HomeMy WebLinkAboutRes-2021-009BOARD OF' COTINTY COMMISSIONERS
COTINTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 202I./')
AUTHORIZING THE CHAIR'S SIGNATTIRE ON TIIE LOCAL AGENCY FEDERAL
AID PROJECT PROSPECTUS FOR THE MANASTASH ROAD CREEK BANK
STABTLTZATION AND SNOW pARr( TMPROVEMENT, CRp 273-16
WIIEREAS: The Manastash Road realignment and bank stabilizationproject was requested in
2016 due to a deteriorating roadway and bank erosion resulting from Manastash
Creek; and
WHEREAS: Kittitas County Public Works submitted for, and was approved for a Federal
Lands Access Program (FLAP) Grant for up to $1,332,968.00; and
WHEREAS: In preparation to starting the preliminary engineering phase Public Works is
requesting the Washington State Department of Transportation to release the
Federal Funds for design; and
WHEREAS:A Local Agency Federal Aid Project Prospectus must be executed by the Chair
acknowledging the project has been reviewed and is consistent with the agency's
comprehensive plan for community development; and
NOW THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best
interest of the public, does hereby approve the Chair's signature on the Local
Agency Federal Aid Project Prospectus for the Manastash Road Creek Bank
Stabilization and Snow Park Improvement, CF.P 273-16.
DATED on this 5th day of January 2021, at Ellensburg, Washington.
BOARD OF COTINTY
COMMISSIONERS
KITTITAS COTINTY
the Board- Julie Kjorsvik
n Deputy Clerk of the Board- Mandy Buchholz
70
Commissioner
^-'w Washington State
Department of Tlansportation Local Agency Federal Aid
Project Prospectus
Date 12/1812020
DUNS Number 01-020-2s47
Federal Employer
Tax lD Number 9r-60t349(WSDOT
Use Only
Prefix Route (
FederalAid
Proiect Number
Local Agency
Project Number RC 1573, CRP 273-16
Agency
Kittitas County Public Works
CAAgency
Z v"s E trto
Federal Program Title
Vzo.zos n otner
Project Title
Manastash Road Creek Bank Stabilization and Snow Park Improvement
Start Latitude trt 46 57'33.51"
End Latitude N46 57'39,17"
Starl Longitude W 120 47'12.59"
End Lonoitude W 120 47'38.02"
Project Termini From-To
10.65 I 1.01
Nearest City Name
Ellensburg
Project Zip Code (+4)
98926-7989
Begin Mile Post
10.65
End Mile Post
11.01
Length of Project
0.36
Award Type
Z tocat ! locat rorces ! State ! Raitroad
Route lD Begin Mile Point
10.65
End Mile Point
1 1.01
City Number County Number
t9
County Name
Kittitas
WSDOT Region
South Central Region
Legislative District(s)
13
Congressional Dishict(s)
8
Urban Area Number
Phase
Total
Estimated Gost
(Nearest Hundred Dollar)
Local Agency
Funding
(Nearest Hundred Dollar)
Federal Funds
(Nearest Hundred Dollar)
Phase Start
Date
Month Year
P.E 263,000.00 35,500.00 227,500.00 January 2021
RA/V
Const.1,188,000.00 83,000.00 1,105,000.00 June2022
Total 1,451,000.00 1i8,500.00 1,332,500.00
Description of Existing Facilit! (Existing Design and present Condition)
Roadway Width
76-22'varies due to washout area
Number of Lanes
2
Manastash Road is currently restricted to one lane due to an actively eroding streambank ofManastash Creek. This lane restriction is impacting a heavily
used snowpark, local residents, access to the Okanogan Wenatchee National Forest (OWNF) and the Countys ability to maintain the roadway during winter
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
The project will repair the embankment and washed out portion of the roadway, widen approximately 0.36
miles of Manastash Road to accommodate parking for recreational access, and provide a turn around for
trailers, County equipment and other recreational vehicles.
Local Agency Contact Person
Darren Case
Title
Construction Manager
Phone
509-962-70t9
Mailing Address
411 North Ruby, Suite 1 .v
City
Ellensburg
State
WA
Zip Code
98926
Approving Authority
By
Project Prospectus
111" Deputy Director / County Engineer s^1gr/i>,funo
Revised 0412015 Previous Editions Obsolete
Page
Agency
Kittitas County Public Works
Project Title
Manastash Road Crcck Bank Stabilization and Snow Park Improvement
Date
t21t812020
Type of Proposed Work
Project Type (Check all that Apply)
M ruew Construction n Path / Trail
M Reconstruction ! eedestrian / Facilities n Z-n
! Raitroad ! Parking Z otner
! erioge
3-R
Roadway Width
24',
Number of Lanes
2
Geometric Design Data
Description Through Route Crossroad
Federal
Functional
Classification
! uruan
E Rural
[] ruHs
! PrincipalArterial
f] MinorArterial
! collector
! tvtalor Collector
f, wtinor Collector
! tocat Access
! uruan
I Rural
[] ruus
! erincipalArterial
f] Vinornrterial
E Collector
! tr,talor Collector
! tvtinor Collector
! tocal Access
Terrain E rtat Z nott f]Mountain E rtat Roll n Mountain
Posted Speed 35
Design Speed 35
Existing ADT 567
Design YearADT
Design Year
Design Hourly Volume (DHV)
Performance of Work
Preliminary Engineering Will Be Performed By
County 60 oA, Consultant 40%
Others
40 o/o
Agency
60 %
Construction Will Be Performed By Conhact
100 o/o
Agency
o/
Envi ronmental Classification
n Ctass I - Environmental lmpact Statement (ElS)
! Project lnvolves NEPA/SEPA Section 404
lnteragency Agreement
! Ctass lll - EnvironmentalAssessment (EA)
! Project lnvolves NEPA/SEPA Section 404
lnteragency Agreements
Z Ctass ll- Categorically Excluded (CE)
! Projects Requiring Documentation
(Documented CE)
Environmental Considerations
Work within the ordinary high water mark of Manastash Creek. Tree clearing (<1 ac) for sno-park and
fuinaround.
140-101
Revised 0412015 Previous Editions Obsolete
Agency
Kittitas County Public Works
Project Title
Manastash Road Creek Bank Stabilization and Snow Park Improvcment
Date
12118/2020
Right of Way
M t to Right of Way Needed
*All construction required by the
contract can be accomplished
within the exiting right of way.
! night of Way Needed
E ruo Relocation ! Relocation Required
Utilities Railroad
n llo utility work required
Zntl utility work will be completed prior to the start
of the construction contract
!ntt utility work will be completed in coordination
with the construction contract
M ruo railroad work required
nrut railroad work will be completed prior to the start of
the construction contract
!ru1 the railroad work will be completed in coordination
with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures lnvolved in the Project
There are existing overhead powerlines and power poles that will need to be moved prior to construction.
There is also buried communication lines that may need to be temporarily relocated. Utilities will be moved
by the franchisee prior to construction.
FAA lnvolvement
ls any airport located within 3.2 kilometers (2 miles) of the proposed project? n Ves Z ruo
Remarks
No airports within 2 miles
This project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's plan for community development.
Agen
Date Mayor/Chairperson tltnr'^*5
DOT Form 140-101
Revised 0412015
By
Previous Editions Obsolete
Page 3
704