April 20, 2021
Request to Approve a Resolution to Adopt the 2021-2023
Road Safety Plan for Kittitas County
BACKGROUND: The Washington State Department of Transportation
(WSDOT) funnels federal funding for county road safety
improvements to local governments and has issued a
Highway Safety Improvement Plan (HSIP) "call for
projects". Kittitas County has been successful in previous
grant years using this program remediating defined hazards
on County roadways. The program last funded guardrail
replacement on Vantage Highway in conjunction with our
pavement improvement. The grant application deadline is
Apri130, 2021. Adopting the plan is required prior to grant
submittal. The 2021-2023 plan addresses priority
intersection and corridor improvements and seeks to begin
retrofitting short span bridge rail.
INTERACTION: Public Works.
RECOMMENDATION: Approve the Resolution to Adopt the Kittitas County Road
Safety Plan 2021-2023.
HANDLING: Return one original to Public Works.
ATTACHMENTS: Resolution; Kittitas County Road Safety Plan 2021-2023
LEAD STAFF: Mark R. Cook, Director.
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2021 -
ADOPTING THE KITTITAS COUNTY ROAD SAFETY PLAN 2021-2023
WHEREAS: In accordance with Washington State Department of Transportation's
(WSDOT) 2021 Federal Highway Safety Improvement Program (HSIP)
County Road Safety Program call for projects, the Transportation Planner
and County Engineer have prepared a Kittitas County Road Safety Plan
2021-2023 updating the plan prepared in 2019; and
WHEREAS: The Kittitas County Road Safety Plan 2021-2023 identifies prioritized
locations for low cost, beneficial, county wide safety improvements based
upon crash data, roadway investigations, engineering judgement, and risk-
based analysis as set forth in WSDOT's HSIP call for projects guidance;
and
WHEREAS: The deadline for County grant submittal is April 30, 2021 and an adopted
plan is required supporting grant submittal;
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in
the best interest of the public, does hereby adopt the Kittitas County Road
Safety Plan 2021-2023, hereto attached, as now submitted by the Kittitas
County Director of Public Works, Transportation Planner and County
Engineer.
DATED on this 20th day of April 2021, at Ellensburg, Washington.
Attest:
C Clerk of the Board- Julie Kjorsvik
Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Brett Wachsmith, Chairman
Laura Osiadacz, Vice -Chairman
Cory Wright, Commissioner
Kittitas County
Road Safety Improvement Plan 2021
April 20, 2421
Kittitas County
Public Works Department
411 North Ruby Street, Suite 1
Ellensburg, WA 98926
Contents
ExecutiveSummary ...................................................................................................................................................3
Introduction................................................................................................................................................................5
DataAnalysis.............................................................................................................................................................5
Risk -Based Prioritization Methodology......................................................................................................................7
Development of Road Segment Safety Improvements..............................................................................................9
Prioritized Cost -Effective Safety Improvement Projects..........................................................................................10
Priority 1: Corridor and Intersection Safety Improvements......................................................................................12
Priority 2: Bridge Rail Improvements — Code 3........................................................................................................15
Priority 3: Denmark Road Safety Improvements......................................................................................................17
Priority 4: Bridge Rail Improvements — Code 2........................................................................................................19
Priority 5: Bridge Rail Improvements — Code 1........................................................................................................21
Priority 6: Huntzinger Road Safety Improvements...................................................................................................23
References.........................................................................................................................................25
Appendix A: Kiftitas County Collision Data, 2015-19...............................................................................................27
Appendix B: Road Segment Scoring and Project Prioritization................................................................................31
2
Executive Summary
The Kittitas County Road Safety Pian 2021 is continuation of a biennial road safety plan program created to reduce
collisions within the County road network. Following the Washington State Department of Transportation's (WSDOT)
Highway Safety Improvement Plan (HSIP) grant application methodology for creating a prioritized road safety plan,
crash data analysis in combination with staff identification of certain roadway characteristics throughout the County
road network, a list of prioritized projects implementing various countermeasures was created. These projects were
further prioritized with engineering judgement using considerations such as estimated project cost, feasibility, and
improvement timing. Total project costs were also determined and accumulated, and if needed, broken down in
phases to be completed as funding opportunity allows.
• Priority One — IntersectionlCorddor Safety Improvements
No. 6 Road intersections at both Kittitas Hwy and Vantage Hwy are high frequency collision areas. Kittitas
Hwy and Vantage Hwy corridors and intersections were moved up in priority due to safety improvements
recently identified as deficient, out of date, or altogether missing throughout these corridors. Monitoring of
these corridors and intersections will continue to track the success of the recently constructed and future
countermeasures. Additional intersections have been noted countywide as needing safety implementation
or updates due to lack of countermeasures in response to accident activity.
ESTIMATED PROJECT COST - $336,680
Priority Two - Bridae Rail -Code 3
60 bridges and/or structures with no rail or timber rail were classified as Code 3. Phases are identified by
maintenance districts. Some districts had less bridge rail to update and were then grouped with adjacent
maintenance districts. Phase breakdowns are provided in the project description with further cost estimates
by phase.
ESTIMATED PROJECT COST- $1,968,147 (Phases 1-3)
• Priority Three - Denmark Rd.
Denmark Rd MP 0.5 to MP 4.35 has moved up in scoring prioritization. It was noted in our previous 2017
and 2019 Road Safety Plans as priority five. This roadway has five bridges/structures that have deficient or
no bridge rail. The segment scoring 100 has a curve that needs safety improvements and contains accident
history. This project would provide safety countermeasures to the entire Denmark Rd corridor.
ESTIMATED PROJECT COST- $431,498
• Priority Four - Bddae Rail -Code 2
Bridges and/or structures with no approaches or non-crashworthy railing were classified as Code 2. Phases
are identified by maintenance districts. Some districts had less bridge rail to update and were then grouped
with adjacent maintenance districts. Phase breakdowns are provided in the project description with further
cost estimates by phase.
ESTIMATED PROJECT COST- $5,806,978 (Phases 1-7)
• Priority, Five - Bridge Rail -Code 1
Bridges and/or structures with rail that does not meet current AASHTO Manual for Assessing Safety
Hardware (MASH) standards were classified as Code t. Following the phase identification process as in
Priority T wo and Priority Four, phases are by maintenance district to create more manageable projects.
Phase breakdowns are provided in the project description with further cost estimates by phase.
ESTIMATED PROJECT COST- $2,060,284 (Phases 1-3)
Priority Six - Huntzinger Rol.
Phases identified by milepost instead of total score because all phases are priority six. Milepost conscious
phases allow the county to continue heading south along the corridor. Phase breakdowns are provided in
the project description with further cost estimates by phase.
ESTIMATED PROJECT COST— $1,692,850
4
Introduction
The 2021 Kittitas County Road Safety Plan is a comprehensive program of safety improvements aimed at reducing
all collisions, but specifically fatalities and serious injury accidents across the entire county road network. This safety
improvement program was developed using a strategy similar to the Washington State Strategic Highway Safety
Pian: Target Zero 2019, in which crash data is analyzed to identify accident trends and contributing factors, and then
sites within the road system are prioritized using a risk-based ranking system. Safety improvement projects are then
developed to target specific locations and systemic improvements that provide the greatest benefit to the traveling
public by preventing potential fatal and serious injury accidents.
Due to the sporadic nature of crashes on rural county roads, it can be difficult to determine trends using past data
alone to choose locations for improvements. However, past crash data can be used to predict future crashes by
evaluating the contributing factors and targeting improvements for roads with similar characteristics. As a result,
Kittitas County has decided to utilize this strategy to allow for a proactive approach that benefits more locations
throughout the entire county road system and is more cost effective than only focusing on past crash locations.
Data Analysis
Data used for this evaluation was provided by Washington State Department of Transportation (WSDOT). The data
includes detailed information about crashes on Kittitas County roads from 2015 to 2019, including a comparison of
how Kittitas County's roads to other public roads in the state, detailed in Table 1. Although overall, fatal and serious
injury collisions occur at a similar rate to other public roads within the state, Kittitas County is committed to reducing
these types of collisions and strives to collaboratively achieve the statewide goal of zero deaths and serious injuries
on Washington's roadways by 2030. The Kittitas County Road Safety Plan focuses on identifying cost efficient safety
improvement projects that offer substantial safety benefits oountywide and reduce potential fatal and serious injury
collisions along Kittitas County's roadway network.
Table 1. Types of collisions, number of crashes and percent of crashes for Kittitas County, all counties -county maintained roads,
and all public roads.
Type of Collision
Kittitas County
All Counties -Co.
Maintained Roads
AD Public Roads
(Washington State)
Number
Of
Crashes
Percent
of
Crashes
Number
of
Crashes
Percent
of
Crashes
Number
of
Crashes
Percent
of
Crashes
Number of Fatal Collisions
5
16.70%
670
24.70%
2,538
21.10%
Number of Serious Injury Collisions
17
83.30%
2,044
75.30%
9,470
78.90%
Number of Alcohol -Related Collisions
9
37.50%
674
24.80%
2,594
21.60%
Total Number of Fatalities
5
-
704
-
2,730
-
Total Number of Collisions*
650
-
73,172
-
588,324
-
Total Number of injuries**
232
-
32,694
-
240,286
-
*includes fatal and non-fatal colllsions
*"includes serious and non -serious collisions
The 2015 - 2019 WSDOT provided collision data was further evaluated to determine the predominant crash types,
contributing factors, and specific locations. As shown in Table 2 below, the predominant causes of fatal and serious
injury collisions in Kittitas County are "hitting a fixed object" and "overturning.* Crashes involving fixed -object hazards,
or non -traversable roadside slopes within clear zone accounted for 41.7% of all fatal and serious injury collisions.
Additionally, 25.0% of the fatal and serious injury collisions were caused by vehicles overturning. Unprotected
roadside slopes steeper than 31-lorizontalIVertical are considered non -traversable and contribute to overturning
accidents. The predominant conditions where fatal and serious injury collisions occurred included higher speed
roadways with low lighting conditions, and where roadway curvature was a factor. This accident data seems
consistent for a county like Kittitas where most of the roadway network is rural without lighting features.
Accidents tend to be more severe when speeds are higher and where low light conditions hinder driver acuity,
especially in horizontal curves where drivers are more likely to leave the roadway. Non -intersection related collisions
accounted for 79.2% of the fatal and serious injury collisions, although a large proportion of total accidents (non-
injury, serious injury, and fatal) occurred at intersections and main corridors leading to potential for more serious
accidents at these locations. For the fatal and serious injury collisions accident report details please see Appendix A.
6
Table 2. Crash data for fatal and serious injury collision by jurisdiction and collision type.
2015 th,-ough 2019 Crash Data
Fa`a !Ssrlous lnjuq( Collisior Types and Conditions
Collision Type
Wttltas COUt1ty
All Counfles — Co.
=ads
Mashinaton Statal
Haintalnad Roads
Number Percent
Number
Percent
Number
Percent
(Run-off the road}
of of
of
of
of
of
Crashes Crashes
I Crashes
Crashes
Crashes
Crashes
Hit Fixed Object — Tree/Stump Stationary
2
2000%
274
232%
611
18.6%
Hit Fixed Object — Roadway Ditch
1
10.00%
178
15.1%
369
11.1%
Hit Fixed. Object — Fence
1
10.00°%
85
720%
' 173
620%
Hit Fixed Object — Guardrail
1
10.00%
74
6.30%
315
9.50%
Hit Fixed Object — Earth Bank
1 :
1000%
132
1120%
289
870%
Hit Fixed Object — Utility Pole
1
10.00%
121
10.20%
255
7,70%
Hit Fixed Object — Over Embankment
1
10.0%
94
8,0°%
224
6
Hit Fixed Object — Culvert
1
10.0%
22
1.9%
43
1.3°%
Fixed Object —_Crash Cushions
1
10,D%
3
03%
16
5%
—Hit
Total Hit Fixed Object
16
447%
1,J$1
43.5%
3,310
_0
27,600.
Overtum
6
250%
246
9.1%
823
5.2%
Light Condition — Dark, No Street Lights
8
33.3%
755
27.8%
1,_896
15.5%
Light Conditon — Dusk
1
4.2%
66
24%
214
' "S
Light Condition — Dark, Street Lights On
0
0.0%
91
3.4%
374
3.1%
L;ght Condit:cn — Dawn
1
4 2%
259 I
95%
2M ,
23.3%
Total LJoht Condition
15
41 7`A, 1
1.1 fiI �
43 1%
� 5,F77 ,
4�.7%
Non -intersection — Not Related
19
792%
1,821
671 %
6.588
5.57%
Road Curvature — Horizontal Curve
8
33.3%
1,022
37.7%
2,968
24,7%
Over Centerline
2
4 9%
176
4 8°%
574
37%
Motorcycle
2
6.5°%
591
15.4°%
2,391
12.6%
Posted Speed at 50 m h
21
778%
872
26 2%
1,735
10.8°%
Risk -Based Prioritization Methodology
Run-off the road crashes have been identified as the predominant collision type in Kittitas County and are occurring
at a disproportionately high rate on specific corridors as compared to other public roads in the state as shown in the
crash data provided by WSOOT for 2015-2019, reflected in Table 2. As a result, this plan will focus on roadside
safety improvements to reduce the severity and number of accidents on Kittitas County roads where it is most likely
that run-off the road crashes will occur.
From a safety perspective, the ideal roadway is straight with roadsides that are flat and unobstructed by hazards.
Straight roadways eliminate the need for drivers to navigate curves, reducing the chances of running off the road.
Providing the recommended clear zone and roadside slopes allows drivers to safely recover control of a vehicle in
the event they do leave the roadway and helps ensure fixed -object hazards do not cause fatal or serious injury
accidents. The aforementioned roadway geometry and clear recovery area is the goal in improving roadside safety
but is often cost prohibitive due to the geography of the area and is not supported by rural character or practical
design. in cases where it is cost prohibitive to eliminate roadway curvature and create an unobstructed traversable
roadside, alternative improvements that may reduce the severity of an accident or alert a driver to a hazard should be
considered. This safety plan focuses on roadway segments and intersections where low-cost high benefit
countermeasures and improvements can be implemented. These countermeasures and improvements may include
improved or increased pavement markings, breakaway features on posts, guardrail deployment, bridge rail retrofits,
rumble strip installation, and signing and traffic delineation upgrades, all of which may be implemented to reduce fatal
and serious injury collisions.
Based on the crash data for 2015-2019, 76.2% percent of the total crashes involved roads with an average daily
traffic (ADT) of 175 or more and with a speed limit of 35mph of higher. In order to have the greatest potential impact
in reducing collisions, the county considered roads for evaluation and prioritization of safety improvements with the
following characteristics:
MINIMUM CRITERIA FOR INCLUDING ROAD SEGMENTS IN SAFETY PLAN:
Paved: Asphalt Concrete Overlay (ACP), Hot Mix Asphalt (HMA), or Bituminous Surface Treatment
(BST).
• ADT of 175 or more.
• Posted speeds of 35 mph or more.
Collision within segment in the past five years.
The minimum criteria include the preliminary eligibility requirements as defined by the U.S. Department of
Transportation Federal Highway Administration's Highway (FHWA) Safety Improvement Program (HSIP) as stated
under the 2021 County Safety Program: Call for Projects solicitation for grant funding. Additional scoring criteria has
been developed by Kittitas County Public Works Staff and used consistently throughout multiple years of safety
planning to provide scoring and prioritization continuity. The additional criteria include a heavier weighted score for
segments listed in the previous County safety plan, inadequate clear zones with embankments or ditches, fixed
objects in the clear zones, roadway curvature — horizontal curve, and collision seriousness (injury, serious, or fatal).
County road segments possessing the minimum criteria characteristics, as well as the additional criteria
characteristics, were evaluated and scored by the weighted method shown in Table 3. The complete list of resulting
road segment prioritization is shown in Appendix B.
8
Table 3. Scoring criteria and weighted score values used in assessing road safety project priority for 2021. Higher scores
indicate a higher priority road segment andlor higher countermeasure needs.
Development of Road Segment Safety Improvements
After roadway segments were prioritized using the risk-based scoring as described above, the results were reviewed,
and the list was shortened so the plan could focus on the segments that would see the most benefit from safety
improvements and eliminated erroneous results or locations reflecting outdated information.
Road segments with a score lower than 55 were removed from consideration in an attempt to break segments down
into higher priority rating and lower priority rating groups. Road segments that were within the scope of current
improvement projects or recently completed improvement projects were also removed. Each accident report was
examined for further details regarding the incident to further identify contributing factors, driver actions, alcohol or
drug influence, intersection related, and any countermeasures already in place. The list of candidate locations was
further reduced by eliminating roadway segments where accidents were alcohol or drug related with no hazard at the
site and segments where countermeasures were already in place and or where no countermeasures would have
prevented the accident. While these road segments are important to monitor, focus is given to other locations where
collisions due to deficiencies in the road structure can be addressed. The remaining roadway segments were then
evaluated for potential safety improvements and countermeasures.
9
Scoring Criteria and Weighted Scores
MGM
Number
Factors and Collision Types
scone
1
OVERALL CRITERIA MET:
Meets minimum criteria and was included in previous local safety plan
20
Meets minimum criteria but not included in previous local safety plan
10
Does not meet minimum criteria and was included in previous local safety plan.
5
2
Inadequate clear zone with steep embankment or ditches noguardrail)
Over 50% of the side slopes are too steep
20
About 10% to 50% of side slopes too steep
10
At least one section has side slopes too steep
5
3
Fixed objects in clear zone fences, utility poles, trees, mailboxes, etc,
Over 50% of the road has fixed objects in clear zone
20
About 10% to 50% of the road has fixed objects in clear zone
10
At least one section of the road has fixed objects in clear zone
5
4
Roadway Curvature — Horizontal Curve
Over 50% of the road is in a horizontal curve
20
About 10% to 50% of the road is in a horizontal curve
10
At least one section of the road is in a horizontal curve
3-
5
ONE OR MORE FATAL OR SERIOUS INJURY COLLISION(S) — 2015 THROUGH 2019
Fatality (per erson1s
50 ea.
Serious Injury (per rson1s
40 ea.
6
INJURY(perperson/9)
15 ea.
Development of Road Segment Safety Improvements
After roadway segments were prioritized using the risk-based scoring as described above, the results were reviewed,
and the list was shortened so the plan could focus on the segments that would see the most benefit from safety
improvements and eliminated erroneous results or locations reflecting outdated information.
Road segments with a score lower than 55 were removed from consideration in an attempt to break segments down
into higher priority rating and lower priority rating groups. Road segments that were within the scope of current
improvement projects or recently completed improvement projects were also removed. Each accident report was
examined for further details regarding the incident to further identify contributing factors, driver actions, alcohol or
drug influence, intersection related, and any countermeasures already in place. The list of candidate locations was
further reduced by eliminating roadway segments where accidents were alcohol or drug related with no hazard at the
site and segments where countermeasures were already in place and or where no countermeasures would have
prevented the accident. While these road segments are important to monitor, focus is given to other locations where
collisions due to deficiencies in the road structure can be addressed. The remaining roadway segments were then
evaluated for potential safety improvements and countermeasures.
9
Corridor and intersection improvements were identified as a safety need in this plan. Crash data shows a significant
number of total collisions, injury collisions (serious and non -serious), and fatal collisions along two of Kittitas County's
major roads, Kittitas Highway and Vantage Highway. These two corridors, or highways, are high ADT, arterial
collector roadways in good condition providing local resident access and freight connections. Intersections along
these highways have been identified as areas where safety improvements would make a large impact to reducing
total accidents. Proposed updated and enhanced signage along these corridors and intersections would provide a
cost-effective safety countermeasure covering a relatively large County footprint.
Additionally, the County has recognized copious amounts of inadequate bridge raiiing. There is a total of 269 bridge
structures within Kittitas County, many of which have insufficient existing railing or no railing at all. Since these
observed hazards have a high potential for serious injury or fatal accidents, Kittitas County has chosen a proactive
approach to include these locations in this road safety plan to prevent potential future crashes. This preventative,
systemic, risk-based approach is supported using the Federal highway Administration (FHWA) Systematic Safety
Project Selection Tool criteria, which states that a site can be identified as a candidate for safety investment if it has
multiple risk factors but no crash history.
Finally, Kittitas County previously recognized a need to collect data to support a clear zone inventory for the entire
County road system. Future safety improvement projects will be better identified using a more thorough clear zone
inventory targeting known hazard locations. For this reason, a planning project has been identified and will be
implemented as part of this overall safety plan to collect clear zone inventory data, which will create a roadside
hazard database, and identify potential locations and countermeasures for future road safety plans.
Prioritized Cost -Effective Safety Improvement Projects
Road segment safety improvement identification used a combination of spot location and systematic approaches.
After improvements were identified, they were prioritized based on the potential for crash prevention and greatest
benefit, as supported by engineering judgement.
Kittitas County evaluated the scoring and road segment safety improvement results to find high risk, sizable benefit
countermeasures to group together as countywide safety projects that promptly provide the biggest benefit for the
most efficient cost. By focusing on similarities in the roads and their needs, safety improvement projects were formed
rather than road focused projects, allowing the county to better reduce the possibility of fatalities and/or serious
injuries. Locations with similar geographic vicinity, or projects with similarly proposed improvements were grouped
together to provide efficient contracting and cost effectiveness. A summary of the Safety Improvement Projects can
be found in Table 4, followed by project details including preliminary scope, locations of the proposed work, and an
estimated cost for the improvements. Notes regarding the engineering judgment that affected project prioritization
can be found in the Executive Summary,
10
Table 4. List of reads, characteristics, and acddent severity ra1'ng system far project priortizatlon using criteria Hems and ratings from Table 3.
Road
Number
Road Name
BMP
EMP
Paved
Wiift
Speed
Limit
AOT
Overall Inadequate Faed Roadway
CdWa Clear2one Objects Curvature
Fatal or
Serious
Injury
Mary
Tocol
Score
PRfORITY
LEVEL
9895'
KIT fA5 HPJY
264
28
50
5448
i G
5 10 0
54
165
240
96951
KITUAS HAT
P36
54
336
28
50
1876
2C
5 10 D
90
45
170
96351
K'77iTAS H1MY
52
236
20
50
5448
20
0 5 1 0
40
135
200
96951
K:TTITA814'hY
382
28
50
1875
10
5 10 0
C
45
7D
94Si41
e_.
940:1
94 6
Wg4404
VAN-, AGE
> ASTACs^ �-VVV
Va'tir•AGE -r P .... _ _.
VAtr'rAG PA'y�M-,
JC�
y 77
103
5S7
456
4 05
.15?
26
2A -
2C
26
5;t �53i 2G f t�. � 5 0
_.. 1 �_........y.�...- _. .� _ ._....
5Q - ti 28?3 7 ��.._ 5 # 0
5G. R 5a9— 6 }^ 2C _ V C I_._��_ -- 5
5 _ 71'1 10 7T, 5� 0
:2: i
4.,
0
63
_ 46
75
505
2D5
T .00
105
.W 12A
1
1
i
it
BRIDGE RAIL -CODE 3-PHASE 1
BRIDGE RAIL -DDE 3-PHASE 2
2
BRIDGE RAIL -CODE 3-PHASE 3
63501
DENMARK RD
3.08
435
20
50
312
20
t0 5 20
a
45
150
63501
DENMARK RD
05
308
20
50
319
20
5 5 0
6
0
30
3
75040
HUNUINGER RD -PHASE I
27
4 88
24
50
809
2C
2n 10 20
0
15
95
75840
HURONGER RO-PHASE 1
514
699 1
24
50
734
20
20 20 20
0
15
95
4
75040
HUFONGERRD-PHASE3
699
1014
24
50
371
20
F 20 M
0
i5
so
BRIDGE RAP: -CODE 2 -PHASE'
BRIDGE RAIL -CODE 2 -PHASE:
BRIDGE RAIL -CODE 2-PHASE3
BRIDGE UL-OOOE 2-PHA.SE4
5
BRIDGE RAIL -CODE 2 -PHASE 5
f
BRIDGE ML-GCOE2-PHASE6
f j
BRIDGE RAIL -CODE 2-PHASE7
f t
BRIDGE RAIL -CODE 1 -PHASE 1
BRIDGE RAIL -CODE t-PHASE2
6
BRIDGE RAIL -CODE 1 -PHASE 3
Priority 1: Corridor and Intersection Safety Improvements
This project provides corridor and intersection countermeasures and improvements at unsignalized intersections and
road segments identified as having insufficient, 'out of date", or non -effective safety measures based on accident
data analysis and safety studies. Both Vantage Highway and Kittitas Highway are 50 mph, high -ADT, arterial access
corridors with overall roadways that are in good condition which have a higher collision rate than any other County
road.(Appendix A, Table 2).This project would provide identification and target specific intersections as well as
potential spot -improvements to these heavily traveled intersections throughout the county with implementation of
countermeasures presumed to be effective for each specific location. Kittitas County recognizes that improvements
to these corridors may provide benefit to a great number of local residents, recreational travelers, and freight transit;
and, any improvements that could reduce potential future crashes are beneficial. We previously identified No. 6 Rd.
and Vantage Hwy, as well as two other intersections along Kittitas Hwy at Matthews Rd and No. 6 Rd, for safety
improvements. Emphasis should be put on corridor and intersection improvements on Kittitas Hwy and Vantage Hwy
as a combined 26% of all serious and fatal crashes have occurred on Kittitas Hwy and Vantage Hwy combined.
Additionally, all serious and fatal accidents at Kittitas Hwy and No. 6 Rd have occurred during dark hours with
yielding issues as the cause.
The combination of repeated accident history and their quantities at No. 6 Rd and Kittitas Hwy makes this
intersection a high frequency collision area (two reportable crashes per year over a three year period, or three or
more over a five year period) bringing this segment up in the priority list of projects. The Kittitas Hwy/No. 6 Rd project
would include providing an adequate clear zone, LED -enhanced signs, and possible increased visibility measures.
Continued monitoring and further evaluation will also continue at this location to identify potential future safety
improvement opportunities.
Local safety improvements along Kittitas Hwy and Vantage Hwy include large scale improvements such as widening
and bridge replacements with updated guardrail. The county is taking this opportunity to evaluate the
countermeasures recently installed for performance success to analyze if corridor related accidents decrease. This
will allow for identification of whether additional countermeasures may need to be implemented in the future.
Signage proposed includes, but may not be limited to, solar powered LED -enhanced flashing stop signs, LED -
enhanced stop ahead signs, LED -enhanced cross traffic signs, and additional warning signs such as "Cross Traffic
Does Not Stop" and "T intersection" in locations where accident frequency is high or the County has recognized a
need to increase safety. These areas include intersections or road segments where signage is not existing (but
should be), is lacking, and/or needs updated equipment. One example would be the intersection of Thrall Rd. and
Clemons Rd. (T -intersection) which has an existing outdated beacon light which is hard powered in. Additional
signage could include standard curve signs where not existent or LED -enhanced curve signs where accidents are
I
requent or serious or fatal on curves such as Upper Peoh Point Rd (Appendix A, Table 1) which has multiple road
segments with high scores based on criteria rating in Appendix B, Table 1.. Below is a figure depicting our current
intersection signage at rural intersections (left) and an intersection after the proposed signage improvements are
implemented (right).
Woe kit �
eRn :-160i�
smtaoeee Lia I _ 4y
Ir
WSSTFAF [ROBSrT
WnreLFD-erharced=3sgr'-is:s a:'omiib-krls:cF gEt -angje After Lifl-enMroedswpSir 3TISadd1VOASJwamingSrIrm4bli !7
Cashes. slgnificsnt. &&esan in ris cis gist ar Ee sashes.
Figure 1. Depiction of current County rural intersection (left) and a proposed County rural intersection with improvements (right).
Image from carmanah.com
Data shows LED -embedded flashing stop signs are proven to make unsignalized intersections safer, especially in
rural areas with low lighting. In a study published by the Minnesota Department of Transportation (Davis, G.A. 2014),
researchers found a 41.5% reduction in right-angle crashes after installing flashing LED -enhanced stop signs
throughout the state. Another study completed in Texas noted that the introduction of an LED -embedded stop sign
produced a 28.9% reduction in the number of vehicles not fulling stopping (Gates et. al. 2004), and a 52.9%
reduction in the number of vehicles moving through the intersection without significantly slowing down. A similar
yielding result was found in Virginia, where researchers also noted even higher compliance during dark hours (Arnold
and Lantz 2007). LED -embedded flashing traffic signs are also an efficient means of safety compensation for color
deficient or colorblind roadway users, especially during seasonal and light/dark time changes when sign colors and
shades can blend with the natural environment (Chandler, B. 2021).
13
Priority 1: Intersection/Corridor Improvements
^ ESTIMATED COST $336,600
A
W _
Fd I Location
1 6b.fimandKwmHwy v—
..__2 j!+b, B fF.iand Ysnlafls FIKY
S lVarlage Hwy w d N £ergusan
4 VW11",s%yar!dN MU"nR3
6 VarsWe Hwy a^diai�tsaw �
6 Van4ags rWy and M. $I RS
7 KWn"myand Fahpklr M
B H+r y sa` N F'ttposan ^.�
0 K dras KY y MW WDWN iew Fid
10 OHM Ri and'Thmp M
11 Look Fid a" So -dens H` d
12 lkrptaaumand !.Nraatalhrfi:rarbOmnRd
13 Errs R y Rad WIUM s Fid
14 Coup Rd and f.SR:ysCBih
15e fid and wsaan Eaa
is s Thorp m4yan3 Rahlram dinyonm
17 a Thorp F -k' y and Weaver W.
• Vantage Hwy and Kittitas Hwy have had safety improvements recently constructed in previous projects: The
county would like to observe the recent improvements in combination with enacting future safety projects.
• The two intersections that will be the focus of this monitoring project are at Kittitas Highway and at No. 6 Rd
Priority 2: Bridge Rail Improvements -- Code 3
Phase 1 -County Maintenance Districts A - F
• 19 bridges or structures
Phase 2- County Maintenance Districts G - I
• 21 bridges or structures
Phase 3- County Maintenance Districts J - L
a 20 bridges or structures
Due to the large number of locations needing improvements, it would be cost prohibitive to provide improvements for
all locations in a single project. As a result, countywide bridge rail improvements will be executed in a series of
projects. Each phase priority will include a number of locations that are grouped by County Maintenance Districts (A-
L) and phased to be manageable for design and construction. The projects were first ranked based on the
inadequacy of the bridge rail and then by the location in which the greatest benefit would be achieved.
Although not specifically identified through the risk-based prioritization scoring, this project is a high priority for Kittitas
County due to the number of locations observed to be at high risk with the potential for high severity accidents
throughout the entire county road system. The potential accidents that this project would prevent are serious injury
and fatal accidents. The County has identified this widespread hazard and is taking a proactive, systemic approach to
reduce the potential for future accidents.
There have been 60 bridges rated as Code 3; this rating reflects bridges with timber railing or no railing at all. 4f all
the bridges identified with substandard rail, these bridges or structures have the highest vulnerability because they
provide no protection for an errant vehicle.
15
A
Priority 2: Bridge Rail Improvements
Code 3
L
• :naefq'
— LLELCJ6 ■
�:ti-Y V,Y.JT O t
—RX.vi • L
Phase 1 is within County Maintenance Districts A -F with 19 bridges or structures.
o ESTIMATED COST $655,213
Phase 2 is within County Maintenance District G-1 with 21 bridges or structures.
o ESTIMATED COST $617,553
Phase 3 is within County Maintenance Districts J -L with 20 bridges or structures.
o ESTIMATED COST $695,379
Bridges that have been coded 3
are severely inadequate bridges or
structures with wood rail or no rail
at all.
There will be three projects by
geographic location of code 3
bridges to allow for manageable
and cost-conscious improvements.
16
Priority 3: Denmark Road Safety Improvements
Safety countermeasures and roadway improvements of a sharp corner with steep embankments at MP 3.57 would
aid to prevent run -off-road accidents on this specific road as it has a history of accidents at this location and was
identified in previous road safety plans. The priority level is lower than other projects because it only targets a specific
location and road characteristic. The county included multiple road segments to provide improvements to this entire
roadway corridor, from MP 0.50 to MP 4.35 which includes bundling bridge rail improvements to the project for
efficiency and cost-effective contract letting. This segment includes five Code 3 bridges within maintenance district K:
79143-ob, 79144, 79261-ob, 79262-ob, 79351-ob. Recent improvements at this site include extension of the culvert
under Denmark Rd by about 15ft and the addition of rock to prevent undercutting of road. The shoulders of the
roadway were also built up by 2 ft on the outside of the corner and 3 ft on inside of the corner. Further
countermeasures such as those mentioned in this section are needed as this work itself does not prevent run off road
events.
17
Priority 3: Denmark Rd Safety Improvements
ESTIMATED COST $431,498
Denmark Rd from MP 0.50 to MP 3.08 has several structures in need of adequate railing.
Denmark Rd from MP 3.08 to MP 4.35 has steep curves, both vertical and horizontal. The road narrows
greatly at the corner with steep embankments on both sides of the road. The countermeasures in place are
minimal and no rail is present at the corner,
Recent improvements include extension of the existing culvert and the addition of rock to prevent
undercutting of the roadway and shoulder buildup.
• Denmark Rd includes five bridges rated as Code 3 (see Priority Two in this plan). Bridge IDs are: 79143-ob,
79144, 79261-ob, 79262-ob, 79351-ob.
18
Priority 4: Bridge Rail Improvements - Code 2
Phase 1- County Maintenance Districts A - D
• 6 bridges or structures
Phase 2- County Maintenance District E
• 16 bridges or structures
Phase 3- County Maintenance District F
• 17 bridges or structures
Phase 4- County Maintenance District G
• 21 bridges or structures
Phase 5- County Maintenance District H - I
• 14 bridges or structures
Phase 6- County Maintenance District J - K
14 bridges or structures
Phase 7- County Maintenance District L
• 12 bridges or structures
The second highest risk bridges or structures were rated as Code 2. These bridges have railing that do not meet
WSDOT's modern standards for crashworthiness and do not have approach railing. Many of these bridges have w -
section metal beam rail and steel posts attached to the outer edge of the bridge deck. This is a design that was crash
tested and approved by FHWA in 1959 and has since been discontinued due to a tendency of the concrete deck to
fail at the post connection upon impact, allowing errant vehicles to continue off the deck. Bridges without approach
railing do not provide any protection to an errant vehicle that leaves the roadway just before the bridges. There are
100 bridges that are coded 2 throughout Kittitas County. As with priority 2, this project will be broken into 7 phases to
create more manageable projects for design and construction.
Priority 4: Bridge Rail Improvements
Code 2
G E.V. Wt.
IW Wn1. YWM.
.._, ac—
;
�t'91:t
• Phase 1 is within County Maintenance Districts A -D with 6 bridges or structures.
o ESTIMATED COST $893,325
Phase 2 is within County Maintenance District E with 16 bridges or structures.
ESTIMATED COST $1,085,245
• Phase 3 is within County Maintenance District F with 17 bridges or structures.
o ESTIMATED COST $1,112,359
Phase 4 is within County Maintenance District G with 21 bridges or structures.
o ESTIMATED COST $1,173,879
• Phase 5 is within County Maintenance Districts H-1 with 14 bridges or structures.
o ESTIMATED COST $1,007,091
+ Phase 6 is within County Maintenance Districts J -K with 14 bridges or structures.
o ESTIMATED COST $876,199
• Phase 7 is within County Maintenance Districts L with 12 bridges or structures.
o ESTIMATED COST $658,463
a There are 100 bridges that have been coded 2 for inadequate rail with no approaches.
There wi11 be seven projects by maintenance districts of coded bridges to allow for manageable and cost-
conscious improvements.
20
Priority 5: Bridge Rail Improvements -- Code 1
Phase 1- County Maintenance Districts A -D
• 2 bridges or structures
Phase 2- County Maintenance District E
1 bridge or structure
Phase 3- County Maintenance Districts F -L
• 15 bridges or structures
These bridges were identified with lower risk because they feature bridge rail and approaches; however, the rail
and/or approaches and terminal do not meet WSDOT's current standards for crashworthiness and will need to be
upgraded to maintain adequate protection for errant vehicles. There are 18 bridges and/or structures that have been
rated as Code 1. These structures have rail and approaches yet do not meet code. The priority is low on this project
as the bridges are functional but will need updated railing in the future to assist in preventing serious injury or fatal
accidents.
Priority 5: Bridge Rall Improvements
Code 1
kld9�R�{: i[lXWRMl�
C 914:N� Rwd• IR Wipl G�hN�
Un�igr iwil{�i
— 6[d1Y i
-�OLMOW e
C
�OlIIfM WWR G
�LRl1f
• Phase 1 is within County Maintenance Districts A -D with 2 bridges or structures.
o ESTIMATED COST $478,583
• Phase 2 is within County Maintenance District E with 1 bridge or structures.
o ESTIMATED COST $1,063,507
• Phase 3 is within County Maintenance District F -L with 17 bridges or structures.
o ESTIMATED COST $518,192
• These bridges or structures will need upgraded rail and approaches to be brought up to standards to
prevent serious injury or fatality accidents if collision should occur.
22
Priority 6: Huntzinger Road Safety Improvements
a. Phase 1 -MP 2.70 to MP 4.88
b. Phase 2 -MP 5.14 to MP 6.99
c. Phase 3 -MP 6.99 to MP 10.74
Huntzinger Road has several segments of road that scored high on the risk-based prioritization. Although there is no
significant accident data to reflect the hazards, the characteristics of the road show several areas of curves; both
vertical and horizontal, steep embankments, and no shoulder which are the largest contributing factors to run -oft -road
accidents. Guardrail, signing and delineation improvements to this corridor are cost -prohibitive so the county has
prioritized the phases in order of mileposts. This project is a priority for Kittitas County because it prevents the most
common type of accident (run -off-road) and scored high on risk-based prioritization, and because recreation
opportunities and new residence traffic are rapidly increasing along this roadway. It is a lower priority than other
projects because we are already addressed the first roadway segments (MP 0.66 to 2.69) in 2017. Kittitas County
would like to acknowledge a current and continuing monitoring and evaluation stage for safety in this segment of
Huntizinger Rd.
23
Priority 6: Huntzinger Rd. Safety Improvements
AmWWWR.
—rram'lu »r.t Rar#t
ra•r,K•u •u.� -ter:-tr
S.lEMS6Jl,•
xn. ar
� x+r•,c� c�nr ,
�tnee: d
Phase 1 is between MP 2.70 to MP 4.88 has several horizontal curves, steep embankments, and no
shoulder in places with minimal countermeasures in place.
o ESTIMATED COST $778,557
• Phase 2 is between MP 5.14 to MP 6.99 where there are steep embankments, no shoulder in areas and
need of guardrail, signs and/or delineation.
ESTIMATED COST $366,129
• Phase 3 is between MP 6.99 to MP 10.74 with sharp horizontal curves, vertical curves, steep embankments,
very little to no shoulder and inadequate clear zone.
o ESTIMATED COST $586,638
24
References
Arnold Jr., E.D. and Lantz Jr., K.E., Evaluation of best practices in traffic operations and safety: Phase 1: Flashing
LED stop sign and optical speed bars. Virginia Transportation Research Council. 2007.
Chandler, 8., Grey means go: Colorblindness in transportation. Institute of Transportation Engineers. March 2021.
Davis, GA, Hourdos, J., Xiong, H., Estimating the crash reduction and vehicle dynamics effects of flashing LED stop
signs. Minnesota Department of Transportation. 2014.
Gates TJ, Carlson PJ, Hawkins HG. Field evaluations of warning and regulatory signs with enhanced conspicuity
properties. Transportation Research Record. 2004.
Kittitas County Public Works Department. Kittitas County Road Safety Plan. 2019.
List of Appendices
Appendix A:
Utitas County Collision Data, 2015-19
Appendix B:
Road Segment Scoring and Project Prioritization
Appendix A
Kittitas County Collision Data 2015,45
27
.able'. Fate! and seaous !^jury acc.dents'n Klttltas County, 2015-".9 wt. accident and roadway details.
�i
E
Se
o
M
C
p
Q
m
FATAL COLLMONS
2868069
3!27.2016
KITTITAS HWY
2.8
Y
Culvert and/or another
Y
i Y
28
440
50
E573713
8/13/2016
UPPER PEOH POINT
5.3
Y
Crash Cushions - Impact
Y
Y
28
839
35
817-06144
6/27/2017
KITTITAS HWY
2.3
Bicyclist
Y
Y
Y
28
440
50
3789538
61712018
COLOCKUM RDP
18
Y
Rock
Y
-
'2
50
E99381'..
12/14/2019
THORP HWY
7.3
Y
Fence
Y
Y
Y
20
423
50
E419344
4/23/2015
—
NELSON SIDING RD
—
0.7
Y
SERIOUS IN,EURY COLLISIONS
Guardrail
Y
Y
Y
Y
All
28
343 1
35
E427284
5/2412015
PARKE CREEK RD
0.9
Y
U61' PolelBox
Y
Y
Y
Y
28
550
50
E482019
11/612015
ROBINSON CANYON
1.2
Y
Y
Y
Y
22
769
50
E551558
6812016
BOYLSTON RD
0.7
Y
Cd!vert
Y
Y
Y
Y
24
101
50
3595453
1016/2016
VANTAGE HWY"
4
Y
Irri at!or. DitchfCrees
Y
Y
Y
28
486
50
E683349
3/15/2017
KITTITAS HWY
3.0
Utili Pole/Guardratl
Y
Y
28
440
50
E6678125
5/31/2017
BERRY RDNU
0.9
Fence
Y
Y
Y
Y
20
81
50
E701962
8/1512017
BULLFROG RD
2.4
Y
Y
28
416 1
50
E711795
9/1012017
SISTERS RDu
0.5
Y
Y
20
58 1
35
E793527
4/23/2018
VANTAGE HVVY
4.2
Other Moving Vehicle
Y
Y
Y
28
385
50
E834445
8/2712018
UPPER PEOH POINT
3.1
Y
Fence
Y
34
690
50
2866316
9/5/2018
HUNZINGER RD
4.9
Y
Rood Wall
Y
Y
Y
Y
24
628
50
E852245
1012312018
KITTITAS HWY
2.3
Y
Y
28
MA
50
E8727077
171612018
LOWER PEOH POINT
2.2
Y
Trewstrnp
Y
Y
Y
22
475
35
E880610
1812019
CANYON RD
5.3
Ober Moving Vehicle
Y
34
121
35
E913398
1112!2019
UPPER BADGER 1
2.6
Over Embankment
Y
Y
Y
28 1
495
50
E924190
5/26/2019
VANTAGE HWY
5.5
Other Mowing Vehicle
Y
Y
Y
28
283
50
E981438
111512019 1
MANASTASH RDS
i0.
Y I
Tree/Stump
Y
Y
Y
Y
22
953
50
u—underage unver
ORV — Off Road Vehicle
A/D—Alcohol and/or thug Related
P — Pdmifive Road
Kiftltas County
A!" lnjury Cwlh6lors
Oil CaumRNtways
N415-1$
rJary Typby Stmt/
ftw
Pture 1. Al: vehicle accidaIs reported on Kildis County roads, and injure severity, 2015 -19,
29
Table 2. Total number of accidents per road (County maintained roads only), 2015-19.
Road Name
1ST ST (THORP)
AIRPORT RD — CLE ELUM
ALLEY ST (RONALD)
ANDERSON RD
BADGER POCKET RD
BALLARD HILL RD
BENDER RD
BERRY RD
BOAT RAMP RD
BOYLSTON RD
BRICK MILL RD
BRICK RD
BROWN RD
t BULLFROG RD
BURKE RD
BYNUM RD
CABIN CREEK RD
CANYON RD
CAREK RD
CARIBOU RD
CASASSA RD
CASCADE PLACE
CATTAIL RD
CHRISTENSEN RD
CLEMAN RD
CLERF RD
COLOCKUM RD
COOKE CANYON RD
COVE RD
DELTA ST
DENMARK RD
DRY CREEK RD
FAIRVIEW RD
FAUST RD
FERGUSON RD NORTH
FOURTH PARALLEL RD
GAME FARM RD
GLAD MAR RD
GOLF COURSE RD
HANSON RD
Number
of Road Name
accidents
1 HAROLD RD
3 I HAYWARD RD
1 HEMINGSTON RD
5 HUNGRY JUNCTION RD
8 HUNTZINGER RD
1 HYAK DRIVE EAST
4 JUDGE RONALD RD
3 KACHESS LAKE RD
1 KILLMORE RD
1 KITTITAS HWY
8 KOFFMAN RD
8 LIBERTY RD
6 LOOK RD
11 L. GREEN CANYON RD
1 L. PEOH POINT RD
1 LYONS RD
1 `r MAIN ST (VANTAGE)
MANASTASH RD
1 M. FORK TEANAWAY RD
3 MOHAR RD
1 MORRISON RD
1 i MT DANIELS OR
1 NANEUM RD
1 NELSON DAIRY RD
16 NELSON SIDING RD
2 NO.6 RD
5 NO. 81 RD
2 N. FORK TEANAWAY RD
3 OLD HIGHWAY TEN
1 PARKE CREEK RD
6 I PASCO RD
10 PAYNE RD
9 PAYS RD
1 PEAKVIEW DR
1 PFENNING RD
2 I PRATER RD
5 1 RADER RD
2 j RAILROAD ST
2 t REECER CREEK RD
RIVERBOTTOM RD
>10 and <50 accidents >50 accidents
Number
of Road Name
accidents
1 ROBBINS RD
1 ROBINSON CANYON RD
1 SALMON LA SAC RD
13 1 SANDERS RD
12 ' SISTERS RD
3 SMITHSON RD
1 SNOQUALMIE DRIVE
1 ` SORENSON RD
1 ' SPARKS RD
68 STRANDE RD
1 SUNCADIA TRAIL
1 : SUNLIGHT DRIVE
10 j SUSAN RD
6 i TANEUM RD WEST
8 TAYLOR RD
2 ' TEANAWAY RD
3 THOMAS RD
18 THORP CEMETERY RD
2 THORP HWY NORTH
2 THORP HWY SOUTH
2 ; THORP PRAIRIE RD
1 THRALL RD
10 TIPTON RD
1 TJOSSEM RD
6 UMPTANUM RD
31 UNIVERSITY WAY
10 UNKNOWN
2 U. BADGER POCKET RD
1 U. PEOH POINT RD
7 VANTAGE HWY
1 VENTURE RD
1 WATSON CUTOFF RD
1 ; WATT CANYON RD
1 WEAVER RD
4 � W. FORK TEANAWAY RD
1 WESTSIDE RD
1 WILSON CREEK RD
4
36
3
Number
Of
accidents
3
10 1
7
3`
1'
2'
1j
2'
1�
1
1
1
2
13
2
4
4
17
9
28
1
10
22
6
1
10
14
70
1
2
1
2
1
22
28
Appendix B
Road Segment Scoring Results
31
Table 1. County road segme ds analyzed and scored by prioritization criteca, highest to lowest.
RIDad
Road Name
BMP
EMP
Width
Limit
ADT
Criteria
Inadequatm
Clear Zoe
Fbred
Objects
Clear
Zone
Cu Curvature
Fatal or
Serio
Injury
ScoreTotal
96951
KlTTITAS HWY
2.36
2.64
28
50
5448
10
5
10
0
50
165
240
9400'
VANTAGE HWY
4.08
5.57
28
50
3851
1 20
0
5 1
0
120 1
60
205
96951
KITTITAS HWY
1.52
2.35
28
50
5448
10
0
5
0
40
135
190
96951
iCTTITAS HWY
2.64
3.36
28
50
1876
20
5
10
0
90
45
170
63501
DENMARK RD
3.08
4.35
20
50
595
10
10
20
20
0
90
150
92275
BULLFROG RD
2.04
2.7
28
50
4166
20
5
20
20
40
30
135
94001
VANTAGE
2.02
2.53
28
50
7311
10
0
5
0
0
105
120
95417
THORP HWY NORTH
6.79
7.69
20
50
423
1 10
0
20
20
50
15
115
95417
THORP HWY SOUTH
0
0.34
28
50
3680
20
0
0
2C
0
75
115
95417
THORP HWY SOUTH
0.34
0.43
24
50
2274
20
C
0
20
C
75
115
24610
UPPER PEOH POINT RD
3.66
5.32
28
35
690
20
5
5
5
50
30
115
24610
UPPER PEOH POINT RD
3.16
3.66
34
35
690
10
5
5
10
80
0
110
54510
ROBINSON CANYON RD
1.2
2.72
22
50
438
20
0
5 1
5
0
75
105
64756
U. BADGER POCKET RD
1.27
5.61
22
50
495
10
0
5
20
40
30
105
75040
HUNTZINGER RD
4.88
5.14
24
25
627
10
10
20
20
40
0
100
54510
ROBINSON CANYON RD
0.96
1.2
20
50
769
10
0
5
0
40
45
100
94001
VANTAGE HWY
5.57
6.56
28
50
2833
1G
0
5
0
40
45
100
94001
VANTAGE HWY
2.77
4.08
28
50
4574
10
0
5
5
0
75
95
95301
MANASTASH RD
5.58
11.0
22
35
963
10
10
10
20
40
0
90
40600
BRICK RD
1.12
1.22
22
35
1775
10
5
5
5
0
60
85
26180
CASASSA RD
0
1.12
22
35
283
20
10
20
20
0
15
85
95301
MANASTASH RD
1 1.36
3.35
24
50
2409
20
10
10
0
0
45
85
23030 1
NELSON SIDING RD
0.48
1.82
28
35
1096
10
0
10
10
40
15
85
Road
ID
Road Name
BMP
EMP
Pave
ent
Width
Speed
Limit
ADT
Overall
Criteria
Inadequate
Clear Zone
Fixed
Objects
In Clear
Zone
Roadway
Curvature
Fatal yr
SeriousInjury
Injury
Total
Sevre
22770
LOWER PECH POINT RD
1.43
2.9
22
35
475
13
5
5
5
40
15
80
28500
TEANAWAY RD
0.11
0.73
24
50
860
10
10
10
20
4
30
80
75040
HUNTZINGER RD
2.7
4.88
24
50
627
10
10
20
20
0
15
75
75040
HUNTZINGER RD
5.14
6.99
24
50
473
10
10
20
20
0
15
75
75040
HUNTZINGER RD
6.99
10.7
24
50
473
10
10
20
20
C
15
75
40761
LOOK RD
1.34
1.84
28
50
1169
20
5
10
10
0
30
75
40761
LOCK RD
1.84
2.88
28
50
622
20
5
10
10
0
30
75
22350
MCHAR RD
0
0.55
1 22
35
249
10
10
20
20
0
15
75
96200
NO.6 RD
3.58
5.1
22
50
1135
20
0
5
5
0
45
75
43132
THOMAS RD
0
1.51
20
50
302
10
10
20
20
0
15
75
96951
KIT ITAS HWY
3.36
3.82
28
50
1876
10
5
10
0
0
45
70
21560
SALMON LA SAC RD
1.75
10.6
30
35
835
10
5
5
20
0
30
70
94001
VANTAGE MY
23.36
27.5
26
50
586
20
5
5
10
0
30
70
9661i
BROWN RD
1.81
2.68
18
5C
647
10
10
10
20
0
15
65
92275
BULLFROG RD
0.72
2.03
28
50
3497
10
10
10
20
0
15
65
96076
CANYON RD
3.02
5.47
40
50
1219
10
0
0
0
40
15
65
96400
CLEMAN RD
1.4
1.7
28
50
1408
10
10
10
20
0
15
65
38350
LIBERTY RD
0.84
1.47
26
35
123
10
13
20
10
0
15
65
93526
REECER CREEK RD
0.31
0.56
44
35
3794
10
0
20 1
20
01
1.5
65
52770
THORP PRAIRIE RD
0
3.51
26
50
275
1 20
5
5
20
0
15
65
96865
TJOSSEM RD
0.98
1.39
28
50
718
20
0
10
20
0
15
65
94001
VANTAGE HWY
6.56
7.56
28
50
1923
10
5
5
0
0
45
65
94126
W:LSON CREEK RD
2.55
4.09
24
50
647
.0
5
5
0
0
45
CABIN CREEK RD
0.07
0.22
2425
195
10
5
10
20
0
15
�1113090
33
Road
ID
Road Name
BMP
EMF
Paved
Width
Speed
Limit
ADT
Overall
Criteria
Inadequate
Clear Zone
Fixed
Objects
in Clear
Zone
Roadway
Curvature
Fatal or
Serious
Injury
Injury
Total
Score
31510
HU�v'GRYJ;[NCTION RD
1.74
2.84
23
50
811
20
5
20
3
0
15
60
107.150
HYAK DRIVE EAST
0.29
0.44
1 26
20
1 184
1 10
10
20 1
5
0
115
60
34383
L. GREEN CANYON RD
0
0.28
24
50
1 215
10
0
10
10
030
•
60
53010
RIVERBO TOM RD
C
1.83
20
25
258
10
5
20
10
0
4;5
60
64756
U. BADGER POCKET RD
0
1.27
26
50
607
20
5
0
20
0
15
60
94001
VANTAGE HWY
18.4
21.2
26
50
5%
10
5
5
10
0
30
60
42000
NANEUM RD
2.54
4.11
23
50
409
10
C
10
5
0
30
55
93526
REECER CREEK RD
4.8
6.68
24
50
358
10
0
5 1
10
0
30
55
96937
UMPTANUM RD
0.5
0.69
40
35
5508
20
0
0
5
0
30
55
23010
AIRPORT RD, CLE ELUM
0.41
2.73
22
35
208
10
0
10
0
0
30
50
95600
HANSON RD
0
0.81
28
50
1274
10
0
5
20
0
15
50
31510
HUNGRY JUNCTION RD
2.84
3.25
20
50
753
10
5
20
0
0
15
50
40761
LOOK RD
0
0.59
28
50
1681
20
0
10
5
0
15
50
69760
PFENNING RD
1.53
1.97
20
35
1319
1 10
0
10
0
0
30
50
95417
THORP HWY SOUTH
1.74
3.35
24
50
691
20
0
5
10
0
15 ,
50
96751
THRALL RD
0.15
1.1 1
26
50
1882
20
5
5
5
0
15
50
96751
THRALL RD
1.1
2.18
26
50
1569
20
5
5
5
0
M
50
60640
ANDERSON RD
0
0.32
32
35
2648
20
0
10
0
0
15
45
96076
CANYON RD
3.02
5.47
40
50
1219
10
0
20
0
0
15
45
96400
CLEMAN RD
1.7
4.25
30
50
805
10
10
10
0
0
15
45
43883
COOKE CANYON RD
0
2.04
24
50
268
10
10
5
5
0
15
45
93025
DRY CREEK RD 1
1.115
1.31
28
35
596
20
0
10
0
0
45
45
96951
KITTITAS HWY 1
4.87
5.3
28
50
3133
20 1
5
5
0
C
15
45
34
Road
ID
Road Name
BMP
EMP
Paved
Width
Speed
Limit
ADT
Overall
Criteria
Inadequate
Clear Zone
Fixed
Objects
In Clear
Zone
Roadway
Curvature
Fatal or
Injury
Injury
Total
Score
22770
LOWER PECH POINT RD
2.9
5.05
20
35
339
10
5
10
5
0
15
45
40772
1 LYONS RD
4
6.29
26
50
257
10
10
10
0
0
15
45
95301
MANASTASH RD
0
0.74
28
50
2395
20
5
5
0
0
15
45
23030
NELSON SIDING RD
1.82
3.04
28
35
630
10
0
10
10
0
15
45
96200
NO.6 RD
0.36
0.68
24
50
2357
20
0
10
0
0
15
45
94326
NO. 81 RD
0.53
1
24
35
1557
20
0
10
0
0
15
45
21560
SALMON LA SAC RD
0
1.12
30
35
1469
20
0
5
5
0
15
45
55550
THORP CEMETERY RD
0
3.02
24
50
382
10
5
10
5
0
15
45
95417
THORP HWY SOUTH
0.43
1.55
24
50
1679
20
0
5
5
0
15
45
96751
THRALL RD
4.69
5.68
26
50
776
20
0
5
5
0
15
45
96751
THRALL RD
5.68
6.23
20
50
237
20
0
5
5
0
15
45
95865
TJOSSEM RD
0
0.98
28
50
718
10
5
10
5
0
15
45
24610
UPPER PEOH POINT RD
0
3.16
34
35
955
10
5
5
10
0
15
45
24610
UPPER PEOH POINT RD
0
3.16
34
35
955
10
5
5 1
10
0
15
45
94001
VANTAGE HWY
9.6
1.0.6 1
26
50
791
20
5
5
0
0
15
45
40761
LOOK RD
0.69
1.34
28
50
1271
10
0
10
5
0
15
40
22770
LOWER PEOH POINT RD
0.34
0.59
22
35
644
10
5
5
5
0
15
40
75060
MAIN ST (VANTAGE)
0,19
0.92
32
35
552
10
0
10
5
0
15
40
42000
NANEUM RD
1.99
2.54
24
50
399 1
10
0
10
5
0 1
15
40
93526
REECER CREEK RD
9.18
11.5
22
50
268
10
0
5
10
0
15
40
96865
TJOSSEM RD
3.12
5.65
28
50
872
10
5
10
0
0
15
40
23010
AIRPORT RD (CLE ELUM)
0.23
0.41
22
35
760
10
0
10
0
0
15
35
60640
ANDERSON RD
0.32
0.38
32
35
2648
10
0
10
0
0
15
35
60640
ANDERSON RD
0.38
0.41
32 1
35
2437
10
0
10
0
0
15
35
Road
ID
Road Name
BMP
EMP
Paved
Width
Speed
Limit
ADT
Overall
Crlterla
Inadequate
Clear Zone-
Fixed
Objects
In Clear
Zone
Roadway
Curvature
Fatal or
InjSerury
Injury
Total
Score
68910
BADGER POCKS? RD
1.3
3.35
20
50
178
10
10
0
0
0
15
35
62701
FERGUSON RD NORTH
1.02
2.01
22
50
483
4.0
5
5
0
0
15
35
42000
NANE1M RD
4.11
4.86
20
50
201
10
C
10
0
0
15
35
95200
NO.6 RD
0
0.26
24
50
2357
10
0
10
0
0
15
35
94326
NO. 81 RD
1
2.54
24
50
869
20
0
0
0
0
15
35
94001
VANTAGE HWY
7.56
9.6
26
50
1251
10
5
5
0
0
15
35
94126
WILSON CREEK RD
4.87
5.33
26
50
822
1 10
5
5
0
0
15
35
94126
WILSON CREEK RD
5.33
6.66
24
50
693
10
5
5
0
0 1
15
35
96951
KITTITAS HWY
1.03
1.34
28
35
6700
10
0
5
C
0
15
30
93526
REELER CREEK RD
0.76
1.26
38
50
3794
10
C
5
0
0
15
30
93526
REECER CREEK RD
1.26
2.26
34
50
1934
10
0
5
0
0
15
30
93526
REECER CREEK RD
2.26
4.8
28
50
681
10
0
5
0
0
15
30
54510
ROBINSON CANYON RD
0
0.09
20
50
763
10
0
5
0
0
15
30
54510
ROBINSON CANYON RD
0.09
0.96
20
50 1
763
10
0
5
0
0
15
30
94001
VANTAGE
2.02
2.53
28
50
7311
20
5
5
0
0
0
30
94001
VANTAGE HVY
2.53
2.77
28
50
6454
20
5
5
0
0
0
30
68910
BADGER POCKET RD
0.57
1.3
22
50
314
10
0
0
0
0
15
25
96200
NO.6 RD
1.85
2.22
26
50
787
10
0
0
0
0
15
25
36