HomeMy WebLinkAboutResolution_Prospectus Vantage HighwayKITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
AGENDA STAFF REPORT
AGENDA DATE: April 6, 2021
ACTION REQUESTED: Request to approve a Resolution Authorizing the Chair's
signature on the Local Agency Federal Aid Project Prospectus
for the Vantage Highway Project, CRP 298-19.
BACKGROUND: On December 19, 2019, Kittitas County Public Works was
advised by Washington State Department of Transportation
(WSDOT) that our Vantage Highway Project was selected to
receive funding through the Highway Safety Improvement
Program (HSIP).
This project will be combined with an asphalt overlay that will
happen concurrently in the same location with a portion of the
funding coming through the Rural Arterial Program.
Public Works is preparing to solicit for bids In April of 2021.
This requires the Local Agency Federal Aid Project Prospectus
to be signed and approved by the Chair of the BOCC and
WSDOT Local Programs prior to Federal funds being released.
The Project Prospectus for the engineering phase was approved
in February of 2020, Resolution 2020-023. A resolution to award
the design contract to KPG P.S. occurred on November 3, 2020
(2020-185). A new Project Prospectus for the construction phase
is required prior to the Federal Funding being released for a new
phase of the project. Kittitas County is ready for the construction
phase and is prepared to get approval from WSDOT Local
Programs.
INTERACTION: Public Works
RECOMMENDATION: Approve the Resolution Authorizing the Board's signature on the
Local Agency Federal Aid Project Prospectus for the Vantage
Highway Project, CRP 298-19.
HANDLING: Return two (2) originals to Public Works
ATTACHMENTS: Resolution, Local Agency Federal Aid Project Prospectus
LEAD STAFF: Mark Cook, Director
BOARD OF COUNTY
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2021 -
AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY
FEDERAL AID PROJECT PROSPECTUS CONSTRUCTION PHASE FOR THE
VANTAGE HIGHWAY PROJECT, CRP 298-19
WHEREAS: The Vantage Highway Project was awarded Federal funds (HSIP) that will
be used to install and upgrade non-compliant guardrail, and protect
hazardous slopes along Vantage Highway MP 21.25 — MP 27.51; and
WHEREAS: This project will be tied with a Rural Arterial Program project, which will
repair and provide an asphalt overlay on all lanes of Vantage Highway to
build surface depth and structural capacity at the same location; and
WHEREAS: In preparation to advertise the project for construction in April of 2021
Public Works is requesting the Washington State Department of
Transportation to release the Federal Funds for construction; and
WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the
Chair acknowledging the project has been reviewed and is consistent with
the agency's comprehensive plan for community development; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in
the best interest of the public, does hereby approve the Board's signature
on the Local Agency Federal Aid Project Prospectus for the Vantage
Highway Project, CRP 298-19.
DATED on this 6th day of April, 2021, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Brett Wachsmith, Chairman
Laura Osiadacz, Vice -Chairman
Cory Wright, Commissioner
Washington State
Adft
�AF Department of Transportation
Local Agency Federal Aid
Project Prospectus
DOT Form 140-101 Page t
Revised 04/2015 Previous Editions Obsolete
Prefix
Route
( )
Date
March 25, 2021
Federal Aid
Project Number
HSIP- 19CN(003)
DUNS Number
01-020-2547
LoalAgency
CRP 298-19, RC 1913
WSDOy 1
Federal Employer
91-601349
Project Number
\ Use Only J
\
Tax ID Number
Agency
CAAgency
Federal Program Title
Kittitas County
❑✓ Yes ❑ No
❑✓ 20.205 ❑ Other
Project Title
Start Latitude N 46057'31.23"
Start Longitude W 1200 7'22.99"
Vantage Highway
End Latitude N 46056'56.04"
End Longitude W 119°59'44.22"
Project Termini From -To
Nearest City Name
Project Zip Code (+4)
21.25 27.51
Ellensburg
98950-AO21
Begin Mile Post
End Mile Post
Length of Project
Award Type
21.25
27.51
6.26 Miles
ZLocal ❑ Local Forces ❑State ❑Railroad
Route ID
Begin Mile Point
End Mile Point
City Number
County Number
County Name
21.25
27.51
19
Kittitas
WSDOT Region
Legislative District(s)
Congressional District(s)
Urban Area Number
South Central Region
13
8 7
I
Total
Local Agency
Federal Funds
Phase Start
Phase
Estimated Cost
Funding
Date
Nearest Hundred Dollar
Nearest Hundred Dollar
Nearest Hundred Dollar
Month Year
P. E.
355,300
252,900
102,400
March 2020
RNV
Const.
4,171,400
2,981,400
1,190,000
April 2021
Total
4,526,700
13,234,300
1,292,400
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width
Number of Lanes
MP 21.25-23.36 = 38', MP 23.36-27.51=26'
MP 21.25-23.36 = 3 lanes, MP 23.36-27.51 = 2 lanes
The segment has non compliant guardrail, and many hazardous slopes. This segment shows HMA distress in
the form of transverse and longitudinal cracking, with significant annual maintenance and repair costs.
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
HMA repair and an asphalt overlay on all lanes in an attempt to build surface depth and structural capacity.
Federal funds will be used to install/upgrade guardrail.
Local Agency Contact Person
Title
Phone
Darren Case
Construction Manager
(509)962-7523
Mailing Address
City
State
Zip Code
411 N Ruby St, Suite 1
Ellengburg
WA
98926
By
Approving Authority
Project Prospectus
Title Deputy Director / County Engineer
Date 63 Put
DOT Form 140-101 Page t
Revised 04/2015 Previous Editions Obsolete
Agency
Project Title
Date
Kittitas County
Vantage
Highway
March 25, 2021
Type of Proposed Work
Project Type (Check all that Apply)
Roadway Width
Number of Lanes
❑ New Construction ❑ Path / Trail
❑ 3-R
26-38
2-3
❑✓ Reconstruction ❑ Pedestrian / Facilities
❑ 2-R
❑ Railroad ❑ Parking
❑ Other
❑ Bridge
Geometric Design Data
Description
Through Route
Crossroad
❑ Principal Arterial
❑ Principal Arterial
Federal
❑ Urban
❑ Minor Arterial
❑ Urban
❑ Minor Arterial
Functional
❑✓ Rural
❑ Collector
❑ Rural
❑ Collector
Classification
❑ NHS
❑ Major Collector
❑NHS
[:]Major Collector
Minor Collector
❑ Minor Collector
❑ Local Access
❑ Local Access
Terrain
❑ Flat ❑ Roll ❑✓ Mountain
[--]Fiat ❑ Roll ❑ Mountain
Posted Speed
50
Design Speed
50
Existing ADT
586
Design Year ADT
Design Year
2020
Design Hourly Volume (DHV)
Performance of Work
Preliminary Engineering Will Be Performed By
Others
Agency
KPG (Consultant) / Kittitas County Public Works
80 oho
20
Construction Will Be Performed By
Contract
Agency
Contractor
100 %
oho
Environmental Classification
❑ Class I - Environmental Impact Statement (EIS)
❑✓ Class II - Categorically Excluded (CE)
❑ Project Involves NEPA/SEPA Section 404
❑ Projects Requiring Documentation
Interagency Agreement
(Documented CE)
❑ Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreements
Environmental Considerations
DOT Form 140-101 Page 2
Revised 04/2015 Previous Editions Obsolete
Agency Project Title Date
Kittitas County Vantage Highway March 25, 2021
Right of Way
❑✓ No Right of Way Needed
❑ Right of Way Needed
All construction required by the
❑ No Relocation ❑ Relocation Required
contract can be accomplished
within the exiting right of way.
Utilities
Railroad
❑ No utility work required[,/1
No railroad work required
❑✓ All utility work will be completed prior to the start
❑ All railroad work will be completed prior to the start of
of the construction contract
the construction contract
❑ All utility work will be completed in coordination
❑AII the railroad work will be completed in coordination
with the construction contract
with the construction contract
Description of Utility Relocation orAdjustments and Existing Major Structures Involved in the Project
Three power poles were permanently relocated by the utility company during the design phase to get them
outside of the clear zone.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? []Yes ❑✓ No
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Agency
Date By
Mayor/Chairperson
DOT Form 140-101 Page 3