Loading...
HomeMy WebLinkAboutResolution_HLA TO 1_Kachess CulvertKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS 2021 AGENDA STAFF REPORT AGENDA DATE: March 16, 2021 ACTION REQUESTED: Request to approve a Resolution to authorize the Director's Signature on HLA Engineering and Surveying Inc. Task Order #1 — Kachess Road Culvert Replacement Design BACKGROUND: Recently, Public Works removed design duties for the Kachess Lake Culvert replacement project from Jacobs Engineering. The design process had stalled, and progress was not being made. Concerns regarding spring 2021 runoff and the existing integrity of the failing metal culvert necessitates immediate corrective action. Public Works has a Task Order contract with HLA Engineering and Surveying Inc. and has negotiated a scope of work and fee to complete design efforts. The task order cost is $80,000. INTERACTION: Public Works. RECOMMENDATION: Authorize the Director's signature on Task Order No. I with HLA Engineering and Surveying Inc. for final design of the Kachess Road Culvert Replacement. HANDLING: Return one original to Public Works. ATTACHMENTS: Resolution; Task Order No. 1 with HLA LEAD STAFF: Mark R. Cook, Director. BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2021 - AUTHORIZING THE DIRECTOR OF PUBLIC WORKS TO SIGN TASK ORDER NO. 1 WITH HLA ENGINEERING AND SURVEYING, INC. FOR THE FINAL DESIGN OF THE KACHESS ROAD CULVERT REPLACEMENT PROJECT WHEREAS: Public Works has a master Task Order contract in place with HLA Engineering and Surveying Inc. resulting from a solicitation effort from 2020; and WHEREAS: Jacobs Engineering is unable to finalize design of the Kachess Road Culvert Replacement in a timely manner; and WHEREAS: Concerns over the integrity of the existing metal culvert necessitate immediate action finalizing culvert design components; and WHEREAS: Public Works has negotiated a scope of work and fee for HLA Engineering and Surveying, Inc. to complete final design of the needed culvert replacement, NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby authorize the Director of Public Works signature on HLA Engineering and Surveying, Inc. Task Order No. 1 for $80,000.00. DATED this 16th day of March 2021, at Ellensburg, Washington. BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Brett Wachsmith, Chairman Attest: ❑ Clerk of the Board- Julie Kjorsvik Laura Osiadacz, Vice -Chairman ❑ Deputy Clerk of the Board- Mandy Buchholz Cory Wright, Commissioner uo,..o,N KITTZTAIS COTJNTY c coy 4 Y DEPARTMENT OF PUBLIC WORKS K=]TAS COONN Formal Task Order Document HLA Engineering and Land Surveying Inc. Task Order Number 01 Maximum Amount Payable $80,000.00 Completion Date 07/31/2021 The general provisions and clauses of Professional Services Agreement dated 05/28/2020 shall be in full force and effect for this Task Order. Location of Project: Kachess Road MP 2.30 to MP 2.70 Project Title: Kachess Lake Road Culvert Replacement Description of Work: Design a culvert that accommodates realignment of the stream replacing an undersized metal culvert that is problematic for maintenance. The new culvert minimizes maintenance and facilitates fish passage. A complete scope of work is attached as EXHIBIT A to this task order. Cost Breakdown: See attached EXHIBIT B Project Schedule: Begin design 04/01/2021 and complete design no later than 07/31/2021. Agency Signature: Date: Consultant Signature: aJw, zer Date: 3 io Zv �`si EXHIBIT A SCOPE OF WORK Kachess Lake Road Culvert Replacement Kachess Road MP 2.30 to MP 2.70 HLA Project No. 21077E Kittitas County (COUNTY) desires to replace an existing undersized culvert crossing Kachess Lake Road to minimize maintenance and improve fish passage. The culvert is located at approximate MP 2.70 and replacement includes stream realignment both upstream and downstream of the culvert. HLA Engineering and Land Surveying, Inc. (HLA), shall provide professional services to the COUNTY for the Kachess Lake Road Culvert Replacement project (PROJECT) as outlined in the Work Task descriptions below. The following general provisions/assumptions have been made: A. Work conducted will meet COUNTY design standards. B. It is anticipated one (1) bid package will be prepared for all elements of the PROJECT, and the COUNTY plans to Advertise for Bids in July 2021. C. The COUNTY will obtain an approved Hydraulic Project Approval (HPA) necessary to complete the PROJECT. D. All stream and culvert hydraulics have been performed by others, culvert size and material have been previously selected, and all items have been approved by the COUNTY for use in the design. E. The COUNTY will obtain all right of way and/or easements necessary for construction of the improvements. F. The COUNTY shall pay all fees for permitting, advertising or other associated fees necessary for the PROJECT. G. The COUNTY will prepare all documents necessary to meet the federal funding requirements of the PROJECT. No federal funds shall be used in design of the PROJECT. H. All calculations, analyses, design, plans, specifications, and other project work will be prepared in English units. The use of metric units for any aspect of the work will not be required. I. It is understood and agreed that tasks may be added or deleted from the scope of services by mutual agreement between the COUNTY and HLA. HLA Engineering and Land Surveying, Inc. (HLA) agrees to perform the following services: ENGINEERING DESIGN PLANS SPECIFICATIONS ESTIMATE AND BIDDING 1. Provide complete project management necessary to deliver the PROJECT within mutually agreed expectations, including progress reports, schedule updates, and invoice preparation. 2. Attend meetings with the COUNTY regarding technical aspects of the work. It is anticipated up to two (2) meetings may be held. 3. Coordinate project information with the COUNTY's environmental consultant. 4. Perform field visit necessary to confirm aspects of the design. 5. Review and prepare for design use the topographic survey completed and provided by the COUNTY. 6. Coordinate and establish project assumptions/design matrix with the COUNTY. 7. Prepare preliminary plans and cost estimate and submit to the COUNTY for review and comment. 8. Notify utility companies of the pending improvements. 9. Review and coordinate design elements of the preliminary plans with the COUNTY. 10. Verify proposed improvements fall within established right of way and easements obtained by the COUNTY. G1Contracts & Task OrdersWhiitas CountyV0212021-03-10 Kachess Lake Road CulvertReplacement Scope. oc Page 1 of 2 11. Based on approved preliminary plans and design assumptions, finalize, submit and review 60% plans, specifications, and estimate with the COUNTY. 12. Based on approved 60% plans, specifications, and estimate, finalize, submit, and review 90% plans, specifications, and estimate with the COUNTY. 13. Based on approved 90% plans, specifications, and estimate, finalize and submit 100% plans, specifications, and cost estimate to the COUNTY. 14. Perform in-house quality control and assurance review. 15. Furnish electronic copies of the final plans, specifications, and estimate in .pdf format. 16. Prepare and submit Engineer's Opinion of Cost. 17. Answer questions from the COUNTY and prospective bidders during the bidding period. 18. If necessary, prepare and provide Addenda to the COUNTY. Deliverables: Project assumptions/design matrix Preliminary plans and cost estimate Plans, Specifications, and Cost Estimate at 60%, 90% and Final completion Electronic copies of final plans, specifications, and estimate in .pdf format ADDITIONAL SERVICES For services not included in the Scope of Work, the COUNTY may request HLA complete additional services, as mutually agreed, at the rates in affect at the time of service. TIME OF PERFORMANCE: ENGINEERING DESIGN, PLANS, SPECIFICATIONS, ESTIMATE, AND BIDDING All work described in the Scope of Services above shall begin upon authorization to proceed and be completed no later than July 31, 2021. All bidding assistance services are anticipated to be provided during a three-week bidding period determined by the COUNTY following July 31, 2021. FEE FOR SERVICES: For the services furnished by HLA as described above, COUNTY agrees to pay HLA the fees as set forth herein. The maximum amount listed below may be revised only by written agreement of both parties. DESIGN ENGINEERING. PLANS, SPECIFICATIONS, ESTIMATE, AND BIDDING All work described in the Scope of Services above shall be performed on an hourly basis for the maximum amount of $80,000 (see attached fee summary). GAContnacls & Task Orders\Kittitas County\2021\202143.10 Kschess Lake Road Culvert Replacement Scope.Doc Page 2 of 2 EXHIBIT B Proecl Title: Kachess Lake Road Culvert Replacement Client: Kittitas Count Date: March 10, 2021 ENGINEER'S HOURLY ESTIMATE Task No Protecl Task Senior Pnncipal Engineer License tl Principal Engineer Project Engineer Licensed Land Surve or Two Man Survey Crew CAD Technician Admlm Clerical Total Hours Tasn Direct Costs $222 1 $200 $165 $164 1 $230 1 $130 1 $87 Engineering Design, Plans, Specifications, Estimate and Bidding 1 Project Management, Reports, Schedule & Invoices 8 16 0 0 0 0 4 28 $5,324 2 Attend Meetings with the COUNTY regarding Technical Aspects of the Work (est. 2 ea) 4 8 0 0 0 4 2 18 $3,182 3 Coordinate Environmental Services by Jacobs 0 4 4 0 0 0 0 8 $1,460 4 Perform Field Visit 0 8 4 0 0 0 0 12 $2,260 5 Review and Prepare Topographic Survey (By Kilt Co.) 0 4 0 0 0 16 0 20 $2,880 6 Project Assumpgons/Design Matrix 0 2 4 0 0 2 0 8 $1,320 7 Prepare Preliminary Plans and Cost Estimate 4 16 16 0 0 24 2 62 $10,022 8 Notify Private Utility Companies of Pending Imp, 0 2 4 0 0 2 0 B $1,320 9 Coordinate Design with County 0 S 8 0 0 4 0 20 $3,440 10 Verify ow and easements 0 2 2 4 0 2 0 10 $1,646 11 lFinalize, Submit and Review 60%PS&E with COUNTY 4 18 24 0 0 40 8 94 $14,344 12 Finalize, Submit and Review 90%PS&E with COUNTY 4 16 24 0 0 40 6 90 $13,770 13 Perform and Submit Final PS&E to COUNTY 16 0 0 24 4 60 $9,396 14 In-house quality control and assurance review 4 0 0 4 2 16 $2,598 15 Furnish electronic copies of Final PS&E 2 0 0 2 1 7 $1,077 16 Prepare and Submit Engineer's Opinion of Cost 4 0 0 4 0 12 $1,980 17 Answer Questions during Bidding Period !3E32 4 0 0 2 0 10 $1,720 18 Prepare Addenda (est. 1) 4 0 0 6 2 14 $2,014 19 Advertisement, Bidding, Review and Award by KiB. Co. 0 0 0 0 0 0 $0 Labor Subtotal 124 40 176 31 497 $79,753 SUBCONSULTANTS Subconsultants Fee Mark -u None Anticipated $0 1.1 $0 Subtotal Subconsultants $0 EXPENSES Expenses: Ground Das Das Miles Units Mileage 440 $250 MManavementReserve Expenses $25D $250 F Tool�Eng'f aFlrig De�lph,�CJenu,iBpgoltice�l8ie", 114¢i► i�;d�iailt .a