2. QUADCO TAP Grant with the City of Ellensburg
3. Infrastructure for Rebuilding America Grants (INFRA) Notice of Funding Opportunity
4. Thompson Park Milfoil Treatment Donation
5. Other business
6. Adjourn
Created on 3/5/2021 8:06:34 AM
KITTITAS COUNTY
PUBLIC WORKS STUDY SESSION MINUTES
Webex
Regular Meeting
MONDAY 1:30 PM MARCH 8, 2021
Board members present: Chairman Brett Wachsmith, Vice -Chairman Laura
Osiadacz and Commissioner Cory Wright
Others: Mark Cook, Candie Leader, Josh Fredrickson, Rebecca Cruse,
Nicole Ogan, Public Works; Dan Carlson, Jessica Miller, Mike Flory,
Pat Nicholson, Ryan McAllister, Community Development Services; Neil
Caulkins, Prosecuting Attorney's Office; Marc Eylar, Noxious Weed and
One (1) Member of the Public
At 1:30 pm Chairman Brett Wachsmith opened the Public Works Study
Session.
QUADCO TAP GRANT WITH THE CITY OF ELLENSBURG
Mark Cook gave background on the grant program through QUADCO and
last week staff had a meeting with the City of Ellensburg regarding a
project for a new pedestrian connection on Pfenning Road and Third
Avenue. Mark Cook continued that the City of Ellensburg asked if the
County would be interested in partnering on the grant application and
a twenty (20) percent match would be used. Mark Cook added that the
City of Ellensburg and the County would each be responsible for ten
(10) percent and county staff would provide the survey. Discussion
was held. Staff was directed to move forward with the grant
application with the City of Ellensburg.
INFRASTRUCTURE FOR REBUILDING AMERICA GRANTS (INFRA) NOTICE OF
FUNDING OPPORTUNITY
Mark Cook gave background on the grant program and stated that staff
did research on doing a design application for the I-90 widening
project however, the application would be secondary to any projects
that are construction ready. Mark Cook continued that the grant
application would have to be done by the middle of March and it
doesn't seem feasible to get an application done by that timeline.
Mark Cook added that the Washington State Department of
Transportation did request a letter of support for the re -decking of
the bridge over the Columbia River and that has been sent over for
BOCC review and consideration. Discussion was held. No direction
was given.
2021-03-08 MINUTES
THOMPSON PARK MILFOIL TREATMENT DONATION
Mark Cook gave background on Thompson Park and the renaming to honor
Sheriff Deputy Ryan Thompson along with other improvements to the
park by the county road crew and milfoil treatment. Mark Cook stated
that Marc Eylar with Noxious Weed contacted him about the donation of
herbicide to control the milfoil infestation that does not affect the
wildlife. Mark Cook added that Noxious Weed would donate staff time
to apply the herbicide and no fiscal impacts are expected. Marc
Eylar commented that the owner of the vegetation company contacted
him after seeing the article in the newspaper for the renaming of the
park and wanted to get involved. Marc Eylar added that he is
licensed to apply the herbicide as well. Staff was directed to move
forward with the application.
OTHER BUSINESS:
There was no other business for discussion.
Meeting adjourned at 1:45 pm.
k; _
Candie Leader
2021-03-08 MINUTES
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Brett Wachsmith, Chairman
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: March 8, 2021
TOPIC: QUADCO TAP Grant with the City of Ellensburg
ACTION REQUESTED: Support Staff
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Support staff making a joint TAP Grant application with the City of Ellensburg.
BRIEFING SUMMARY:
• The City of Ellensburg desires applying to QUADCO for a Transportation
Alternative Program (TAP) grant.
• The City proposes a new pedestrian connection along the West side of Pfenning
Road connecting Palouse to Cascade Trail to the existing multi -use pathway on
3rd Avenue.
• The trail will require a pedestrian bridge spanning Town Ditch.
• School District support is anticipated, and the route provides a connection for
Valley View Elementary School, Ellensburg High School, and Grasslands to the
Palouse to Cascade trail.
BACKGROUND:
QUADCO recently issued a call for projects using Surface Transportation Block Grant
Transportation Alternatives Program set aside funding. The City of Ellensburg has the
connection from 3`d Avenue to Vantage Highway identified in its Active Transportation
Plan. The project area is fully contained in the City's growth management area as
managed by the County.
DISCUSSION:
Staff proposes a joint application with the City designing and constructing the pedestrian
connection from Yd Avenue to Vantage Highway. Public Works (PW) proposes
providing survey for the project with cash match from the Road Fund "Paths and Trails"
budget line item. Currently, the funding ask appears to be in the $400,000 dollar range
with a preferred twenty percent match of $80,000 (along with in kind credit for survey
and design). The project is expected to benefit the school district and Grasslands
residents.
Pagel of 3
Public Works "Work Session Staff Report", 2021
FISCAL IMPACTS:
$40,000 in cash match from the Road Fund (Paths and Trails) along with survey costs.
The survey costs are covered by annual program budgets.
ATTACHMENTS:
Exhibit 1: City of Ellensburg exert from "Active Transportation Plan"
Page 2 of 3
Public Works "Work Session Staff Report", 2021
EXHIBIT 1: EXERT FROM CITY OF ELLENSBURG ACTIVE TRANSPORTATION
PLAN
Page 3 of 3
Public Works "Work Session Staff Report", 2021
n V Q D 0 m O m d V
m M n m c O. w� y M ^
om
— O v°i " O 0� S O 111
a d N,= 0 = d
L" a m o 301 s G aoq �.
J 1 a J d N Nd.
p S S D M a= = PSI G
�d Gn n W ao O ol—
Ju�
M A �. K A Ci d MM J
— J M
M O S J d J O C
1p N d O d Qp C J J
D O d_ J 0
o a w o d
C lJi 0 J uCi d O 0 0.
n m u,
o a J C I a S a a o
c n T of 1n d m pa
COC p J
, - m °<< `° I I1 0,
S
N 0 Kd O C 9 N
0 X@ S S J NM (1
m'm W,J» -aJa '2
V O 0 RI
J
a C a d M ry N
N N �9 � J
N in >• `G Q
d O
O o o a m C c
J Q N N O WP3
!6 w a n T d �• £ M
.< ui O' n S N N m
J-
�{
'"o N
dna.. of°a d'A
M d s A 0,7 n
O�Cnv 0
^
N O J J S O —K
N J. N pp vt
pan
O
9
a
sm
�2>
>
DODO
o
am
as mm�'�}
A
d a C d
3
N 3•
d
W
O
y
O
G
bl
y�
ei—
�^ O
d'� C J
O d O
(WC
ry N
O,
N,
V O
O
0
T
n
O
'N�
d �•
£
< J J
o
�
3
D°
c
a
d
vt• a
m
0
^
d
m
3
a
Qy
u�
>• n
n= a ,n
w
r n N C
3
>>>
p y
'30
Jm
e
m
£
anm
o-X'0a
Gia;
g x.a
woa
o
d
Sr
LT
au"1�d
£ LA.
da
00
=
d� N
J�
am
assn
�
J
K
W
IN
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: March 8, 2021
TOPIC: Infrastructure for Rebuilding America Grants (INFRA) Notice of Funding
Opportunity (NOFO)
ACTION REQUESTED: Direct Staff
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Do not prepare an application in response to U.S. Department of Transportation's Notice
of Funding Opportunity for the Department of Transportation's Infrastructure For
Rebuilding America (INFRA) Program for Fiscal Year 2021
BRIEFING SUMMARY:
• Infrastructure for Rebuilding America Grants (INFRA) are currently being
solicited.
• Small projects are minimum $5 million.
• Large projects are over $25 million and not exceeding $100 million.
• Projects require forty (40) percent funding match by non-federal funds.
• Recent cost data from Washington State Department of Transportation indicates
$54,000,000 per mile for I-90 (Keechelus Dam to Stampede Pass) and
$53,250,000 per mile Stampede Pass to Easton.
• Large projects must demonstrate technical feasibility and preliminary design as
well as additional environmental permitting and reviews in place.
• A benefit cost analysis (BCA) should be provided to determine cost effectiveness.
BACKGROUND:
The current notice of funding for INFRA grants does not preclude planning projects but
does notice a preference for construction projects. If we assume fifteen (15) percent of
project costs towards engineering (industry standard), then the thirteen (13) miles from
Easton to Cle Elum is expected to cost in the range of $105 million to design.
DISCUSSION:
The amount needed to design the next phase of I-90 will likely exceed the large project
funding cutoff for INFRA (over $100 million). Large project applications presume
preliminary engineering, environmental impact assessments and permitting, and state and
local plan review is complete. The required grant match for $105,000,000 in engineering
Page 1 of 3
Public Works "Work Session Staff Report", 2021
costs equates to $42,000,000 in required matching funds. The timeline for grant
submittal is tight (March 19, 2021).
A summary of the INFRA funding notice prepared by The Ferguson Group is attached
(EXHIBIT 1) for Board review.
FISCAL IMPACTS:
INFRA Grant cost match is not defined but is required at 40%.
ATTACHMENTS:
Exhibit 1: INFRA Funding Summary from the Ferguson Group
Page 2 of 3
Public Works "Work Session Staff Report", 2021
EXHIBIT 1: INFRA FUNDING SUMMARY FROM THE FERGUSON GROUP
Page 3 of 3
Public Works "Work Session Staff Report", 2021
FEDERAL
GRANT PROFILE
Department: U.S. Department of Transportation
Agency: Office of the Secretary of Transportation
FY 2021 Nationally Significant Freight and
Highway Projects: Infrastructure for
Rebuilding America (INFRA) Grants
Grant Overview
The INFRA program provides federal financial assistance to
fund transportation projects of national and regional
significance that are in line with the Biden Administration's
principles for national infrastructure projects that result in
good -paying jobs, improve safety, apply transformative
technology, and explicitly address climate change and racial
equity. Eligible applicants are states, metropolitan planning
organizations (MPOs), local governments, special purpose
districts and public authorities with transportation function,
Federal land management agencies, tribal governments, and
multistate or multijurisdictional groups of public entities.
Program History
2020 $906 million 20
2019 $856 million 20
Key Information
Total Funding: $889 million
Minimum Grant Award: $5 million rural, $25 million urban
Match: 40 percent
Solicitation date: February 17, 2021
Proposal due: March 19, 2021
https://www.transportation.gov/buildamerica/financing/infra-
grants/infrastructure-rebuild ing-america
Oi LRgM1,
Z
�'°rArEs of �i
Awardee Profile
Mississippi Department of
Transportation
AMOUNT: $71.4 million
YEAR: 2020
The Mississippi
Department of
Transportation received
funding to complete the
construction of the 15.6 -
mile Greenville Bypass,
which will carry US 82
from near the Greenville
Bridge over the
Mississippi River to
Leland, east of Greenville.
of ReLuilding Anlellcn (INFRA) 6rantz ® 2
Department: U.S. Department of Transportation
Agency: Office of the Secretary of Transportation
FY 2021 Nationally Significant Freight and
Highway Projects: Infrastructure for
Rebuilding America (INFRA) Grants
Detailed Summary
The INFRA program provides federal financial assistance to highway and freight projects of national or regional
significance. Transportation infrastructure projects should support six key objectives:
• Supporting Economic Vitality: projects that move goods the American economy produces and
facilitate the movement of the workers who are responsible for that production. Projects that use
project labor agreements and deploy local hiring provisions also contribute to economic vitality.
• Climate Change and Environmental Justice Impacts (newt: projects that have considered climate
change and environmental justice in the planning stage and were designed with specific elements to
address climate change impacts. Projects should directly support Climate Action Plans or apply
environmental justice screening tools in the planning stage. Projects should include components that
reduce emissions, promote energy efficiency, incorporate electrification or zero emission vehicle
infrastructure, increase resiliency, and recycle or redevelop existing infrastructure.
• Racial Equality and Barriers to opportunity (new): projects that encourage racial equity in two areas:
(1) planning and policies related to racial equity and barriers to opportunity; and (2) project
investments that either proactively address racial equity and barriers to opportunity, including
automobile dependence as a form of barrier, or redress prior inequities and barriers to opportunity.
• Leveraging of Federal Funding: projects that seek to maximize all available federal and non-federal
funding for investment in infrastructure.
• Innovation: transformative projects that encourage innovation in three areas: (1) the deployment of
innovative technology and expanded access to broadband; (2) use of innovative permitting,
contracting, and other project delivery practices; and (3) innovative financing. Projects should
support the integration of new technology and practices and demonstrate how those technologies
and practices will contribute to the goals of the program.
• Performance and Accountability: projects that increase project sponsor accountability and
performance and provide plans to address the full lifecycle costs of their project.
Eligible projects include:
• Highway freight projects carried out on the National Highway Freight Network
• Highway or bridge projects carried out on the National Highway System (NHS), including projects that
add capacity on the Interstate System to improve mobility or projects in a national scenic area
• Railway -highway grade crossing or grade separation projects
• Freight projects that are 1) an intermodal or rail project, or 2) within the boundaries of a public or
private freight rail, water (including ports), or intermodal facility.
to I r,It t Lich i rr Ioi Rebuilding Anieilra (INFRA) Grails
fig.
INFRA grants may be used for the construction, reconstruction, rehabilitation, acquisition of property
(including land related to the project and improvements to the land), environmental mitigation, construction
contingencies, equipment acquisition, and operational improvements directly related to system performance.
Statutorily, INFRA grants may also fund development phase activities, including planning, feasibility analysis,
revenue forecasting, environmental review, preliminary engineering, design, and other preconstruction
activities, provided the project meets statutory requirements. However, DOT is seeking to use INFRA funding
on projects that result in construction, meaning development phase activities are less competitive by nature
of the evaluation structure.
New to the program, is the INFRA Extra Initiative. Projects for which an INFRA application is advanced by the
Senior Review Team on the List of Projects for Consideration, but that are not awarded, are automatically
designated INFRA Extra Projects, unless the DOT determines that they are not reasonably likely to satisfy the
Transportation Infrastructure Finance and Innovation Act (TIFIA) project type eligibilities. This is a novel
designation that provides the sponsors of these projects the opportunity to apply for TIFIA credit assistance
for up to 49% of eligible project costs. Under current policy, TIFIA credit assistance is limited to 33% of eligible
project costs unless the applicant provides strong rationale for requiring additional assistance. Projects
designated as INFRA Extra Projects will be announced by the Secretary after INFRA award announcements are
made. An INFRA Extra Project designation does not guarantee that an applicant will receive TIFIA credit
assistance nor does it guarantee that any award of TIFIA credit assistance will be equal to 49% of eligible
project costs.
Applicant Eligibility
Eligible applicants for INFRA grants include:
• A state or group of states
• A metropolitan planning organization that serves an Urbanized Area (as defined by the Bureau of the
Census) with a population of more than 200,000 individuals
• A unit of local government or group of local governments
• A political subdivision of a state or local government
• A special purpose district or public authority with a transportation function, including a port authority
• A federal land management agency that applies jointly with a state or group of states
• A tribal government or a consortium of tribal governments
• A multi -State or multijurisdictional group of public entities
Under the INFRA Program, DOT has defined "urban" as inside an Urbanized Area, as a designated by the U.S.
Census Bureau, with a population of 200,000 or more. Click here for a list of Urbanized Areas that are
considered urban for the purposes of the INFRA grant program. The Department will consider a project to be
in a rural area if the majority of the project (determined by geographic location(s) where the majority of the
money is to be spent) is located in a rural area.
Funding
In FY 2021, $889 million is available for awards. In addition to the FY 2021 INFRA funds, amounts from prior
year authorizations, presently estimated at up to $150 million, may be made available and awarded under this
solicitation. INFRA funds must be obligated by September 30, 2024.
I ntrastructure for Rebuilding America (INFRA) bi iit,
Approximately, 10 percent of available funds are reserved for small projects, and 90 percent of funds are
reserved for large projects.
To qualify as a large project, the minimum grant request must be at least $25 million and the minimum project
size must be the lesser of $100 million; 30 percent of a State's FY 2020 Federal -aid apportionment if the
project is located in one State; or 50 percent of the larger participating State's FY 2020 apportionment for
projects located in more than one State. For a small project, including both construction awards and project
development awards, the grant must be at least $5 million. Previously incurred costs will be counted toward
the minimum project size requirement only if they were eligible project costs and were expended as part of
the project for which the applicant seeks funds.
INFRA grants may be used for up to 60 percent of future eligible project costs. Other Federal assistance may
satisfy the non -Federal share requirement for an INFRA grant, but total Federal assistance for a project
receiving an INFRA grant may not exceed 80 percent of future eligible project costs. Non -Federal sources
include State funds originating from programs funded by State revenue, local funds originating from State or
local revenue -funded programs, private funds or otherfunding sources of non -Federal origins. DOT is seeking
applications for projects that exceed the minimum non -Federal cost share requirement.
Contact Information
Paul Baumer
(202)366-1092
paul.baumer@dot.gov
httos://www.transi)ortati on.gov/bu i Id america/financi n¢/infra-grants/i nfrastructure-rebuilding-america
nfI�1(1Llr tui t foi Re hi d ldint, Anieii ro(INF RA) Gra, its ® 5
INFRA Application Criteria
The Department of Transportation recommends that the maximum 25 -page narrative follow the below outline
to ensure all program requirements are addressed.
Project Description
This section of the application is used to provide a concise description of the project, the transportation
challenges that it is intended to address, and how the project will address those challenges. This section
should discuss the project's history, including information on investments made to date advancing the project.
Project Location
This section of the application should describe the project location, including a detailed geographical
description of the proposed project, a map of the project's location, and description of connections to existing
transportation infrastructure. Be sure to discuss area demographics, whether the project is urban or rural, and
document whether the project is in a Federally designated community development zone, such as a qualified
opportunity zone, empowerment zone, promise zone, or choice neighborhood. A project located in a Federally
designated community development zone is more competitive than a similar project that is not located in a
Federally designated community development zone.
Project Parties
This section of the application should list all project parties, including details about the proposed grant
recipient and other public and private parties who are involved in delivering the project. Applicants should
clearly articulate roles and responsibilities of each entity identified in this section.
Grant Funds, Sources and Uses of all Project Funds
This section of the application should describe the budget for the INFRA project. Be sure to clearly identify
previously incurred expenses and future eligible costs separately. Additionally, document the sources and uses
of all funds associated with the project, including a line -item budget with contingency. This will assist DOT
reviewers assess that the project costs are reasonable.
Merit Criteria
Criterion #1: Support for National or Regional Economic Vitality
This section of the application is largely supported by the Benefit Cost Analysis (BCA) findings to document the
economic impact the project will have. Other factors important to economic vitality, including how a project
contributes to the creation of jobs with a choice to join a union, support for American industry through
compliance with domestic preference laws, the use of project labor agreements, and local hiring
requirements, will be considered in other ways. DOT will rely on quantitative, data -supported analysis to
assess how well a project addresses this criterion.
.,1 11 i Ni ® 6
Criterion #2: Climate Change and Environmental Justice Impacts (new)
This section of the application should demonstrate whether the project has incorporated climate change and
environmental justice in terms of a) planning and policy or b) design components with outcomes that address
climate change. To address the planning and policies element of this criterion, the application should describe
what specific climate change or environmental justice activities have been completed for this project. The
application should state whether a project is incorporated in a climate action plan, whether an equitable
development plan has been prepared, and whether tools such as EPA's EJSCREEN have been applied in project
planning. To address the design components element of this criterion, the application should describe specific
and direct ways that the project will mitigate or reduce climate change impacts. This may include a description
of how the project encourages modal shift, temporal changes in asset utilization to reduce congestion, or
incorporates multimodal infrastructure to reduce vehicle miles traveled, other ways that the project reduces
emissions or uses technology to increase energy efficiency, incorporates resiliency measures for disaster
preparedness, or recycles and enhances existing idle or dilapidated infrastructure.
Criterion #3: Racial Equity and Barriers to Opportunity (new)
The Department seeks to use the INFRA program to encourage racial equity in two areas: (1) planning and
policies related to racial equity and barriers to opportunity; and (2) project investments that either proactively
address racial equity and barriers to opportunity, including automobile dependence as a form of barrier, or
redress prior inequities and barriers to opportunity.
Criterion #4: Leveraging of Federal Funding
This criterion will be evaluated in tandem with information provided in the Grant Funds, Sources and Uses
section of the application. Clearly articulate where the required cost share is coming from and what federal
funds outside of INFRA have been invested in the project to date. Provide evidence that matching funds are
stable, dependable and will be available should the project be awarded.
Criterion #6: Potential for Innovation
This section of the application should contain sufficient information to evaluate how the project can be
transformative in achieving program goals and includes or enables innovation in: (1) the accelerated
deployment of innovative technology, including expanded access to broadband; (2) use of innovative
permitting, contracting, and other project delivery practices; and (3) innovative financing. If the project does
not address a particular innovation area, the application should state this fact.
Criterion #6: Performance and Accountability
In this section, applicants must describe a credible plan to address the full lifecycle costs associated with the
project and implement an accountability measure. A credible plan to address full lifecycle costs should include,
at a minimum, (1) an estimate of the lifecycle costs of the project; (2) an identified source of funding that will
be sufficient to pay for operation and maintenance of the project; and (3) a description of controls in place to
ensure the identified funding will not be diverted away from operation and maintenance. Applicants must
meet at least one of three options outlined by DOT: (1) the applicant should state in the application that it
agrees to meet a specific construction start and completion date and state those dates in the application; (2)
the applicant should propose a specific indicator of project success that will be evident within 12 months of
6)fi aI5 ructwe loi Rebuilding AnmvIC,� (INFRA) Gfoi,ts
project completion; or (3) the applicant should show that they will meet a negotiated Community Benefit
Agreement or have completed an Equitable Project Assessment and will be monitoring compliance.
Project Readiness
In this section of the application, DOT will consider project readiness in two ways: to assess the likelihood of
successful project delivery and to confirm that a project will satisfy statutory readiness requirements.
Applicants must demonstrate there are no significant risks to successful obligation of funding for a project,
including risks associated with environmental review, permitting, technical feasibility, funding, and capacity to
manage project delivery. Applications which demonstrate mitigated risks will be considered more competitive
than a comparable project with unaddressed risks.
Technical Feasibility
Applicants must demonstrate the technical feasibility of the project with engineering and design studies and
activities; the development of design criteria and/or a basis of design; the basis for the cost estimate
presented in the INFRA application, including the identification of contingency levels appropriate to its level of
design; and any scope, schedule, and budget risk -mitigation measures. Be sure to include a detailed statement
of work that focuses on the technical and engineering aspects of the project and describes in detail the project
to be constructed.
Project Schedule
Provide a detailed project schedule outlining major milestones including state and local planning approvals
(inclusion in the STIP), beginning and completing NEPA, design completion, right of way completion, approvals
of PS&Es, procurement, and construction. All necessary pre -construction activities must be complete prior to
the September 30, 2024 obligation deadline.
Required Approvals
Environmental Permits and Reviews. The application should demonstrate receipt (or reasonably anticipated
receipt) of all environmental approvals and permits necessary for the project to proceed to construction on
the timeline specified in the project schedule and necessary to meet the statutory obligation deadline,
including satisfaction of all Federal, State and local requirements and completion of the NEPA process.
State and Local Approvals. The applicant should demonstrate receipt of State and local approvals on which
the project depends, such as State and local environmental and planning approvals and STIP or TIP funding.
Additional support from relevant State and local officials is not required; however, an applicant should
demonstrate that the project has broad public support.
Federal Transportation Requirements Affecting State and Local Planning. Applicants should demonstrate
that a project that is required to be included in the relevant State, metropolitan, and local planning documents
has been or will be included in such documents. If the project is not included in a relevant planning document
at the time the application is submitted, the applicant should submit a statement from the appropriate
planning agency that actions are underway to include the project in the relevant planning document.
Assessment of Project Risks and Mitigation Strategies
Applicants must identify all material risks to the project and the strategies that the lead applicant and any
project partners have undertaken or will undertake to mitigate those risks. This includes project risks, such as
procurement delays, environmental uncertainties, increases in real estate acquisition costs, uncommitted local
match, or lack of legislative approval. Be sure to include how these risks affect the likelihood of successful
project start and completion. Applicants are encouraged to contact USDOT modal field or headquarters offices
to ensure that their project schedule is reasonable and that there are no risks of delays in satisfying Federal
requirements.
Large/Small Project Requirements
To select a large project for award, the Department must determine that the project—as a whole, as well as
each independent component of the project–satisfies several statutory requirements. Applicants should use
this section of the application to summarize how their project and, if present, each independent project
component, meets each of the following requirements. Applicants are not required to reproduce the table
below in their application but following this format will help evaluators identify the relevant information that
supports each large project determination. Supporting information provided in appendices may be
referenced.
Does the project generate national or regional
economic, mobility, or safety benefits?
Is the project cost effective?
Summarize the economic, mobility, and safety
benefits of the project and independent project
components and describe the scale of their
impact in national or regional terms. Refer
reviewer to the Economic Vitality criterion.
Highlight the results of the benefit cost analysis,
as well as the analyses of independent project
components if applicable. Refer reviewer to the
Economic Vitality criterion.
With respect to non -Federal financial commitments,
Indicate funding source(s) and amounts that will
does the project have one or more stable and
account for all project costs. Refer the reviewer
dependable funding or financing sources to construct,
back to Grant Sources and Use of Funds section.
maintain, and operate the project?
Are contingency amounts available to cover State the contingency amount available for the
unanticipated cost increases? project.
Is the project reasonably expected to begin Provide expected obligation date and
construction not later than 18 months after the date of construction start date, referencing project
obligation of funds for the project? budget and schedule as needed.
Intldstl uctuie for Rebuilding Amei ico (INFRA) Gent
Is the project based on the results of preliminary
engineering?
Does the project contribute to one or more of the
following goals:
• Safety: To achieve a significant reduction in traffic
fatalities and serious injuries on all public roads
• Infrastructure condition: To maintain the highway
infrastructure asset system in a state of good
repair.
• Congestion reduction: To achieve a significant
reduction in congestion on the National Highway
System.
• System reliability: To improve the efficiency of the
surface transportation system.
• Freight movement and economic vitality: To
improve the national freight network, strengthen
the ability of rural communities to access national
and international trade markets, and support
regional economic development.
• Environmental sustainability: To enhance the
performance of the transportation system while
protecting and enhancing the natural environment
• Reduced project delivery delays: To reduce project
costs, promote jobs and the economy, and
expedite the movement of people and goods by
accelerating project completion through
eliminating delays in the project development and
delivery process, including reducing regulatory
burdens and improving agencies' work practices.
State which of the following activities have been
completed:
• Environmental Assessment
• Topographic Surveys
• Metes and Bounds Surveys
• Geotechnical Investigation
• Hydrologic Analysis
• Utility Engineering
• Traffic Studies
• Financial Plans
• Revenue Estimates
• Hazardous Materials Assessments
• General estimates of the types and
qualities of materials
Other work needed to establish parameters for
the final design
Specify the Goal(s) and summarize how the
project and independent project components
contributes to that goal(s). The Department will
base its determination on the project's benefits
as assessed according to the Economic Vitality
criterion.
Infras true twc fa Reb,,i Udine Anwo irr (II'd FIRA) 6rents 0 gD
Describe the potential negative impacts on the
proposed project if the INFRA grant (or other
Federal funding) was not awarded. Respond
to the following:
• How would the project scope be affected if
INFRA (or other Federal funds) were not
received?
• How would the project schedule be affected
if INFRA (or other Federal funds) were not
Is it the case that the project cannot be easily and received?
•
efficiently completed without other Federal funding or How would the project cost be affected if
financial assistance available to the project sponsor?
INFRA (or other Federal funds) were not
received?
If there are no negative impacts to the project
scope, schedule, or budget if INFRA funds
are not received, state that explicitly. Impacts
to a portfolio of projects will not satisfy this
requirement; please describe only project
specific impacts. Re -stating the project's
importance for national or regional economic,
mobility, or safety will not satisfy this
requirement
For a small project to be selected, the Department must consider the cost effectiveness of the proposed
project and the effect of the proposed project on mobility in the State and region in which the project is
carried out. If an applicant seeks an award for a small project, it should use this section to provide information
on the project's cost effectiveness and the project's effect on the mobility in its State and region or refer to
where else the information can be found in the application.
Benefit Cost Analysis
Applicants should delineate each of their project's expected outcomes in the form of a complete BCA to
enable the Department to consider cost-effectiveness (small projects), determine whether the project will be
cost effective (large projects), estimate a benefit -cost ratio and calculate the magnitude of net benefits and
costs for the project. In support of each project for which an applicant seeks funding, the applicant should
submit a BCA that quantifies the expected benefits and costs of the project against a no -build baseline.
Applicants should use a real discount rate (i.e., the discount rate net of the inflation rate) of 7 percent per year
to discount streams of benefits and costs to their present value in their BCA.
The primary economic benefits from projects eligible for INFRA grants are likely to include savings in travel
time costs, vehicle operating costs, and safety costs for both existing users of the improved facility and new
users who may be attracted to it as a result of the project. Reduced damages from vehicle emissions and
savings in maintenance costs to public agencies may also be quantified. Applicants may describe other
categories of benefits in the BCA that are more difficult to quantify and value in economic terms, such as
improving the reliability of travel times or improvements to the existing human and natural environments
(such as increased connectivity, improved public health, storm water runoff mitigation, and noise reduction),
I i ticture for Rebuilding Ameiicr. (INFRA) Gr;,nt,
while also providing numerical estimates of the magnitude and timing of each of these additional impacts
wherever possible. Any benefits claimed for the project, both quantified and unquantified, should be clearly
tied to the expected outcomes of the project. The BCA should include the full costs of developing,
constructing, operating, and maintaining the proposed project (including both previously incurred and future
costs), as well as the expected timing or schedule for costs in each of these categories. The BCA may also
consider the present discounted value of any remaining service life of the asset at the end of the analysis
period (net of future maintenance and rehabilitation costs) as a deduction from the estimated costs. The costs
and benefits that are compared in the BCA should also cover the same project scope. The BCA should carefully
document the assumptions and methodology used to produce the analysis, including a description of the
baseline, the sources of data used to project the outcomes of the project, and the values of key input
parameters. Applicants should provide all relevant files used for their BCA, including any spreadsheet files and
technical memos describing the analysis (whether created in-house or by a contractor). The spreadsheets and
technical memos should present the calculations in sufficient detail and transparency to allow the analysis to
be reproduced by DOT evaluators. Additional BCA guidance can be found here.
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: March 8, 2021
TOPIC: Thompson Park Milfoil Treatment Donation
ACTION REQUESTED: Direct Staff
LEAD STAFF:
Mark R. Cook and Marc Eylar
RECOMMENDATION:
Accept the donation from AquaTechnex to apply ProcellaCor to the pond at Thompson
Park and direct staff manage the application effort.
BRIEFING SUMMARY:
• Eurasian water milfoil is a Class B noxious weed designated for control in bodies
of water with public access in Kittitas County and the pond at Thompson Park has
become heavily infested with milfoil.
• Noxious Weed has been contacted by Mr. Terry McNabb from AquaTechnex who
is offering to donate an application of the herbicide ProcellaCor for milfoil
treatment
• Staff time (Noxious Weed) is anticipated for conducting the application effort.
BACKGROUND:
Last year Naneum Pond was renamed to Thompson Park honoring Sheriff Deputy Ryan
Thompson. An attempt at manually controlling the milfoil was conducted last year as
well. Herbicide treatment of the milfoil is highly recommended by the Noxious Weed
Board. Terry McNabb, owner of the aquatic vegetation management company
AquaTechnex, is offering to donate an application of the effective herbicide ProcellaCor
to control the milfoil infestation.
DISCUSSION:
The herbicide is likely to achieve significant milfoil reduction in the pond. The treatment
application can be managed by Noxious Weed employee Marc Eylar with assistance from
Public Works (PW). PW desires assisting Mr. Eylar attempting to eradicate the milfoil
from the pond at Thompson Park.
FISCAL IMPACTS:
None anticipated.
ATTACHMENTS:
Exhibit 1: ProcellaCor fact sheet
Page 1 of 2
Public Works "Work Session Staff Report", 2021
EXHIBIT 1: ProcellarCor Fact Sheet
Page 2 of 2
Public Works "Work Session Staff Report", 2021
July 2018
EGAD #: 3200-2018-83
Florpyrauxifen-benzyl Chemical Fact Sheet
Formulations
Florpyrauxifen-benzyl was registered with
the EPA for aquatic use in 2017. The active
ingredient is 2-pyridinecarboxylic acid, 4-amino-
3-chloro-6-(4-chloro-2-fluoro-3-methoxyphenyl )-
5 -fluoro-, phenyl methyl ester. The current
Wisconsin -registered formulation is a liquid
(ProcellaCORTm EC) solely manufactured by
SePRO Corporation.
Aquatic Use and Considerations
Florpyrauxifen-benzyl is a systemic
herbicide that is taken up by aquatic plants. The
herbicide is a member of a new class of
synthetic auxins, the arylpicolinates, that differ in
binding affinity compared to other currently
registered synthetic auxins. The herbicide
mimics the plant growth hormone auxin that
causes excessive elongation of plant cells that
ultimately kills the plant. Susceptible plants will
show a mixture of atypical growth (larger,
twisted leaves, stem elongation) and fragility of
leaf and shoot tissue. Initial symptoms will be
displayed within hours to a few days after
treatment with plant death and decomposition
occurring over 2 — 3 weeks. Florpyrauxifen-
benzyl should be applied to plants that are
actively growing; mature plants may require a
higher concentration of herbicide and a longer
contact time compared to smaller, less
established plants.
Florpyrauxifen-benzyl has relatively short
contact exposure time (CET) requirements (12 —
24 hours typically). The short required CET may
be advantageous for localized treatments of
submersed aquatic plants, however, the target
species efficacy compared to the size of the
treatment area is not yet known.
In Wisconsin, Florpyrauxifen-benzyl may be
used to treat the invasive Eurasian watermilfoil
(Myriophyllum spicatum) and hybrid Eurasian
watermilfoil (M. spicatum X M. sibiricum). Other
invasive species such as floating hearts
(Nymphoides spp.) are also susceptible. In other
parts of the country, it is used as a selective,
systemic mode of action for spot and partial
treatment of the invasive plant hydrilla (Hydrilla
verticillata). Desirable native species that may
also be negatively affected include waterlily
species (Nymphaea spp. and Nuphar spp.),
pickerelweed (Pontederia cordata), and
arrowhead (Sagiffaria spp.).
It is important to note that repeated use of
herbicides with the same mode of action can
lead to herbicide -resistant plants, even in
aquatic plants. Certain hybrid Eurasian
watermilfoil genotypes have been documented
to have reduced sensitivity to aquatic herbicides.
In order to reduce the risk of developing
resistant genotypes, avoid using the same type
of herbicides year after year, and utilize
effective, integrated pest management
strategies as part of any long-term control
program.
Post -Treatment Water Use
Restrictions
There are no restrictions on swimming,
eating fish from treated waterbodies, or using
water for drinking water. There is no restriction
on irrigation of turf. Before treated water can be
used for non-agricultural irrigation besides turf
(such as shoreline property use including
irrigation of residential landscape plants and
homeowner gardens, golf course irrigation, and
non-residential property irrigation around
business or industrial properties), follow
precautionary waiting periods based on rate and
scale of application, or monitor herbicide
concentrations until below 2 ppb. For
agricultural crop irrigation, use analytical
monitoring to confirm dissipation before
irrigating. The latest approved herbicide product
label should be referenced relative to irrigation
requirements.
The Wisconsin Department of Natural Resources provides equal opportunity in its employment, programs, services, and
functions under an Affirmative Action Plan. If you have any questions, please write to Equal Opportunity Office, Department of
Interior, Washington, D.C. 20240. This publication is available in alternativeformat (targeprint, Braille, audio tape. etc.) upon
request. Please call (608) 267-7694 for more information.
Page 2
Florpyrauxifen-benzyl Chemical Fact Sheet
Herbicide Degradation, Persistence
and Trace Contaminants
Florpyrauxifen-benzyl is broken down
quickly in the water by light (i.e., photolysis) and
is also subject to microbial breakdown and
hydrolysis. It has a half-life (the time it takes for
half of the active ingredient to degrade) ranging
from 1 — 6 days. Shallow clear -water lakes will
lead to faster degradation than turbid, shaded,
or deep lakes.
Florpyrauxifen-benzyl breaks down into five
major degradation products. These materials
are generally more persistent in water than the
active herbicide (up to 3 week half-lives) but four
of these are minor metabolites detected at less
than 5% of applied active ingredient. EPA
concluded no hazard concern for metabolites
and/or degradates of Florpyrauxifen-benzyl that
may be found in drinking water, plants, and
livestock.
Florpyrauxifen-benzyl binds tightly with
surface sediments, so leaching into groundwater
is unlikely. Degradation products are more
mobile, but aquatic field dissipation studies
showed minimal detection of these products in
surface sediments.
Impacts on Fish and Other Aquatic
Organisms
Toxicity tests conducted with rainbow trout,
fathead minnow, water fleas (Daphnia sp.),
amphipods (Gammarus sp.), and snails
(Lymnaea sp.) indicate that florpyrauxifen-benzyl
is not toxic for these species. EPA concluded
florpyrauxifen-benzyl has no risk concerns for
non -target wildlife and is considered "practically
non-toxic" to bees, birds, reptiles, amphibians,
and mammals.
Florpyrauxifen-benzyl does not
bioaccumulate in fish or freshwater clams due to
rapid metabolism and chemical depuration.
Human Health
EPA has identified no risks of concern to
human health since no adverse acute or chronic
effects, including a lack of carcinogenicity or
mutagenicity, were observed in the submitted
toxicological studies for florpyrauxifen-benzyl
regardless of the route of exposure. EPA
concluded with reasonable certainty that
drinking water exposures to florpyrauxifen-
benzyl do not pose a significant human health
risk.
For Additional Information
Environmental Protection Agency Office of
Pesticide Programs
www.epa.gov/pesticides
Wisconsin Department of Agriculture, Trade,
and Consumer Protection
hfti)7Hdatcp.wi.gov/Plants/Pesticides/
Wisconsin Department of Natural Resources
608-266-2621
htti)://dnr.wi.gov/lakes/i)lants/
National Pesticide Information Center
1-800-858-7378
http://npic.orst.edu/
Washington State Department of Ecology. 2017.
https://fortress.wa.gov/ecv/i)ublications/documen
is/1710020.pdf
QJWisconsin Department of Natural Resources EGAD #: 3200-2018-83
Box 7921
Madison, W153707-7921
SPECIMEN LABEL
ProcellaCOR.EC
A selective systemic herbicide for management of freshwater aquatic
vegetation in slow-moving /quiescent waters with little or no
continuous outflow: ponds, lakes, reservoirs, freshwater marshes,
wetlands, bayous, drainage ditches, and non -irrigation canals,
including shoreline and riparian areas in or adjacent to these sites.
Also for management of invasive freshwater aquatic vegetation in
slow-moving/quiescent areas of rivers (coves, oxbows or
similar sites).
Active Ingredient:
Florpyrauxifen-benzyl: 2-pyridinecarboxylic acid,
4 -am ino-3chloro-5-(4-chloro-2-fluoro-3-methoxy-
phenyl)-5-fluoro-, phenyl methyl ester ................................................ 2.7%
Other Ingredients: ............................................................................... 97.3%
TOTAL: ................................................................................................. 100.0%
Contains 0.0052 lb Florpyrauxifen-benzyl per Prescription Dose Unit^
(PDU' ) or 0.21 Ib florpymuxifen-benzyl/gallon. 1 PDU is equal to 3.2 fl. oz.
of product.
Keep Out of Reach of Children
CAUTION
Refer to the inside of label booklet for additional precautionary
information including directions for use.
Notice: Read the entire label before using. Use only according to label
directions. Before buying or using this product, read Warranty Disclaimer
and Misuse statements inside label booklet If terms are not acceptable,
return at once unopened.
Agricultural Chemical: Do not ship or store with food, feeds, drugs or
clothing.
PRECAUTIONARY STATEMENTS
HAZARDS TO HUMANS AND DOMESTIC ANIMALS
CAUTION. Causes moderate eye imitation. Avoid contact with eyes
or clothing. Wash thoroughly with soap and water after handling and
before eating, drinking, chewing gum, using tobacco or using the toilet
Remove and wash contaminated clothing before reuse.
PERSONAL PROTECTIVE EQUIPMENT (PP
Applicators and other handlers must wear:
• Long-sleeved shirt and long pants;
• Shoes plus socks;
• Protective eyewear; and
• Waterproof gloves.
Follow manufacturer's instructions for cleaning/maintaining PPE. If no such
instructions for washables exist, use detergent and hot water. Keep and
wash PPE separately from other laundry.
Engineering Controls: When handlers use closed systems or enclosed
cabs in a manner that meets the requirements listed in the Worker Protection
Standard (WPS) for agricultural pesticides [40 CFR 170.240(d)(5)J, the handler
PPE requirements may be reduced or modified as specified in the WPS.
Users should:
• Wash hands before eating, drinking, chewing gum, using tobacco or
using the toilet.
• Remove clothing/PPE immediately if pesticide gets inside. Then wash
thoroughly and put on clean clothing.
• Remove PPE immediately after handling this product. Wash the outside
of gloves before removing. As soon as possible, wash thoroughly and
change into clean clothing.
FIRST AID
If in eyes
• Hold eye open and rinse slowly and gently with water for
15 to 20 minutes.
• Remove contact lenses, if present, after the first 5 minutes;
then continue rinsing eye.
• Calla poison control center or doctor for treatment advice.
HOTLINE NUMBER
Have the product container or label with you when calling a poison control
center or doctor, or going for treatment. In case of emergency endangering
health or the environment involving this product, call INFOTRAC at
1-800-535-5053.
Environmental Hazards
Under certain conditions, treatment of aquatic weeds can result in oxygen
depletion or loss due to decomposition of dead plants, which may cause
fish suffocation. Water bodies containing very high plant density should
be treated in sections to prevent the potential suffocation of fish. Consult
with the State agency for fish and game before applying to public waters to
determine if a permit is needed.
DIRECTIONS FOR USE
It is a violation of Federal Law to use this product in a manner inconsistent
with its labeling. Read all Directions for Use carefully before applying.
Do not appy this product in a way that will contact workers or other persons
either directly or through drift. Only protected handlers may be in the area
during application. For any requirements specific to your State or Tribe,
consult the agency responsible for pesticide regulation.
Shake well before using
PRODUCT INFORMATION
ProcellaCOR EC is a selective systemic herbicide for management of
freshwater aquatic vegetation in slow-moving/quiescent waters with little or no
continuous outflow: ponds, lakes, reservoirs, freshwater marshes, wetlands,
bayous, drainage ditches, and non -irrigation canals, including shoreline and
riparian areas in or adjacent to these sites. Also for management of invasive
freshwater aquatic vegetation in slow-moving/quiescent areas of rivers (coves,
oxbows or similar sites).
Apply ProcellaCOR EC directly into water or spray onto emergent foliage
of aquatic plants. Depending upon method of application and target plant,
ProcellaCOR EC is absorbed by aquatic vascular plants through emergent or
floating leaves and from water through submersed plant shoots and leaves.
In -water treatments are effective in spot and partial treatment designs with
relatively short exposure times (hours to several days). Species susceptibility
to ProcellaCOR EC may vary depending upon time of year, stage of growth,
and water movement. For best results, apply to actively growing plants.
However, effective control can be achieved over a broad range of growth
stages and environmental conditions. Application to mature target plants
may require higher application rates and longer exposure periods to achieve
control.
Resistance Management
ProcellaCOR EC is classified as a WSSA Group 4 Herbicide (HRAC Group
O). Weed populations may contain or develop biotypes that are resistant to
ProcellaCOR EC and other Group 4 herbicides. If herbicides with the same
mode of action are used repeatedly at the same site, resistant biotypes may
eventually dominate the weed population and may not be controlled by these
products. Unless ProcellaCOR EC is used as part of an eradication program
or in a plant management system where weed escapes are aggressively
controlled, do not use ProcellaCOR EC alone in the same treatment area for
submersed and emergent plant control for more than 2 consecutive years,
unless used in combination or rotated with an herbicide with an alternate
mode of action.
To further delay herbicide resistance consider taking one or more of the
following steps:
• Use tank mixtures with herbicides from a different group if such use is
permitted; Consult your local extension service or SePRO Corporation
if you are unsure as to which active ingredient is currently less prone to
resistance.
• Adopt an integrated weed -management program for herbicide use that
includes scouting and uses historical information related to herbicide use,
and that considers other management practices.
• Scout after herbicide application to monitor weed populations for
early signs of resistance development. Indicators of possible herbicide
resistance include: (1) failure to control a weed species normally controlled
by the herbicide at the dose applied, especially if control is achieved
on adjacent weeds; (2) a spreading patch of non -controlled plants of
a particular weed species; (3) surviving plants mixed with controlled
individuals of the same species. If resistance is suspected, prevent weed
seed production in the affected area by using an alternative herbicide
from a different group or by a mechanical method that minimizes plant
fragmentation.
• If a weed pest population continues to progress after treatment with this
product, switch to another management strategy or herbicide with a
different mode of action, if available.
• Contact your local extension specialist or SePRO Corporation for
additional pesticide resistance -management and/or integrated
weed -management recommendations for specific weed biotypes.
Stewardship Guidelines For Use
Apply this product in compliance with Best Management Practices (BMP)
that include site assessment, prescription, and implementation. BMP have
been developed to ensure accurate applications, minimize risk of resistance
development, and monitor concentrations in water to document levels
needed for optimal performance and manage potential irrigation use. SePRO
Corporation will work with applicators and resource managers to implement
BMP for application and monitoring to meet management objectives and
ensure compatibility with potential water uses.
Use Precautions
• There are no restrictions for recreational purposes, including swimming
and fishing.
Use Restrictions
• Obtain Required Permits: Consult with appropriate state or local water
authorities before applying this product to public waters. State or local
public agencies may require permits.
• Chemigation: Do not apply this product through any type of irrigation
system.
• For in -water applications, the maximum single application rate is 25.0
Prescription Dose Units (PDU) per acre-foot of water with a limit of three
applications per year.
• For aquatic foliar applications, do not exceed 10.0 PDU per acre for a single
application, and do not apply more than 20.0 PDU total per acre per year.
• To minimize potential exposure in compost, do not allow livestock to drink
treated water.
• Do not compost any plant material from treated area.
• Allow 14 days or greater between applications.
• Do not use water containing this product for hydroponic farming.
• Do not use treated water for any form of irrigation, except as described
in the Application to Water Used for Irrigation on Turf and Landscape
Vegetation section.
• Do not use for greenhouse or nursery irrigation.
• Make applications in a minimum of 10 gallons per acre (GPA) for ground
and a minimum of 15 gallons per acre (GPA) for aerial applications.
• Do not apply to salt/brackish water.
• Do not apply ProcellaCOR EC directly to, or otherwise permit FrocellaCOR
EC to come into contact during an application, with carrots, soybeans,
grapes, tobacco, vegetable crops, flowers, ornamental shrubs or trees, or
other desirable broadleaf plants, as serious injury may occur. Do not permit
spray mists containing ProcellaCOR EC to drift onto desirable broadleaf
plants. Further information on spray drift management is provided in the
Spray Drift Management section of this label.
• For treatments out of water, do not permit spray mists containing this
product to drift onto desirable broadleaf plants as injury may occur. Further
information on spray drift management is provided in the Spray Drift
Management section of this label.
• Do not allow tank mixes of ProcellaCOR EC to sit overnight. See additional
tank mix restrictions below.
• Do not use organosilicone surfactants in spray mixtures of this product.
• Do not tank mix this product with malathion or methyl parathion.
• Do not make an application of malathion or methyl parathion within 7
days of an application of this product. See additional tank mix restrictions
below.
Application to Water Used for Irrigation on Turf and Landscape
Vegetation
To reduce the potential for injury to sensitive vegetation, follow the waiting
periods (between application and irrigation) and restrictions below, and inform
those who irrigate with water from the treated area. Follow local and state
requirements for informing those who irrigate.
When monitoring ProcellaCOR EC concentrations, analyze water samples
using an appropriate analytical method for both the active ingredient and the
acid form. Use of HPLC (High -Performance Liquid Chromatography), which is
also referenced as FaSTESTe, is recommended.
Applications to invasive freshwater aquatic vegetation in slow-moving/
quiescent areas of rivers (coves, oxbows or similar sites).
• Users must be aware of relevant downstream use of water for irrigation
that may be affected by the treatment and must ensure all label restrictions
are followed. All potential downstream water intakes with irrigation
practices that may be affected by the treatment must be documented and
affected irrigation users notified of the restrictions associated with such
treatment.
Residential and other Non-Andruhural Irrigation (such as shoreline
property use including irrigation of residential landscape plants and
homeowner gardens, golf course irrigation, and non-residential property
irrigation around business or industrial properties. Excludes greenhouse or
nursery irriaation).
• Turf Irrigation: Turf may be irrigated immediately after treatment.
• For irrigation of landscape vegetation or other forms of non-agricultural
irrigation not excluded above, conduct one of the following:
o analytically verify that water contains less than 2 ppb (SePRO
recommends use of FasTEST); or
o if treated areas) have the potential to dilute with untreated water, follow
the precautionary waiting periods described in the tables 1 and 2 below
for in -water or foliar application.
TABLE 1: Non-agricultural irrigation following in -water application
Waiting Period (Days) for Irrigation at Specific Target Treatment Rates
Treatment Rates
Percent Area of
Waterbody Treated'
(PDU per acre-foot)
10% or less
0.5 day
Percent Area>3.5
11 -20%
1 da
>5.0 to
>10.0 to
>15.0 to
>20.0 to
of Waterbody
1-3 PDU
PDU
10.0
15.0
20.0
25.0
Treated'
PDU
PDU
PDU
PDU
2% or less
6 hours
1 day
1 day
2 days
2 days
3 days
3-10%
1 day
3 days
5 days
7 days
10 days
14 days
11-20%
3 days
7 days
10 days
10 days
14 days
21 days
21-30%
5 days
10 days
14 days
21 days
28 days
35 da s
>30%
7 days
14 days
21 days
28 days
35 days
35 da s
Assumes treated area(s) have the potential to dilute with untreated water. If the treated
area is not projected to dilute rapidly (example: confined cove area), utilize FasTEST
to confirm below 2 ppb or verily vegetation tolerance before irrigation use. Consult a
SePRO Aquatic Specialist for additional site-specific recommendations.
TABLE 2: Non-agricultural irrigation following foliar application
Waiting Period (days) for Irrigation at Specific Target
Treatment Rates
Percent Area of
Waterbody Treated'
5.0 PDU / acre >5.0 to 70.0 PDU / acre
10% or less
0.5 day
1 day
11 -20%
1 da
2 days
>20%
2 days
3 davs
Assumes treated area(s) have the potential to dilute with untreated water. If the treated
area is not projected to dilute rapidly (example: confined cove area), utilize FasTEBT
to confirm below 2 ppb or verify vegetation tolerance before irrigation use. Consult a
SePRO Aquatic Specialist for additional site-specific recommendations.
Susceptible Plants
Do not apply where spray drift may occur to food, forage, or other plantings
that might be damaged. Spray drift may damage or render crops unfit for
sale, use or consumption. Small amounts of spray drift that may not be visible
may injure susceptible broadleaf plants. Before making a foliar or surface
spray application, please refer to your state's sensitive crop registry
(if available) to identify any commercial specialty or certified organic
crops that may be located nearby. At the time of a foliar or surface spray
application, the wind cannot be blowing toward adjacent cotton, carrots,
soybeans, conn, grain sorghum, wheat, grapes, tobacco, vegetable
crops, flowers, ornamental shrubs or trees, or other desirable broadleaf
plants.
Spray Drift Management
Avoiding spray drift at the application site is the responsibility of the
applicator. The interaction of many equipment- and weather-related factors
determines the potential for spray drift. The applicator is responsible for
considering all these factors when making decisions.
The following drift management requirements must be followed to limit
off -target drift movement from aerial applications:
Aerial Application:
• Aerial applicators must use a minimum finished spray volume of 15 gallons
per acre.
• Drift potential is lowest between wind speeds of 2 to 10 mph. Do not apply
below
2 mph due to variable wind direction and high potential for temperature
inversion. Do not apply in wind speeds greater than 10 mph.
• To minimize spray drift from aerial application, apply with a nozzle class
that ensures coarse or coarser spray (according to ASABE S572) at spray
boom pressure no greater than 30 psi.
• The distance of the outer most operating nozzles on the boom must not
exceed 70% of wingspan or 80% of rotor diameter.
• Nozzles must always point backward parallel with the air stream and never
be pointed downwards more than 45 degrees.
• Do not apply under conditions of a low-level air temperature inversion.
• The maximum release height must be 10 feet from the top of the weed
canopy, unless a greater application height is required for pilot safety.
Evaluate spray pattern and droplet size distribution by applying sprays
containing a water-soluble dye marker or appropriate drift control agents
over a paper tape (adding machine tape). Mechanical flagging devices may
also be used. Do not apply under conditions of a low-level air temperature
inversion. A temperature inversion is characterized by little or no wind and
lower air temperature near the ground than at higher levels. The behavior of
smoke generated by an aircraft -mounted device or continuous smoke column
released at or near site of application will indicate the direction and velocity
of air movement. A temperature inversion is indicated by layering of smoke at
some level above the ground and little or no lateral movement.
Ground Application
• Ground applicators must use a minimum finished spray volume of 10
gallons per acre.
• To minimize spray drift from ground application, apply with a nozzle class
that ensures coarse or coarser spray (according to ASABE S572).
• For boom spraying, the maximum release height is 36 inches from the soil
for ground applications.
• Where states have more stringent regulations, they must be observed.
The applicator should be familiar with, and take into account the information
covered in the following Aerial Drift Reduction Advisory (this information is
advisory in nature and does not supersede mandatory label requirements.)
Aerial Drift Reduction Advisory
Information on Droplet Size: The most effective way to reduce drift potential
is to apply large droplets. The best drift management strategy is to apply the
largest droplets that provide sufficient coverage and control. Applying larger
droplets reduces drift potential, but will not prevent drift if applications are
made improperly, or under unfavorable environmental conditions (see Wind,
Temperature and Humidity, and Temperature Inversions).
Controlling Droplet Size:
• Volume - Use high flow rate nozzles to apply the highest practical spray
volume. Nozzles with higher rated flows produce larger droplets.
• Pressure - Do not exceed the nozzle manufacturer's specified pressures.
For many nozzle types, lower pressure produces larger droplets. When
higher flow rates are needed, use higher flow rate nozzles instead of
increasing pressure.
• Number of Nozzles - Use the minimum number of nozzles that provide
uniform coverage.
• Nozzle Orientation - Orienting nozzles so that the spray is released
parallel to the air stream produces larger droplets than other orientations.
Significant deflection from horizontal will reduce droplet size and increase
drift potential.
• Nozzle Type - Use a nozzle type that is designed for the intended
application. With most nozzle types, narrower spray angles produce larger
droplets. Consider using low -drift nozzles. Solid stream nozzles oriented
straight back produce the largest droplets and the lowest drift.
Boom Length: To further reduce drift without reducing swath width, boom
must not exceed 70% of wingspan or 80% of rotor diameter.
Application Height: Do not make applications at a height greater than 10
feet above the top of the largest plants unless a greater height is required for
aircraft safety. Making applications at the lowest height that is safe reduces
exposure of droplets to evaporation and wind.
Swath Adjustment: When applications are made with a crosswind, the swath
will be displaced downwind. Therefore, on the up and downwind edges of the
field, the applicator must compensate for this displacement by adjusting the
path of the aircraft upwind. Swath adjustment distance should increase with
increasing drift potential (higher wind, smaller drops, etc.).
Wind: Drift potential is lowest between wind speeds of 2 to 10 mph. However,
many factors, including droplet size and equipment type, determine drift
potential at any given speed. Do not make applications below 2 mph due
to variable wind direction and high inversion potential. Do not apply in wind
speeds greater than 10 mph. Local terrain can influence wind patterns. Every
applicator should be familiar with local wind patterns and how they affect
spray drift.
Temperature and Humidity: When making applications in low relative
humidity, set up equipment to produce larger droplets to compensate for
evaporation. Droplet evaporation is most severe when conditions are both hot
and dry.
Temperature Inversions: Do not apply during a local, low level temperature
inversion because drift potential is high. Temperature inversions restrict
vertical air mixing, which causes small suspended droplets to remain in a
concentrated cloud. This cloud can move in unpredictable directions due to
the light variable winds common during inversions. Temperature inversions
are characterized by increasing temperatures with attitude and are common
on nights with limited cloud cover and light to no wind. They begin to form
as the sun sets and often continue into the morning. Their presence can be
indicated by ground fog; however, if fog is not present, inversions can also be
identified by the movement of the smoke from a ground source or an aircraft
smoke generator. Smoke that layers and moves laterally in a concentrated
cloud (under low wind conditions) indicates an inversion, while smoke that
moves upward and rapidly dissipates indicates good vertical air mixing.
USE DIRECTIONS
ProcellaCOR EC performance and selectivity may depend on dosage, time of
year, stage of growth, method of application, and water movement.
Aquatic Plants Controlled: In -Water Application
Table 3 lists the expected susceptible species under favorable treatment
conditions for aquatic plant control. Use of lower rates will increase
selectivity on some species listed. Consultation with SePRO Corporation is
recommended before applying PmcellaCOR EC to detemtine best in -water
treatment protocols for given target vegetation.
TABLE 3. Vascular aquatic plant control with in -water application
Vascular Aquatic Plants Controlled: In -Water Application
Common name
Scientific name
Floating Plants
Mosquito fernAzolla
spp.
Water hyacinth
Eichhomia crassipes
Emersed Plants
Alli atorweed
Altemanthers philoxercides
American lotus
Nelumbo lutea
Floating heart
Wrnphoides spp.
Water perm ort
H drocofyle umbellate
Water primmse
Ludwi is sop.
Watershield
Brasenia schrebed
Submersed Plants
Baco a
Baco a spit.
Coontail'
Cerato h Plum demersum
H drilla'
H drilla verticillata
Parrotfeather
Mynciphyllum a uaticum
Water chestnut
Irapa spp.
Watermiffoil, Eurasian
M doph llum spicatum
Watermiffoil,Hbri -Eurasian
Mydophllum spicatum X M. spp.
Watermiffoil, Variable
M no h Ilum heteroph lura
Higher -rate applications within the specified range may be required to control
less -sensitive weeds.
Aauatic Plants Controlled: Foliar Application
Table 4lists the expected susceptible species using labeled foliar rates
(5.0-10.0 PDU per acre) under favorable treatment conditions for aquatic
plant control. Use higher rates in the rate range on more established, dense
vegetation. Consultation with SePRO Corporation is recommended before
applying ProcellaCOR EC to determine best foliar treatment protocols for
given target vegetation.
TABLE 4. Vascular aquatic plant control with foliar application
Vascular Aquatic Plants Controlled: Foliar Application
Common name
Scientific name
Floating Plants
52%
Mosquito fern
TAzclia spp.
Water hyacinth
Eichhomie crassi es
Emersed Plants
2-3
Alli atorweed
Altemanthem philoxeroides
American lotus
Ne/umbo lutea
Floating heart
Nym hoides sipp.
Parroffeather(emersed)
M do h llum aquaticum
Water pennywort
Hydrocotyle umbellate
Water primrose
Ludwi is spp.
Watershield
Brasenia schreberi
APPLICATION INFORMATION
Mixing Instructions
In -Water Application to Submersed or Floating Aquatic Weeds
ProcellaCOR EC can be applied undiluted or diluted with water for in -water
applications. To dilute with water, it is recommended to fill the spray tank to
one-half full with water. Start agitation. Add correct quantity of ProcellaCOR
EC. Continue agitation while filling spray tank to required volume and during
application.
Foliar Application to Floating and Emergent Weeds
Dilute PmcellaCOR EC with water to achieve proper coverage of treated
plants. To dilute with water, it is recommended to fill spray tank to one-half full
with water. Start agitation. A surfactant must be used with all post -emergent
foliar applications. Use only surfactants that are approved or appropriate for
aquatic use. For best performance, a methylated seed oil (MSO) surfactant is
recommended. Read and follow all use directions and precautions on aquatic
surfactant label. After adding PmcellaCOR EC and surfactant, continue
agitation while filling spray tank to required volume and during application.
TANK -CLEANOUT INSTRUCTIONS
ProcellaCOR EC should be fully cleaned from application equipment prior to
use for other applications. Contact a SePRO Aquatic Specialist for guidance
on methods for thorough cleaning of application equipment after use of the
product.
APPLICATION METHODS
In -Water Application to Submersed or Floating Aquatic Weeds
ProcellaCOR EC can be applied via trailing hose, by sub -surface injection, or
surface spray as an in -water application to control weeds such as hydrilla,
floating heart, water hyacinth, and other susceptible weed species. This
product has relatively short exposure requirements for in -water treatments
(hours to days), but treatments with high exchange and short exposure
periods should be carefully planned to achieve best results. Where greater
plant selectivity is desired - such as when controlling hydrilla or other more
susceptible species, choose a lower dose in the specified range. A SePRO
Aquatic Specialist can provide site-specific prescriptions for optimal control
based on target weed, management objectives, and site conditions.
Apply ProcellaCOR EC to the treatment area at a prescription dose unit
(PDU) to achieve appropriate concentrations. A PDU is a unit of measure
that facilitates the calculation of the amount of product required to control
target plants in 1 acre-foot of water or 1 acre for foliar applications. Per Table
5 below, 1-25 PDU are needed to treat 1 acre-foot of water, depending on
target species and the percent of waterbody to be treated.
Use Table 5 to select the dose needed to treat 1 acre-foot of water.
TABLE 5: Prescription Dose Units (PDU**) per acre-foot of water*
Percent Area
of Waterbody
Treated
Eurasian
Watermilfoil
Ta et Species
Hybrid Variable Leaf
Watermilfoil Watermilfoil
Other
52%
3-4
4-5
3-5
3-25
>2-10%
2-3
3-5
3-4
3-20
>10-20%
1-3
3-4
2-4
3-15
>20-30%
1-2
2-3
2-3
2-10
>30%
1-2
2-3
1-2
1-5
In all cases, user may apply up to the maximum of 25 PDU per acre-foot. Consult
your SePRO Aquatics Specialist for site-specific recommendations.
" 1 PDU contains 3.17 fl. oz. of product.
To calculate the amount of product needed in fluid ounces, use the formula
below:
Number of acres X average depth (feet) X PDU' X 3.17 = fluid ounces
': from Table 5
Example Calculation:
To control hybrid watermilfoil in 2 acres of a 5 -acre lake (>30% treated)
with an average depth of 2 feet:
2 acres X 2 feet X 3 PDU X 3.17=38.04 fl. oz.
For in -water applications, the maximum single application is 25.0 PDU /
acre-foot, with a limit of three applications per year. Allow 14 days or greater
between applications. Product may be applied as a concentrate or diluted
with water prior to or during the application process. Use an appropriate
application method that ensures sufficiently uniform application to the treated
area.
Foliar Application to Floating and Emergent Weeds
Apply PmcellaCOR EC as a foliar application to control weeds such as
water hyacinth, water primrose, and other susceptible floating and emergent
species. Use an application method that maximizes spray interception by
target weeds while minimizing the amount of overspray that inadvertently
enters the water.
For all foliar applications, apply ProcellaCOR EC at 5.0 to 10.0 PDU per
acre. Use of a surfactant is required for all foliar applications of ProcellaCOR
EC. Use only surfactants that are approved or appropriate for aquatic use.
Methylated seed soil (MSO) is a recommended surfactant and is typically
applied at 1.0% volume/volume. Refer to the surfactant label for use
directions. For best results, apply to actively growing weeds. ProcellaCOR EC
may be applied more than once per growing season to meet management
objectives. Do not exceed 10.0 PDU per acre during any individual
application or 20.0 PDU total per acre, per year from all combined treatments.
Foliar Spot Treatment
To prepare the spray solutions, thoroughly mix PmellaCOR EC in water at
a ratio of 5.0 to 10.0 PDU per 100 gallons (0.12 to 0.24% product) plus an
adjuvant. For best results, a methylated seed oil at 1 % volume/volume is the
recommended spray adjuvant. When making spot application, ensure spray
coverage is sufficient to wet the leaves of the target vegetation but not to the
point of runoff.
Aerial Foliar Application to Floating and Emergent Weeds
Apply ProcellaCOR EC in a spray volume of 15 gallons per acre (GPA) or
more when making a post -emergence application by air. Apply with coarse
to coarser droplet category per S-572 ASABE standard; see NAAA, USDA
or nozzle manufacturer guidelines. Follow guidelines and restrictions in the
Spray Drift Management and Aerial Drift Reduction Advisory sections to
minimize potential drift to off -target vegetation. Aircraft should be patterned
per Operation Safe/PAASS program for calibration and uniformity to provide
sufficient coverage and control.
Boat or Ground Foliar Application to Floating and Emergent Weeds
When applying ProcellaCOR EC by boat or with ground equipment to
emergent or floating -leaved vegetation, use boom -type, backpack or
hydraulic handgun equipment. Apply ProcellaCOR EC in a sufficient spray
volume (e.g. 20 to 100 gpa) to provide accurate and uniform distribution of
spray particles over the treated vegetation while minimizing mnoff. Use higher
spray volumes for medium to high density vegetation. For boom spraying,
use coarse or coarser nozzle spray quality per S-572 ASABE standard;
see USDA literature or nozzle manufacturer guidelines. Follow nozzle
manufacturer's recommendations for nozzle pressure, spacing and boom
height to provide a uniform spray pattern. Follow appropriate spray drift
management information where drift potential is a concern.
TANK MIXES WITH OTHER AQUATIC HERBICIDES
DO NOT TANK MIX ANY PESTICIDE PRODUCT WITH THIS PRODUCT
without first referring to the following website for the specific product:
www.3206tankmix.com. This website contains a list of active ingredients that
are currently prohibited from use in tank mixture with this product.
Only use products in tank mixture with this product that: 1) are registered for
the intended use site, application method and timing; 2) are not prohibited for
tank mixing by the label of the tank mix product; and 3) do not contain one of
the prohibited active ingredients listed on www.3206tankmix.com website.
Applicators and other handlers (mixers) who plan to tank -mix must access
the website within one week prior to application in order to comply with the
most up-to-date information on tank mix partners.
Do not exceed specified application rates for respective products or
maximum allowable application rates for any active ingredient in the tank mix
Read carefully and follow all applicable use directions, precautions, and
limitations on the respective product labels. It is the pesticide user's
responsibility to ensure that all products in the mixtures are registered for the
intended use. Users must follow the most restrictive directions for use and
precautionary statements of each product in the tank mixture.
Always perform a as* test to ensure the compatibility of products to be used
in tank mixture.
STORAGE AND DISPOSAL
Do not contaminate water, food, or feed by storage or disposal.
Pesticide Storage: Store in original container only. Keep container closed
when not in use. Do not store near food or feed. In case of spill or leak
on floor or paved surfaces, soak up with vermiculite, earth, or synthetic
absorbent.
Pesticide Disposal: Pesticide wastes are toxic. Improper disposal of
excess pesticide, spray mixture, or rinsate is a violation of Federal law. If
these wastes cannot be disposed of by use according to label instructions,
contact your State Pesticide or Environmental Control Agency or the
Hazardous Waste Representative at the nearest EPA Regional Office for
guidance.
Container Handling
Non -refillable Container. DO NOT reuse or refill this container. Triple
rinse or pressure rinse container (or equivalent) promptly after emptying;
then offer for recycling, if available, or reconditioning, if appropriate, or
puncture and dispose of in a sanitary landfill, or by incineration, or by other
procedures approved by state and local authorities.
Triple rinse containers small enough to shake (capacity!g 5 gallons)
as follows: Empty the remaining contents into application equipment or
a mix tank and drain for 10 seconds after the flow begins to drip. Fill the
container Y4 full with water and recap. Shake for 10 seconds. Pour rinsate
into application equipment or a mix tank, or store rinsate for later use or
disposal. Drain for 10 seconds after the flow begins to drip. Repeat this
procedure two more times.
Triple rinse containers too large to shake (capacity > 5 gallons) as
follows: Empty the remaining contents into application equipment or a
mix tank. Fill the container 1/< full with water. Replace and tighten closures.
Tip container on its side and roll it back and forth, ensuring at least one
complete revolution, for 30 seconds. Stand the container on its end and tip
it back and forth several times. Turn the container over onto its other end
and tip it back and forth several times. Empty the rinsate into application
equipment or a mix tank, or store rinsate for later use or disposal. Repeat
this procedure two more times.
Pressure rinse as follows: Empty the remaining contents into application
equipment or mix tank and continue to drain for 10 seconds after the flow
begins to drip. Hold container upside down over application equipment or
mix tank, or collect rinsate for later use or disposal. Insert pressure rinsing
nozzle in the side of the container and rinse at about 40 PSI for at least 30
seconds. Drain for 10 seconds after the flow begins to drip.
Warranty Disclaimer: SePRO Corporation warrants that this product
conforms to the chemical description on the product label. Testing and
research have also determined that this product is reasonably fit for the uses
described on the product label. To the extent consistent with applicable law,
SePRO Corporation makes no other express or implied warranty of fitness
or merchantability nor any other express or implied warranty and any such
warranties are expressly disclaimed.
Misuse: Federal law prohibits the use of this product in a manner
inconsistent with its label directions. To the extent consistent with applicable
law, the buyer assumes responsibility for any adverse consequences if this
product is not used according to its label directions. In no case shall SePRO
Corporation be liable for any losses or damages resulting from the use,
handling or application of this product in a manner inconsistent with its label.
For additional important labeling information regarding SePRO Corporation's
Terms and Conditions of Use, Inherent Risks of Use and Limitation of
Remedies, please visit http.-,Il�eprotabels com/terms or scan the image below.
°Copyright 2018 SePRO Corporation
SePA :,
SISPRO Corporation
11550 North Meridian Street, Suite 600
Carmel, IN 46032, U.S.A.
Conforms to HazCom 2012/United States
SAFETY DATA SHEET jSePR
ProcellaCOR EC
Section 1. Identification
GHS product identifier : ProcellaCOR EC
Recommended use of the chemical and restrictions on use
Identified uses
EPA Registration No.
Supplier's details
Emergency telephone
number (with hours of
operation)
End use herbicide product
SePRO Corporation
11550 North Meridian Street
Suite 600
Carmel, IN 46032 U.S.A.
Tel: 317-580-8282
Toll free: 1-800-419-7779
Fax: 317-580-8290
Monday - Friday, Sam to 5pm E.S.T.
www.sepro.com
INFOTRAC - 24-hour service 1-800-535-5053
The following recommendations for exposure controls and personal protection are intended for the manufacture, formulation and packaging of this product.
For applications and/or use, consult the product label. The label directions supersede the text of this Safety Data Sheet for application and/or use.
Section 2. Hazards identification
Hazard classification: This material is not hazardous under the criteria of the Federal OSHA Hazard Communication
Standard 29CFR 1910.1200.
Other hazards: No data available.
Section 3. Composition/information on ingredients
Chemical nature: This product is a mixture.
Component
CASRN
Concentration
Flor rauxifen-benz I
1390661-72-9
2.7%
Eth Ihexanol
104-76-7
2.1%
Methanol
67-56-1
0.9%
Balance
Not available
94.3%
Page 1 of 11
Section 4. First aid measures
Description of first aid measures
General advice: If potential for exposure exists refer to Section 8 for specific personal protective equipment.
Inhalation: Move person to fresh air. If person is not breathing, call an emergency responder or
ambulance, then give artificial respiration; if by mouth to mouth use rescuer protection (pocket
mask etc). Call a poison control center or doctor for treatment advice.
Skin contact: Take off contaminated clothing. Rinse skin immediately with plenty of water for 15-20 minutes.
Call a poison control center or doctor for treatment advice.
Eye contact: Hold eyes open and rinse slowly and gently with water for 15-20 minutes. Remove contact
lenses, if present, after the first 5 minutes, then continue rinsing eyes. Call a poison control
center or doctor for treatment advice.
Ingestion: No emergency medical treatment necessary
Most important symptoms
and effects, both acute
and delayed: Aside from the information found under Description of first aid measures (above) and
Indication of immediate medical attention and special treatment needed (below), any
additional important symptoms and effects are described in Section 11: Toxicology
Information.
Indication of any immediate medical attention and special treatment needed
Notes to physician: No specific antidote. Treatment of exposure should be directed at the control of symptoms
and the clinical condition of the patient. Have the Safety Data Sheet, and if available, the
product container or label with you when calling a poison control center or doctor, or going for
treatment.
Section 5. Fire -fighting measures
Suitable extinguishing media: Water fog or fine spray. Dry chemical fire extinguishers. Carbon dioxide fire extinguishers.
Foam. Do not use direct water stream. May spread fire. General purpose synthetic foams
(including AFFF type) or protein foams are preferred if available. Alcohol resistant foams (ATC
type) may function.
Unsuitable extinguishing
media: No data available
Special hazards arising from the substance or mixture
Hazardous combustion
products: During a fire, smoke may contain the original material in addition to combustion products of
varying composition which may be toxic and/or irritating. Combustion products may include
and are not limited to: Nitrogen oxides. Hydrogen fluoride. Hydrogen chloride. Carbon
monoxide. Carbon dioxide.
Unusual Fire and
Explosion Hazards: Violent steam generation or eruption may occur upon application of direct water stream to hot
liquids.
Advice for firefighters
Fire Fighting Procedures: Keep people away. Isolate fire and deny unnecessary entry. Consider feasibility of a
controlled burn to minimize environment damage. Foam fire extinguishing system is preferred
Page 2 of 11
because uncontrolled water can spread possible contamination. Do not use direct water
stream. May spread fire. Burning liquids may be moved by flushing with water to protect
personnel and minimize property damage. Contain fire water run-off if possible. Fire water
run-off, if not contained, may cause environmental damage. Review the "Accidental Release
Measures" and the "Ecological Information" sections of this SDS.
Special protective
equipment for firefighters: Wear positive -pressure self-contained breathing apparatus (SCBA) and protective fire fighting
clothing (includes fire fighting helmet, coat, trousers, boots, and gloves). Avoid contact with
this material during fire fighting operations. If contact is likely, change to full chemical resistant
fire fighting clothing with self-contained breathing apparatus. If this is not available, wear full
chemical resistant clothing with self-contained breathing apparatus and fight fire from a
remote location. For protective equipment in post -fire or non -fire clean-up situations, refer to
the relevant sections.
Section 6. Accidental release measures
Personal precautions,
protective equipment and
emergency procedures: Isolate area. Keep unnecessary and unprotected personnel from entering the area. Refer to
section 7, Handling, for additional precautionary measures. Use appropriate safety equipment.
For additional information, refer to Section 8, Exposure Controls and Personal Protection.
Environmental precautions: Spills or discharges to natural waterways are likely to kill aquatic organisms. Prevent from
entering into soil, ditches, sewers, waterways and/or groundwater. See Section 12, Ecological
Information.
Methods and materials for
containment and cleaning up: Contain spilled material if possible. Small spills: Absorb with materials such as: Clay. Dirt.
Sand. Sweep up. Collect in suitable and properly labeled containers. Large spills: Contact
SePRO Corporation for clean-up assistance. See Section 13, Disposal Considerations, for
additional information.
Section 7. Handling and storage
Precautions for safe handling: Keep out of reach of children. Do not swallow. Avoid contact with eyes, skin, and clothing.
Avoid breathing vapor or mist. Wash thoroughly after handling. Keep container closed. Use
with adequate ventilation. See Section 8, EXPOSURE CONTROLS AND PERSONAL
PROTECTION.
Conditions for safe storage: Store in a dry place. Store in original container. Keep container tightly closed when not in use.
Do not store near food, foodstuffs, drugs or potable water supplies.
Section 8. Exposure controls/personal protection
Control parameters: Exposure limits are listed below, if they exist.
Component I Regulation I Type of Listing Value/Notation
Ethylexanol Dow IHG
TWA
2 ppm
Dow IHG
TWA
SKIN
Methanol ACGIH
TWA
200 ppm
ACGIH
STEL
250 ppm
OSHA Z-1
TWA
260 mg/m3 200 ppm
ACGIH
TWA
SKIN, BEI
Page 3 of 11
ACGIH STEL SKIN, BEI
CAL PEL C 1,000 ppm
CAL PEL PEL 260 mg/m3 200 ppm
CAL PEL STEL 325 mg/m3 250 ppm
RECOMMENDATIONS IN THIS SECTION ARE FOR MANUFACTURING, COMMERCIAL BLENDING AND PACKAGING
WORKERS. APPLICATORS AND HANDLERS SHOULD SEE THE PRODUCT LABEL FOR PROPER PERSONAL
PROTECTIVE EQUIPMENT AND CLOTHING.
Exposure controls
Engineering controls: Use local exhaust ventilation, or other engineering controls to maintain airborne levels below
exposure limit requirements or guidelines. If there are no applicable exposure limit
requirements or guidelines, general ventilation should be sufficient for most operations. Local
exhaust ventilation may be necessary for some operations.
Individual protection measures
Eye/face protection: Use safety glasses (with side shields).
Skin protection
Hand protection: Use gloves chemically resistant to this material. Examples of preferred glove barrier materials
include: Chlorinated polyethylene. Neoprene. Polyethylene. Ethyl vinyl alcohol laminate
("EVAL"). Polyvinyl chloride ('PVC' or "vinyl"). Viton. Examples of acceptable glove barrier
materials include: Butyl rubber. Natural rubber ("latex"). Nitrile/butadiene rubber ("nitrile" or
"NBR"). NOTICE: The selection of a specific glove for a particular application and duration of
use in a workplace should also take into account all relevant workplace factors such as, but
not limited to: Other chemicals which may be handled, physical requirements (cut/puncture
protection, dexterity, thermal protection), potential body reactions to glove materials, as well
as the instructions/specifications provided by the glove supplier.
Other protection: Use protective clothing chemically resistant to this material. Selection of specific items such as
face shield, boots, apron, or full body suit will depend on the task.
Respiratory protection: Respiratory protection should be worn when there is a potential to exceed the exposure limit
requirements or guidelines. If there are no applicable exposure limit requirements or
guidelines, wear respiratory protection when adverse effects, such as respiratory irritation or
discomfort have been experienced, or where indicated by your risk assessment process. For
most conditions no respiratory protection should be needed; however, if discomfort is
experienced, use an approved air -purifying respirator. The following should be effective types
of air -purifying respirators: Organic vapor cartridge with a particulate pre -filter.
Section 9. Physical and chemical properties
Appearance
Physical State
Liquid
Color
Amber
Odor
Solvent
Odor Threshold
No data available
pH
4.24 (1 % aqueous suspension)
Melting point/range
Not applicable to liquids
Freezing point
No data available
Boiling point (760 mmHg)
No data available
Flash point
> 100 °C (> 212 °F)
Evaporation Rate
(Butyl Acetate =1)
No data available
Flammability (solid, gas)
Not applicable
Lower explosion limit
No data available
Upper explosion limit
No data available
Vapor pressure
0.0000002 mmHg at 20°C (68°F)
Relative Vapor Density
(air = 1)
No data available
Page 4 of 11
Relative Density (water= 1)
Water solubility
Partition coefficient:
n-octanol/water
Auto -ignition temperature
Decomposition temperature
Dynamic Viscosity
Kinematic Viscosity
Explosive properties
Oxidizing properties
Liquid Density
Molecular weight
,"Melilla
0.93
0.015 mg/I at 20°C (68°F)
No data available
260°C (500 °F)
No data available
15.4 mPa.s at 20°C (68°F) 8.90 mPa.s at 40°C (104°F)
14.2 mm2/s at 20°C (68°F) 7.91 mm2/s at 40°C (104°F)
Not explosive
Not oxidizing
0.9257 g/cm3 at 20 °C (68 °F) Digital density meter
No data available
The physical data presented above are typical values and should not be construed as a
specification.
Section 10. Stability and reactivity
Reactivity: No dangerous reaction known under conditions of normal use.
Chemical stability: Thermally stable at typical use temperatures.
Possibility of hazardous
reactions: Polymerization will not occur.
Conditions to avoid: Exposure to elevated temperatures can cause product to decompose.
Incompatible materials: None known.
Hazardous
decomposition products: Decomposition products depend upon temperature, air supply and the presence of other
materials. Decomposition products can include and are not limited to: Carbon monoxide.
Carbon dioxide. Hydrogen chloride. Hydrogen fluoride. Nitrogen oxides.
Section 11. Toxicological information
Toxicological information appears in this section when such data is available.
Acute toxicity
Acute oral toxicity Very low toxicity if swallowed. Harmful effects not anticipated from swallowing small amounts.
As product: LD50, Rat, female, > 5,000 mg/kg
Acute dermal toxicity Prolonged skin contact is unlikely to result in absorption of harmful amounts.
As product: LD50, Rat, male and female, > 5,000 mg/kg
Acute inhalation toxicity No adverse effects are anticipated from single exposure to mist. Based on the available data,
respiratory irritation was not observed.
As product: LC50, Rat, male and female, 4 Hour, dust/mist, > 5.40 mg/1 No deaths occurred
at this concentration.
Skin corrosion/irritation Brief contact may cause slight skin irritation with local redness
Serious eye damage/
eye irritation May cause slight eye irritation. Corneal injury is unlikely.
Sensitization Did not cause allergic skin reactions when tested in guinea pigs. For respiratory sensitization:
No relevant data found.
Page 5 of 11
Specific Target Organ
Systemic Toxicity
(Single Exposure)
Evaluation of available data suggests that this material is not an STOT-SE toxicant.
Specific Target Organ
Systemic Toxicity
(Repeated Exposure)
For the active ingredient(s): Based on available data, repeated exposures are not anticipated
to cause significant adverse effects.
For the major component(s): Based on available data, repeated exposures are not anticipated
to cause significant adverse effects.
For the minor component(s): In animals, effects have been reported on the following organs:
Blood, kidney, liver, and spleen.
Carcinogenicity
For the active ingredient(s): Did not cause cancer in laboratory animals.
For the major component(s): No relevant data found.
Teratogenicity
For the active ingredient(s): Did not cause birth defects or any other fetal effects in laboratory
animals.
For the major component(s): No relevant data found.
For the minor component(s): Has caused birth defects in laboratory animals only at doses
toxic to the mother. Has been toxic to the fetus in laboratory animals at doses toxic to the
mother. These concentrations exceed relevant human dose levels.
Reproductive toxicity
For the active ingredient(s): In animal studies, did not interfere with reproduction.
For the major component(s): In animal studies, did not interfere with reproduction. In animal
studies, did not interfere with fertility.
Mutagenicity
In vitro genetic toxicity studies were negative. Animal genetic toxicity studies were negative.
Aspiration Hazard
Based on physical properties, not likely to be an aspiration hazard.
No aspiration toxicity classification
Section 12. Ecological information
Ecotoxico/ogical information appears in this section when such data is available.
Toxicity
Acute toxicity to fish Material is practically non-toxic to fish on an acute basis (LC50 > 100 mg/L).
EC50, Cyprinus carpio (Carp), static test, 96 Hour, > 120 mg/I, OECD Test Guideline 203 or
Equivalent
Acute toxicity to
aquatic invertebrates Material is slightly toxic to aquatic invertebrates on an acute basis (LC50/EC50 between 10
and 100 mg/L).
EC50, Daphnia magna (Water flea), 48 Hour, 49 mg/l, OECD Test Guideline 202
Acute toxicity to
algae/aquatic plants Material is very highly toxic to some aquatic vascular plant species.
ErC50, Pseudokirchneriella subcapitata (green algae), 72 Hour, > 5.4 mg/l, OECD Test
Guideline 201
ErC50, Myriophyllum spicatum, 14 d, 0.000919 mg/I
NOEC, Myriophyllum spicatum, 14 d, 0.0000954 mg/I
Page 6 of 11
Toxicity to Above Ground
Organisms Material is practically non-toxic to birds on an acute basis (LD50 > 2000 mg/kg).
oral LD50, Colinus virginianus (Bobwhite quail), > 2500mg/kg bodyweight.
oral LD50, Apis mellifera (bees), 48 Hour, > 212.2pg/bee
contact LD50, Apis mellifera (bees), 48 Hour, >200pg/bee
Toxicity to soil -dwelling
organisms LC50, Eisenia fetida (earthworms), 14 d, mortality, >2,500 mg/kg
Persistence and degradability
florgvra uxife n -be nzvl
Biodegradability: Material is expected to biodegrade very slowly (in the environment). Fails to pass OECD/EEC
tests for ready biodegradability.
10 -day Window: Fail
Biodegradation: 14.6%
Exposure time: 29 d
Method: OECD Test Guideline 301 B
Stability in Water (1l2 -life)
Hydrolysis, DT50, 913 d, pH 4, Half-life Temperature 25 °C
Hydrolysis, DT50, 111 d, pH 7, Half-life Temperature 25 °C
Hydrolysis, DT50, 1.3 d, pH 9, Half-life Temperature 25 °C
Ethvlhexanol
Biodegradability:
Material is readily biodegradable. Passes OECD test(s) for ready biodegradability. Material is
5 d -72016
ultimately biodegradable (reaches > 70% mineralization in OECD test(s) for inherent
20 d 86-87%
biodegradability).
10 -day Window: Not applicable
Biodegradation:
> 95 %
Exposure time:
5 d
Method:
OECD Test Guideline 302B or Equivalent
10 -day Window: Pass
Biodegradation:
68%
Exposure time:
17 d
Method:
OECD Test Guideline 301 B or Equivalent
Theoretical
Oxygen Demand:
2.95 mg/mg
Chemical
Oxygen Demand:
2.70 mg/mg
Biological oxygen demand
(BOD)
Photodegradation
Test Type:
Sensitizer:
Atmospheric half-life:
Method:
Half-life (indirect photolysis)
OH radicals
9.7 Hour
Estimated.
Page 7 of 11
Incubation Time BOD
5 d -72016
10d 75-811.
20 d 86-87%
Photodegradation
Test Type:
Sensitizer:
Atmospheric half-life:
Method:
Half-life (indirect photolysis)
OH radicals
9.7 Hour
Estimated.
Page 7 of 11
Methanol
Biodegradability:
Material is readily biodegradable. Passes OECD test(s) for ready biodegradability.
10 -day Window: Pass
Biodegradation:
99%
Exposure time:
28 d
Method:
OECD Test Guideline 301 D or Equivalent
Theoretical Oxygen
Demand:
1.50 mg/mg
Chemical Oxygen
Demand:
1.49 mg/mg Dichromate
Biological oxygen demand (BOD)
Incubation Time BOD
5d
72%
20d
79%
Photodegradation
Test Type:
Half-life (indirect photolysis)
Sensitizer:
OH radicals
Atmospheric half-life:
8-18 d
Method:
Estimated.
Balance
Biodegradability: No relevant data found.
Bioaccumulative potential
F to rpyra uxife n -be nzvl
Bioaccumulation: Bioconcentration potential is moderate (BCF between 100 and 3000 or Log Pow between 3
and 5).
Partition coefficient:
n-octanol/water(log Pow): 5.5 at 20 °C
Bioconcentration
factor (BCF): 356 Lepomis macrochirus (Bluegill sunfish) 30 d
Ethvlhexanol
Bioaccumulation: Bioconcentration potential is moderate (BCF between 100 and 3000 or Log Pow between 3
and 5).
Partition coefficient:
n-octanol/water(log Pow): 3.1 Measured
Methanol
Bioaccumulation: Bioconcentration potential is low (BCF < 100 or Log Pow < 3).
Partition coefficient:
n-octanol/water(log Pow): -0.77 Measured
Bioconcentration
factor (BCF): <10 Fish Measured
Balance
Bioaccumulation: No relevant data found.
Page 8 of 11
Mobility in soil
Florpyrauxifen-benzyl
UN 3082
Class
Expected to be relatively immobile in soil (Koc > 5000).
Packing group
Partition coefficient (Koc): 34200
Ethvlhexanol
Florpyrauxifen-benzyl
Transport in bulk
Potential for mobility in soil is low (Koc between 500 and 2000).
according to Annex I or 11
Partition coefficient (Koc): 800 Estimated.
Methanol
IBC or IGC Code
Potential for mobility in soil is very high (Koc between 0 and 50).
Partition coefficient (Koc): 0.44 Estimated.
Balance
No relevant data found.
Section 13. Disposal
considerations
Disposal methods:
If wastes and/or containers cannot be disposed of according to the product label directions,
disposal of this material must be in accordance with your local or area regulatory authorities.
This information presented below only applies to the material as supplied. The identification
based on characteristic(s) or listing may not apply if the material has been used or otherwise
contaminated. It is the responsibility of the waste generator to determine the toxicity and
physical properties of the material generated to determine the proper waste identification and
disposal methods in compliance with applicable regulations. If the material as supplied
becomes a waste, follow all applicable regional, national and local laws.
Section 14. Transport information
DOT
Not regulated for transport
Classification for SEA transport (IMO•IMDG):
Proper shipping name Environmentally hazardous substance, liquid, n.o.s. (Florpyrauxifen-benzyl)
UN number
UN 3082
Class
9
Packing group
III
Marine pollutant
Florpyrauxifen-benzyl
Transport in bulk
Consult IMO regulations before transporting ocean bulk
according to Annex I or 11
of MARPOL 73/78 and the
IBC or IGC Code
Classification for AIR transport (IATA/ICAO):
Proper shipping name Environmentally hazardous substance, liquid, n.o.s. (Florpyrauxifen-benzyl)
UN number UN 3082
Class 9
Packing group III
This information is not intended to convey all specific regulatory or operational requirements/information relating to this
product. Transportation classifications may vary by container volume and may be influenced by regional or country variations
in regulations. Additional transportation system information can be obtained through an authorized sales or customer service
representative. It is the responsibility of the transporting organization to follow all applicable laws, regulations and rules relating
to the transportation of the material.
Page 9 of 11
I Section 15. Requlatory information
OSHA Hazard
Communication Standard
Superfund Amendments and
Reauthorization Act of 1986
Title III (Emergency Planning
and Community
Right -to -Know Act of 1986)
Sections 311 and 312
Superfund Amendments and
Reauthorization Act of 1986
Title III (Emergency Planning
and Community
Right -to -Know Act of 1986)
Section 313
Pennsylvania Worker and
Community
Right -To -Know Act:
California Proposition 65
(Safe Drinking Water and
Toxic Enforcement
Act of 1986)
United States TSCA
Inventory (TSCA)
This product is not a "Hazardous Chemical' as defined by the OSHA Hazard Communication
Standard, 29 CFR 1910.1200.
This product is not a hazardous chemical under 29CFR 1910.1200, and therefore is not
covered by Title III of SARA.
This material does not contain any chemical components with known CAS numbers that
exceed the threshold (De Minimis) reporting levels established by SARA Title III, Section 313.
The following chemicals are listed because of the additional requirements of Pennsylvania
law: Components CASRN
Ethyl hexanol 104-76-7
WARNING: This product contains a chemical(s) known to the State of California to cause birth
defects or other reproductive harm.
This product contains chemical substance(s) exempt from U.S. EPA TSCA Inventory
requirements. It is regulated as a pesticide subject to Federal Insecticide, Fungicide, and
Rodenticide Act (FIFRA) requirements.
Secti®n 16. Other information
Hazard Rating System
National Fire Protection Association (U.S.A.)
Health: 1 Flammability: 1 Instability:
Leaend
ACGIH
USA. ACGIH Threshold Limit Values TL
C
Ceiling
CAL PEL
California permissible exposure limits for chemical contaminants Title 8, Article 107
Dow IHG
Dow Industrial Hygiene Guideline
OSHA Z-1
USA. Occupational Exposure Limits OSHA —Table Z-1 Limits for Air Contaminants
PEL
Permissible exposure limit
SKIN
Absorbed via skin
SKIN, BEI
Absorbed via Skin, Biological Exposure Indice
STEL
Short term exposure limit
TWA
Time weighted average
Page 10 of 11
History
Date of issue mm/dd/yyyy 10/09/2017
Version : 1.0
Notice to reader
To the best of our knowledge, the information contained herein is accurate. However, neither the above-named supplier, nor any of its subsidiaries,
assumes any liability whatsoever for the accuracy or completeness of the information contained herein. Final determination of suitability of any
material is the sole responsibility of the user. All materials may present unknown hazards and should be used with caution. Although certain hazards
are described herein, we cannot guarantee that these are the only hazards that exist.
Page 11 of 11