Loading...
HomeMy WebLinkAbout2021-05-10-minutes-public-works-study-sessionKJTMAS COUNTY COGS vG�]i0M®NERS PubUc Works Study Sassoon Regular Meefing Monday May I®9 20211 e 1,30 Pel Webex 1. Call to Order 2. Surface Transportation Block Grant - Call for Projects 3. Other business 4. Adjourn Created on 5/7/2021 7:26:16 AM KITTITAS COUNTY PUBLIC WORKS STUDY SESSION MINUTES Webex Regular Meeting MONDAY 1:30 PM MAY 10, 2021 Board members present: Chairman Brett Wachsmith, and Vice -Chairman Laura Osiadacz. Others: Josh Fredrickson, Rebecca Cruse, Nicole Ogan, Liz Remeto, Public Works; Jessica Miller, Community Development Services At 1:30 pm Chairman Brett Wachsmith opened the Public Works Study Session. SURFACE TRANSPORTATION BLOCK GRANT - CALL FOR PROJECTS Nicole Ogan presented that Public Works would like to reallocate the STBG Funds to municipalities with shovel ready projects in the county. Nicole Ogan stated the funds must be used by August 31, 2021 to prevent the money from reverting to the State. Nicole Ogan added that staff is seeking direction to move forward with a call for projects that have funding needs from all municipalities in Kittitas County by May 21, 2021. Staff was directed to move forward with the call for projects. Meeting adjourned at 1:34 pm. kw4,(At4' Rebecca Cruse, Administrative Assistant 2021-05-10 MINUTES KITTITAS COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Brett Wachsmith, Chairman KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: May 10, 2021 TOPIC: Surface Transportation Block Grant — "Call for Projects" ACTION REQUESTED: Support Staff Action LEAD STAFF: Josh Fredrickson RECOMMENDATION: Support action to issue a call for projects utilizing Federal funding allocated by Washington State Department of Transportation's (WSDOT) rural Surface Transportation Block Grant (STBG) funding obligation prior to August 31, 2021. BRIEFING SUMMARY: • Recent decision to change design consultants at Kachess Lake Culvert replacement project forces reconsideration of using STBG funds allocated to County Lead Agency through WSDOT's Local Programs. • There is a known funding need supporting the City of Cle Elum's 2nd Street improvement design proposal. • There is a known funding need supporting the City of Ellensburg's Reecer CreekfUniversity Way traffic signal installation project. • Failure to obligate FY 2021 STBG money could result in the money reverting to the State. BACKGROUND: Kittitas County Public Works supports the WSDOT STBG program as a County Lead Agency through solicitation of projects from jurisdictions within the County. A call for projects is typically a two-year cycle, or biennial, with Public Works monitoring project progress to ensure obligation of awarded funds within the allocated time frame. Public Works (PW) has been efficiently utilizing STBG money for the past six years. Most recent funding awards were to the City of Kittitas, City of Ellensburg, and the County. We recently applied project savings from Bullfrog Road revitalization efforts to Kachess Lake Culvert replacement, believing 2021 construction was likely. Unfortunately, PW has been forced to change consultants late in the design process. This decision now imperils our ability in meeting our forecasted obligations of Fiscal Year (FY) 2021 construction funding. Our decision results in the repayment obligation of approximately $70,000 and imperils approximately $372,401 in federal funding. It appears that the City of Kittitas is on track to obligate approximately $502,000. Additional funding consequences subsequent to non -obligation include a reduction in the next FY available funds. For example, Kittitas County programs $864,000 in STBG funding per year. If Page 1 of 4 Public Works "Work Session Staff Report", 2021 Kittitas County does not obligate the remaining $372,401, then Kittitas County may only receive $560,799 in FY 2022 ($864,000-$372,401). DISCUSSION: PW recently learned of QUADCO Regional Transportation Planning Organization (RTPO) grant applications from the City of Cle Elum funding design improvement to 2nd Street. It is likely the project will fail to receive funding from QUADCO based on the ranking committee's project rankings and PW believes we can redirect STBG funding towards supporting the City of Cle Elum's 2nd Street improvement project. In addition, the City of Ellensburg was previously awarded STBG funding for the traffic signal installation at the intersection of Reecer Creek and University Way. Their recent bid opening identified additional need based on available funding. PW believes additional STBG funding can be directed towards the support of this traffic signal installation project. Due to the short timeline to obligate the funding by the end of the State's fiscal year, PW has submitted a "Call for Projects" and intends to receive applications for projects with a May 21, 2021 deadline for submittal. While other projects may exist within the County, we believe we can meet current year STBG obligations presuming we receive applications from the City of Cle Elum and the City and Ellensburg. In addition, another call for projects for funding in the next biennium is anticipated towards the end of the year. FISCAL IMPACTS: Obligation of the STBG funds to the City of Cle Elum 2nd Street improvement construction project and the City of Ellensburg's Reecer Creek/University Way traffic signal installation project totaling of $372,401 by August 31, 2021 prevents the money being returned to the State, as well as future funding reduction consequences for FY 2022. ATTACHMENTS: Exhibit 1: STBG Call for Projects Exhibit 2: STBG Application Page 2 of 4 Public Works "Work Session Staff Report", 2021 EXHIBIT 1: STBG CALL FOR PROJECTS Page 3 of 4 Public Works "Work Session Staff Report", 2021 STBG Regional Federal Funds 2021 Application for roil Federal Fiscal Years 2021 Surface Transportation Block Program (STBG)* *formerly known as Surface Transportation Program (STP) What is STBG? STBG is a federal funding program for state and local transportation needs. Projects eligible for STBG funding include highway and bridge construction and repair, transit capital projects, bicycle, and pedestrian and recreational trails. Kittitas County's STBG Regional Priorities Washington State Department of Transportation (WSDOT) allocates STBG funds to County Lead Agencies for prioritizing and selecting projects that align with their regional priorities involving all entities eligible to participate. Kittitas County serves as the lead agency for the Federal Surface Transportation Block Grant's (STBG) regional prioritization and selection process to allocate funds within the Kittitas County region. The regional priorities for utilizing federal funds to improve the transportation system include: 1. Ability to quickly obligate funds (by August 31, 2021) 2. Preservation 3. Safety 4. Regional Corridors STBG Selection Process Kittitas County notifies all local jurisdictions that are eligible to receive STBG funding within the county region of the competitive grant opportunity. In addition to Kittitas County, eligible local jurisdictions include: • City of Cle Elum • City of Ellensburg • City of Kittitas • City of Roslyn • Town of South Cle Elum The selection process is open, competitive, and encourages regional partnerships. All proposals will be reviewed by the technical committee to ensure that they are complete and eligible to receive STBG regional funding. Project proposals are evaluated based on the following criteria: 1. Ability to quickly obligate funds (by August 31, 2021) 2. Preservation 3. Safety 11Page STBG Regional Federal Funds 2021 Application for Federal Fiscal Years 2021 4. Roadway geometric deficiencies 5. Plan consistency (whether in local, RTPO, or state plans) 6. Congestion reduction 7. Partnerships (public or private) Projects selected for STBG Regional federal funds shall be consistent with the transportation policies in the Washington Transportation Plan and the Regional Transportation Plan. STBG Eligibility Requirements Only projects located on roadways that are federally classified as an urban collector, rural minor collector, or higher are eligible for STBG funds. Federal functional classification and federal urban area boundaries can be viewed at: http://www. wsdot. wa.gov/data/toolslgeoportaV?confiq=FunctionalCl ass& layers IFFY 2021 STBG Requirements This project call will consider projects for FFY 2021. Surface Transportation Block Grant (STBG) applications are due 10:00 AM May 21, 2021. Kittitas County programs $864,000 in STBG funding per year. For the fiscal year 2021 there is $372,401 remaining to be obligated. The statewide target obligation of awards is on or before the end of the Federal fiscal year or 8/31/2021. If this target of obligation is not met, the unobligated funding will reduce the following years funding. For example: If $372,401 remaining to be obligated is not obligated, Kittitas County will only receive $560,799 in 2022. ($864,000 - $372,401). It is very important that the applicants for this award commit to obligating the funding prior to 8/31/2021. The lead agency/jurisdiction (or co -lead agencies) will be responsible for providing the minimum required 13.5% match for STBG funds — the maximum federal STBG participation on any project is 86.5%. The STBG technical committee will score the submitted applications for proposed funding and present to the Kittitas County Board of Commissioners for review and adoption. Awarded Applicants will be responsible for providing the County lead agency quarterly progress reports and copies of all reimbursement requests sent to local programs. Quarterly progress reports shall include cost and schedule updates for project phases. Any changes in federal funding amounts or anticipated obligation dates must be reported to the County lead agency quarterly or as realized. 2 1 P a g e STBG Regional Federal Funds 2021 Application for Federal Fiscal Years 2021 Applicant Responsibilities Project applications must include a complete and signed application, project site map, and supporting documentation. Applicants will identify the month of anticipated obligation of federal funds based on a realistic timeline for 1) securing non-federal matching funds, and 2) procedural steps that are required. Applicants seeking funding need to identify project costs for all phases necessary to complete their project: preliminary engineering (PE), right-of-way (RW), and construction (CN). Program Contact For further questions, please contact: Nicole Ogan Environmental/Transportation Planner Kittitas County Public Works nicole.ogan@co.kittitas.wa.us (509)962-7610 Submission For projects to be considered for funding, applications must be received by 10:00 AM on May 21, 2021. Applications shall be submitted in .PDF form by electronic mail to Kittitas County Public Works at the following address: nicole.ogan@co.kittitas.wa.us 3 1 P a g e EXHIBIT 2: STBG Application Page 4 of 4 Public Works "Work Session Staff Report", 2021 STBG Regional Federal Funds 2021 Application for Federal Fiscal Year 2021 2021 Surface Transportation Block Grant (STBG) Application Project Title: Project Contact: Agency or Organization Contact Person Phone Number Email Address Project Co -Sponsor (Leave Agency or Organization Contact Person Phone Number Email Address Regional Funding Priority (check all that apply) ❑ Readiness ❑ Preservation ❑ Safety ❑ Regional Corridors wanK n not General Project Information: Project Title Street Name and Limits Federal Functional Class & FFC # Total Project Cost STBG Requested Funding Project is competing for: ❑ Urban ❑ Rural ❑ Both Date of Obligation ❑X 2021 (August 31) *(If the project is competing for both urban and rural funds, indicate the length of the urban and rural portions. To be eligible for federal STBG funding, the project must be on a road functionally classified as urban collector, rural minor collector, or higher). I IP1 e STBG Regional Federal Funds 2021 Application for Federal Fiscal Year 2021 Project Overview Provide a brief description of your project including work items anticipated, timelines for completion, the regional significance of this project, and an attached vicinity map: Project Location and Details vrovlae a norrarive OT me projecr locarlon ona 2 1 P a g e STBG Regional Federal Funds 2021 Application for Federal Fiscal Year 2021 Ability to Quickly Obligate Funds /20 Roadway Preservation Needs /20 Roadway Safety Needs AS Roadway Geometric Deficiencies Needs /10 Describe how this project will improve roadway geometric deficiencies: Plan consistency /10 Indicate the plans this project is identified in - local comprehensive and/or transportation plans, Regional Transportation Planning Organization (RTPO) plan, or other plans: STBG Regional Federal Funds 2021 Application for Federal Fiscal Year 2021 Congestion Reduction /10 Indicate how this project will reduce congestion. Provide the Average Annual Daily Traffic (AADT) and other traffic and congestion indicators to justify reduction of congestion: Partnerships Identify financial contributing partners for this project: Freight Mobility Show how this project enhances mobility for freight in the region: /5 /5 Multi -Modal /5 Indicate improvements for modes of travel (besides trucks and cars) for this project: 4IPa�,c STBG Regional Federal Funds 2021 Application for Federal Fiscal Year 2021 Project STBG Funding Requested (Max 86.5%) Local/Non-federal Matching Funds (min 13.5%) Source(s) of Matching Funds Obligation Target (month/year) Preliminary Engineering Right of Way Construction $ $ Total = $ TOTAL POINTS: 5 Page STBG Regional Federal Funds 2021 Application for Federal Fiscal Year 2021 Project Verification and Endorsement This project proposal reflects established local funding priorities consistent with the Regional Transportation Plan. Stated costs represent accurate planning level estimates needed to accomplish the work described. If selected, the project must obligate by August 31, 2021 as specified in the award letter. Failure to do so may result in loss of funding for the project and an alternate project may be funded instead. I realize that the use of federal funds for this project entails administrative and project compliance requirements over which Kittitas County has no control, and for which this agency or organization will be responsible. This project has the full endorsement of this agency or organization. Project Contact Signature Agency Signature: Project Contact Person: Other Contributing Agencies: (print name and title) (signature) (print name and title) (signature) (phone) (print name) 6 1 P a g e