Loading...
HomeMy WebLinkAboutMass X Change OrderOriginal Contract& COPL-3 Change Order Proposal #4 New Contract amount 5158,971.90 Total cost does not include sales tax. Kittitas County Solid Waste Programs And Maintenance Department 925 lndustrialWay, Ellensburg, WA 98926 Telephone: (509) 962-7 542 Fax: (509) 962-7087 Stqt,ags.qt s 1t,276.49 luly 20,202! Mass X Construction P.O. Box 1-205 Ellensburg, WA 98926 RE: Change Order #1 This change order includes change order proposal4 which is attached Approval Kittitas Cou Name: TITLE: Chair Board m Mass X Construction BY Name: TITLE 14n"tpnZ +/a/ot/rDATDATE: Arst, CHANGE ORDER PROPOSAL NO: 04 Project Name: Colockum Demo Owner: Kittitas County Contractor: Mass X Construction, LLC. Job Number: 2020-031 $pol(aNF 203 tti Wcrshlnglon Sulle 400 $pokono, WA 99201 p 50?.838.8568 dlscerchliects.com TO:Mass X .c onlractor, please furnish your proposal for performing the changes outlined below and/or detailed on the attachments referred to: An old unmarked stave pipe was discovered during excavation that was leaking. Multiple attempts at repairing the stave pipe were made due to not knowing if this was a live line or not. None of the repair attempts were successful. City engineers came out to veriff that this pipe was to be abandoned. The pipe was crushed in place and backfitled with 1 Ya" minus drain rock. There was one soft spot found during excavation that was next to a bollard that was to be removed. The unsuiiable material was dug out and filled wlth T, CY af concrete. Due to the soft nature of the subgrade, during paving the toaded trucks created ruts into the subgrade as they backed up to the paving machine. ln order to continue with paving, this was compensated for with additional HMA ptaced. This required an additional '16.26 TNS of HMA. Costs included to expedite the schedule to finish before the 7i6121 event. ALSC Archltects. P.S.By Tndd Kallcr Dale:71Q612021 PROPOSAL: To the Owner: We propose to perform all changes described in the above request for a total ADDITIONIEEEEiOFiON- (cross out one) to the contract sum of: Eleven thousand two hundred seventv six & 49/100 $ 11,276.49 (not including Sales Tax) We have attached cost estimate detail sheets, and the foregoing arnount covers all direct and indirect costs related to this proposal and to the effect of the proposal on the remainder of the project. All other provisions of the contractremaininfullforceandeffect'Werequestthecompletiondatebeffi(crossoneout).N/A calendar days because of this work. The Contractor agrees to be bound to this proposal quotation for sixty (60)days after this date, Mass X Construction, LLC,christy Daniers /lr,;tn+^ tr)CIarc 7/13/2021 Contractor r RECOMMENDATION: TO: Owner, we have examined the foregoing proposal and flnd it to be appropriate for the request. We recommend its acceptance. ALSC P-S.%21 PROPOSAL AGCEPTANCE: The Owner hereby accepts the foregoing proposal. This instrument, when signed below, constitutes the conditions upon which a Change Order will be issued. ALSC Architects \\ We bring our clients' etories to life. AlS,s*, Date- Owner ALSC Architects \\ We bring our clients'stories to life. MASS X CONSTRUCTION P.O. Box L205 Ellensburg, WA 98926 CHANGE ORDER PROPOSAT COST BREAKDOWN PROJECT: Colockum Demolition COP #: 4 CONTRACT: Kittitas County DATE SUBMITTED: 7/L3/2027 WORK DESCRIPTION: COP 4 - Abandon in place an unknown stave pipe, overexcavate a soft spot, soft subgrade required an additonal 16.26 TNs of HMA to be placed and overtime expenses to expedite the project schedule. Overtime charged per the attached rate sheet, difference in OT rates minus regular time rates included below. LABOR DESCRIPTION QUANTITY HOURS UNIT RATE TOTAL Superintendent L 5 s ss.oo 5 475.00 Laborer 7 0.5 S s8.81 s 29.4r Excavator Operator JD 200 I 5 s es.43 s 477.15 Excavator Operator 305.5 Mini T 0.5 s e4.72 s 47.36 Laborer OT at 1.5x (FrilSat)L 25.5 S 29.4L s 749.96 Dump Truck Driver OT at 1.5x (Fri/Sat)T 3 S g+.ro s ro2.30 Excavator Operator 305.5 Mini OT at 1.5x (Frilsat)1 1.5 S 47.36 s 7t.04 Roller Operator OT at 1.5x (Fri/Sat)L t S +s.ga s 45.34 Grader Operator OT at 1.5x (FrilSat)L L8 S 48.13 s 866.34 Grader Operator OT at 2x (Sunday)7 6 s s6.26 5 577.56 Total Labor:5 4,L98.57 Subtotal: S Markup 22%: $ Subtotal: S Markup 22%: S 3,441.45 757.r2 478.1.4 105.19 s 583.33Total Equipment: EQUIPMENT DESCRIPTION QUANTITY HOURS UNIT RATE TOTAL Excavator JD 200 L 5 5 74.t0 s 370.50 JD 200 Hoe Pack T I S gs.oo s 3s.00 Excavator 305.5 Mini t 0.5 S 4s.28 s 22.64 Work Truck Dodge 25004x4 t 5 s 10.00 s s0.00 MATERIALS, RENTAL EQUIPMENT & DUMP FEES DESCRIPTION QUANTITY UNIT UNIT RATE TOTAL CSBC 15 TN 5 e.2s s 138.75 Concrete 0.5 CY S rzs.ss s 64.L8 Rental Grader L LS S r,843.27 s 7,843.27 ECP Opening Fee Saturday 6/26/2L L DAY s L,500.00 s 1",500.00 Subtotal: S Markup 22%: 5 3,546.20 780.76 $ 4,326.36Total Mat'ls, Rentals, F Lof2 SUBCONTRACTORS DESCRIPTION QUANTITY UNIT UNIT RATE TOTAL Mark Hunt Trucking 1 HR s 1s0.00 s 1s0.00 Central Paving t6.26 TNS s 112.00 $L,821.72 s Subtotal: Markup 10%: Total Subs: GRAND 7,97t.L2 L97.tL 5 2,L68.23 s s S LL,276.49 2of2 Mass X Construction Labor RatesColockum DemolitionGrader Operators70.49s5.39so.42s7.78s2.73Roller & SkidsteerOperators66.30s5.07s0.40sL.67s2.73Excavator OperatorOver 15TNs69.87s5.35s0.42s1.76s2.73Excavator OperatorUnder 15TNs69.33s5.30so.42s1.75s2.I3Dump Truck Drivers49.38s3.78s0.30s!.24s2.73Laborer542.32s3.24s0.2sst.o7s2.13Rates7.65%0.6%252%s 2.13Trade ClassificationBase RateFICA (SS & Medicare)FUTASUTAlndustrial lnsura nce L&l80.2275.57s79.5378.93s56.8349.01Subtotal Direct Labor Costss1.60s12.03s2.4rs1.51s1r.34s2.27$1.59s11.93s2.39s1.58s11.84s2.37sr.t4s8.52s7.70s0.98s7.35s7.472.00%75.00%3.OO%Safely 2%Supervision 15%SmallTools 3% for Prime96.26s90.6995.4394.7268.20s58.81144.39s136.03743.t5142.07102.3088.22sTOTALOvertime at L.5xDouble Time at 2xFriday & Saturday OT Diff at 1.5xSunday OT Difference at 2xs1-92.s2s181.38s190.87s189.43s136.40s177.63s48.13s45.34s47.72s47.36s34.10s29.4796.26s90.69s95.4394.7268.2058.81 WorkPayIDdump truck OTBrandon J Metreveli 8458 HourlylaborerBrandon J Metreveli 8458 HourlyKenneth A Dirks 0462 Hourly0462 Hourly0462 HourlyRTOTRTRTRTRTRT8458AHours Worked by DayPaid PayJobGrossCraig Larimer Owner/Operator 10 hours Operating Skidsteer/Bobcat on 612221Craig Larimer Owner/Operator '1.5 hours Operating Excavator under 15 TNs on 6/23121Craig Larimer Owner/Operator 10 hours Operating Skidsteer/Bobcat on6124121Craig Larimer Owner/Operator 10 hours Operating Gradet on 6125121Craig Larimer Owner/Operator 8 hours Operating Gradet on6126121Kittitas County:Colockum Demo & Wash-#2021 -51 I205 W 5th Avenue Suite 108Ellensburg WA 9892610703Total Social Medi- Federal StateTax Tax Other17 178.21 41.212,842.17 1509.00 0.00 26.69 753.112,842.17 176.21 41.211.21 509.00 0.00 26.692,978.78 184.69 43.20542.00 0.OO 27.760703 2,978.78 't 84.69Contractor MassxConstruction LLCPO Box 1205ELLENSBURG, WA 98926ProjectProjecUContract #Payroll NumberFor Week Ending6t26t20215Total1 2,089.062JA1 13.6s 2,181.130.000.000.000.000.000.000.002,66.3074.072.OO3.002,180.4969.3363.483.009.502,180.4942.3209 r's1 1.001002JAO.497.00 49.381.00 1(x.002,298.188.50 69"33o50 lMOO2,29A.1813.50 42.3216.00 63482,298.181.00 69.8716.50 64.712.003.003.009.501 1.001007.001.008.50o5013.501 6_00'1.0016.50'1.001.003.0020 2'l 22 23 24 25 261.00'1.00 1.004.50 5.001003.008.001(.lf.}5.00 2.003.004.00 1.50o508.00 8.006.00 1.50 6.001.0010.00 1.50 10.00 10.00 8.00 Gertified Payroll ReportContractor Mass x Construction LLCPO Box 1205ELLENSBURG, WA 98926Project Kittitas County:Colockum Demo & Wash#2021-518205 W sth Avenue Suite 108Ellensburg WA 98926TimesheetPaid PayHours Rate GrossJobFringeProjecucontract #Payroll NumberFor Week Endingb71312021Hours Worked by DayWork8458Brandon J Metreveli 8458 HourlyBrandon J Metreveli 8458 HourlyBrandon J Metreveli 8458 HourlyRTRTRTLarimer Owner/OperatorKenneth A Dirks 0462 HourlyRTRTRTKenneth A Dirks 0462 HourlyKenneth A Dirks 0462 HourlyPayRTTotal Social Medi- Federal Statecare Tax Tax0712 1,552.73 96.27 22.210712 1,552.73210712 1.00 0.00 18.24210712 1.00 0.00 18.24210713 1,526.00Totals44.03 1,208.7018.24 344.03 118.18 335.91 1,190.09335.91 1,190.0933s.91 1,190.092'to713 1,526.00 94.61210713 1,526.00Craig Larimer Owner/Operator 6 hours Operating Grader on 6127121Craig Larimer Owner/Operator I hours Operating Grcdet on 6128121Craig Larimer Owner/Operator 8 hours Operating Excavator 15 TNs to 30 TNs on 6/29121Craig Larimer Owner/Operator I hours Operating Excavator under 15 Tns on 6/30/21Craig Larimer O\ ner/Operator t hours Operating Skidsteer/Bobcat on7|11210.000.000.000.000.000.000.001.50 66.30 1,162.731.50 69.33 1,162.7318.OO 42.32 1,162.734.00 49.38 1,162.731.00 66.30 1,t36.0022.00 42.32 1,136.002.00 69.33 1,136.001.501.5018.004_0031.001.0022.OO2.OO27242930'l 231.501.505.00 4.00 8.00 1.004.006.00 8.00 8.00 8.00 1.001.007.00 6.00 8.00 1.002.00 Terms Due Upon Completion Job #21-0420 Prevailing Estimator Joel Greear 509-899-7 37 1 Central Paving, LLC 1410 W Dolanruay Rd Ellensburg, WA 98926 509-929-1044 team@centralpavi nq llc.com www.centralpavi nq llc.com Additional Service - Additional HMA tonnage due to soft subgrade 174.26 tons placed - 158 tons (base+CO1+CO2) = 16.26 ton overage 16.26 X $112.00 Y $1,821j27 Central Paving, LLC 1410 W Dolanruay Road Ellensburg, WA 98926 US +1 8008010310 team@centralpavinollc. com l':l,irJtl lr"f'd ilir:iiii rru Equipment Rental lnvoice IllACllllItRY **** Our Remit To Address Has C BIA TO:/Customer Number 528624L IT,ASS X CONSTRUCTION I,I,C 27I BOSTON RD EIJIJENSBURG wA 98926 lnvoice Number 3 07453 0 0 lnvoice Date .fune 25, ,202L ShlpTo: CRAIG BLOOM PAVILION 901 E 5TII AVE EIJIJENSBURG wA 98926 Pap6 Machinery PO Box 35144 #5077 Seattle, WA9812441M Contract Number Customer P.O. 307453 Ordered Bv Rental Term CHRISTY F Ship Ma Store 03 Salesman CCHH BRIAII GAMREAU Qty Mk/Mode1 Serial #Description S!art End Rate Extended 1 JD/77 OGP 1DW77OGPTCE5474O9 770 TANDEM DRIVE MG TAX A!.{OI'NT PXCR UP TAX AMOI'NT DEIJIVERY TAX A!.IOI'NT 6/25/2L 6/25/2L $1,400.00 s104.58 $1, 260. 00 1 $546.00 $4s.32 s545.00 ${s.32 L SHIPPED CLEAII FUI,I, OF FUEL NO DAMAGE Box blade rental: $450.00/week +$200.00 delivery & pickup +$53.95 rental tax Rental difference: $2,547.22 available 770 grader cost -$703.95 box blade rental cost $1,843.27 expedited rental cost $703.95 total rental cost We had a box blade attachment lined up for rental the week of 716 to grade the rock for asphalt prep, it was determined in the progress meeting on 6124 that the additional contract days for CO 1 pushed the contract date past the event date of 7/6. Due to this we were asked to expedite the schedule to finish before 715.The box blade wasn't available for rent until 7/6, so we found another grading machine that was available at such short notice in order to expedite the schedule. The difference between the costs of $1,843.27 are included in COP 4. Total Rent: Total Tax: $2,352.00 il9s.22 Pay This Amount #2,547 .22TERMS: Netl0 Days Thank You! Arst, CHANGE ORDER PROPOSAL NO: 04 Project Name: Colockum Demo Owner: Kittitas County Contractor: Mass X Construction, LLC. Job Number: 2020-031 spot(ANt 203 Ai Wcrshlngfon Suile 400 Spokane, WA 99201 p 509.838,8568 olscqrchil€cts,com TO Mass X Cnnsfrrrcfinn Contractor, please furnish your proposal for performing the changes outlined below and/or detailed on the attachments referred to: An old unmarked stave pipe was discovered during excavation that was leaking. Multiple attempts at repairing the stave pipe were made due to not knowing if this was a live line or not. None of the repair attempts were successful. City engineers came out to verify that this pipe was to be abandoned. The pipe was crushed in place and backfilled with 1 Tr" minus drain rock. There was one soft spot found during excavation that was next to a bollard that was to be removed. The unsuitable material was dug out and filled with Y, CY of concrete. Due to the soft nature of the subgrade, during paving the foaded trucks created ruts inlo the subgrade as they backed up to the paving machine. ln order to contlnue with paving, this was compensated for with additional HMA placed. This required an additional j 6.26 TNS of HMA. Costs included to expedite the schedule to finish before the 7/6/21 event. ALSC P.S.By Todd Keller Dale:71O612021 PROPOSAL: To the Owner: We propose to perform all changes described in the above request for a total ADDITION,€EEE}9FiO}{- (cross out one) to the contract sum of: Eleven thousand two hundred seventv six & 49/100 $l1gs.4s (not including Sales Tax) We have attached cost estimate detailsheets, and the foregoing amount covers all direct and indirect costs related to this proposal and to the effect of the proposal on the remainder of the project. All other provisions of the contractremaininfullforceandeffect'Werequestthecompletiondatebeffi(crossoneout)."N/A calendar days because of this work. The Contractor agrees to be bound to this proposal quotation for sixty (60) days after this date. Mass X Constru LLC,Daniels oa"J.!i3!2a21- Contractor RECOMMENDATION: TO: Owner, we have examined the foregoing proposal and find it to be appropriate for the request. We recommend its acceptance. ALSC Architects. P.S."l PROPOSAL AGCEPTANCE: The Owner hereby accepts the foregoing proposal. This instrument, when signed below, conslitutes the conditions upon which a Change Order will be issued. D ALSG Architects l\ We bring our clients' atories to life. ARCHIlECTS Date Owner ALSC Architects \ We bring our clients' stories to life. MASS X CONSTRUCTION P.O. Box 1-205 Ellensburg, WA 98926 CHANGE ORDER PROPOSAL COST BREAKDOWN PROJECT: Colockum Demolition COP #: 4 CONTRACT: Kittitas County DATE SUBMITTED: 7/L3/202t WORK DESCRIPTION: COP 4 - Abandon in place an unknown stave pipe, overexcavate a soft spot, soft subgrade required an additonal L6.25 TNs of HMA to be placed and overtime expenses to expedite the project schedule. Overtime charged perthe attached rate sheet, difference in OT rates minus regulartime rates included below. TABOR DESCRIPTION QUANTIW HOURS UNIT RATE TOTAL Superintendent t 5 s ss.oo s 475.00 La borer L 0.5 $ sg.sr s 29.47 Excavator Operator JD 200 I 5 s 9s.43 s 477.I5 Excavator Operator 305.5 Mini 7 0.5 S gq.tz s 47.36 Laborer OT at 1.5x (Frilsat)T 25.5 5 2e.41 s 749.96 Dump Truck Driver OT at 1.5x (FrilSat)T 3 S s+.ro s L02.30 Excavator Operator 305.5 Mini OT at 1.5x (Frilsat)t 1.5 5 47.36 s 7L.04 Roller Operator OT at L.5x (FrilSat)L L S 4s.34 s 45.34 Grader Operator OT at 1.5x (FrilSat)!L8 s 48.L3 5 866.34 Grader Operator OT at 2x (Sunday)1 5 s s6.26 s 577.56 s 4,198.57 EQUIPMENT DESCRIPTION QUANTITY HOURS UNIT RATE TOTAL ExcavatorJD 200 1 5 S 74.L0 s 370.50 JD 200 Hoe Pack I 1 5 gs.oo s 3s.00 Excavator 305.5 Mini T 0.5 s 4s.28 s 22.64 Work Truck Dodge 25OO4x4 t 5 5 1o.oo s s0.00 Subtotal: Markup22%: Total Labor: Subtotal: Markup22%: Total Equipment: Subtotal: Markup22%: Total Mat'ls, Rentals, Fees: 3,44L.45 757.L2 478.14 105.19 3,546.20 780.16 s 4,326.36 s s 5 $ 5 s 5 s83.33 MATERIALS, RENTAL EqUIPMENT & DUMP FEES DESCRIPTION QUANTITY UNIT UNIT RATE TOTAL CSBC 15 TN s s.2s s 138.75 Concrete 0.5 CY s 128.3s s 64.18 Rental Grader L LS S Lsqz.zt s L,843.27 ECP Opening Fee Saturday 6/2612L L DAY s 1,500.00 $1,500.00 Lof 2 SUBCONTRACTORS DESCRIPTION QUANTITY UNIT UNIT RATE TOTAL Mark Hunt Trucking I HR s 1s0.00 s 1s0.00 Central Paving L6.26 TNS $ 1_L2.00 s r,82t.t2 s Subtotal: S Markup too/o: 5 Total Subs GRAND L,97L.Lz L97.L7 5 2,L68.23 S Lt,276.49 2 ol2 Mass X Construction Labor RatesColockum DemolitionGrader Operators70.49s5.39s0.42s1.78s2.73Roller & SkidsteerOperators66.30s5.07s0.40sr.67s2.L3Excavator OperatorOver 15TNs69.87s5.35s0.42s1.76s2.r3Excavator OperatorUnder 15TNs69.33ss.30so.42s7.75s2.73Dump Truck Drivers49.38s3.78s0.30s7.24s2.73Laborers42.32t3.24s0.25st.o7s2.73Rates7.65%0.6%2.52%S z.rsTrade ClassificationBase RateFICA (SS & Medicare)FUTASUTAlndustrial lnsurance L&l80.22s75.5779.53s78.93s56.8349.01Subtotal Direct Labor Costss1.60s12.03s2.47s1.51s7L.3452.27s1.59s11.9352.39s1.58s1r.84s2.37st.t4s8.52s!.702.00%150.981s.00%l s7.353.oo%l s1.47Safety 2%Supervision 15%Small Tools 3% for Prime95.2690.6995.43s94.7258.2058.81744.39136.03743.15L42.07102.30$88.22TOTALOvertime at 1.5xDouble Time at 2xFriday & Saturday OT Diff at 1.5xSunday OT Difference at 2x192.s2181.38s190.87189.43136.407r7.63s48.13s45.3447.7247.3634.1029.4196.2690.6995.43s94.7258.2058.81 CertifiedrollContractor Mass x Construction LLCPO Box 1205ELLENSBURG, WA 98926PayHours Worked by DaySun Mon Tue Wed Thu Fri SatTimesheetPaid PayProjectKittitas County:Colockum Demo & Wash-#2021-518205 W sth Avenue Suite 108Ellensburg WA 98926FringeCheckTotal Social Medi- Federal Statecare Tax TaxProjecucontract #Payroll NumberFor Week Ending17 176.2'1 41.21 509.006n6t202141.21 509.00 0.00 26.695WorkName lD ClassificationBrandon J Metreveli 8458 Hourlydump truckBrandon J Metreveli 8458 HourlylaborerRTOTOTRT84588458mrnr exKenneth A Dirks 0462 HourlyRTRT0462laborerKenneth A Dirks 0462 HourlyCraig LarimerHoursHours RateCraig Larimer Owner/Operator 10 hours Operating Skidsteer/Bobcat on 6122121Craig Larimer Owner/Operator 1 .5 hours Operating Excavator under 15 TNs on 6/23121Craig Larimer Owner/Operator 10 hours Operating Skidsteer/Bobcat on6124121Craig Larimer Owner/Operator 10 hours Operating Gtadet on 6125121Craig Larimer Owner/Operator 8 hours Operating Gtadet on 6126121210702 2,842.17 176.212'l210702 2,842jTotal11 2,089.0626.69 753.11 2,089.0627.76 797.65 2,181.13210703 2,97A.78 1184.69 43.20 542.OO O.OO 27.76210703 2,978.78 184.69 43.200.000.000.000.000.000.000.002,180.492.OO 66_303.OO 74.072j80.493.00 69.339.50 63.482,180.4911.OO 42.321.00 99.452,180.497.00 49.381 00 104 002,298.188.50 69.330.50 104.002,298.1813.50 42.3216 00 63 482,298.181.00 69.8716.50 64.712.OO3.003.009.501 1.0010n7.001008.50o5n13.5016 001.0016 5020 21 22 23 24 25 26't.001.003.001.001.00 1.004.50 5.001nn3.008.001.005.00 2.003.004.00 1.50o508_00 8.006.00 1.50 6.001.0010.00 1.50 10.00 10.00 8.00 Gertified Payroll ReportContractor Mass x Construction LLCPO Box 1205ELLENSBURG, WA 98926Project Kittitas County:Colockum Demo & Wash#2O21-51A205 W 5th Avenue Suite 108Ellensburg WA 98926Hours Worked by DayFnTimesheetPaid Pay JobHoul1sHours Rate Gross2 1,552.732 1,552.1071210712210713210713 1210713Craig Larimer Owner/Operator 6 hours Operating Gtadet on 6127121Craig Larimer Owner/Operator 8 hours Operating Gtadet on 6128121Craig Larimer Owner/Operator 8 hours Operating Excavator 15 TNs to 30 TNs on 6/29121Craig Larimer Owner/Operator I hours Operating Excavator under 15 Tns on 6/30/21Crai g Larimer Owner/Operator t hours Operating Skidsteer/Bobcat on 7 I 1 121Projecucontract #Payroll NumberFor Week Ending7t3t2021o.oo 18.246Brandon J Metreveli 8458 HourlyJ Metreveli 8458 HourlyWorkPayRTRTRT8458Brandon J Metreveli 8458 HourlyKenneth A Dirks 0462 HourlyRTRTCrai g Larimer Owner/OperatorKenneth A Dirks 0462 HourlyKenneth A Dirks 0462 HourlyRTTotal Social Medi- Federal StatecareTotal18.24 344.03 1,208.7022.52 207.O0 O.22.52 207.O0 O.94.61 22.12 201.00 0.0012 201.00 0.00 18.18.00 0.00 18.180.000.000.000.000.000.000.001.50 66.30 1,162.731.50 69.33 1,162.7318.OO 42.32 1,162.734.00 49.38 1,162.731.00 66.30 1,136.0022.OO 42.32 1,136.002.00 69.33 1,136.001.501.5018.OO4.OO31.001.0022.OO2.OO272429301231.501.505.00 4.00 8.00 1.004.006.00 8.00 8_00 8.00 1.001.00.7.00 6.00 8.00 1.002.OO Terms Due Upon Completion Job # Prevailing 21-0420 Y Joel Greear 509-899-7 37 1Estimator Central Paving, LLC 1410 W Dolarway Rd Ellensburg, WA 98926 509-929-1044 team@centralpavi nqllc.com www.centralpavi ng llc.com Additional Service - Additional HMA tonnage due to soft subgrade 174.26 tons placed - 158 tons (base+CO1+CO2) = 16.26 ton overage 16.26 X $112.00 $1 ,821.127 Central Paving, LLC 1410 W Dolanruay Road Ellensburg, WA 98926 US +1 8008010310 team@centraloavinqllc. com Equipment Rental lnvoice MAC||IIIIERY **** Our Remit To Address Has ShipTo: CRAIG BI,OOM PAVILION 901 E sTH AVE ELLENSBURG wA 98926 lnvoice Number 30745300 lnvoice Date ilune 25, ,202LPap6 Machinery PO Box 35144 #5077 Seattle, WA9812441M Blll TO:/Gustomer Number 528624L MASS X CONSTRUCTION LLC 271 BOSTON RD EIJIJENSBURG wA 98926 Contract Number Customer P.O. 307 453 Ordered By RentalTerm CHRISTY F Shio Via Store 03 Salesman CCHH BRTAN GAI'DREAU Qty MklModel Serial #Deacrlptioa Start End Rate Extended L JD/77OGP 1D!{77OGPTCE5474O9 770 TANDEM DRIVE MG TAX A}'OIJNT PICK I'P TAX A,!(OI'NT DEIJIVERY TAX AIIOI'NT 6/2s/2L 6/28/2r $1,400.00 $104.58 s1,250.00 1 $s4 00 32 00 32 1 $4 $54 $4s SHIPPED CLEAN FUI,L OF FUEIJ NO DAI.TAGE Box blade rental: $450.00/week +$200.00 delivery & pickup +$53.95 rental tax Rental difference: $2,547.22 available 770 grader cost -$703.95 box blade rental cost $1,843.27 expedited rental cost $703.95 total rental cost We had a box blade attachment lined up for rental the week of 7/6 to grade the rock for asphalt prep, it was determined in the progress meeting on 6124 that the additional contract days for CO 1 pushed the contract date past the event date of 7/6. Due to this we were asked to expedite the schedule to finish before 7/5. The box blade wasn't available for rent until 7/6, so we found another grading machine that was available at such short notice in order to expedite the schedule. The difference between the costs of $1,843.27 are included in COP 4. Total Rent: Total Tax: $2,352 .00 #19s.22 Pay This Amount $2 ,547 .22TERMS: Net 10 Days Thank You!