Loading...
HomeMy WebLinkAbout2nd Page_Prospectus Vantage HighwayAgency Project Title Date Kittitas County Vantage Highway March 25, 2021 Type of Proposed Work Project Type (Check all that Apply) Roadway Width Number of Lanes ❑ New Construction ❑ Path / Trail ❑ 3-R 26-38 2-3 ❑✓ Reconstruction ❑ Pedestrian / Facilities ❑ 2-R ❑ Railroad ❑ Parking ❑ Other ❑ Bridge Geometric Design Data Description Through Route Crossroad ❑ Principal Arterial ❑ Principal Arterial Federal ❑ Urban ❑ Minor Arterial ❑ Urban ❑ Minor Arterial Functional ORural ❑Collector E] Rural E] Collector Classification El NHS ❑ Major Collector E] NHS E] Major Collector 0 Minor Collector ❑ Minor Collector ❑ Local Access ❑ Local Access Terrain ❑ Flat [:]Roll Z Mountain ❑ Flat ❑ Roll ❑ Mountain Posted Speed 50 Design Speed 50 Existing ADT 586 Design Year ADT Design Year 2020 Design Hourly Volume (DHV) Performance of Work Preliminary Engineering Will Be Performed By Others Agency KPG (Consultant) / Kittitas County Public Works 80 % 20 Construction Will Be Performed By Contract Agency Contractor 100 % oho Environmental Classification ❑ Class I - Environmental Impact Statement (EIS)✓❑ Class II - Categorically Excluded (CE) ❑ Project Involves NEPA/SEPA Section 404 ❑ Projects Requiring Documentation Interagency Agreement (Documented CE) ❑ Class III - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreements Environmental Considerations DOT Form 140-101 Page 2 Revised 0412015 Previous Editions Obsolete