Loading...
HomeMy WebLinkAboutRes-2021-071RESOLUTTON NO"4 -o BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter of initiating a county road project designated as: CRP NO: 304-20 JOB NO: RC2093 lT lS HEREBY RESOLVED for Hungry Junction Road (M.P. 0.00-1.74) lmprovements The existing BST pavement is narrow with areas of significant longitudinal cracking and settling over the top of drainage structures. This existing pavement will be removed and replaced per design. There are also four vertical curves that need to be corrected to meet safe sight stopping distance design standards for the posted speed limit. The road will be widened, and above ground obstacles will be removed or relocated, guardrail installed or slopes flattened where warranted. ARTERIAL ACCESS This project is hereby declared to be a public necessity and the Director of Public Works acting as the County Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). lT lS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the Director of Public Works' estimate, is hereby made in the amounts and for the purposes shown: osh Fred , P.E. County Engineer THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED2O2l ANNUAL ROAD PROGRAM AS ITEM NO. 12 THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM IN ACCORDANCE WITH RCW 36.81,130 IT IS FURTHER RESOLVED THAT: THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT WITH RCW 36.77 .02O ET.SEQ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COU wAc 136-18. CE WTH RCW 36.77.065 ANDuFN AD.PTED ui. 4fl\ a^y or Y\\-fuy'F ,zozt BOARD OF COUNTY KITTITAS COUNTY , Chair NERS Cory Wright, Commissioner 4t28t2021 PURPOSE AMOUNT TOTALS $ 504.044PRELMINARY ENGINEERING CONSTRUCTION ENGINEERING $ 168,015 RIGHT-OF.WAY ACQU ISITION $ 50,000 SUB-TOTAL $ 722,059 $County Forces coNsrRucroN CONTRACT CONSTRUCTION $ 3,629.1 19 $ 3.629.1 19SUB-TOTAL TOTAL PROJECT COST $ 4,351 ,178 GRANT OR OTHER FUNDS $ 3,631,500 Grant Source: RAP $ 719,678TOTAL COUNTY ROAD FUND ALLOCATION m ID g :\base\forms\e ng\crp-f rm Vice-Chair liltlll