Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Bowers Field - Hangar Taxilane Cost Estimate_October 2021
Item No.Description Approx. Qty Unit Unit Price Total Price 1 Mobilization 1 LS $29,000.00 $29,000.00 2 Traffic Control 1 LS $10,000.00 $10,000.00 3 Construction Staking 1 LS $10,000.00 $10,000.00 4 Contractor Quality Control 1 LS $20,000.00 $20,000.00 5 Temporary Erosion and Sediment Control 1 LS $5,000.00 $5,000.00 6 Unclassified Excavation 700 CY $20.00 $14,000.00 7 Embankment in Place 60 CY $25.00 $1,500.00 8 4" Asphalt (P-401)400 TN $200.00 $80,000.00 9 6" Crushed Aggregate Base (P-209)520 CY $65.00 $33,800.00 10 Pavement Marking 300 SF $4.00 $1,200.00 11 Topsoil 200 CY $55.00 $11,000.00 12 Seeding 0.8 AC $5,000.00 $4,000.00 Subtotal $219,500.00 September, 2021 CENTURY WEST ENGINEERING PLANNING LEVEL COST ESTIMATE Kittitas County BOWERS FIELD Hangar Taxilane