Loading...
HomeMy WebLinkAboutSet PHearing_Irrigation Franchise_MooreKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: January 19, 2021 ACTION REQUESTED: Request to Set a Public Hearing for February 16, 2021 at 2pm to consider an irrigation franchise with David Moore along Badger Pocket Road. BACKGROUND: David Moore has applied for an irrigation franchise to install irrigation pipe along Badger Pocket Road. The proposed franchise is to install a 10" irrigation pipe for 1160' along Badger Pocket Road to a pump station located on Mr. Moore's property servicing a pivot utilized by Mr. Moore. Upon approval of the irrigation franchise, a right of way permit will be required to conduct the proposed work. The Franchise Application is complete, and the appropriate application fee has been collected. INTERACTION: Public Works RECOMMENDATION: Set a public hearing on February 16, 2021 at 2:00 pm and advertise accordingly, to consider an irrigation franchise with David Moore along Badger Pocket Road. ATTACHMENTS: Franchise Application LEAD STAFF: Mark Cook Director of Public Works Page 1 of 1 Public Notice Kittitas County, Ellensburg WA The Board of Commissioners will meet at 2:00pm on February 16, 2021 at the Commissioners' Auditorium, 205 West 5th Avenue, Room 109, Kittitas County Courthouse, Ellensburg, WA to consider a franchise application by David Moore for an irrigation franchise along Badger Pocket Road located in Section 36, Township 17 North, Range 19 East, W.M.. More information is online at http://www.co.kittitas.wa.us/notices/. Clerk Publish: Daily Record: 01/21/2021; 01/28/2021; 02/04/2021 file:///C:fUsers/candie.leader/Downloads/newspaper-text°/`20(l).html 1/12/2021 Page 1 of I For more information, contact Public Works file:///C:[Users/candie.leader/Downloads/www-text%20(1).html 1/12/2021 �u�vrcti aawry 3KY1=YYAlS V®Vi%Tf Z DEPARTMENT OF PUBLIC WORKS FRANCHISE APPLICATION Facility in County Road Right of WAY Fee (NonRefundable): $1,615.00 Owner Name -David. Mailing Add/ggss 06 MO'F '✓c'NrtQ Phone Number 360 y q__20 -, 5P61 Applicant Name Mailing Address Phone Number Payment Method: � Check I i 1 I O Cash Permit#�� DATE STAMP Pursuant to KCC 15A.03.040, upon receipt of the application, Kittitas County Public Works will contact the applicant to schedule a meeting with the Director of Public Works and/or the County Engineer to discuss terms and conditions of franchise agreement and schedule a Public Hearing for consideration of the franchise agreement by the Board of County Commissioner's. Su000rtine Documents Required for complete application: • Detailed Project Plans • Detailed Vicinity Map batr-Its RC Schedule for Work to be performevel N d CALL BEFORE YOU DIG 1-800424-5555 or 811 Applicant is responsible for calling for underground utility locates 48 hours prior to construction. Warning: The County does not mark any of the County infrastructures; the Applicant is responsible for any damage to the County infrastructure. 13 All required supporting documents have been attached. O Applicant agrees to obtain a work in Right -of -Way permit upon approval of the franchise agreement. Applicant/Agent Signature "—�- ./r t�f/Y�4A Date 411 N. Ruby St. Suite 1 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663 Kooy's Irrigation 5284 HWY. 281 N Quincy, WA 98848 Office: 509-787-3184; (2): 509-797-3524 paul@kooysirr.com en }.r k J r 5+>•�c i ^� - Dave M00fB 4 Page 1 of 3 Pwrc� 4,3 l6h IbPH� �c en }.r k J r 5+>•�c i ^� - Dave M00fB 4 Page 1 of 3 Pwrc� 4,3 l6h IbPH� Project plan for Dave ,:,00re irrigation project We are planning on running 1160' of 10" pvc 100# pipe along side Badger Pocket Rd starting from the KRD canal which is 3900' south of the intersection of Thrall Rd and Badger Pocket Rd. It will then turn approximately 45 degrees and headNE through Dave Moore property to an existing pump station point in his field. Kooy's Irrigation will be installing the pipe. Dave Moore will be hiring an excavator company to do the trench work. Currently pvc pipe is hard to get so as soon as the pipe comes in we would like to start digging and installing this pipe line. Our goal is to have it completed by March 31, 2021 We will be laying the pipe in the county ditch with a minimum cover of 30". We will have to dig out the current ditch to get that amount of cover. Work schedule for Davi Moore We plan on having this project completed by March 31, 2021, We will be starting on this as soon as all permits are completed and weather permits.