Loading...
HomeMy WebLinkAboutResolution_Establish CRP_FairviewRdKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA DATE: ACTION REQUESTED: AGENDA STAFF REPORT May 4, 2021 Request to approve a Resolution to establish County Road Project (CRP) number supporting the resurfacing of Fairview Road BACKGROUND: In 2020 Kittitas County improved stream crossings and the roadway between mile point 5.13 to mile point 5.42 on Fairview Road. This improvement realigned the stream, removed three stream crossings by replacing a single larger more fish passable crossing. The road base was also reconstructed, and new guardrail installed. The surface was left as aggregate and is proposed to be replaced with pavement. County forces will perform the work to pave the roadway. Funding in the amount of $220,000.00 will come from the County road fund. INTERACTION: Public Works RECOMMENDATION: Approve the Resolution establishing a County Road Project (CRP) number supporting the resurfacing of Fairview Road. HANDLING: Return one (1) original to Public Works ATTACHMENTS: Resolution establishing CRP No. 303-20 LEAD STAFF: Joshua Fredrickson, County Engineer RESOLUTION NO. BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter of initiating a county road project designated as: CRP NO: 303-20 JOB NO: RC2190 IT IS HEREBY RESOLVED for Fairview Road Improvements Improvement to Fairview Road from mile post 5.13 to mile post 5.42, upgrading the road from gravel to hard surface. ARTERIAL ❑ ACCESS This project is hereby declared to be a public necessity and the Director of Public Works acting as the County Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the Director of Public Works' estimate, is hereby made in the amounts and for the purposes shown: PURPOSE AMOUNT TOTALS PRELMINARY ENGINEERING $ 9565.00 CONSTRUCTION ENGINEERING $ 19,130.00 RIGHT-OF-WAY ACQUISITION $ SUB -TOTAL $ 28,695.00 County Forces CONSTRUCTION $ 191,305.00 CONTRACT CONSTRUCTION $ SUB -TOTAL $ 191,305.00 TOTAL PROJECT COST 1§ 220,000.00 GRANT OR OTHER FUNDS $ Grant Source: RAP TOTAL COUNTY ROAD FUND ALLOCATION Is 220,000.00 ,,�Josh Fredrickson, P.E. County Engineer ® THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2021 ANNUAL ROAD PROGRAM AS ITEM NO. 4 ❑ THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM IN ACCORDANCE WITH RCW 36.81.130 IT IS FURTHER RESOLVED THAT: ❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ. ® THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND WAC 136-18. Attest: �� I ADOPTED this day of , 2021. BOARD OF COUNTY COMMISSIONERS Clerk of the Board KITTITAS COUNTY, WASHINGTON -- - - -----i Brett Wachsmith, Chair Laura Osiadacz, Vice -Chair Cory Wright, Commissioner g:\base\forms\eng\crp-frm 4/28/2021