PROJECT PROSPECTUS FOR THE MANASTASH ROAD CREEK BANK STABILIZATION
AND SNOW PARK IMPROVEMENT, CRP 273.16
WHEREAS: The Manastash Road realignment and bank stabilization project was requested
in 2016 due to a deteriorating roadway and bank erosion resulting from
Manastash Creek; and
WHEREAS: Kittitas County Public Works submitted for, and was approved for a Federal
Lands Access Program (FLAP) Grant for up to $1,332,968.00, with up to
$154,169.00 available for preliminary engineering; and
WHEREAS:January 5, 2020, a Local Agency Project Prospectus was signed that included an
amount that exceeded the Western Federal Lands programmed amount for
preliminary engineering with resolution 2021-009. This Project Prospectus has
been updated lowering the amount for preliminary engineering and increasing the
amount for construction. This Prospectus will replace the one dated January Sth;
and
WHEREAS:
WHEREAS:
ln preparation to starting the preliminary engineering phase Public Works is
requesting the Washington State Department of Transportation to release the
Federal Funds for design; and
A LocalAgency FederalAid Project Prospectus must be executed by the Chair
acknowledging the project has been reviewed and is consistent with the agency's
comprehensive plan for community development; and
NOW, THEREFORE BE lT RESOLVED that the Board of County Commissioners, in the best
interest of the public, does hereby approve the Chair's signature on the Local
Agency Federal Aid Project Prospectus for the Manastash Road Creek Bank
Stabilization and Snow Park lmprovement, CRP 273-16.
DATED on this 2nd day of March 2021, at Ellensburg, Washington.
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY,GTON\\\llllll//,/
sm ch a
ABSENT
Laura acz, Vice-Chairman
of'Julie Kjorsvik
lltililll
! Deputy Clerk of the, Board-
Cory Wright, Commissioner
Prefix Route ()
FederalAid
Proisct Number
Local Agency
Prcject Number RC 1573, CRF 273-16
-W H#r*Xn *1f"""*rrarion Local Agen cy Federal Aid
P Pros $
WSDOT
Use Only
Description of Proposed Work
Desoiption of Proposed Work {Atiach additional shoet{s) if necessary}
The project will repair the embankment and washed out portion of the roadway, widen approximately t).36
miles of Manastash Road to accommodate parking for recreational access, and provide a turn around for
hailers, County equipment and other recreational vehicles.
Uate 2lr6l2t2t
DUNS Number 4b020-7s47
Federal Employer
Tax lD Number 9l-60r 349
Agency
Kittitas County Public Works
CAAgency
M ves f]ruo
Federal Program Title
Vza.zos I otrer
ProjectTide
Manrstash Road C.reek Bank Stabilization and Snow Park Improvcnrent
$tarl Latitude g 46 57'33,51 "
End Latitude N 46 57'39.17"
$tart Lorgitudo W I 20 47' l?,.59"
End Lonoitude W 120 47'38.02'
Project Termini From-To
10.65 I t.0t
Nearest City Name
Ellensburg
Project Zip Code i+4;
98926-7e89
Begin Mile Post
10.65
End Mile Post
I l.0l
Length of Project
0.36 ffi Locarfltocat Forces I state flRaikoad
Award Type
Route lD Begin Mile Point
10.65
End Mile Point
l l.0l
City Number County Number
t9
County Name
Kittitas
WSDOT Region
South Ccntral Region
Legislative DNrict(s)
l3
Congressional District(s)
I
Urban Area Number
Phase
Total
Estimated Cost
{Nearest Hundred Dollar)
Local Agency
Funding
(Nearest Hundred Dollar)
Federal Funds
(Nearest Hundred Dollarl
Phase $tart
Date
Month Year
P.E.178,300.00 24,100.00 I54,200.00 March 20?l
Hvw
Const.t,362,900.00 184,000.00 1,178,800.00 Jlune 2422
lictal 1,541,100.00 208,100.00 1,333,000.00
Descrlption of Existing Facility {Existing Design and Present Gondition}
Roadway Width
16-?2'varies due to washout area
Number of Lanes
2
Manastnsh Road is currently rcstrised to one lane due to an actively eroding streambank of Manastash Creek. This lanc rc$biction is inrpacting a heavily
used snowpark, local residents, access to the Okanogan Wenatchcc Nationai Fcrcst (OWNF) antl the Countys ability to maintain tlre roaiway iurilg wintcr
Local Agency Contact Person
Darren Case
Title
Construetion Manager
Phone
509-962-70t9
Mailing Address
4l I North Ruby, Suite I
City
Ellensburg
Stats
WA
Zip Code
989?6
n1" Deputy Director / County Engineer
By
Project Prospectus
Revised 04/2015 Previous Edilions Obsolote
Agency
Kittitas Cor.rnty Public Works
Project Title
Llanasmsh Road Creeh Bank. Stabiliz{tior nnd Snow Park lrlpnrvernent
Date
2/rcna2r
Type of Proposed Work
Project Type (Check all that Apply)
[l] N"* construction flPath / Trail [f r-n
ffi Reconstruction flPedestrian / Facitities fl2-R
f] Railroad flParking llj ottrer
il ericge
Roadway Widlh
24',
Number of Lanes
2
Geometris Design Data
Description Through Route Crossroad
Federal
Functional
Classification
fluroan
ffJ Rurat
flruns
flRrincipalArterial
flMinorArterial
fJcoltector
fJrua3or Collector
il frlinor Collector
flLocalAccess
I urban
n Rurat
il ttHs
fl Principal Arterial
fltrrtinor Arterial
I coltector
I wtalor Collector
I tvtinor Collector
I Locat Access
Terrain llll rtat lZ nott ll Mountain f-l rlat llll nott l-l Mountain
Posted $peed 35
Design Speed 35
Existing ADT s67
Design YearADT
Design Year
Design Hourly Volume (CIHV)
Performance of Work
Preliminary Engineuing Wtl Be Performed By
Coung 75 o/o, Consultant2l0/o
Others
25 o/o
Agency
75 o/a
Conslruction Witl Be Performed By Contract
100 o/o
Agency
oa
Environmental Classification
flCtass l* Environmental lmpact Statement (ElS)
il Proiect lnvolves NEPA/SEPA Section 404
Interagency Agreernent
flCtass lll - EnvironmentalAssessment (EA)
il project lnvolves NEP}ISEPA Section 404
lnteragency Agreements
Itl Ctass ll - Categorically Excluded (CE)
fl fropcts Requiring Socumentation
(Documented CE)
Environmental Considerations
Work within the ordinary high water mark of Manastash Creek. Tree clearing (<l ac) for sno-park and
turnaround.
Revised 0412015 Provious Editions Obsolete
Agency
Kittitas Counly Public Works
Project Title
Mamsash Road Crer:k Sunk Stabilizutinn and Srorv Park Improvement
Date
21rcnAzl
ir'-] No Right of Way Needed
* Afl construction required by the
contract can be accomplished
within the of
of Way
n Relocation Required
il nignt of Way Needed
f] t'to Relocation
Utilities Railroad
il mo utility work required
LZJnt *tity work will be cornpleted prior to the start
of the construction contraci
ilrut.utility work will be completed in coordination
with the construction contract
[d ruo railroad work required
flett raitroad work will be completed prior to the start of
the construction coniract
[f ntthe railroad work will be completed in coordination
with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures lnvolved in the Project
There are existing overhead powerlines and power poles that will need to be moved prior to construction.
There is also buried communication lines that may need to be temporarily relocated. Utilities will be moved
by the franchisee prior to construction.
This project has been by the legislative body the administration agency or agencies, or
design ee, and is not inconsistent with the agency'$comprehensive
Date 3lzlat BY
SOT Form 140-101
Revised O4/2Ol 5
located within 3"2 kilometers miles of the project? flves [7-] t'to
FAAlnvolvement
ls any a
Remarks
Nb airports within 2 miles
Previous Editions Obsoiote
for com opment.