HomeMy WebLinkAbout2021-03-22-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS
Public Works Study Session
Regular Meeting
Monday March 22, 2021 -1:30 PM
Webex
1. Call to Order
2. Flood Control Zone District Advisory Committee Bylaw Revision
3. Benson Road Vacation Request
4. Interlocal Agreement with State Parks - Ginko Parking Lot Improvement Design and
Construction
5. Other business
6. Adjourn
Created on 3/19/2021 8:26:35 AM
KITTITAS COUNTY
PUBLIC WORKS STUDY SESSION MINUTES
Webex
Regular Meeting
MONDAY 1:30 PM MARCH 22, 2021
Board members present: Vice -Chairman Laura Osiadacz, and Commissioner
Cory Wright
Others: Mark Cook, Josh Fredrickson, Rebecca Cruse, Public Works; Dan
Carlson, Jessica Miller, Jeremy Johnston, Bridgett Pechtel, Community
Development Services; Jason Eklund, IT; Neil Caulkins, Prosecuting
Attorney's Office;(2) Members of the Public
At 1:56 pm Vice -Chairman Laura Osiadacz opened the Public Works Study
Session.
FLOOD CONTROL ZONE DISTRICT ADVISORY COMMITEES BYLAWS REVISION
Mark Cook requested the Board of County Commissioners consider two
(2) revisions to the Flood Control Zone District Advisory Committee
Bylaws. The first update is something staff has recently encountered
while working during Covid outbreaks, and the revision is to allow
cancellation of a regular meeting with advanced notice. The second is
to begin the implementation of ranking criteria that Director Cook
and Arden Thomas have worked together to develop. Vice -Chairman Laura
Osiadacz made a motion to approve the bylaws as presented with
Commissioner Cory Wright seconding said motion.
BENSON ROAD VACATION
Mark Cook gave background on the public right of way in the Plat of
"Timber Valley", stating that the Right of Way is obsolete in this
private subdivision, splitting the lot owner's parcels. Discussion
was held. Staff was directed to prepare enabling documents to
schedule a public hearing at the next agenda session.
INTERLOCAL AGREEMENT WITH STATE PARKS- GINKGO PARKING LOT
IMPROVEMENT, DESIGN, CONSTRUCTION
Mark Cook requested the Board of County Commissioners to consider an
Interlocal Agreement with State Parks for the design and construction
of the parking at Ginkgo Petrified Forest State Park along Vantage
Highway. Discussion was held. Staff was directed to prepare enabling
documents for consideration at the next agenda session.
2021-03-22 MINUTES
OTHER BUSINESS:
Mark Cook stated that ongoing conversations with the Upper Kittitas
County Traffic Committee has brought forth the need to gather
comments from Upper County residents affected by traffic issues. Mark
Cook continued that staff would like to use an online survey via
Survey Monkey and publish the link on the County Website. Mark Cook
added that along with the survey, staff would draft and send out a
brochure directing residents to the online survey, helping staff get
a better understanding of issues and attain contact information from
affected residents. Mark Cook requested direction in contacting IT to
help with the website additions. Vice -Chairman Laura Osiadacz stated
she would like to have the survey posted on BOCC site under
"Committees", and on the county homepage under "Hot Topics". Vice -
Chairman Laura Osiadacz added she is in agreement that the online
survey will present the best result and is the least labor-intensive
option to receive answers from Upper County residents. Staff was
directed to move forward with the survey and online postings as
discussed.
Meeting adjourned at 2:11 pm.
A. C,�./
Rebecca Cruse, Administrative
Assistant
2021-03-22 MINUTES
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Laura Osiadacz, Vice -Chairman
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE:
TOPIC:
ACTION REQUESTED:
LEAD STAFF:
Mark Cook
March 22, 2021
Flood Control District Advisory Committee
Bylaw Revision
Approve Proposed Revisions
RECOMMENDATION: Approve Proposed Revisions to the Flood Control Zone District
Advisory Committee Bylaws.
BRIEFING SUMMARY:
• Each year the Flood Control Zone District Advisory Committee reviews the
Advisory Committee Bylaws.
• The Advisory Committee is recommending two changes for 2021: 1) clarification
that regularly scheduled meetings can be canceled with advance notice and 2) the
Advisory Committee recommends a Capital Facility Plan and utilizes evaluation
criteria for this purpose.
• Bylaw revisions must be approved by the Board of County Commissioners.
BACKGROUND:
The Flood Control Zone District Advisory Committee reviewed its bylaws during a
special meeting held on March 10, 2021. The Advisory Committee approved a motion to
recommend two bylaw changes to the Board of County Commissioners: 1) clarification
that regularly scheduled meetings can be canceled with advance notice and 2) the
Advisory Committee recommends a Capital Improvement Plan to the Board of County
Commissioners and utilizes evaluation criteria supporting project selection. The bylaws
specify that changes must be approved by the Advisory Committee and the Board of
County Commissioners.
DISCUSSION:
The proposed bylaw changes reflect current (COVID 19 impacted meeting schedules)
and proposed practices of the Advisory Committee. Specifying that project prioritization
criteria will be adopted and utilized each year to develop the Capital Facility Plan reflects
the goal of the advisory committee to utilize a transparent and defensible process to
evaluate and prioritize potential flood alleviation projects.
Page 1 of 3
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
FISCAL IMPACTS:
No financial impacts to the 2021 Flood Control Zone District adopted budget.
ATTACHMENTS:
Exhibit 1: Flood Control Zone District Bylaws with Proposed Revisions (Redline and
Clean copies)
Page 2 of 3
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
EXHIBIT 1: FLOOD CONTROL ZONE DISTRICT BYLAWS WITH PROPOSED
REVISIONS (REDLINE AND CLEAN COPY)
Page 3 of 3
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
KITTITAS COUNTY FLOOD CONTROL ZONE DISTRICT ADVISORY
COMMITTEE BY-LAWS
Article 1— Name:
Resolution 2017-183 of the Kittitas County Board of Commissioners establishes the Kittitas
County Flood Control Zone District Advisory Committee.
Article 2 — Purpose of the Advisory Committee:
Support of ongoing prioritization of the Flood Control Zone District annual capital facility
planning; work planning elements; and give recommendations to the Board of County
Commissioners.
Article 3 — Membership and Structure:
As established by Resolution 2017-183, the Advisory Committee is composed of seven members
as follows:
Two (2) Rate Payers from Commissioner District 1
Three (3) Rate Payers from Commissioner District 2
Two (2) Rate Payers from Commissioner District 3
The Advisory Committee shall elect both a chair and vice -chair. A formal vote to fill these
positions shall be taken at the first advisory committee meeting of each year.
The chair of the Advisory Committee shall set the agenda, approve previous meeting minutes,
and guide the conduct of the public meeting.
The vice -chair shall perform the duties of the chair in the chair's absence.
The meeting shall be guided by Robert's Rules of Order.
Four (4) members shall serve two-year terms and three (3) members shall serve a one-year term.
Subsequent terms will be for a two year period.
Term length will be randomly selected in each Commissioner District.
Should a member miss two (2) consecutive unexcused or four (4) total unexcused meetings in
one year, such member will be removed from the advisory committee upon a majority
recommendation from the committee.
Should a member resign from the advisory committee, new applications will be submitted and
the Board of County Commissioners shall select a new rate payer from that Commissioner
District.
Terms of the committee shall begin January 1, 2019.
Article 4 — Termination:
Removal — If the Kittitas County Flood Control District Advisory Committee members
determine by a majority vote that a member should be removed; the Chair of the Committee shall
report that recommendation to the Board of County Commissioners for its consideration.
Resignation — Resignations by members shall be submitted, in writing, to the Committee Chair
or Clerk. They will forward a copy of the resignation to the Board of County Commissioners.
Reasons for dismissal — The Board of County Commissioners may remove a member when it is
determined it is in the best interest of the Committee or the county to do so.
Article 5 — Meetings:
The Advisory Committee shall meet once a month on the fourth (4a') Wednesday of each month
in the Commissioner's Auditorium at the Kittitas County Courthouse at 5:30pm. Regularly
larly
...t�,.,:_iy be canceled with advanced notification.
Special meetings of the Advisory Committee may be held at the request of the Board of County
Commissioners, or as matters arise that require the Committee's attention.
All meetings of the Advisory Committee are open to the public and are subject to the Public
Records Act.
Public comments will be encouraged and will be accepted verbally or in writing. Anyone who
wishes to voice an opinion, information or concerns to the Committee may attend meetings and
time will be allotted at the beginning of meetings as appropriate to assure public participation.
Items may be placed on a meeting agenda by any Committee member or by county staff.
Members shall be provided with a copy of the agenda and supporting materials in advance of the
meeting.
Staff from Kittitas County Public Works shall be the Clerk of the Committee and will be
responsible for taking and documenting the minutes from all meetings of the Advisory
Committee. These minutes will then be approved at a future meeting and placed on the Kittitas
County website.
The majority of the appointed committee members will constitute a quorum for the transaction of
all business at meetings.
Each Committee member will be entitled to one (1) vote on all issues presented at meetings at
which the member is present. Simple majority vote is the primary decision—making method. The
committee's goal for a primary decision—making method is consensus. Majority is defined as a
simple majority of the appointed committee members.
Article 6 — Capital Facility Plan:
The Kittitas County Flood Control Zone District Advisory Committee shall each year
recommend an annual and 6six-year Capital Facility Plan to the Board of County
Commissioners. This Capital Facility Plan will be developed utilizing project evaluation criteria.
Ranked projects that are reviewed and adopted each year by the Committee. :em=bers.
Article 6-7 — Amendment to Bylaws:
The Kittitas County Flood Control Zone District Advisory Committee shall periodically review
the bylaws and may propose amendments to the bylaws. Any recommendations agreed upon by
thesimple majority of the members shall be forwarded to the Board of County Commissioners
for approval.
Article 7-8 — Adoption:
Bylaws are in full force and effect when adopted and approved by the Kittitas County Flood
Control Zone District Advisory Committee and the Board of County Commissioners.
Article 8-9 — Bylaws Review:
Bylaws shall be reviewed annually by the Kittitas County Flood Control Zone District Advisory
Committee and the Board of County Commissioners.
*The foregoing Bylaws of the Kittitas County Flood Control Zone District Advisory Committee
approved and adopted this 26' day of September and approved and adopted by the Board of
County Commissioners this 26`h day of November, 2018.
KITTITAS COUNTY FLOOD CONTROL ZONE DISTRICT ADVISORY
COMMITTEE BY-LAWS
Article I — Name:
Resolution 2017-183 of the Kittitas County Board of Commissioners establishes the Kittitas
County Flood Control Zone District Advisory Committee.
Article 2 — Purpose of the Advisory Committee:
Support of ongoing prioritization of the Flood Control Zone District annual capital facility
planning; work planning elements; and give recommendations to the Board of County
Commissioners.
Article 3 — Membership and Structure:
As established by Resolution 2017-183, the Advisory Committee is composed of seven members
as follows:
Two (2) Rate Payers from Commissioner District 1
Three (3) Rate Payers from Commissioner District 2
Two (2) Rate Payers from Commissioner District 3
The Advisory Committee shall elect both a chair and vice -chair. A formal vote to fill these
positions shall be taken at the first advisory committee meeting of each year.
The chair of the Advisory Committee shall set the agenda, approve previous meeting minutes,
and guide the conduct of the public meeting.
The vice -chair shall perform the duties of the chair in the chair's absence.
The meeting shall be guided by Robert's Rules of Order.
Four (4) members shall serve two-year terms and three (3) members shall serve a one-year term.
Subsequent terms will be for a two-year period.
Term length will be randomly selected in each Commissioner District.
Should a member miss two (2) consecutive unexcused or four (4) total unexcused meetings in
one year, such member will be removed from the advisory committee upon a majority
recommendation from the committee.
Should a member resign from the advisory committee, new applications will be submitted, and
the Board of County Commissioners shall select a new rate payer from that Commissioner
District.
Terms of the committee shall begin January 1, 2019.
Article 4 — Termination:
Removal — If the Kittitas County Flood Control District Advisory Committee members
determine by a majority vote that a member should be removed; the Chair of the Committee shall
report that recommendation to the Board of County Commissioners for its consideration.
Resignation — Resignations by members shall be submitted, in writing, to the Committee Chair
or Clerk. They will forward a copy of the resignation to the Board of County Commissioners.
Reasons for dismissal — The Board of County Commissioners may remove a member when it is
determined it is in the best interest of the Committee or the county to do so.
Article 5 — Meetings:
The Advisory Committee shall meet once a month on the fourth (4`h) Wednesday of each month
in the Commissioner's Auditorium at the Kittitas County Courthouse at 5:30pm. Regularly
scheduled meetings may be canceled with advanced notification.
Special meetings of the Advisory Committee may be held at the request of the Board of County
Commissioners, or as matters arise that require the Committee's attention.
All meetings of the Advisory Committee are open to the public and are subject to the Public
Records Act.
Public comments will be encouraged and will be accepted verbally or in writing. Anyone who
wishes to voice an opinion, information or concerns to the Committee may attend meetings and
time will be allotted at the beginning of meetings as appropriate to assure public participation.
Items may be placed on a meeting agenda by any Committee member or by county staff.
Members shall be provided with a copy of the agenda and supporting materials in advance of the
meeting.
Staff from Kittitas County Public Works shall be the Clerk of the Committee and will be
responsible for taking and documenting the minutes from all meetings of the Advisory
Committee. These minutes will then be approved at a future meeting and placed on the Kittitas
County website.
The majority of the appointed committee members will constitute a quorum for the transaction of
all business at meetings.
Each Committee member will be entitled to one (1) vote on all issues presented at meetings at
which the member is present. Simple majority vote is the primary decision-making method. The
committee's goal for a primary decision-making method is consensus. Majority is defined as a
simple majority of the appointed committee members.
Article 6 — Capital Facility Plan:
The Kittitas County Flood Control Zone District Advisory Committee shall each year
recommend an annual and six-year Capital Facility Plan to the Board of County Commissioners.
This Capital Facility Plan will be developed utilizing project evaluation criteria. Ranked projects
are reviewed and adopted each year by the Committee.
Article 7 — Amendment to Bylaws:
The Kittitas County Flood Control Zone District Advisory Committee shall periodically review
the bylaws and may propose amendments to the bylaws. Any recommendations agreed upon by
simple majority of the members shall be forwarded to the Board of County Commissioners for
approval.
Article 8 — Adoption:
Bylaws are in full force and effect when adopted and approved by the Kittitas County Flood
Control Zone District Advisory Committee and the Board of County Commissioners.
Article 9 — Bylaws Review:
Bylaws shall be reviewed annually by the Kittitas County Flood Control Zone District Advisory
Committee and the Board of County Commissioners.
*The foregoing Bylaws of the Kittitas County Flood Control Zone District Advisory Committee
approved and adopted this 26th day of September and approved and adopted by the Board of
County Commissioners this 26th day of November 2018.
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: March 22, 2021
TOPIC: Benson Road Vacation Request
ACTION REQUESTED: Prepare Enabling Legislation and Schedule the Public
Hearing
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Prepare enabling legislation and schedule the required public hearing.
BRIEFING SUMMARY:
• Dedicated plat public right of way inside a private subdivision.
• Road was never built.
Lot owner desires clearing title and having full use of the property.
Public Works (PW) supports the requested vacation with no value for the vacated
right of way.
BACKGROUND:
Within the plat of "Timber Valley"; large portions of Little Creek Road and Timber
Valley Road were not constructed. A portion of Nelson Creek Road was also not
constructed. The property owner of lots 100-103 and 87-90, has dedicated public right of
way separating his lots (see EXHIBIT 1). Because that the right of way is dedicated for
public use, Public Works is required to vacate pursuant to county code and state law.
DISCUSSION:
The requested vacation preserves access to an adjoining parcel as thirty (30) feet are
reserved for a future private driveway. The action allows parcels 87-103 to be joined and
the property owner is no longer burdened by the right of way. PW is proposing that no
value be assigned to the right of way as no improvements have been created impacting
any Road Fund expenditures. A subsequent record of survey by the property owner will
clear title and allow full use of the proponent's property. PW supports the requested
vacation of a portion of Nelson Creek Road and a portion of Little Creek Road (legal
description attached as EXHIBIT 2).
FISCAL IMPACTS:
The applicant has paid PW's vacation application fee of $4,205.00.
Page 1 of 4
Public Works "Work Session Staff Report", 2021
ATTACHMENTS:
Exhibit 1: Plat of Timber Valley with the proposed ROW vacation highlighted
Exhibit 2: Legal Description of proposed ROW vacation limits
Page 2 of 4
Public Works "Work Session Staff Report", 2021
EXHIBIT 1: PLAT OF TIMBER VALLEY WITH THE PROPOSED ROW
VACATION HIGHLIGHTED
LA- no 64
Page 3 of 4
Public Works "Work Session Staff Report", 2021
EXHIBIT 2: LEGAL DESCRIPTION OF PROPOSED ROW VACATION LIMITS
TIMBER VALLEY 1
COUNTY ROAD VACATION LEGAL DESCRIPTION
That portion of the Plat of Timber Valley 1, recorded in Book 6 of Plats at Page 3, under
Auditor's File No. 381784, records of Kittitas County Washington, described as follows:
All that portion of Nelson Creek Road, Timber Valley Road and Little Creek Road
located between centerline and the roadside face of Lots 87, 88, 89, 90, 100, 101, 102,
and 103 of said plat. The terminal lines to be drawn perpendicular to road centerline
except for lot 100, where the terminal line runs from centerline angle point to Northwest
corner of right of way.
Page 4 of 4
Public Works "Work Session Staff Report", 2021
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: March 22, 2021
TOPIC: Interlocal Agreement with State Parks — Ginko Parking Lot Improvement
Design and Construction
ACTION REQUESTED: Direct Staff Prepare Enabling Documents
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Direct staff prepare enabling documents for Board consideration.
BRIEFING SUMMARY:
• State Parks is requesting Public Works (PW) design parking lot improvements to
Ginko State Park and administer construction of the project.
• PW is preparing to improve Vantage Highway in front of Ginko.
• Vantage Highway improvements are anticipated to have some impact on the
existing parking lot.
• This is a unique opportunity to improve the parking lot in conjunction with our
Vantage Highway improvement project.
• A draft interlocal agreement is attached as EXHIBIT 1.
BACKGROUND:
PW is improving Vantage Highway from Vantage to the top of the grade. The entrance
to Ginko State Park will likely be impacted by PW improvements to Vantage Highway.
State Parks has desired improvements to the existing parking lot for some time and is
now requesting design and construction support.
DISCUSSION:
Improvements to Ginko State Park will facilitate better traffic circulation and allow for
improvements to stormwater discharges from the existing parking lot. PW has the
expertise and capacity to support parking lot design and construction services at Ginko
State Park that will complement our current scheduled improvements to Vantage
Highway.
FISCAL IMPACTS:
PW will obtain cost recovery from State Parks for parking lot design efforts. Total
design and construction services are estimated to cost $130,411.
Page 1 of 4
Public Works "Work Session Staff Report", 2021
ATTACHMENTS:
Exhibit 1: Draft interlocal with State Parks.
Exhibit 2: Map of the parking area.
Page 2 of 4
Public Works "Work Session Staff Report", 2021
EXHIBIT 1: DRAFT INTERLOCAL WITH STATE PARKS — GINKO PARKING
LOTIMPROVEMENTS
Page 3 of 4
Public Works "Work Session Staff Report", 2021
INTERLOCAL AGREEMENT BETWEEN KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS AND WASHINGTON STATE
PARKS FOR THE DESIGN AND CONSTRUCTION OF A PARKING LOT
AT GINKO STATE PARK
This Interlocal Agreement is made and entered into this day of , 2021, by and
between Kittitas County (hereinafter the "COUNTY") and Washington State Parks (hereinafter
the "STATE PARKS").
RECITALS
WHEREAS, the Interlocal Cooperation Act, as amended, and codified in Chapter 39.34 of the
Revised Code of Washington ("RCW"), provides for public agencies to enter into agreements for
joint or cooperative action authorized under that chapter; and
WHEREAS, Kittitas County and Washington State Parks are public agencies within the
meaning of chapter 39.34 RCW; and
WHEREAS, Kittitas County is improving Vantage Highway summer of 2021 from mile post
21.25 to milepost 27.51 and will be impacting the parking lot at Ginko State Park; and
WHEREAS, Kittitas County has the expertise and experience designing parking lot
improvements and is offering to design improvements at Ginko State Park in conjunction with
2021 Vantage Highway improvements; and
WHEREAS, State Parks desires utilizing the County's design expertise and has sufficient
funding supporting the design of parking lot improvements to Ginko State Park; and
WHEREAS, State Parks desires having the County administer the construction parking lot
improvements and has sufficient funding for construction and project administration;
NOW THEREFORE, it is agreed as follows
TERMS
1. Legal Basis. This Agreement is entered into pursuant to Chapter 39.34 (the Interlocal
Cooperation Act).
2. Purpose. The purpose of this agreement is for the COUNTY and STATE PARKS to
work cooperatively to perform the Scope of Work identified in Exhibit A and for the
COUNTY to provide design and construction services to STATE PARKS for the
completion of the tasks identified in Exhibit A along with the fee estimate for service
Interlocal Agreement between State Parks and Kittitas County Public Works for Ginko State Park Parking
Lot Improvements
identified in Exhibit B. It is anticipated that STATE PARKS will accept the final bid
ready plans and specifications upon satisfaction that the Scope of Work has been
completed and authorize construction of parking lot improvements administered by the
County.
3. Term of Agreement. The term of this Agreement shall be from its effective date
through December 31, 2021 or as otherwise agreed to by the parties as provided in
Section 14 or terminated as provided in Section 16.
4. Payment. Payment shall be made on a reimbursable basis for costs incurred by the
COUNTY to complete the scope of work identified in Exhibit A (Ginko State Park
Parking Lot Improvements design and construction management. Payment for
satisfactory performance shall not exceed $130,411.00 unless the parties mutually agree
in writing to a higher amount.
5. Billing Procedure. The COUNTY shall submit invoices monthly. Invoices are to be
sent to: STATE PARKS (c/o Mr. Brian Patnode, 270 9' Street NE, Suite 200, East
Wenatchee, WA 98802) and will be paid within thirty (30) days of receipt by STATE
PARKS. Upon expiration of the Agreement, any claim for payment not already made
shall be submitted within thirty (30) days after the expiration date or termination of the
Agreement, whichever is earlier.
6. Contract Management. The Agreement Administrator for each of the parties shall be
responsible for and shall be the contact person for all communications and billings
regarding the performance of this Agreement.
The Agreement Administrator for STATE PARKS is Mr. Brian Patnode, 270 9`s Street
NE, Suite 200, East Wenatchee, WA 98802.
The Agreement Administrator for the COUNTY is: Josh Fredrickson, PE, 411 North
Ruby Street, Suite 1, Ellensburg, WA 98926. Telephone: 509-962-7523.
Maintenance of Record. Each parry hereto agrees to maintain books, records and
documents using accounting procedures which accurately reflect all direct and indirect
costs related to the performance of services described herein. Each party may examine
the other party's books and records to verify the accuracy of invoices. Each party's fiscal
management system shall include the capability to provide accurate and complete
disclosure of all costs invoiced under this Agreement. All books, records, documents and
other materials relevant to this agreement will be retained for six years after expiration of
the Agreement, and the Office of the State Auditor and any persons duly authorized by
Interlocal Agreement between State Parks and Kittitas County Public Works for Ginko State Park Parking
Lot Improvements
the parties shall have full access and the right to examine any of these materials during
this period. Each party will utilize reasonable security procedures and protections to
assure that records and documents provided by the other parry are not erroneously
disclosed to third parties.
8. Indemnification. Each party agrees to be responsible and assume liability for its own
wrongful and/or negligent acts or omissions, or those of its officers, agents or employees
to the fullest extent provided by the law, and further agrees to save, indemnify, defend
and hold harmless the other parry from any and such liability arising out of the
performance of this Agreement. In the case of negligence of more than one party, any
damages allowed shall be levied in proportion to the percentage of the negligence
attributable to each party. This indemnification paragraph shall survive the termination
of this Agreement.
9. Assignment. This Agreement cannot be assigned, transferred or any portion
subcontracted by either party hereto without the prior written consent of the other party,
which consent shall not be reasonably withheld.
10. Future Support. Neither parry to this Agreement makes any commitment to future
support and assumes no obligation for future support of any activity contracted for herein,
except as may be expressly set forth in this Agreement.
11. Compliance with Laws. Each party hereto, in its performance of this Agreement, agrees
to comply with all applicable local, State and Federal laws and ordinances.
12. Relationship of the Parties. In the performance of the work herein contemplated
(Exhibit A), the parry performing the work is an independent contractor with the
authority to control and direct the performance of the details of the work; however, the
work contemplated herein shall be subject to the general rights of inspection and review
of the party requesting the work be done, to secure the satisfactory completion thereof.
13. Jurisdiction. Any legal dispute between the parties to this Agreement shall be governed
by the laws of the State of Washington, and any action to enforce this Agreement shall be
brought in Kittitas County, Washington.
14. Modification. The provisions of this Agreement may be modified or amended only by
written mutual agreement of the parties, executed by personnel authorized to bind each of
the parties.
Interlocal Agreement between State Parks and Kittitas County Public Works for Ginko State Park Parking
Lot Improvements
15. Waiver. A failure by either party to exercise its rights under this Agreement shall not
preclude that party from subsequent exercise of such rights and shall not constitute a
waiver of any other rights under this Agreement unless stated to be such in a writing
signed by an authorized representative of the party and attached to the original
Agreement.
16. Termination. This Agreement shall remain in full force and effect until terminated on
December 31, 2021, by mutual written agreement of the parties, or by written notice of
termination given by one party to the other at least thirty (30) days prior to the date of
such termination; or upon final acceptance of Exhibit A deliverables by STATE PARKS.
17. Agreement Not for Benefit of Third Parties. This Agreement is entered into solely for
the benefit of the parties hereto and vests no rights in, or is it enforceable by, any third
parties.
18. Severability. If any provision of this Agreement or any provision of any document
incorporated by reference shall be held invalid, such invalidity shall not affect the other
provisions of this Agreement which can be given effect without the invalid provision, if
such remainder conforms to the requirements of applicable law and the fundamental
purpose of this agreement, and to this end the provisions of this Agreement are declared
to be severable.
19. Filing. This Agreement shall be filed with the Kittitas County Auditor, or, alternatively,
listed by subject on each or either party's website or other electronically retrievable
public source pursuant to Revised Code of Washington 39.34.040.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed as of
the date first written above.
STATEPARKS
Attest:
KITTITAS COUNTY
Brett Wachsmith, Chairman
Attest:
Interlocal Agreement between State Parks and Kittitas County Public Works for Ginko State Park Parking
Lot Improvements
Clerk of the Board
Approved as to Form:
County Prosecuting Attorney
Interlocal Agreement between State Parks and Kittitas County Public Works for Ginko State Park Parking
Lot Improvements
h►v::r3awl
Scope of Work
Ginko State Park Parking Lot Improvements
Interlocal Agreement between State Parks and Kittitas County Public Works for Ginko State Park Parking
Lot Improvements
Po�T. °"""""S T"T"`���y6 KZTTZTAiS COUNTY
DEPARTMENT OF PUBLIC WORKS
wimps MUu Mark R. Cook, PE Director
EXHIBIT A
SCOPE OF WORK
Ginkgo State Park Parkin¢ Lot Improvement
Vantage Highway Milepost 25.75
Washington State Parks (STATE) desires to make improvements to their parking lot serving
Ginkgo State Park adjacent to Vantage Highway. The parking lot is located at approximate
milepost 25.75 on the north side of Vantage Highway. The parking lot is currently gravel with
one access at the eastern side, a solar powered charging station and pit toilet are also on the site.
The project is to be completed in two phases. Phase I includes engineering and design of the
parking lot improvement. Phase II is construction support of said improvements. Phase II will be
authorized by Washington State Parks providing work can be completed by June 30, 2021.
Kittitas County Public Works (KCPW), shall provide professional services to the Washington
State Parks for the Ginkgo State Park Parking Lot Improvement project (PROJECT) as outlined
in the Work Task descriptions below. The following general provisions/assumptions have been
made:
A. Work conducted will meet STATE design standards.
B. It is anticipated that one (1) bid package including plans and estimate will be prepared for
all elements of the PROJECT.
C. Specifications for construction will use Washington Department of Transportation
Standard Specifications for Road, Bridge, and Municipal Construction 2021.
D. Project specific specifications are not anticipated.
E. All necessary permits will be obtained by STATE
F. The STATE shall pay all fees for permitting, advertising or other associated fees
necessary for the PROJECT.
G. No federal funds shall be used in design or construction of the PROJECT.
H. All calculations, analyses, design, plans, specifications, and other project work will be
prepared in English units. The use of metric units for any aspect of the work will not be
required.
I. It is understood and agreed that tasks may be added or deleted from the scope of services
by mutual agreement between the STATE and KCPW.
J. Construction is to be completed by KCPW.
Kittitas County Public Works agrees to perform the following services:
ENGINEERING DESIGN, PLANS, ESTIMATE AND CONSTRUCTION SUPPORT
411 N. Ruby St, Suite #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
Dept. of Public Works
Page 2
1. Provide complete project management necessary to deliver the PROJECT within
mutually agreed expectations, including progress reports, schedule updates, and invoice
preparation.
2. Attend meetings with the STATE regarding technical aspects of the work. It is
anticipated up to two (2) meetings may be held at mutually agreed location.
3. Perform field visit necessary to confirm aspects of the design.
4. Submit preliminary plans, design assumptions and cost estimate.
5. Based on approved preliminary plans and estimate, finalize, submit and review 90%
plans and estimate with the STATE.
6. Based on approved 90% plans and attached cost estimate, finalize, and submit 100%
plans and cost estimate to the STATE.
7. Perform in-house quality control and assurance review.
8. Furnish electronic copies of the final plans and estimate in .pdf format.
9. Prepare and submit Engineer's Opinion of Cost.
Deliverables:
PHASE I—
Preliminary plans and cost estimate
Plans, cost estimate at 90% and Final completion
Electronic copies of final plans and estimate in .pdf format
PHASE II —
Based on availability of KCPW resources, Equipment, material, and labor to construct
improvements outlined on the design documents.
Construction management
ADDITIONAL SERVICES
For services not included in the Scope of Work, the STATE may request KCPW complete
additional services, as mutually agreed, at the rates in affect at the time of service.
TIME OF PERFORMANCE:
ENGINEERING DESIGN, PLANS, ESTIMATE, AND BIDDING
PHASEI-
All work described in the Scope of Services above shall begin upon authorization to proceed and
be completed no later than April 23, 2021.
PHASE II —
At the request of the STATE, construction work is to be complete by June 30, 2021.
FEE FOR SERVICES:
For the services furnished by KCPW as described above, STATE agrees to pay KCPW the fees
as set forth herein. The maximum amount listed below may be revised only by written agreement
of both parties.
411 N. Ruby Sl, Suite #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
Dept. of Public Works
Page 3
ENGINEERING DESIGN, PLANS, ESTIMATE AND CONSTRUCTION
PHASEI-
All work described in the Scope of Services above shall be performed on an hourly basis for the
maximum amount of $10,996.00 (see attached fee summary).
PHASE II—
Construction work described on the design plans shall be performed on a lump sum basis for the
maximum amount of $119,855 (see attached fee summary).
411 N. Ruby Sl, Suite #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509)962-7663
EXHIBIT B
Fee Estimate for design and construction management — Ginko State Park Parking Lot
Improvements
Interlocal Agreement between State Parks and Kittitas County Public Works for Ginko State Park Parking
Lot Improvements
Ginkgo State Park Parking Lot
MIP N/A TO PROJECT LENGTH N/A
UTIO21 Days
SCOPING ESTIMATE $130,8S1 ;ONSTRUCTION CREATED: 3/12/2021 By: C. CURTIS
Construction of parking lot improvements at Ginko State Park consisting of drainage improvments, grading, aspahlt paving and stripping. Phase 1 design costs
are estimate at $10,996. Phase 2 costs are estmated at $119,855.
QUANT.
UNIT
ITEM NO.
ITEM
UNIT PRICE
AMOUNT
PREPARATION
1
L.S.
0001
MOBILIZATION
10%
$9,088
1
L.S.
0050
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
$1,000.00
$1,000
DRAINAGE
250
C.Y.
1030
DITCH EXCAVATION
$14.00
$3,500
80
L.F.
3567
HIGH-DENSITY POLYPROPYLENE (HDPE) PIPE 18 IN. DIAM
$90.00
$7,200
1
EACH
3091
CATCH BASIN TYPE 1
$1,450.00
$1,450
SURFACING
460
C.V.
5095
CRUSHED SURFACING BASE COURSE
$35.00
$16,100
HOT MIX ASPHALT
450
TON
5767
HMA CL. 1/2 IN. PG 64-28
$135.00
$60,750
TRAFFIC
700
L.F.
6806
PAINT LINE
$1.25
$875
PROJECT CHANGE TRACKING I BID ITEM SUBTOTAL WIO MOBILIZATION
$90,875
3/17/2021 MC Added detail for interlocal agreement exhibit inclusion
DESIGN ALLOCATIONS 10.00°
BID ITEM TOTAL
SALES TAX @ 0.00
PROJECT SUBTOTAL
CONSTRUCTION ENGINEERING @ 5
CONTINGENCIES @ 4%
CN ESTIMATE
PE PHASE 10%
$0
$109,959
$5,498
$4,398
$119,855
10,996
EXHIBIT 2: MAP OF GINKO PARKING LOT
Page 4 of 4
Public Works "Work Session Staff Report", 2021
Project Area
Ginko State Park
Parking Area Project
a
t i� it}�'' • s L '
i
v L'
N
W+E
S
Project Vacinity
Vantage Highway
Milepost 25 76
City of Vantage 2 05mi East
City of Ellensburg 24.81 mi West
Legend
All Roads
Owned By
- KITTITAS COUNTY
`.
11, 1
IIt L tii to .•F-.� . .
0.05 0.075 0.1 l
Mile<
Source Esn DJgi,aIGA' e�+GeoEye Earthstar GeograpNics GNE'�%AiibusD!s",
i icnA wrasZoa: nRin�ir?`n�J rv,ai rrro,ri�c'_i r{
•:�.�.'
a
'.
c.-
•tet. i•
I...
Project Vacinity
Vantage Highway
Milepost 25 76
City of Vantage 2 05mi East
City of Ellensburg 24.81 mi West
Legend
All Roads
Owned By
- KITTITAS COUNTY
`.
11, 1
IIt L tii to .•F-.� . .
0.05 0.075 0.1 l
Mile<
Source Esn DJgi,aIGA' e�+GeoEye Earthstar GeograpNics GNE'�%AiibusD!s",
i icnA wrasZoa: nRin�ir?`n�J rv,ai rrro,ri�c'_i r{