Acquisition Phase 1 Improvements: Construct BNSF Actuated Crossing Phase 2 Improvements: Build Road Network and Camp Sites Phase 3 Improvements: Build Boat Ramp 2026 Ellensburg Rotary Indoor Soccer (LC) County Cost Share with Ellensburg   Phase 2 Improvements: Construct Island Improvements Phase 2: Build Trails 250,000                   200,000                     400,000                     750,000      120,000   4,000,000 36,200                 Towns to Teanaway Trailhead Improvements Prepare Development Plan Phase 1: Construction BEGINNING FUND BALANCE                                3,950,000          1,000,000 Vantage River Walk (LC) Prepare Development Plan Phase 1 Improvements: Design and Construct Bridge Access Upper County ATV Trail (UC) Prepare Development Plan Trailhead Parking (UC) 92,000                577,000              ENDING FUND BALANCE 10,000                 77,500                                  65,200                 10,600                     77,500                 65,200                                  10,600                 36,200                     1,000,000                700,000                   ‐                        675,000                  695,000               1 of 1 APPENDIX D Kittitas County Flood Control Zone District Kittitas County Flood Control Zone District Capital Facility Plan 2022-2027 July 28, 2021 Introduction Every year, the Kittitas County Flood Control Zone District (“District”) develops a list of capital improvement projects for Board of County Commission consideration. The listing is reviewed and approved by the Flood Control Zone District Advisory Committee, an entity composed of county rate payers that is responsible for assisting the Flood Control Zone District Administrator formulate the annual capital facility plan and advising on annual District work program elements. The proposal is finalized and presented to the Board of County Commissioners during the annual County budget process. Given the complexity of flood hazard planning, engineering, environmental permitting, and construction, the Flood Control Zone District Advisory Committee schedules projects an additional five years behind the first budget year. The planning schedule includes programmed funding amounts and sources along with project forecast expenses. The schedule identifies the various projects beginning in the first budget year (2022) extending to the last year in program (2027). This plan This plan is organized into three major components for the ease of understanding the various projects contained in the six-year plan: 1. Map identifying the various projects located around the County. 2. The six-year project listing and associated funding plan. 3. Project specific sheets listing specific project information including title, project description, project status, photos and funding sources. Acronyms CIP Capital Improvement Project CTP Cooperating Technical Partners Program DOE Washington State Department of Ecology EWC Ellensburg Water Company FCAAP Flood Control Assistance Account Program FCZD Flood Control Zone District FEMA Federal Emergency Management Agency SRFB Salmon Recovery Funding Board WNC Wilson-Naneum-Cherry Watershed YBIP Yakima Basin Integrated Plan Kittitas County 2022-2027 Six Year Floodplains Improvement Plan 16 74( it , 18 Projects 1- Flood Hazard Risk & Repetitive Loss Program 3- Ringer Loop Property Improvements 5- Hanson Levee & Private Berm Removal 6- Reecer Creek Dollarway to University 7- Stream Gaging and Early Warning System (Multiple Locations) 8- CTP Flood Studies (Multiple Locations) 10- Whiskey Creek at EWC Siphon 11- WNC - Phase 2 Whiskey Reroute Feasibility Study 12- WNC - Phase 3 Whiskey Reroute Design 13- Reach Assessment (Elk Meadows) 14- Flow Conveyance Restoration, Site 2 15- Flow Conveyance Restoration, Site 3 N 16- Crystal Creek Conveyance Project 17- Manastash - Cove Road Replacement 18- Hazard Mitigation Plan Update VTN P PR A,I 4'1.� TABLE MOUNTAIN 01W - "\,I ldJ1 ` 17 ❑3 ❑5 0 1 2 4 6 8 Miles N Environmental Systems Research Institute, Inc. (ESRI), U.S.AGedtog 'cal Survey (USGS) EROS Data Center, U.S. Ge gical Survey - U.S. Board on Geographic Names (BGN), National Geospatial Intelligence Agerfcy JNGA), NAVTEQ (Naystreets), M'[ A In mation Systems (USGS, NASA), Oregon Metro N `l` 5 C A D E R A N G E � O - G Six Year Program Summary *Costs are shown as thousands 610 610 640 640 670 670 12 12 12 12 12 12 2,774 2,040 1,530 1,580 1,262 2,490 1,486 1,656 1,496 1,576 1,176 2,496 TAX LEVY OTHER INCOME PERMITS GRANTS / COST SHARE ADMINISTRATION TRAINING/CONFERENCES PERMIT PROCESSING PUBLIC TECHNICAL AGENCY COORDINATION PUBLIC OUTREACH AND FLOW CONVEYANCE LEVEE MAINTENANCE STORMWATER PROPERTY MAINTENANCE EMERGENCY RESPONSE 2,164 21 21 100 100 100 100 10 10 30 30 10 10 90 890 940 50 50 50 90 30 150 150 150 25 25 25 25 840 840 840 770 610 690 290 180 180 180 180 5921,430 840 21 21 21 840 25 600 25 25 25 25 8 50 15 100 10 840 21 25 1,610 FCZD CAPITAL PROGRAM PROJECT COSTS 180 1,820 8 8 8 8 8 15 15 15 15 25 50 50 294 290 (4) (86) $328 $294 $290 $204 6 204 $210 TOTAL (COST) INCOME FOR BEGINNING FUND AMOUNT ENDING FUND AMOUNT 60 100 10 180 30 30 30 15 30 30 60 $712 150 150 712 150 (1,288) 2,000 (384) (34) 328 SUMMARY: 6-YEAR PROGRAM REVENUE, COSTS AND ENDING FUND AMOUNTS TOTAL ANNUAL INCOME TOTAL ADMINISTRATION AND OPERATIONS COSTS TOTAL ANNUAL COSTS 25 AREANon-Local Source2022 Local2022 Non-Local2023 Local2023 Non-Local2024 Local2024 Non-Local2025 Local2025 Non-Local2026 Local2066 Non-Local2027 Local2027 Non-Local#1 FLOOD HAZARD RISK & REPETITIVE LOSS PROGRAM Yakima River FCAAP 50 150 40 40 40 30 110 #3 RINGER LOOP PROPERTY IMPROVEMENTS Ringer Reach IP 200 200 #5 HANSON LEVEE AND PRIVATE BERM REMOVAL Ringer Reach SRFB / IP 100 90 510 90 510 #6 REECER CREEK DOLARWAY TO UNIVERSITY WNC City of Ellensburg 890 #7 STREAM GAGING AND EARLY WARNING SYSTEM County-Wide 202020505050 2022: Cove Road, McElroy Rd., 2022: Naneum Creek #8 CTP FLOOD STUDIES General CTP 30 30 100 60 100 60 100 #10 WHISKEY CREEK AT EWC SIPHON WNC Private 500 250 250 #11 WNC-Phase 2 Whiskey Reroute Feasibility Study WNC 100 #12 WNC-Phase 3 Whiskey Reroute Design WNC FEMA / FCAAP 4001008020 Implement capital recommendations from Phase 2 Feasibility Study #13 REACH ASSESSMENT (Elk Meadows)Yakima River SRFB 1001004 #14 FLOW CONVEYANCE RESTORATION - SITE 2 WNC Ecology 20 70 270 #15 FLOW CONVEYANCE RESTORATION - SITE 3 TBD Ecology 20 82 290 #16 CRYSTAL CREEK CONVEYANCE PROJECT Crystal Creek 10020 Implement project identified through Crystal Creek CTP study #17 MANASTASH - COVE ROAD REPLACEMENT Manastash FCAAP 1000200 #18 HAZARD MITIGATION PLAN UPDATE Dept. of MilitaryCounty-Wide 20 100 1564 600 660 770 280 610 250 690 302 290 210 1610 Comprehensive Flood Planning and Repetitive Loss Hazard Assessment Control for invasive species, riparian buffer plantings, and building decomissioning at County-owned properties Implementation of preferred alternantive from Hanson Pits Restoration Plan and Design . 2023 SRFB design only grant. Flood Control Zone District Cost share in support of City of Ellensburg Project to purchase property, construct setback levees and construct second bridge alongg Dolarway Rd. Continued funding through FEMA's Cooperating Technical Partnership (CTP) program to improve flood models and channel migration zone mapping. Increase flood conveyance, eliminate canal / creek intermingling, and address fish passage barrier by replacing current EWC crossing at Whiskey Creek with a siphon. KCCD managed project, with FCZD cost-share. Hydrologic analysis with existing 2-d model to evaluate Whiskey Creek tie-in at Reecer Creek project. Evaluate effects of Mercer Creek flow routing north of the airport on hydrologic regime, design specification needed at proposed railroad crossing, and within Reecer Creek floodplain site, and water needs downstream of proposed reroute site. Assessment to identify and prioritize flood alleviation and habitat restoration actions within the Elk Meadows area along the Yakima River. Request SRFB funding in 2022 round for implementation in 2023/2024. Implementation of project similar to Mercer at Helena flow conveyance project, site TBD Implementation of project similar to Mercer at Helena flow conveyance project, site TBD Replace existing Cove Road bridge with bridge of sufficient freeboard and span to pass sediment and flood flows. 2026: Design and Permitting The Multi-jurisdictional Hazard Mitigation Plan needs to be updated every 5-years. CAPITAL PROGRAM ANNUAL TOTAL (LOCAL AND NON-LOCAL AMOUNTS IDENTIFIED) Costs are shown as thousands KITTITAS COUNTY FLOOD CONTROL ZONE 2022-2027 SIX YEAR CAPITAL FACILITY PLAN Project Name: #1 Flood Hazard Risk & Repetitive Loss Countywide Last Updated: July 23, 2021 Basis for Project: Kittitas County Hazard Mitigation Plan Schedule: Planning: 2021—2022 Project Description: Unincorporated Kittitas County has 7 repetitive loss areas. Four of these areas are along the Yakima River, two are along the Teanaway River, and one is along the Middle Fork Teanaway River. Kittitas County will conduct a repetitive loss area analyses to support subsequent retrofltting, purchase, or relocation of structures or infrastructure located in hazard -prone areas. This analy- sis will produce a detailed mitigation plan needed to pursue funding for mitigation measures. Status: In progress Flood Impacts: Reduce impacts and costs associated with frequently fiooded properties. For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us Funding • FCAAP (potential) • FCZD Levy • Future phases will be grant eligible Project Name: #3 Ringer Reach Property Improvements Yakima River—Ringer Reach Last Updated: June 21, 2021 Basis for Project: Yakima River Corridor Plan Schedule: 2020—2023 Project Description: Control for invasive species, riparian buffer plantings, and building decommissioning at County-owned properties that were pur- chased for fioodplain conservation and restoration. Status: In progress Flood Impacts: Improved fioodplain function. For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us Funding • Yakima Basin Integrated Plan Project Name: #5 Hanson Levee and Private Berm Removal Yakima River—Ringer Reach Last Updated: June 21, 2021 Basis for Project: Yakima River Corridor Plan Schedule: 2023—2025 Project Description: Remove failing Hanson Pit Levee and private berm located on Flood Control Zone District acquired property. Levee removal allo w property purchased for fioodplain function to be used for this purposes, will reduce off-site fiood elevations and will reduce long- term District O&M costs associated with the levee and berm. Status: Initial study completed. Flood Impacts: Better managed fiood hazard risks and improved fioodplain function. For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us Funding • Yakima River Basin Integrated Plan (potential) • Salmon Recovery Funding Board (potential) Project Name: #6 Reecer Creek Dolarway to University Wilson-Naneum-Cherry Subbasin Last Updated: September 30, 2020 Basis for Project: Wilson-Naneum-Cherry Assessment Schedule: 2020—2021 Project Description: Flood Control Zone District Cost share in support of City of Ellensburg Project to purchase property, construct setback levee s and construct second bridge along Dolarway Rd to address Reecer Creek fiooding. Status: In progress. Flood Impacts: Decreased fiood risk to West Ellensburg Community and Dolarway Road For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us Funding • FCZD Levy Project Name: #7 Stream Gaging and Early Warning System Wilson-Naneum-Cherry Subbasin Last Updated: June 21, 2021 Basis for Project: Wilson-Naneum-Cherry Assessment, Hazard Mitigation Plan Schedule: 2020—2021 Project Description: Installation and annual maintenance costs of real time stream gage network. Sites proposed to be added in 2022: Cove Road, Smithson Road and McElroy Road. Status: In progress Flood Impacts: Improved real-time fiood communication and development of a hydrologic dataset to inform future fiood projects. For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us Funding • FCZD Levy Project Name: #8 CTP Flood Studies County-Wide Last Updated: June 21, 2021 Basis for Project: Kittitas County Hazard Mitigation Plan Schedule: 2020—2025 Project Description: Continued funding through the Federal Emergency Management Agency’s Cooperating Technical Partnership (CTP) program to improve fiood models and channel migration zone mapping. Costs in 2022 are to support survey work to support fiood study in 2023. Status: In progress Flood Impacts: Improved fiood risk information For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us Funding • Community Technical Partner- ship Program (potential) • FCZD Levy Project Name: #10 Whiskey Creek at EWC Siphon Wilson-Naneum-Cherry Last Updated: June 21, 2021 Basis for Project: Wilson-Naneum-Cherry Assessment Schedule: 2021—2022 Project Description: Increase fiood conveyance, eliminate canal and creek intermingling, and address flsh passage barrier by replacing current the Ellensburg Water Company crossing at Whiskey Creek with a siphon. Final design is expected in 2021 with construction in 2022 . Status: Planned project Flood Impacts: Decreased fiooding along Whiskey Creek. For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us Funding • FCZD Levy—design and con- struction. • Grant or partner support for construction. Project Name: #11 Wilson-Naneum-Cherry Phase 2 Wilson-Naneum-Cherry Last Updated: June 21, 2021 Basis for Project: Wilson-Naneum-Cherry Assessment Schedule: 2023 Project Description: Hydrologic analysis with existing 2-d model to evaluate a potential Whiskey Creek tie-in at the Reecer Creek Floodplain project. Evaluate the effects of Mercer Creek fiow routing north of the airport on hydrologic regime, determine the design speciflcations needed at proposed railroad crossing, evaluate the available fiood capacity within Reecer Creek fioodplain site, and assess w ater -right considerations downstream of the proposed reroute site. Status: Planned project Flood Impacts: Decreased fiood risk to the West Ellensburg Community. For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us Funding • FCZD Levy Project Name: #12 Wilson-Naneum-Cherry Phase 3 Wilson-Naneum-Cherry Last Updated: June 21, 2021 Basis for Project: Wilson-Naneum-Cherry Assessment Schedule: 2025—2026 Project Description: Implement capital recommendations from Phase 2 Feasibility Study (FCZD Project # 11) Status: Planned project Flood Impacts: Decreased fiood risk to the West Ellensburg Community. For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us Funding • FCZD Levy • Flood control assistance account program (potential) Project Name: #13 Reach Assessment (Elk Meadows) Yakima River Last Updated: June 21, 2021 Basis for Project: Planning need Schedule: 2023—2024 Project Description: Assessment to identify and prioritize fiood alleviation and habitat restoration actions along a hazard prone area of th Yakim a River, including the Elk Meadows communities. Status: Planned project Flood Impacts: Flood hazard risk identiflcation. For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us Funding • FCZD Levy • Salmon Recovery Funding Board (potential) Project Name: #14 Flow Conveyance Restoration (Site 2) Based on need Last Updated: September 30, 2020 Basis for Project: Recurring need Schedule: 2022—2023 Project Description: Implement fiow conveyance restoration project that exceeds scope of annual fiow conveyance maintenance activities. Typically these project require the removal of crack willow and associated sediment accumulations. Site to be determined. Status: Planned project Flood Impacts: Decreased fiood frequency. For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us Funding • FCZD Levy • Ecology Centennial Clean Water Grant (potential) Project Name: #15 Flow Conveyance Restoration (Site 3) Based on need Last Updated: September 30, 2020 Basis for Project: Recurring need Schedule: 2022—2023 Project Description: Implement fiow conveyance restoration project that exceeds scope of annual fiow conveyance maintenance activities. Typically these project require the removal of crack willow and associated sediment accumulations. Site to be determined. Status: Planned project Flood Impacts: Decreased fiood frequency. For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us Funding • FCZD Levy • Ecology Centennial Clean Water Grant (potential) Project Name: #16 Crystal Creek Conveyance Project Crystal Creek Flood Study Last Updated: September 30, 2020 Basis for Project: Crystal Creek Flood Study Schedule: 2025—2026 Project Description: Implement Crystal Creek conveyance project identifled through current Crystal Creek fiood study. Site to be determined. Status: Planned project Flood Impacts: Decreased fiooding along Crystal Creek. For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us Funding • Grant funding to be identifled after project identiflcation. Project Name: #17 Manastash Cove Road Replacement Manastash Last Updated: September 30, 2020 Basis for Project: Manastash Creek Corridor Plan Schedule: 2026 Project Description: Replace existing Cove Road bridge with bridge of sufflcient freeboard and span to pass sediment and fiood fiows. Status: Future Project Flood Impacts: Decreased fiood risk along the Manastash River alluvial fan during signiflcant fiood events. For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us Funding • FCZD Levy • Flood control assistance account program (potential) Project Name: #18 Hazard Mitigation Plan Update County-wide Last Updated: June 21, 2021 Basis for Project: Kittitas County Hazard Mitigation Plan Schedule: 2023 Project Description: Kittitas County last updated its Multi-Jurisdictional Hazard Mitigation Plan in 2019. This plan must be updated every 5 -years. An up-to-date mitigation plan that has been approved by the Federal Emergency Management Agency (FEMA) is required to be eli- gible for mitigation grants, such as FEMA’s Pre-Disaster Mitigation Grant Program (PDM) and Hazard Mitigation Grant Program (HMGP) . Status: Future Project Flood Impacts: Identify key fiood needs and maintain eligibility for Federal funding sources. For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us Funding • FCZD Levy • Washington State Department of Military (potential)