My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_HLA TO 1_Kachess Culvert
>
Meetings
>
2021
>
03. March
>
2021-03-16 10:00 AM - Commissioners' Agenda
>
Resolution_HLA TO 1_Kachess Culvert
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:45:27 PM
Creation date
3/11/2021 1:45:18 PM
Metadata
Fields
Template:
Meeting
Date
3/16/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
o
Item
Request to Approve a Resolution to Authorize the Director's Signature on HLA Engineering and Surveying, Inc. Task Order #1 - Kachess Road Culvert Replacement Project
Order
15
Placement
Consent Agenda
Row ID
73736
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />2021 AGENDA STAFF REPORT <br />AGENDA DATE: March 16, 2021 <br />ACTION REQUESTED: Request to approve a Resolution to authorize the Director's <br />Signature on HLA Engineering and Surveying Inc. Task <br />Order #1 — Kachess Road Culvert Replacement Design <br />BACKGROUND: Recently, Public Works removed design duties for the <br />Kachess Lake Culvert replacement project from Jacobs <br />Engineering. The design process had stalled, and progress <br />was not being made. Concerns regarding spring 2021 <br />runoff and the existing integrity of the failing metal culvert <br />necessitates immediate corrective action. Public Works has <br />a Task Order contract with HLA Engineering and <br />Surveying Inc. and has negotiated a scope of work and fee <br />to complete design efforts. The task order cost is $80,000. <br />INTERACTION: Public Works. <br />RECOMMENDATION: Authorize the Director's signature on Task Order No. I <br />with HLA Engineering and Surveying Inc. for final design <br />of the Kachess Road Culvert Replacement. <br />HANDLING: Return one original to Public Works. <br />ATTACHMENTS: Resolution; Task Order No. 1 with HLA <br />LEAD STAFF: Mark R. Cook, Director. <br />
The URL can be used to link to this page
Your browser does not support the video tag.