Loading...
HomeMy WebLinkAboutOrd-2021-001BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON oRDrNANcen". &0& l-001 ADOPTION OF THE KITTITAS COUNTY CAPITAL IMPROVEMENT PROGRAM FOR THE PLANNING PERIOD 2021.2026 WHEREAS: Kittitas County opted into the Growth Management Act, RCW 36.70A, voluntarily on December 27, 1990, through Resolution 90-13g; and WHEREAS: Kittitas County adopted the Kittitas County Comprehensive Ptan in August of 1996 and the Capital Facilities Plan was adopted as part of the Comprehensive Plan; and WHEREAS: Kittitas County amended the Comprehensive Plan in 2001 to adopt the six year Capital lmprovement Program through a process separate from the annual comprehensive plan amendment process and any changes made are adopted by reference to the Kittitas County Comprehensive Plan at adoption; and WHEREAS: The Kittitas County Commissioners conducted a public hearing on December 2g,2020 to consider the six year Capital lmprovement Program for the planning period 2021-2026; and WHEREAS: The Kittitas County Commissioners considered public testimony at said public hearing and approved the Capital lmprovement Program for the planning period 2021-2026. NOW' THEREFORE BE lT ORDAINED That the Board of County Commissioners after due deliberation and in the best interest of the public, does hereby approve the six year Capital lmprovement program for the planning period 2021-2026 as attached hereto. ADOPTED this 5rh day of Januarv ,2021, at Ellensburg, Washington BOARD OF COU MISSIONERS KITTIT N Commissioner APPROVED AS TO FORM: Julie Kjorsvik ! Deputy plerk of the Board- Ma ndy Buchholz Neil Caulkins, Deputy Prosecuting Attorney signing for Gregory L. Zempel Prosecuting Attorney Kittitas County Capital Improvement Program 2021-2026 Six Year Plan From the Cascades ,.. to the Columbia Adopted January 5,2027 by the Board of County Commissioners a ordinance No.00Al-NI Kittitas County Capital lmprovement Program Table of Contents Six-Year P|an,,,,.,,.. lntroduction Accomplishments.,, 2021 -2026 Summary,..,.... Airport Facilities Kittitas County Administrative Offices ,,,., Kittitas Valley Event Center / Fairgrounds ........24 Kittitas County Maintenance Shops, Storage, & Parking ,..,,31 Kittitas County Roads .,,,..,.,......,..33 Regional Parks and Trails......,,,.. .,,,,..,.......,,.,,, 34 Solid Waste, .,,,,,,,.,,..35 Library Services ......37 Emergency Services ..,,.,..38 Education,,,....,..47 Water - Group A Systems .....,..,...61 Sanitary Sewer.,,,,..,,, .,,,......,..,,,.,.64 Kittitas County Flood Control Zone District ,,,,.,65 Frequently Asked Questions,.,..,,.66 January 5, 2021 .,,,,..,,,,..,,.1 '''......'....,.1 1 1 I 2 1 7 1. 2. 3, 4. 5. 6, 7. 8, o 10 11 12 13 Table of Contents Page i Kittitas County Capital lmprovement Program January 5, 2021 Six-Year Plan lntroduction The Six-Year Plan shows capital improvements that are needed to provide adequate public facilities in Kittitas County. The County either directly provides these capital improvements or coordinates with other agencies to provide them. The Six-Year Plan is reviewed and updated annually. Annual updates are made to correct or modi$ project costs, revenue sources, and dates of construction. Accomplishments Kittitas County completed several capital improvements during the 2015 to 2020 period. These accomplishments included: o Purchase ofproperty for the new Ellensburg Transfer Stationo Installed rebuilt septage lagoon and installed new screeno Completion of Kittitas County Fairgrounds Master Plan o Purchase of 5 tax parcels southeast of Alder St and University Way for Master Plan expansion o Rodeo Arena lighting upgraded to LED r Irrigation system, fire suppression system, and electrical upgrades to Bloom Pavilion o Replacement of footing in Rodeo Arena r Fire District I Station 13 o Bloom Pavilion ventilation and fire system upgrades o Removed 21 units from Shady Brook Mobile home park r Completed Space needs analysis of Courthouse r Bowers Field rehabilitated the windsock and segmented circle. r Bowers Field removed tree obstructions Runway lll29 approaches. o Bowers Field properly graded North and South Runway lll29 safefy areas. o Bowers Field upgraded apron lighting and other airfield lighting to LED o Central Washington University Science II Building o Central Washington University Samuelson Renovation and Addition r Central Washington University Health Sciences Building o Central Washington University Dugmore Hall r Cle Elum-Roslyn School District Music Building r Cle Elum-Roslyn School District Transportation Facility Six-Year Plan Page 1 Kittitas County Capital lmprovement Program 2021-2026 Summary The following table summarizes the 2021-2026 Six-Year Plan. January 5,2021 Table 1 - Six.Year Plan Summary 2021-2026 Summary Kiftitas County Public Facility Projects 1. Airport Facilities Proiect Name Location & Description Fundins Source Schedule Total Cost Wetland Mitigation for EA Projects Following the Environmental Assessment and Advanced Design, the airport will undergo a wetland mitigation proiect. FAA GA Entitlement and Local Match 2022-2026 $2,585,000 Runway ll/29 Parallel Taxiway and Taxiway Lighting Project Construct runway new taxiway including pavement, lighting, and marking installation FAA GA Entitlement and other funding and Local Match 2022-2026 $5,555,000 Rehabilitate Runway 1 l/29 including AGIS, Runway Lighting, and Runway Width Reduction Rehabilitate Runway 11/29 including completing an AGIS suryey, reducing the runway width from 150 feet to 75 feet (per FAA requirements), drainage improvements, and replacing the runway liehtins svstem. FAA GA Entitlement and Local Match 2022-2026 $555,000 East Hangar Taxilane and Utilities Extension of east hanger taxilane 300 feet x 25 feet to include utilities to 12 additional lots. FAA GA Entitlement and Local Match 2022-2026 $485,000 Runway 7/25 Rehabilitatron Rehabilitating and reducing Runway 7125 length and width to 3.700 feet x 60 feet. FAA GA Entitlement and Local Match 2022-2026 $1,320,000 2. Kittitas County Administrative Offices Proiect Name Location & Description Fundins Source Schedule Total Cost County Administration Building N ofCourthouse, conceptual plan ofnew Administration Building and Courthouse remodel REET 2021-2026 $120,000 Public Safety Building Improvements 205 W. 5m, Ellensburg, various improvements to oortions of the iail General Fund 2021-2026 $480,000 Permit Center Building Improvements 411 N Ruby, Ellensburg, remodel & provide ADA imorovements General Obligation Bonds 2022-2026 $250,000 Six'Year Plan Page 2 Kittitas County Capital lmprovement Program January 5,2021 Table 1 - Six.Year Plan Summary 2021-2026 Summary Kittitas Gounty Public Facility Proiects Proiect Name Location & Descriotion Fundins Source Schedule Total Cost Juvenile Detention Holding Facility Building remodel to provide temporary holdins cell Law & Justice Sales Tax 2022-2026 $30,000 Expansion of Prosecutor's Office Expansion of Prosecutors Office to consolidate offices to one location. General Fund 2022-2026 TBD New Courthouse Construction ofnew Courthouse Commissioner approved Bond 2021-2026 42,000,000 3. Kittitas Valley Event Genter/Fairgrounds Proiect Name Location & Description Fundins Source Schedule Total Cost Rodeo arena bleachers and box seats Replace section KK-MM and Section AA Revenue Bonds 202t-2026 $2,670,000 Multi-Purpose Addition to Bloom Pavilion Southwest corner of Fairgrounds in Ellensburg, new multi- purpose addition intended for various events and livestock housing Gen. Obligation Bonds 2022-2026 $ 1,300,000 Bloom Pavilion Upgrades Southwest corner of Fairgrounds in Ellensburg, replace windows and footing, and install protective materials for multi- purpose uses. Install retractable bleachers. Gen. Obligation Bonds 2022-2026 $600,000 Barn Expansion 90lE.7th Ave, add space for various types of livestock Gen. Obligation Bonds 2022-2026 $1,s00,000 Emergency Animal Shelter Kittitas Valley Event Center / Fairsrounds General Fund 2022-2026 $500,000 Armory Parking Lot Paving 901 E. 7th Ave, pave the gravel parking lot and handicap space surrounding the Armory buildins. Gen. Obligation Bonds 2022-2026 $300,000 Six'Year Plan Page 3 Kittitas County Capital lmprovement Progmm January 5,2021 Table 1 continued - Six.Year Plan Summary 2021-2026 Summary Kittitas County Public Facility Projects 4. Kittitas County Maintenance Shops, Storage, Parking, & Pits/Quarries Proiect Name Localion & Description Fundins Source Schedule Total Cost Upper County Maintenance Shop Highway 903, Cle Elum. Finish construction of new facility ER&R Fund 501 2021 $3,1000,000 Lower County Maintenance Shop Potential land acquisition and shop relocation ER&RFund 501 2022-2026 $8,6s0,000 Hyak Joint Maintenance Facility with SPUD Planned new facility near existins site TBD TBD TBD Hansen Pit Potential Advanced Environmental Mitigation site. Airport Fund 107, Flood Control Fund 107, Federal Aviation Admin Grant 2021-2023 $ 1,85o,ooo 5. Roads - County Owned (capital improvements scheduled for construction) Proiect Name Location & Description Fundinp Source Schedule Total Cost Teanaway Rd Hydraulic Improvements North Fork Teanaway Road, Cle Elum. Lick Creek. FLAP/FHWA Funds, Local Funds 202t $1,264,000 Vantage Highway Vantage Highway, MP 21 .25-27 .51 , Vantage.RAP, HSIP 2021 $2,412,000 Kachess Lake Road Culvert Replacement Kachess Lake Road, MP 2.50, Kachess Area HIP/LP Funding, STBG/LP Funding, Local Funds 2021 $1,767,000 Fairview Road Improvement Fairview Road, MP 5.03 -MP 6.05 Local Funds 2021 $220,000 University Way and Reecer Creek Road Intersection Signal University Way and Reecer Creek Road, MP 1.47 -\,ff 1.94 Ellensburg HIP/LP Funding, STBG/LP Funding, Local Funds 2021 $610,000 Upper County Traffic Calming Elk Heights Road to Nelson Siding Road, Thorp to Easton Local Funds 2021 $500,000 N. Thorp Highway- Yakima River Bridge N. Thorp Highway, MP 9.36 - MP 9.76, Thorp Planned BRAC Funds, Local Funds 2021 $2,486,000 Dickey Creek Bridge Replacement N.F. Teanaway Road, MP 2.84, Cle Elum Planned FLAP/FHWA funds, Local funds 2023 $7,915,000 Manastash Road Creek Bank Stabilization and Sno- Park Improvements Manstash Road, MP 10.7 -MP 11.0 Planned FLAP/FHWA funds, Local funds 2022 $1,870,000 Six.Year Plan Page 4 Kittitas County Capital lmprovement Program January 5, 2021 Table 1 continued . Six.Year Plan Summary 2021-20265u mmary Kittitas County Public Facility Proiects Proiect Name Location & Description Fundinp Source Schedule Total Cost Bar 14 Road Turnaround Bar 14 Road, MP 1.15, Ellensburg Local Funds 2021 $200,000 Clear Zone Inventory Various locations throughout county Planned HSIP/LP TBD $78,000 Clear Zone Improvement Project 2022-2023 Various locations throughout county Planned HSIP/LP, Local Funds 2023 $350,000 Lambert Road - Bridge #06345 Lambert Road over Teanaway River, MP 0.67 - MP 0.68, Cle Elum Planned BRAC Funds, Local Funds 2023 $400,000 Hungry Junction Road Widening Hungry Junction, MP 0.00-MP 1.74, Ellensburs Planned RAP funds, Local Funds 2024 $4,351,000 Yellowstone Culvert Replacement Yellowstone, MP 0.70, Snoqualmie Pass Planned STBG Funds, Local Funds 2023 $832,000 Airpofi Road Culvert Replacements Airport Road, MP 0.00 - MP 2.0, Cle Elum Local Funds 2023 $ 1,535,000 Badger Pocket Road HMA Badger Pocket Road, MP 0.00 - MP 0.57, Kittitas Planned STBG/LP Funds, Local Funds 2023 $1,205,000 Badger Pocket Orchard Roads Phase I Badger Pocket Area, Ellensburg/Kittitas.Local Funds 2024 $3,700,000 Clear Zone Improvement Project 2024-2025 Various locations throughout county Planned HSIP/LP, Local Funds 2025 $1,230,000 Sanders Road lmprovements Sanders Road, MP 0.50 - MP l 03, Ellensburg Planned STBG/LP Funds, Local Funds TBD $500,000 Bowers Road Extension Bowers Road, MP 1.93 - MP 2.07, Ellensburg Local Funds 2025 $2,450,000 Badger Pocket Orchard Roads, Phase 2 Badger Pocket Area, Ellensburg/Kittitas Local Funds 2026 $2,780,000 HMA Overlay County-wide Local Funds 202s $1,790,000 Clear Zone Improvement Project 2026-2027 Various locations throughout county Planned HSIP/LP, Local Funds 2027 $250,000 6. Regional Parks and Trails -No projects planned for 2021-2026period, 7. Solid Waste Proiect Name Location & Description Fundins Source Schedule Total Cost Relocate Ellensburg Transfer Station and Compost Facilitv 925 Industrial Way. Build a new Transfer Solid Waste Fund, Public Trust Loan 2021-2026 $11,000,000 Six.Year Plan Page 5 Kittitas County Capital lmprovement Program January 5,2021 Station and Compost Facility. Table 1 continued. Six.Year Plan Summary 2021-2026 Summary Kittitas County Public Facility Projects 8. Library ServiceS - No projects planned for 2021-2026 period, 9. Emergency Services Proiect Name Location & Description Fundins Source Schedule Total Cost Station 2l Upgrade 2020Yantage Highway, Ellensburg Bonds 2021 $3,700,000 Station 26 Replacement Fairview and Brickmill Road Property Tax (existing)2021-2026 $950,000 Upper County Search and Rescue Base Cle Elum Area. Relocation of SAR equipment storage and operations base to Upper County. General Fund 2021 $40,000 Sheriff s Office Vehicle Impound/Storage Facility N. Railroad Ave, Ellensburg. Ellensburg SAR building to be repurposed and fenced for secure storage for impounded/evidence vehicles General Fund 2021 $12,000 Sheriff s Office Upper County Precinct Cle Elum Area. Full- service precinct for Upper Kittitas County with clerical, patrol and investi gative facilities; possibly a shared,/cooperative facility with Cle Elum/Roslyn PD General Fund 2022-2026 $2,500,000 10. Education Proiect Name Location & Descriotion Fundins Source Schedule Total Co.rt Ellensburg School District, New Elementary School 2100 North Cora Street. Construct fourth elementary school. Voter Approved Bonds/State Construction Assistance Prosram. Other. 2021-2026 $27,261,760 Ellensburg School District, New Mt. Stuart Elementary l70l North Cora Street. New building, replacement school. Voter Approved Bonds/State Construction Assistance Proeram. Other. 2021-2026 $28,985,796 Ellensburg School District, New Mt. Stuart Elementary Early Learning Center 705 West 15th Avenue. Remodel building and portable. Voter Approved Bonds/State Construction Assistance Program. Other. 2021-2026 $940,867 Six.Year Plan Page 6 Kittitas Courrty Capital lmprovement Program January 5,2021 Table 1 continued. Six.Year Plan Summary 2021-2026 Summary Kittitas Countv Public Facility Proiects Proiect Name Location & Description Fundins Source Schedule Total Cost Ellensburg School District, New Tennis Courts Mountain View Park. Construct tennis courts jointly with the City of Ellensburg. General Fund 2022-2026 $250,000 Ellensburg School District, New TVF Support to Increased Student Grown/30-Year Bus Replacement 1300 East Third Avenue 30-year bus replacement cycle. General Funds 2022-2026 $538,643 Ellensburg School District, New Valley View Elementary Parking Lot Improvements 1508 East Third Avenue. Improve parking lots to the north, south and west sides of Valley View Elementary. General Funds 2022-2026 $286,663 Ellensburg School District, New Valley View Elementary Bus Loadine/Unloadine 1508 East Third Avenue. Dedicated bus loading/unloading area fencing. General funds 2021 $50,000 Ellensburg School District, New Lincoln Elementary Remodel/Addition 200 South Sampson Street. Remodel/addition Voter Approved Bonds/State Construction Assistance Proeram. Other. 2021-2026 $21,000,000 Ellensburg School District, New Valley View Elementary Building Resurfacing 1508 East Third Avenue. Valley View building resurfacing General funds 2022-2026 $300,000 Ellensburg School District, New Maintenance Warehouse 1300 East Third Avenue. Construct maintenance/grounds eouinment warehouse. General funds 2022-2026 $300,000 Ellensburg School District, New Ellensburg High School Portable Location 1203 East Capitol Avenue. Relocate two portables to high school campus to house Special Programs. Voter Approved Bonds/State Construction Assistance Prosram. Other. 2021 $215,000 Ellensburg School District, New IT Mitigation Plan 1300 East Third. IT Mitigation.Tech Levy 2021-2026 $6,264,000 1 1 . Water - Group A Systems - No projects planned for 2021-2026 period, 12. Sanitary Sewer - No projects planned for 2021-2026 period 13.Flood Control Zone District Proiect Name Location & Description Fundins Source Schedule Total Cost Repetitive Loss Project Yakima and Teanaway Rivers. Repetitive loss area analysis in2021 to support subsequent retrofitting, purchase, or relocation of structures FCZDLevy, Grant funding 2021-2025 $180,000 Six.Year Plan Page 7 Kittitas County Capital lmprovement Program January 5,2021 or infrastructure located in hazard-prone areas. Table 1 continued - Six-Year Plan Summary 2021-2026 Summary Kittitas Countv Public Facilitv Proiects Proiect Name Location & Desciotion Fundins Source Schedule Total Cost Floodplains By Design Acquisitions Yakima River - Ringer Reach. Acquisition of 413 acres ofcontinuous Yakima River floodplain, to facilitate implementation of future flood risk reduction projects and prevent development and associated risk Floodplains by Design 2020-202r $2,950,000 Ringer Reach Property Improvements Yakima River - Ringer Reach. Control for invasive species, riparian buffer plantings, and building decommissioning at County-owned properties that were purchased for fl oodplain conservation and restoration. Yakima Basin Integrated Plan 2021-2024 $550,000 Hanson Pits Restoration Plan and Design Yakima River - Ringer Reach. Technical investigation of potential risks associated with the Hanson Pits and the downstream private berm, and implications for modifications to these structures, habitat restoration goals, and private property and transportation facilities. Yakima Basin Integrated Plan 2021 $102,000 Hanson Pits Restoration Implementation Yakima River - Ringer Reach. Implementation of preferred alternative from Hanson Pits Restoration Plan and Design (FCZD Project #4\. Salmon Recovery Funding Board (potential) 2022-2025 $1,280,000 Reecer Creek Dolarway to University Wilson-Nane um-Cherry Subbasin. Flood Control Zone District Cost share in support of City of Ellensburg Project to purchase property, construct setback levees and construct second bridee alone Dolarwav FCZDLevy 2021 TBD Six.Year Plan Page 8 Kittitas County Capital lmprovement Program January 5,2021 Rd to address Reecer Creek flooding. Table 1 continued . Six.Year Plan Summary 2021-2026 Summary Kittitas County Public Facility Proiects Proiect Name Locqtion & Description Fundins Source Schedule Total Cost Stream Gaging and Early Waming System Wilson-Naneum-Cherry Subbasin. Installation and annual maintenance costs of real time stream gage network at 5 locations: Combined Wilson-Naneum Creeks, Whiskey, Mercer, Wilson and Naneum Creeks, located downstream of respective splits. Survey and Q{QC support for Teanawav River Gaee. FCZDLevy 2021 80,000 CTP Flood Studies County-wide. Improve flood models and channel migration zone mapping. Community Technical Partnership Program (potential), FCZDLew 2021-2025 $464,000 East Branch Wilson Re- Rout Wilson-Naneum-Cherry. Proposal to relocate East Branch of Wilson Creek. FCZDLevy, Grant funding 2021 $20,000 Whiskey Creek at EWC Sipho Wilson-Naneum-Cherry. Increase flood conveyance, eliminate canal and creek intermingling, and address fish passage barrier by replacing current the Ellensburg Water Company crossing at Whiskey Creek with a sinhon. FCZDLevy, Grant funding or partner support. 2021-2022 $700,000 WNC Phase 2 Wilson-Naneum-Cherry Assessment. Hydrologic analysis with existing 2- d model to evaluate a potential Whiskey Creek tie-in at the Reecer Creek Floodplain project. Evaluate the effects of Mercer Creek flow routing north of the airport on hydrologic regime, determine the design specifications needed at proposed railroad crossins. FCZDLevy 2022 $100,000 Six-Year Plan Page 9 Kittitas County Capital lmprovement Program January 5, 2021 evaluate the available flood capacity within Reecer Creek floodplain site, and assess water - right considerations downstream of the proposed reroute site. Table 1 continued . Six.Year Plan Summary 2021-2026 Summary Kittitas County Public Facilitv Proiects Proiect Name Location & Description Fundins Source Schedule Total Cost WNC Phase 3 Wilson-Naneum-Cherry Implement capital recommendations from Phase 2 Feasibility Study. FCZDLevy, Flood control assistance account program (potential) 2025-2026 $600,000 Reach Assessment (Thorp to Gladmar) Yakima River. Assessment to identify and prioritize flood alleviation and habitat restoration actions in a 4. mile reach of the Yakima River, extending from just upstream ofThorp, to Gladmar Park and the I-90 river crossing. FCZDLevy, Salmon Recovery Funding Board (potential) 2023-2024 $104,000 Flow Conveyance Restoration (Site 2) Site to be determined. Implement flow conveyance restoration project that exceeds scope of annual flow conveyance maintenance activities. FCZDLevy, Ecology Centennial Clean Water Grant (potential) 2022-2023 $360,000 Flow Conveyance Restoration (Site 3) Site to be determined. Implement flow conveyance restoration project that exceeds scope of annual flow conveyance maintenance activities. FCZDLevy, Ecology Centennial Clean Water Grant (potential) 2025-2026 $392,000 Crystal Creek Conveyance Project Site to be determined. Implement Crystal Creek conveyance project identified through current Crystal Creek flood studv. Gant funding 2022-2023 $120,000 Manastash Cove Road Replacement Replace existing Cove Road bridge with bridge of suffici ent freeboard and span to pass sediment and flood flows FCZDLevy, Flood control assistance account program (potential) 2026 $200,000 Six-Year Plan Page 10 Kittitas County Capital lmprovement Program January 5,2021 1. Airport Facilities This section includes an inventory of the existing airport facilities in Kittitas County and a detailed description of each airport facility improvement that is included in the six-year plan. The inventory of facilities in Table 2 below also describes each facility's size in order to determine if it addresses the County's long-term community needs. Table 2 Existing Public Facilities and Services Airport Facilities Facility Provider Description Size Bowers Field Airport Kittitas County Asphalt, I l/29 Runway, 4,300'x150', asphalt. 1,300 acres Bowers Field Hanger Bldg 404 Kittitas County Built 1997 20,000 sq. ft. Bowers Field T- Hanger Kittitas County Built 1960.12,500 sq. ft. Cle Elum Municipal Airport City of Cle Elum 50,000 sq. ft. parking apron area, 07125 Runway, 2,552'x40', asphalt, 1,000 aircraft usage per year. 135 acres De Vere Field Jim De Vere (private owner) 08/26 Runway ,2,055'x30' , asphalt, 6 single 50 acres engine aircraft based. Easton State Airfield WSDOT 09/27 Runway,2,640'x100', turi 30 afucraf't usage per month, built in 1930's. 15 acres Aitport Facilities Page 1 1 Kittitas County Capital lmprovement Program Airport Facilities - Wetland Mitigation for EA Projects January 5,2021 lif4.tlon Project Information and Selection Criteria Location Bowers Field Airport. Ellensbure Links to Other Proiects or Facilities N/A Description Following the Environmental Assessment and Advanced Design, the airport will undergo a wetland mitigation proiect. Jus tili catio n (Ne e d/D e mand) This project allows for the construction of the parallel taxiway and other facility needs at Bowers Field. It also mitigates flooding and other wetland concerns for the county. Level of Service &O$ / Proiect Tvne Established LOS: N/A Proiect Type: Desisn and Environmental Comprehensive Plan Citations CF-G4, CF-P28 Gapital Gost 2021 2022-2026 Total Desisn and Ensineerinp $38s,000 838s,000 Construction 82,200,000 $2.200.000 TOTAL $2.585.000 $2.5B5.000 Funding Sources 2021 2022-2026 Total FAA GA Entitlement $2,3s0,000 $2.350.000 Local Match $23s.000 $23s.000 TOTAL $2.s8s.000 $2,s8s,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Proiect None D epartment Respons ibl e for Operations Airport Department Airport Facilities Page 12 Kittitas County Capital lmprovement Program January 5, 2021 Airport Facilities - Runway 11129 Parallel Taxiway and Taxiway Lighting Project 2 ,',lr,ll,'l .',.rr,i.\ , a ffi!! - *- ffi { \\ Project Information and Selection Criteria Location Bowers Field Aimort, Ellensburs Linlcs to Other Proiects or Facilities N/A Description Construct runway new taxiway including pavement, lishtine, and marking installation Jus tifi c a tion (Ne e d/D e mand) This project is needed to provide adequate facilities for proiected airplane operations. Level of Service &O9 / Proiect Tvoe Established LOS: N/A Proiect Twe: New facilitv construction Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2021 2022-2026 Total Design and Ensineerins $49s,000 849s,000 Construction $5,060,000 85.060.000 TOTAL 85.sss.000 $5.ss5.000 Funding Sources 2021 2022-2026 Totsl FAA GA Entitlement & Other Fundins 8s.0s0.000 $s,0s0,000 Local Match $s05,000 $505,000 TOTAL 85,555.000 $5.555.000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savinss Due to Proiect None D ep artment Re sp ons ib I e for Operations Airport Department Airport Facilities Page 13 Kittitas County Capital lmprovement Program January 5, 2021 Airport Facilities - Rehabilitate Runway 11129 including AGIS, Runway Lighting, and Runway Width Reduction Project lnformation and Selection Griteria Location Bowers Field Aimort, Ellensburg Links to Other Proiects or Facilities N/A Description Rehabilitate Runway lll29 including completing an AGIS survey, reducing the runway width from 150 feet to 75 feet (per FAA requirements), drainage improvements, and replacing the runway lighting system. Jus tifi ca tion (Ne e d/D emand) This project removes the outer 75 feet of failed asphalt pavement and replaces the runway lighting system that has outlived its useful life. Level of Service (LOS) / Proiect Type Established LOS: N/A Proiect Tvpe: Facilitv repair and renovation Comprehensive Plan Citations CF-G4, CF.P28 CapitalGost 2021 2022-2026 Totsl Desipn and Enpineerins $I6s.000 $165.000 Construction $385,000 $385,000 TOTAL 8550.000 $5s0,000 Fundinq Sources 2021 2022-2026 Total FAA GA Entitlement $500.000 8500.000 Local Match 8s0.000 $s0,000 TOTAL 8550,000 8s50,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Proiect None D epartment Respons ib I e for Operations Airport Department Airport Facilities Page 14 Kittitas County Gapital lmprovement Program Airport Facilities - East Hangar Taxilane and Utilities January 5, 2021 VICINITYMAP Proiect Information and Selection Griteria Location Bowers Field Airport. Ellensbure Links to Other Proiects or Facilities N/A Description Extension ofeast hangar taxilane 300 feet X 25 feet to include utilities to l2 additional lots. Jus tification (Ne ed/D emand) This project allows for the design and construction of infrastructure to meet the need for hansar development. Level ofService (LOS) / Proiect Type Established LOS: N/A Proiect Twe: Desien and Construction C ompre h ens ive P lan C ita tion s CF-G4. CF-P28 Capital Gost 2021 2022-2026 Total Design and Engineering $140.000 8r40,000 Construction $345,000 $345.000 TOTAL $485.000 $485.000 Fundinq Sources 2021 2022-2026 Total FAA GA Entitlement $0 $0 Local Match $48s.000 8485.000 TOTAL $48s,000 $485,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Proiect None D ep ar tment Res p ons ib I e for Operations Airport Department Airport Facilities Page 15 Kittitas County Capital lmprovement Program Airport Facilities - Runway 7125 Rehabilitation January 5,2021 VIONITY MAP Project lnformation and Selection Griteria Location Bowers Field Aimort. Ellensbure Links to Other Proiects or Facilities N/A Description Rehabilitating and reducing Runway Tl25length and width to 3,700 feet X 60 feet. Jus tifi cation (Ne e d/D emand) The runway was closed due to age anddeterioration. A design was completedin2020 and the project will help to reduce aftcraft congestion. Level of Service &O9 / Proiect Tvpe Established LOS: N/A Proiect Tyoe: Construction Comprehensive Plan Citations CF-G4, CF-P28 Capital Gost 2021 2022-2026 TotuI Design and Ensineerins $0 $0 Construction 81.320.000 81.320.000 TOTAL $1,320,000 8r,320,000 Funding Sources 2021 2022-2026 Total FAA GA Entitlement 80 80 Local Match $1,320,000 $1,320,000 TOTAL $r,320,000 $1,320,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savinss Due to Proiect None Department Responsible for Operations Aimort Department Airport Facilities Page 16 Kittitas County Capital Improvement Program January 5, 2021 2. Kittitas Gounty Administrative Offices This section includes an inventory of Kittitas County Administrative Offices and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 3 below also describes each facility's size in order to determine if it addresses the County's long-term community needs. Table 3 Existing Public Facilities and Services Kittitas County Administrative Offices Facilitv Department Description Size Armory Building Extension, Noxious Weed, and Kittitas Valley Event Center 901E.7h, built 1950. Remodel completed in 2014 13,140 sq. ft. Cle Elum Public Health Public Health 415 E. First Ave., Cle Elum, 2,400 sq. ft. leased building County Courthouse Assessor, Auditor, Clerk, Commissioners, Lower District Court, Human Resources, Information Services, Juvenile Probation, Maintenance, Prosecutor, Superior Court, Treasurer 205 W. 5ft, built 1958. 47,691 sq. ft. Permit Center Public Works, Community Development Services, and Fire Marshal 411 N. Ruby, built 1959 13,625 sq. ft. Public Safety Building Sheriff/Corrections 205 W. 5fr, built 1985. Remodeled 2010 to 2012. 33,209 sq. ft. Sheriff Administration Office Sheriff 307 Umptanum Rd., built 2009 11,880 sq. ft. Sorenson Building Public Health and Misdemeanant 507 Nanum, built 1942. Probation 17,648 sq. ft. Upper District Court Building Upper District Court 700 E. lst, Cle Elum, remodeled in 2013 6,000 sq. ft. Vantage Marine Storage Building Sheriff Vantage Boat Launch, built in2014 1,024 sq. ft. Kittitas County Administrative Offices Page 17 Kittitas County Capital lmprovement Program January 5, 2021 Kittitas County Administrative offices - Permit center Building lmprovements ild !l !l dv I Permit CenterI rAl Project lnformation and Selection Griteria Location 411 N Ruby, Ellensburg- see existing facilitv inventory Links to Other Proiects or Facilities N/A Description Remodel building Jus tifi cation (Ne e d/D emand) This project is needed to upgrade outdated facilities for CDS, PWD, and Fire Marshal offices. This building was constructed in 1959 and the County purchased the building in2002. Level ofService (LOS) / Proiect Tvpe Established LOS: N/A Project Type: Facility repair, remodel, and renovation Comprehensive P lan Citations CF-G4, CF-P28 Capital Gost 2021 2022-2026 Total Design and Engineering To Be Determined To Be Determined Construction $2s0,000 $250,000 TOTAL $250,000 82s0,000 Funding Sources 2021 2022-2026 TotaI Genersl Oblieation Bonds $250.000 $2s0,000 TOTAL $2s0,000 8250,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimsted Reyenues None Anticipated Savings Due to Proiect None Department Responsible for Operations Facilities and Maintenance Office Kittitas County Administrative Off ices Page 1 8 Kittitas County Capital lmprovement Program January 5, 2021 Kittitas Gounty Administrative Offices - Gounty Administration Building Administration Building Location i,r'. g .i+.- , Project lnformation and Selection Criteria Location North of the Courthouse Links to Olher Proiects or Facilities Courthouse, Permit Center, and Morris Sorenson bldg. Description New County Administration Buildine Jus tili c a t i o n ( Ne e d/D e mand ) Office space is needed for all county functions. Consolidating administrative offi ces. This includes Commissioner's Office, Auditors Office, Assessors' Office, Treasurers Office, Fire Marshal, Community Development Services, and Public Works Administrative Office. The Courts and related offices would remain in the existins Courthouse. Level of Service (LOS) / Project Type Established LOS: N/A. Proiect Twe: New facilitv Comprehensive Plan Citations CF.G4, CF-P28 Capital Cost 2021 2022-2026 Total Master Plan / Conceptual Site Plan $120,000 $0 $r20,000 Design and Engineering Construction TOTAL $ I20.000 $0 $120,000 Funding Sources 2021 2022-2026 Total Real Estate Excise Tax (REET)$r20,000 $0 $r 20,000 TOTAL $120.000 $0 $I20,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Suvinss Due to Proiect None D ep ar tment Res p ons ib I e for Operations Facilities and Maintenance Office Kittitas County Administrative Offices Page 19 Kittitas County Capital lmprovement Program January 5, 2021 Kittitas Gounty Administrative Offices - Public Safety Building lmprovements ,, '1f . i,lJl rc sAi I t / Rtlll nl G Proiect lnformation and Selection Griteria Location 205 W. 5th, Ellensburg - see existing facility inventory Public Safety Buildins Links to Other Proiects or Facilities N/A Description Various improvements to include new siding for old portion of iail and replace ceiline in hallways. Jus tilic ation (Ne ed/D emand) This project is needed to provide safe and adequate facilities for inmates and correctional officers. Level of Service (LO$ / Proiect Tvoe Established LOS: N/A Proiect Type: Facilitv remodel and renovation Comprehensive Plan Cilations CF-G4, CF-P28 GapitalGost 2021 2022-2026 Total Design and Engineering $s0,000 $0 $s0.000 Construction $r 30,000 8300.000 $430,000 TOTAL $180.000 8300,000 $480,000 Funding Sources 2021 2022-2026 Total General Fund $180,000 $300.000 $480,0000 TOTAL $r80.000 8300.000 $480,0000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Reyenues None Anticipated Savings Due to Proiect None D epartment Resp ons ib I e for Operstions Sheriff Office Kittitas County Administrative Offices Page 20 Kittitas County Capital lmprovement Program January 5, 2021 Kittitas County Administrative Offices - Juvenile Detention Holding Facility t/ i1 tn l I,i ity Map ) irl olz: L ,j,, l'..t Detentlon Holdlng Facllltyl-;.. l,l,!"r.'ll 'iii l i T I rj.it/ t1 llii i1 '! I I I I ii r.i t-I Ii Project Information and Selection Griteria Location 205 W. 5tr', Ellensburg - see existing facility inventory County Courthouse Links to Other Proiects or Facilities N/A Descriplion Building remodel to provide a temporary holding cell for iuvenile detention. Jus ti/ic ation (Ne ed/D emand) This project is needed to provide a secure area for temporarily holding juveniles at the Courthouse. Permanent detention facilities are rented by Yakima County andiuveniles are transported as needed. Level of Service (LOS) / Project Tvpe Established LOS:N/A Proiect Type: Facility remodel and renovation Comprehensive Plan Citations CF-G4, CF-P28 CapitalCost 2021 2022-2026 Total Desisn snd Ensineerins To Be Determined To Be Determined Construction $30,000 $30,000 TOTAL $30,000 830.000 Fundinq Sources 2021 2022-2026 Totul Law & Justice sales tax $30,000 $30,000 TOTAL $30,000 $30,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savinss Due to Proiect None D epartment Responsible for Operations Facilities and Maintenance Office Kittitas County Administrative Off ices Page 21 Kittitas County Gapital lmprovement Program January 5,2021 Kittitas County Administrative Offices - Expansion of Prosecutor's Office Courthouse - Expansion of Prosecutor's Office Location Project lnformation and Selection Griteria Location To be determined Links to Other Proiects or Facilities Sheriff s Administrative building and Courthouse Description Expansion of Prosecutors Office to consolidate offices to one location. Jus tific a t i o n (Ne e d/D emand ) The Prosecutors Office needs additional office space to consolidate offices located in different buildings to one primarv location. Level of Service (LOS) / Proiect Tvpe Established LOS: N/A. Proiect Type: Facility repair, remodel, & renovation Comprehensive Plan Citations CF.G4, CF-P28 CapitalCost 2021 2022-2026 Total Design and Ensineerins Construction To Be Determined To Be Determined TOTAL To Be Determined To Be Determined Funding Sources 2021 2022-2026 Total General Fund To Be Determined To Be Determined TOTAL To Be Determined To Be Deterrnined Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savinss Due to Proiect None D epartment Respons ibl e for Operations Facilities and Maintenance Office Kittitas County Administrative Offices Page 22 Kittitas County Capital lmprovement Program January 5, 2021 Kittitas County Administrative Offices - New Gourthouse Project lnformation and Selection Criteria Location To be Determined Links to Other Proiects or Facilities Courthouse, Permit Center, and Morris Sorenson buildine Description Construction of New Courthouse Jus tifi cation (Need/D emand) Office space is needed for all county functions. Consolidating administrative office, which includes, Commissioners Office, Auditors Offi ce, Assessors' Office, Treasurers Office, Fire Marshal, Community Development Services, and Public Works Administration office. The Courts and related offices may remain in the existing Courthouse. Further review to take place on the existing facility and cost to remodel Level ofService (LO9 / Proiect Type New Facility Compreltensive Plan Citations CF-G4, CF-P28 CapitalCost 2021 2022-2026 Total Design and Engineerins 84,000,000 $4,000,000 Construction $42,000,000 842.000,000 TOTAL $46.000.000 s46.000.000 Fundins Sources 2021 2022-2026 TotuI Commissioner approved bond $46,000,000 $46,000,000 TOTAL $46,000,000 $46,000.000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Proiect D ep artment Res p o ns ib I e for Operations Facilities and Maintenance Office Kittitas County Administrative Off ices Page 23 Kittitas County Capital lmprovement Program January 5, 2021 3. Kittitas Valley Event Center / Fairgrounds This section includes an inventory of Kittitas Valley Event Center/Fairgrounds facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 4 below also describes each facility's size in order to determine if it addresses the County's long-term community needs. Table 4 Existing Public Facilities and Services Kittitas Valley Event Center / Fairgrounds Facility Built date Size Facility Built date Size Frontier Village Buildings 1890's Unknown Restrooms / R.A. (l) 1960's 2,035 sq. ft. Grandstand - Main/Ileritage Bldg. 1925 18,965 sq. ft.Fair Office and Restrooms lg74 3,954 sq. ft. gth Street Ticket Office 1930,s 1,568 sq. ft.Behind the Chutes 1976 1,000 sq. ft. Souvenir Booth 2004 Unknown Bloom Pavilion 1980 26,400 sq. fr Posse Barn (1)1940's 3,000 sq. ft.Restrooms / R.A. (2) 1982 645 sq. ft. Posse Bam (2)1940's 4,800 sq. ft.Maintenance Shop 1986 1,500 sq' ft' Light Horse Barn 1940,s 3,200 sq. ft.Gazebo 1989 450 sq. ft. Cattle and Swine Barn 1940's 12,000 sq. ft.Buckaroo's Stands & Pens l99l 5,984 sq. ft. Draft Horse Barn 1940's 10,450 sq. ft.Gold Buckle Building 2001 2,400 sq. ft. TeanawayAJmtanum Building 1940's 17,556 sq. ft.Westem Village 2004 3,140 sq. ft. First Rodeo Director's Barn 1940's 3,250 sq. ft.Fair Storage Shed 2004 600 sq. ft. Second Rodeo Director's Barn lg41 3,250 sq. ft.East Rodeo Concession 2005 600 sq. ft. Dog Barn 1940 1,200 sq. ft.Bronze Pig Statue 2007 N/A Ellensburg Armory 1950 13,920 sq. ft.Rodeo Arena Bleachers 2007 3,950 sq. ft. Bleachers W. (Covered) 1960's 10,756 sq. ft.Fair shed (Fuel) 2008 100 sq. ft. Bleachers E. (Uncovered) 1960's 10,000 sq ft West Rodeo Concession Unknown Unknown Kittitas Valley Event Center 1 Fairgrounds Page 24 Kittitas County Capital Improvement Program January 5, 2021 Kittitas Valley Event Center / Fairgrounds - Rodeo Arena Bleachers/Box Seats 'f 1 ap- + JiJ I , ll- i Ir I I l. ! a-_ _i' ,lI i t. I& Proiect Information and Selection Criteria Location 901 E.7tr'. Ellensburs Links to Other Proiects or Facilities N/A Description Replace old rodeo seatins bleachers and box seats Justification (Need/D emand) Phase I of this project is the replacement of section KK-MM and phase 2 is the replacement of section AA- JJ. The cost to the County for phase I is $630,000 and the cost for phase 2 is $2,040,000. Work includes removing existing structures and foundation, site work, new foundations and walls, seating structure and assembly, interior finishing for the skyboxes, fees, and taxes. Level of Service (LOS) / Project Type Established LOS: N/A Proiect Twe: Facilitv renovation Comp rehe ns iv e P lan C i tations CF-G4, CF-P28 GapitalGost 2021 2022-2026 Totsl Desipn and Ensineerins Construction $2,670,000 82,670,000 TOTAL $2,670.000 $2.670.000 Fundinq Sources 2021 2022-2026 Totul Revenue Bonds $2,670,000 $2,670,000 TOTAL $2,670,000 $2,670,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Proiect None D ep artment Resp ons ib I e for Operations Kittitas Valley Event Center and Ellensburg Rodeo Kittitas Valley Event Center / Fairgrounds Page 25 Kittitas County Capital lmprovement Program January 5, 2021 Kittitas Valley Event Genter / Fairgrounds - Multi-Purpose Addition to Bloom Pavilion ! 'Vicinity Map - r-lI :-{ J .1 I +. til Itl- I,li I L i I rllj I I R Project Information and Selection Griteria Location Southwest corner of Fairgrounds in Ellensburg Links to Other Proiects or Facilities N/A Description Add a new multi-purpose addition to existing Bloom Pavilion at the Kittitas Valley Event Center to be used for various events and livestock housing. Ju s tili c a t i o n ( Ne e d/D e mand ) Equestrian activities and other events take place throughout the year and create demand for additional facilities. Level of Service (LOS) / Project Tvne Established LOS:N/A Proiect Type: New Facilitv Comprehensive Plan Citations CF-G4. CF-P28 Gapital Gost 2021 2022-2026 Totul Desisn and Ensineerins Construction $r.300.000 $1.300.000 TOTAL 81.300.000 $r,300,000 Fundinq Sources 2021 2022-2026 Total General Obligation Bonds $r.s00.000 $1.300.000 TOTAL 81.300.000 $r,300,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticiputed Savings Due to Proiect None D ep ar tment Re s p o ns i b I e for Operations Kittitas Valley Event Center Kittitas Valley Event Center / Fairgrounds Page 26 Kittitas County Capital lmprovement Program January 5,2021 Kittitas Valley Event Center / Fairgrounds - Bloom Pavilion Upgrades ' Jt. _fIfl;ll.ti ,lill. 'Vicinity Map'-.+ { 1 I '' 14 -f ,l II R Project Information and Selection Criteria Location Southwest comer of Fairgrounds in Ellensburg Links to Other Proiects or Fscilities N/A Description Replace windows and footing in Pavilion and install new protective materials in order to improve multi- purpose usage. Install retractable bleachers along West wall. Jus tifi c ati on (Ne e d/D e ma nd ) Non-equestrian events have created demand for large indoor facilities. Proper equestrian arenas also require footing replacement to maintain safe use. There is an increased demand for spectating at indoor events, but also need to store seating away for certain events. Level of Service (LOS) / Project Type Established LOS: N/A Proiect Type: Facility Renovation Comprehensive Plan Citations CF-G4, CF-P28 Capital Gost 2021 2022-2026 Total Desisn and Ensineerins Construction $600.000 $600.000 TOTAL 8600.000 8600,000 Fundinq Sources 2021 2022-2026 Total General Obligation Bonds $600,000 $600,000 TOTAL $600.000 $600,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Reventrcs Increased use and twe of use will increase revenue Anticipated Savings Due to Proiect None D epartment Respons ib le for Operations Kittitas Valley Event Center Kittitas Valley Event Center / Fairgrounds Page27 Kittitas County Capital Improvement Program January 5,2021 Kittitas Valley Event Center / Fairgrounds - Barn Expansion Vicinity Map i-t \iu l-)/r I 1 I i :''il --l ' -l I i l--l t- I,R '1 I Project Information and Selection Griteria Location 901 E. 7tr', Ellensburs Links to Other Proiects or Facilities N/A Description Add additional barn space and replace current barn facilities for various types of livestock at the Kittitas Valley Event Center. This upgrade will allow for facilities to be used as emergency animal shelter during an emergency. Jus tification (Need/Demand) Equestrian activities and other livestock events take place throughout the year and create demand for additional facilities. Level of Service (LOS) / Project Tvpe Established LOS: N/A Project Type: Facility renovation Comprehensive Plan Citations CF-G4, CF-P28 CapitalCost 2021 2022-2026 Total Desisn and Ensineerins Construction $r,500,000 $I,s00,000 TOTAL $I,s00,000 $1.500.000 Funding Sources 2021 2022-2026 Totul Genersl Oblisation Bonds $r,500,000 $I,s00,000 TOTAL $I,s00,000 81,500,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues Increased use will generate more revenue. Anticipated Savinss Due to Proiect Maintenance and painting costs lowered. Department Responsible for Operations Kittitas Valley Event Center Kittitas Valley Event Center / Fairgrounds Page 28 Kittitas County Capital lmprovement Program January 5, 2021 Kittitas Valley Event Center / Fairgrounds - Emergency Animal Shelter Vicinity Map Emergency ),. . 1,.1 { I I 1..' !L i1 f'1L{ I w filTIIll.ii1-,---1-- Project lnformation and Selection Griteria Location 901 E. 7rh Avenue, Ellensburg Linlcs to Other Proiects or Facilities N/A Description Upgrade existing barn facilities to allow for different types of animal shelter at the Kittitas Valley Event Center. Currently the barn facilities are built for specific animal species and are difficult to alter when being used as an emergency animal shelter during an emergency. Jus tili c sti on ( Ne e d/D e msnd ) The Kittitas Valley Event Center was used to house animals that were evacuated during the August 2012 fire and the inflexible design made it difficult to provide appropriate shelter for various animals. Level of Service (LOS) / Proiect Type Established LOS: N/A Proiect Twe: Facilitv renovation Comprehensive Plan Citations CF-G4, CF-P28 Capital Gost 2021 2022-2026 Total Design snd Engineering Construction $500.000 ss00.000 TOTAL $s00,000 $500,000 Funding Sources 2021 2022-2026 Total General Fund 8s00.000 $s00,000 TOTAL $s00,000 $500,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savinss Due to Proiect None D epartment Respons ib I e for Operations Facilities and Maintenance Kittitas Valley Event Center 1 Fairgrounds Page 29 Kittitas County Capital lmprovenrent Program January 5,2021 Kittitas Valley Event Center / Fairgrounds - Armory Parking Lot Paving Proiect Information and Selection Criteria Location 901 E 7d' Ave" Ellensburs - Armorv Buildine Links to Other Proiects or Facilities N/A Description Pave the gravel parking lot and handicap spaces surroundins the Armorv buildine. Jus tifi c ation (Need/D emand ) As the highest-tech and most recently remolded facility available, it's become one of the most frequently rented at the fairgrounds. However, event attendees struggle with holding formal events in the building due to multiple year-round issues caused by a dirt parking lot and no safe handicap spaces. It also causes issue during the Kittitas County Fair as one of the epicenters of the camival. Rides could be placed much more efficiently if the proper sround was available. Level of Service (LOS) / Project Tvpe Established LOS:N/A Proiect Tvpe: Facility Renovation Comprehensive Plan Citations CF-G4. CF-P28 Capital Cost 2021 2022-2026 Total Desisn and Ensineerins $0 $0 Construction 8300.000 $300.000 TOTAL 8300.000 $300,000 Fundinq Sources 2021 2022-2026 Total General Oblisution Bonds $300,000 8300,000 TOTAL 8300.000 $300,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Sqvinss Due to Proiect None Department Responsible for Operations Kittitas Valley Event Center Kittitas Valley Event Center / Fairgrounds Page 30 Kittitas County Capital lmprovement Program January 5, 2021 4. Kittitas County Maintenance Shops, Storage, & Parking This section includes an inventory of Kittitas County Maintenance shops, storage, and parking facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 5 below also describes facility's size in order to determine if it addresses the County's long-term community needs. The proposed projects for Kittitas County Maintenance Shops, Storage, and Parking are detailed in Appendix A. Table 5 Existing Public Facilities and Services Kittitas County Maintenance Shop, Storage, and Parking Facilitv Department Description Size Lower County PWD Heavy Equipment Storage West Shed Public Works 15ft & Okanagon, built 1951 4,875 sq. ft. Lower County PWD Heavy Equipment Storage East Shed Public Works 15ft & Okanagon, built 1951 4,875 sq. ft. Lower County PWD Main Heavy Equipment Shop Public Works 15th & Okanagon, built l95l 6,240 sq. ft. Sheriff Central Storage Sheriff 307 Umptanum Rd., built 2009 2,160 sq. ft. Upper County PWD Repair Shop Public Works Third & Short, Cle Elum, built in 1951, remodeled in 201I 3,200 sq. ft. Upper County PWD Heavy Equipment Storage Public Works Third & Short, Cle Elum, built in 1990, remodeled in 2010 2,800 sq. ft Vantage Boat Launch Parking Lot Public Works Vantage Boat Launch built approx. 1990. Includes large stalls for boats 62 stalls Armory Parking Lot Ext, Weed, Gravel parking area, not striped & Event Ctr 20 stalls S Courthouse Parking Lot Courthouse Offices Off-street parking adjacent to Courthouse 21 stalls W Courthouse Parking Lot Courthouse Offices Off-street parking adjacent to Courthouse 7 stalls SW 6rh Ave. & Water Street Courthouse Offices Improved parking lot 44 stalls NW 6th Ave. & Water Street Courthouse Offices Improved parking lot in 2010 58 stalls NE 6s Ave. & Water Street Courthouse Offices Semi-improved parking lot I 8 stalls N Permit Center Public Works Improved off-street parking next to bldg. 14 stalls Kittitas County Maintenance Shops, Storage, and Parking Page 31 Kittitas County Capital lmprovement Program January 5, 2021 Table 5 - Continued Existing Public Facilities and Services Kiftitas County Maintenance Shop, Storage, and Parking Facilitv Department Description Size S Permit Center CDS Improved off-street parking next to bldg. 10 stalls Sheriff Administration Offi ce Parking Lot Improved off-street parking next to bldg. 51 stallsSheriff and Prosecutors SW Sorenson Building Parking Lot Improved off-street parking next to bldg. Public Health 24 stalls W Upper District Court Building Parking Lot Improved off-street parking next to bldg., 700 l.tst., cle Elum 22 (shared)Upper District Cle Elum Centennial Center - Parking Lot for Public Health services by appointment Improved off-street parking next to bldg.,7l9 E. 3"r St, Cle Elum. Building space and parking are provided for Upper County Public Health services 30 (shared)Public Health Suncadia/ Upper County Sheriff Sheriff Offrce Parking Lot Improved off-street parking next to bldg,4240 Bullfrog Rd, Suite l, Cle Elum 22 (shared) Kittitas Valley Event Center/Fairgrounds Parking Lots Does not include the unimproved parking areas used for large events 136KV Event Center Unimproved off-street parking next to 20(approx.) blde. Lower County PWD Shop Parking Lot Public Works Courthouse Improvedoff-streetparking 35E UPS Store Kittitas County Maintenance Shops, Storage, and Parking Page 32 Kittitas County Capital lmprovement Program January 5, 2021 5. Kittitas Gounty Roads The Kittitas County's Six-Year Transportation Improvement Plan provides further detail of the facility improvements that were indicated in Table l. The Six-Year Transportation Improvement Plan is adopted once a year in the fall and amended as needed throughout the first year ofthe program. Appendix B provides a detailed description of the proposed projects, mapping of the projects, and the funding plan. To obtain the latest version of this plan go to: http://www.co.kittitas.wa.us/publicworks/ Kittitas County Roads Page 33 Kittitas County Capital lmprovement Program January 5, 2021 6. Regional Parks and Trails This section includes an inventory of Regional Parks and Trails facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 6 below also describes each facility's size in order to determine if it addresses the County's long-term community needs according to level of service standards. Table 6 Existing Public Facilities and Services Regional Parks and Trails Facility Provider Description Size Coal Mines Trail Coal Mines Trail Commission, Cle Elum, Roslyn, and Kittitas County From Cle Elum to Ronald, Northern Pacific Railway bed 10.4 mi John Wayne Trail / Iron Horse State Park Washington State Parks Department From North Bend to Vantage, Chicago-Milwaukee-St. Paul-Pacifi c Railroad bed. 100 mi Vantage Boat Launch and Restrooms Kittitas County Vantage Boat Launch, built 1990 342 sqft The Cove Recreation Area Grant County PUD and Washington State Parks West of Huntzinger Road near Wanapum Dam. Public access is for day use from Thursdays through Mondays. 20 acres Kittitas County Outdoor Recreation Inventory Varies All other Parks and Trails are listed in the comprehensive inventory of recreation facilities adopted by reference in the Comprehensive Plan. vafles Evergreen Sno-Park I mile east of Snoqualmie Summit. A trail system comprised of 23 miles. Regional Parks and Trails Page 34 Kittitas County Capital lmprovement Program January 5,2021 7. Solid Waste This section includes an inventory of Solid Waste facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 7 below also describes each facility's size in order to determine if it addresses the County's long- term community needs. Table 7 Existing Public Facilities and Services Kittitas Gounty Solid Waste Facilitv Built date Size Facilitv Built date Size Ellensburg Scale House (Storage), 801 Industrial way 1981 160 sq. ft Transfer Station - Cle Elum, 50 #5 Mine Rd., Cle Elum 2003 9,000 sq. ft. Cle Elum Scale House, Hwy 903 Cle Elum 1981 160 sq. ft.MRW - Cle Elum, 50 #5 Mine Rd., Cle Elum 2003 2,000 sq. ft. Cle Elum Bunker Building, Hwy. 903 Cle Elum 1981 3,000 sq. ft.MRW - Ellensburg, 50 #5 Mine Rd., Cle Elum 2001 3,000 sq. ft Cle Elum Storage, Hwy 903 Cle Elum 1981 925 sq. ft.Office/Admin Bldg., 50 #5 2003 120 sq. ft. Mine Rd., Cle Elum Transfer Station Building, 1001 Industrial way 2000 9,078 sq. ft.Cle Elum Scale House - new, 50 #5 Mine Rd., Cle Elum 2003 284 sq. ft. Scale House Bldg., 1001 2000 1,000 sq. ft. Industrial Way Ryegrass Equipment Storage, 25900 Vantage Hwy. 1980 1,620 sq. ft. Transfer Station Offi ce, 925 Industrial Way 1963 1,980 sq. ft.SW 400 sq. ft. building, 25900Yantage Hwy. 2008 400 sq. ft. Transfer Station Shop, 925 Industrial Way 1963 1,680 sq. ft. Solid Waste Page 35 Kittitas County Capital lmprovenent Progranr January 5, 2021 Solid Waste - Relocate Ellensburg Transfer Station and Compost Facility . it i'a ,,1 Ellensburg Transfer Station and Compost Facility \wEa] Project lnformation and Selection Griteria Location 925 Industrial Way, Ellensburg - 50-acre site on Hishwav 97 Links to Other Proiects or Facilities N/A Description Build a new Transfer Station and Compost Facility in the Ellensburg vicinity. Jus tifi cqtion (Ne ed/D emand) The current transfer station has inadequate access and space. It is also in an environmentally sensitive location. Level of Service (LOS) / Project Tvpe Established LOS: N/A Proiect Type: New Facility C ompr e hens ive P I qn Cita tions CF.G4. CF-P2B Capital Cost 2021 2022-2026 Total Design and Engineering $1,000,000 sr.000,000 Construction 83.000,000 $7.000,000 8r0.000.000 TOTAL 83.000.000 $8.000.000 $r L000.000 Fundinq Sources 2021 2022-2026 Total Solid Waste Fund $3,000,000 $8.000.000 $11,000,000 TOTAL $3.000.000 88.000.000 s1 1.000.000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savinss Due to Proiect None Department Respons ibl e for Operations Solid Waste Solid Waste Page 36 Kittitas County Capital lmprovement Program January 5, 2021 8. Library Services This section includes an inventory of Library Services facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 8 below also describes facility's size in order to determine if it addresses the County's long-term community needs. Table 8 Existing Public Facilities and Services Library Services Facility Provider Description Size Gilmour Memorial Library (Kittitas) Kittitas 2nd & Pierce Streets, Kittitas Carpenter Memorial Library (Cle Elum) Cle Elum 302 Pennsylvania Ave., Cle Elum EllensburgPublic Ellensburg Library 209 N. Ruby St, Ellensburg, founded in 1910, recently expanded in 2003. Roslyn Public Library Roslyn 201 S. First St., Roslyn, $3 million remodel began in 2009 to repair and update Library Services Page 37 Kittitas County Capital lmprovement Program January 5,2021 9. Emergency Services This section includes an inventory of Emergency Services facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 9 below also describes each facility's size in order to determine if it addresses the County's long-term community needs. Table 9 Existing Public Facilities and Services Emergency Services Facility Provider Description Size Station #11 Thorp Fire District No. I Thorp - 10700 N. Thorp Hwy., all District 43.5 sq. mi. and serves 2,500 residences, built in 2000, remodeled in 2005,2 engines, I Tender, 2 brush trucks, 1 aid unit, and I rescue. 6,400 sq. ft. Station #12 Clark Fire District No. I Flats Thorp - 10941 SR 10, 2 buildings at site, I tender, I brush truck, and I engine 2,300 sq. ft. for both bldgs. Station #13 Elk Heights Fire District No. 1 Elk Heights - 1 building at site, and I engine. Station #21 Fire District 2 (Kittitas Valley Fire and Rescue) 280 sq. mi. for all Dist 2,2020 Vantage Highway 8-211, E-21 l, E-212, T-211, B-212, M-21 l, M-212 Living Quarters -2020's, Bay - updated 2020, maintenance and training - 2020 Station #22 Fire District 2 2671 Tjossem E-221- 2018 Station 22S - 3301 Denmark Road - 1950's Station #24 Fire District 2 4901 4h ParallelRoad: 8-241, E-241, T-241 - 2004 Station #25 Fire District 2 Main St, Kittitas - E-232, B-232, A-231 - 2010 Station #26 Fire District 2 6651 Brick Mill Road -E-261- 1940's - anticipate replacing in2022 Station #26 Satellite Fire District 2 2380 Game Farm Road -E-262 - 1950's - anticipate decommission and sale 2021 Station #27 Fire District 2 8800 Reecer Cr. Rd - E-271 - 1950's Station #28 Fire District 2 5640 Cove Road - B-281, E-281, T-281 -2002 Station #28 Satellite Fire District 2 5l Barnes Road - E-282 - 1960's Emergency Services Page 38 Kittitas County Capital lmprovement Program January 5, 2021 Table 10 - Continued Existing Public Facilities and Seruices Emergency Services Facility Provider Description Size Station #29 Fire District 2 400 E. Mountainview Ave-M-291, M- 292, M-293, R-29 l, B-29 l, E-29 l, L- 291 - 2018 Easton Station Fire District No. 3 (Easton) I 80 Cabin Creek Easton WA. 98925, PO 3,182 sq. ft. Box 52, 12 sq. mi. for all Dist. 33 182 sq. ft., built in1992, l- aid car, 1-engine,2- tankers, l-rescue truck Vantage Station Fire District No. 4 (Vantage) Information Not Available Snoq. Pass Station Fire District No. 5/King FPD No. 5l (Snoqualmie Pass) 121 I SR 906 E. of I 90 Exit 53, houses 829 1, 8292, 1^29 I, A292, B2g l, Brush291, and Snow291 (snowmobile trailer), built in 201 l. 16,551 sq ft. Station #61 KCFP DistrictNo. 6 (Ronald/Lk. Cle Elum) Serves south end of district / 7 sq. mi. for all Dist. 6. Station #62 KCFP DistrictNo. 6 (Ronald/Lk. Cle Elum) 14030 Salmon La Sac Road, Ronald, WA 98940. Serves north end ofdistrict / 7 sq. mi. for all Dist. 6, 1 engine, 1 brush truck, I tender, and I aid unit. South Cle Elum Fire Station South Cle Elum 523 Lincoln Ave., South Cle Elum, I pumper, I utility truck, and serves 0.5 mile area with 580 people. Can handle twice the size area. 1,200 sq. ft. Station #l Peoh Point Rd. Fire District No. 7 (Upper County Area) 80 sq. mi. for all Dist. 7,1 fre engine, I wild land brush truck, I water tender, 1 aid unit, and ambulance Station #2 SR 970 Fire District No. 7 and Airport Rd. Information Not Available Station #3 off I-90 Fire District No. 7 at Golf Course Exit77 Information Not Available Station ll4Ballard Fire District No. 7 Hill Rd. Information Not Available Station #5 Teanaway Valley at Middle Fork Rd. Fire District No. 7 Information Not Available Education Page 39 Kittitas County Capital lmprovement Program January 5, 2021 Table 10 - Continued Existing Public Facilities and Services Emergency Services Facility Provider Description Size Station #81 Fire District No. 8 (Kachess) 13 sq. mi. for all Dist. 8, Located in Kachess Village, 1 engine 8l l, I command vehicle, I aid car, and I brush truck Station #82 Fire District No. 8 (Kachess) Located at intersection ofKachess Lake and Via Kachess Roads, I wild land engine, I tender/pumper, and rescue snowmobiles & trailer Station #83 Fire District No. 8 (Kachess) Located at intersection of Stampede Pass and Lost Lake Roads, I pumper/rescue truck, 1 tender, I brush truck, I aid car, and I support car Kittitas Valley Community Hospital Hospital District No. I Located at 603 S. Chestnut. Level IV trauma service &24-hr emergency care, S. Chestnut St. & E. Manitoba, Ellensburg 81,000 Cle Elum Medical Center 13,500Hospital District No. 2 Located at 201 Alpha Way, Cle Elum. Family Medicine of Cle Elum. No urgent care services provided. Cle Elum Urgent Hospital District No. 1 Located at2l4W. l't St., Cle Elum. 2,864 Care New Cle Elum Ambulance Garage Hospital District No. 2 Exact address undetermined. Adjacent to 8,500 201 Alpha Way, Cle Elum. Approximate completion date202l, Medical Arts Building Hospital District No. 1 Located at 100 E. Jackson, Ellensburg. No urgent care services provided at this building. KVH clinics include Pediatrics, Women's Health, Lab, and Family Medicine of Ellensburg. Some space also cunently leased to other non-KVH clinical services. TI completed February 2020. 33,671 KVH Physical Therapy Hospital District No. I Located at 301 Mountainview, Ellensburg. Entire building dedicated to physical therapy services. No urgent care services provided. Leased property. 6,912 KVH Occupational Therapy and Speech Hospital District No. 1 Located at 309 Mountain, Ellensburg. Also houses KVH IT Services. No urgent services provided. Leased property. 6,631 9,434Ellensburg Clinic Hospital District No. I Located at 700 Manitoba, Ellensburg. Houses Internal Medicine, KVH Quality Education Page 40 Kittitas County Capital lmprovement Program January 5,202'l Department, and soon to house Neurology Clinic. No urgent care services provided. Table 10 - Continued Existing Public Facilities and Services Emergency Services Facility Provider Description Size Valley Clinic Hospital District No. I Located at 716 Manitoba, Ellensburg. Formally Family Medicine of Ellensburg. This facility is now a pop-up clinic for COVID-l9, and Lab annex. No urgent care services provided. Leased property. 7,230 Empty Building Hospital District No. I Located at 708 Manitoba, Ellensburg. This building is currently vacant but will most likely only be used for office space. 1,000 Mediplex Hospital District No Located at 611 S. Chestnut, Ellensburg. This has suites A-E and are all clinical use. No urgent care services provided by KVH or tenants. 10,291 Work Place Health Hospital District No. I Located at702-B Mountainview, Ellensburg. No urgent care services provided. Leased suite. 1,710 Radio Hill Annex Hospital District No. I Located at 1506 Radio Road, Ellensburg. Currently halfoffice space and half storage. Office space for accounting, Home Care, and Hospice. Will most likely never be clinical space. No urgent care services provided. 21,082 Hospice Friends Friends of Hospice Located at 302 E. 2nd Ave, Ellensburg. Non-KVH office space for Friends of Hospice. KVH owned. 2,325 Education Page 41 Kittitas County Capital lmprovement Program Emergency Services - Station 21 Upgrade January 5, 2021 Proiect lnformation and Selection Criteria Location 2020Yantase Highway Links to Other Proiects or Facilities N/A Description Upgrade Station 21 to include new office and living quarters. Jus tification (Need/D emand) This project is needed for emergency management services personnel office and living quarters. Level of Service (LOS) / Proiect Tvpe Established LOS:N/A Proiect Twe: Facilitv renovation Comprehensive Plan Citqtions CF-G4, CF-P28 Gapital Cost 2021 2022-2026 TotaI Design and Ensineerins I r.000.000 $0 $r.000.000 Construction $2.700.000 $0 $2,700,000 TOTAL $3,700,000 $0 s3,700,000 Funding Sources 2021 2022-2026 Total Commissioner approved bond $3.700.000 $0 83.700.000 TOTAL $3.700.000 $0 $3,700,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savinss Due to Proiect None D e p ar tment Resp ons ib I e for Operations Kittitas Valley Fire and Rescue Education Page 42 Kittitas County Capital lmprovement Program Emergency Services - Station 26 Replacement January 5, 2021 Proiect Information and Selection Griteria Location Fairview and Brickmill Road Links to Other Proiects or Facilities N/A Description Relocate and replace volunteer station Jus tification (Need/D emand) This project is needed due to property inadequate for current use. Level of Service (LOS) / Proiect Type Established LOS: N/A Proiect Twe: Facilitv renovation Comprehensive Plan Citations CF-G4, CF-P28 Gapital Gost 2021 2022-2026 Total Design and Ensineering - property $2s0,000 $0 $250.000 Construction 80 $700,000 $700.000 TOTAL $2s0.000 $700,000 $9s0,000 Funding Sources 2021 2022-2026 Total Property Tax - existing $250,000 $700,000 $950.000 TOTAL $2s0,000 $700.000 $9s0,000 Annual Operations and Maintenance Estimated Costs Currently, the County does not track maintenance costs for these improvements. Estimated Revenues None Anticipated Savings Due to Proiect None D epartment Respons ib I e for Operations Kittitas Valley Fire and Rescue Education Page 43 Kittitas County Capital lmprovement Program January 5,2021 Emergency Services - Upper County Search And Rescue Base Proiect lnformation and Selection Griteria Location Cle Elum area; site to be determined Linlcs to Other Proiects or Facilities Search And Rescue (SAR) building in Ellensburg, leased from BNSF Description Relocation of SAR equipment storage and operations base to Upper Countv Jus tili catio n (Ne e d/D e mand) Ellensburg SAR building is deteriorating an inadequate for the expanding SAR program; Upper County base will provide improved emergency response to most SAR calls. Level of Service ftOS / Proiect Tvne Established LOS: N/A Proiect Type: FaciliW re-purposine and renovation Comprehensive Plan Citations CF-G4. CF-P28 CapitalGost 2021 2022-2026 Total Desipn and Enpineerins Construction $40,000 $0 $40,000 TOTAL $40,000 $0 $40.000 Fundinq Sources 2021 2022-2026 Total General Fund $40,000 $0 $40.000 TOTAL 840.000 80 $40.000 Annual Operations and Maintenance Estimated Costs Electrical and Wifi for video surveillance est. $2"000/vr Estimated Revenues nla Anticipated Savings Due to Proiect nla D epartment Responsib le for Operations SherifPs Office (with KSAR) Education Page 44 Kittitas County Capital lmprovement Program January 5,2021 Emergency Services - Sheriff's Office Vehicle Impound/Storage Facility Proiect lnformation and Selection Griteria Location N Railroad Ave. Ellensburs Links to Other Proiects or Facilities Upper County Search And Rescue base Description Ellensburg SAR building to be repurposed and fenced for secure storage for impounded/evidence vehicles Jus tification (Ne e d/D emand ) Changes in search and seizure law and best practices require holding more vehicles for longer by the S.O. Lack ofa dedicated facility creates congestion and inefficiency at the Sheriff s Office. Level ofService (LOS) / Proiect Type Established LOS:N/A Proiect Type: Facility re-purposing and renovation Comprehensive Plan Citations CF-G4. CF-P28 GaoitalGost 2021 2022-2026 Total Desisn and Ensineerins Construction $r2.000 $0 $12.000 TOTAL 812,000 $0 8r 2.000 Funding Sources 2021 2022-2026 Total General Fund $12,000 80 $12,000 TOTAL $12.000 $0 $12,000 Annual Ooerations and Maintenance Estimated Costs Currently the county does not track maintenance costs for these improvements Estimated Reyenues nla Anticipated Savings Due to Proiect nla D ep ar tment Res p ons ib I e for Operations Sheriff s Office Education Page 45 Kittitas County Capital lmprovement Program January 5,2021 Emergency Services - Sheriff's Office Upper Gounty Precinct Project lnformation and Selection Criteria Location Cle Elum area; site TBD Links to Other Proiects or Facilities Replaces KCSO office at Upper County District Courthouse (to be vacated for use bv UDC) Description Full-service precinct for Upper Kittitas County with clerical, patrol, and investigative facilities; possibly a shared/cooperative facilitv with Cle Elum/Roslvn PD Jus tifi cation (Ne e d/D emand) Upper County growth requires and deserves improved access to Sheriff s Office services. Facility will enhance community service and interagency partnerships. Level of Senice (LOS) / Proiect Type Established LOS: N/A Project Type: New facility Compreltensive Plan Citations CF-G4, CF-P28 CapitalGost 2021 2022-2026 Totul Design and Engineering Construction 82.500.000 $2,500,000 TOTAL $2,s00,000 $2,500,000 Funding Sources 2021 2022-2026 Total General Fund 82.500.000 $2,s00,000 TOTAL 82,s00,000 $2,500,000 Annual Operations and Maintenance Estimated Costs Currently, the county does not track maintenance costs for these improvements Estimated Revenues nla Anticipated Savings Due to Proiect Improved efficiencies of a working local precinct expected to produce undetermined cost savings D ep ar tment Resp o ns ib I e for Operations Sheriff s Office Education Page 46 Kittitas County Capital lmprovement Program January 5, 2021 10. Education This section includes an inventory ofeducation facilities and a detailed description ofeach facility improvement that is included in the six-year plan. The inventory of facilities in Table l0 below also describes each facility's size in order to determine if it addresses the County's long- term community needs. Table 10 Existing Public Facilities and Services Education Facility Provider Description Size Central Washington University Washington State Comprehensive public university main campus, 1500 employees, 94 buildings I l,l l0 students statewide (fatt 2020) Cle Elum / Roslyn High School Cle Elum/ Roslyn School District 2692 - SR 903, Cle Elum, 9th grade to l2b grade 239 students Cle Elum / Roslyn Elementary School Cle Elum/ Roslyn School District 2696 - SR 903, Cle Elum, pre-school, Kindergarten to 5th grade 348 students Cle Elum / Roslyn Alternative School Cle Elum/ Roslyn School District 200 W. Oakes St., Cle Elum, 3'd grade to 12th grade 38 students Walter Strom Middle School Cle Elum/ Roslyn School District 2694 - SR 903, Cle Elum, 6th grade to Sth grade 221 students Cle Elum/ Roslyn School District Music Building Cle Elum/ Roslyn School District Music Building for Walter Strom Middle School and Cle Elum-Roslyn Middle School School bus covered parking, maintenance facility, and transportation staff office building. Cle Elum/ Roslyn School District Transportation Facility Cle Elum/ Roslyn School District 38 students Damman Elementary School Damman School District Kindergarten to 6ft grade, 1 school, 2 teachers, 37 12 U mptanum Rd. 1893 Railroad St., Easton 127 students Easton Elementary, Easton School District Jr., Sr. High School 26 classroom teachers, 200 S. Sampson St., Ellensburg 454 students Lincoln Elementary School Ellensburg School District 27 classroom teachers, 705 W. 15ft Ave., Ellensburg 448 students Mount Stuart Elementary School Ellensburg School District 26 classroom teachers, 1508 E. 3'd Ave., Ellensburg 450 students Valley View Elementary School Ellensburg School District 40 classroom teachers, 400 E. l't Ave., Ellensburg 690 students Morgan Middle School Ellensburg School District Education Page 47 Kittitas County Capital lmprovement Program January 5, 2021 Table 10 - Continued Existing Public Facilities and Services Education Facility Provider Description Size Ellensburg High School Ellensburg School District 40 classroom teachers of atotal 67 887 professional staff, 1203 E. Capitol Ave., students Ellensburg Kittitas Elementary Kittitas School District School Kindergarten to 5ft grade, 7571 Kittitas Hwy, Kittitas 258 students Kittitas High School Kittitas School District 6ft grade to l2th grade,757l Kittitas Hwy, Kittitas 282 students Parke Creek Treatment Center Kittitas School District 11042 Parke Creek Rd.l5 students Thorp Elementary, Thorp School District Jr., and Sr. High Schools Kindergarten to l2th grade, 10831 N. Thorp Hwy, Thorp 164 students Education Page 48 Kittitas County Capital lmprovement Program January 5, 202'l Education - Ellensburg School District, New Elementary School (not yet named) Project lnformation and Selection Griteria Locstion New Elementary (not yet named),2100 North Cora Street Links to Other Proiects or Facilities Description Construct fourth elementary Jus tffi cati on ( Ne e d/D em and)Construct fourth elementary to bring unhoused students into school buildine from portables Level of Service (LOS) / Proiect Type Comprehensive Plan Citations CF-G4, CF-P28 GapitalCost 2021 2022-2026 Total Design and Engineering 81.390,413 $55I.076 $r.94L489 Construction 81.805.780 $20.697,271 $22.s03.051 Professional services & FF&E 844s.382 81.456.110 $t,901,492 Other developmental costs $789.857 $58,445 $848,302 Contingencies $67,426 $67.426 TOTAL $4.431 .43 I $22.830.328 $27.26L760 Fundinq Sources 2021 2022-2026 Total Commissioner aonroved bond $24,655,613 80 824,655,6r 3 State match $l,846, r 47 $0 $r.846.147 Other sources (interest, City, general fund transfer)8760,000 $0 8760,000 TOTAL 827.261.760 $0 827.26L760 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savinss Due to Proiect D ep ar tment Resp o ns ib I e for Operations Education Page 49 Kittitas County Capital lmprovement Program Education - Ellensburg School District, New Mt. Stuart Elementary New-in-Lieu January 5, 2021 Project lnformation and Selection Griteria Location Mt. Stuart Elementary. 1701 North Cora Street Links to Other Proiects or Facilities Description New buildinq. replacement school Jus ti/ication (Ne e d/D emand) Replace 1967 building deemed more costly to repair than replace. Remove portables to bring all students into the one building rather than temporary housins. Level of Service (LOS) / Proiect Type C omp rehens iv e P lan C it ations CF.G4, CF-P28 Gapital Gost 2021 2022-2026 Total Design and Engineering 8r,771,962 $169,927 8I.94 r.889 Construction $17.732,I5B $6.770.927 $24.503.085 Professionsl services & FF&E 81.396.64s s485.756 $1,882,401 Other development cos ts 8567.951 $44,B05 $612,7s6 Continsencies $30,s96 $r 5,069 $45,665 TOTAL $21 ,499,3 12 $7.486,484 $28.98s.796 Funding Sources 2021 2022-2026 TotaI Commissioner snnroved bond $22, r 45,868 $0 $22.145.868 State match $6,374,928 $0 $6.374.928 Other sources (interest)$46s,000 $0 $465.000 TOTAL $28.985.796 $0 $28,98s,796 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savines Due to Proiect D epartment Respons ibl e for Operations Education Page 50 Kittitas County Capital lmprovement Program Education - Ellensburg School District, New Mt. Stuart Elementary Early Learning Genter January 5,2021 Proiect lnformation and Selection Griteria Location Mt. Stuart Elementary Early Learning Center,705 West 15th Avenue Linla to Other Proiects or Fqcilities Description Remodel buildine and portable Jus tffi c ation (Ne e d /D emand) Remodel existing annex building located at the Mt. Stuart Elementary campus to house the Early Learning Center Preschool. Students are currently housed at CWU in rented space. Level of Service (LO$ / Proiect Type Comprehensive Plan Citations CF-G4, CF-P28 CapitalGost 2021 2022-2026 Totsl Desisn and Ensineerins 8s3.621 $6.379 860.000 Construction 8490.35 I 8241.516 8731.867 Professional services & FF&E $79,7s0 $39,270 $119,000 Other development costs $6,700 $3,s00 $10,000 Continsencies 8r s.400 $6,600 $20.000 TOTAL $643.802 $297.065 8940.867 Funding Sources 2021 2022-2026 Total Commissioner approved bond $669.860 $0 $669.860 Other sources (interest, srant)$27 L007 $0 $27 L007 TOTAL 8940.867 $0 $940,867 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticinated Savinss Due to Proiect D ep artment Resp ons ib I e for Ooerations Education Page 51 Kittitas County Capital lmprovement Program January 5,2021 Education - Ellensburg School District, New Tennis Gourts, Joint with City of Ellensburg Project lnformation and Selection Criteria Location Proposed Mountain View Park Links to Other Proiects or Facilities Description Construct tennis courts Jus tiJi c ation (Ne e d /D em and)Contribute $250,000 to City of Ellensburg's tennis court construction oroiect in lieu of future fees for use Level of Service &OS / Proiect Tvne Comprehen sive Plan Citations CF-G4, CF-P28 CapitalCost 2021 2022-2026 Total Desisn and Enpineerins 82s0.000 $250.000 Construction $0 $0 TOTAL $2s0,000 $2s0,000 Fundinq Sources 2021 2022-2026 Total General Fund $2s0,000 $2s0,000 TOTAL $2s0,000 $2s0,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Proiect Department Responsible for Operations Education Page 52 Kittitas County Capital lmprovement Program January 5,202'l Education - Ellensburg School District, New TVF Support to lncreased Student Grown/3O-Year Bus Replacement ,il'q : Project lnformation and Selection Griteria Location Transportation Dept., 1300 East Third Avenue Linlrs to Other Proiects or Facilities Description 30-year bus replacement cycle Jus tili c a tio n (Ne e d/D emand ) Level ofService (LOS) / Proiect Tvpe Comprehensive Plan Citations CF-G4, CF-P28 CapitalCost 2021 2022-2026 TotuI Design and Engineerinp Purchase $s38,643 $538,643 TOTAL $538,643 $538,643 Funding Sources 2021 2022-2026 Total General Fund Transfers $s38.643 $s38,643 TOTAL $s38,643 s538,643 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savinss Due to Proiect D epartment Resp ons ib I e for Operations Education Page 53 Kittitas County Capital lmprovement Program January 5, 2021 Education - Ellensburg School District, New Valley View Elementary Parking Lot lmprovements U\,i l ,'i I Proiect lnformation and Selection Griteria Location Valley View Elementary. 1508 East Third Avenue Links to Other Proiects or Facilities Description Improve parking lots to the north, south and west sides of Valley View Elementary Jus ffi c ation (Ne e d /D emand) Level of Service &OS / Proiect Tvpe Comprehensive Plan Citations CF-G4, CF-P28 CapitalCost 2021 2022-2026 Total Desisn and Ensineerinp Construction TOTAL $286.663 s286.663 Fundinq Sources 2021 2022-2026 Total General Fund Transfer $286.663 $286.663 TOTAL 8286.663 8286.663 Annual Operations and Maintenance Estimuted Costs Estimated Reyenues Anticipated Savings Due to Proiect D epartment Respons ibl e for Onerations Education Page 54 Kittitas County Capital lmprovement Program January 5, 2021 Education - Ellensburg School District, New Valley View Elementary Bus Loading/U nloading .--- Proiect lnformation and Selection Criteria Location Vallev View Elementarv. 1508 East Third Avenue Linlrs to Other Proiects or Facilities Descriotion Dedicated bus loadins/unloadins area fencins Jus tifi cation (Ne ed/D emand) Level of Service (LO9 / Proiect Type Comprehensive Plan Citations CF-G4. CF-P28 CapitalGost 2021 2022-2026 Totul Desisn and Ensineerins Construction $50.000 $0 $50.000 TOTAL $50.000 $0 $50.000 Funding Sources 2021 2022-2026 Total General Fund transfer $s0,000 $0 $50,000 TOTAL $s0,000 $0 $s0,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savinss Due to Proiect D epartment Respons ib I e for Operations Education Page 55 Kittitas County Capital lmprovement Program Education - Ellensburg School District, New Lincoln Elementary Remodel/Add ition January 5,2021 Proiect Information and Selection Criteria Location Lincoln Elementary,200 South Sampson Street Links to Other Proiects or Facilities Descrintion Remodel/addition Ju s tiJi c a ti on (Ne e d /D emand) Upgrades to seismic, HVAC, addition of gym and kitchen, remodel of existing structure, removal of portables to bring all students into the one building rather than temporary housing Level of Service &OS) / Proiect Type Comprehensive Plan Citations CF-G4" CF-P28 Capital Cost 2021 2022-2026 Total Construction $r 2,429,s58 $6,214,779 $r8,644,337 Professional Services & FF&E 8r,225,598 $s27,826 $ t,7 53,424 Other Developmental Costs $427,469 $146,63s $574,r02 Continsencies $28.1 37 $28.1 37 TOTAL $r4,082,62s $6.917.37 5 $21.000.000 Fundinq Sources 2021 2022-2026 Total Comrnis s i oner aoo rov e d b ond $1 1.728.506 $s00,1 s3 $I2,028,659 State match $0 88.521.341 $8.521.34I Other sources (interest)$250,000 $200,000 $4s0,000 TOTAL $r r,978,506 89,02I,494 $2r,000,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticinated Ssvinps Due to Proiect Department Responsible for Onerations Education Page 56 Kittitas County Capital lmprovement Program January 5,2021 Education - Ellensburg School District, New Valley View Elementary Blvd Resurfacing Project lnformation and Selection Criteria Location Valley View Elementary, 1508 East Third Avenue Links to Other Proiects or Facilities Description Valley View Blvd resurfacing Jus tific a tio n (Ne e d/D emand ) Level of Service (LO$ / Proiect Tvoe Comprehensive Plan Citations CF-G4, CF-P28 Capital Cost 2021 2022-2026 Total Desisn and Ensineerins Construction TOTAL $s00,000 8300.000 Funding Sources 2021 2022-2026 Total General Fund transfer $s00,000 $300,000 TOTAL $300,000 $300.000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savinps Due to Proiect D ep artment Res p ons i b I e for Operations Education Page 57 Kittitas County Capital lmprovement Program January 5, 2021 Education - Ellensburg School District, New Maintenance Warehouse I a - I Proiect lnformation and Selection Criteria Location Maintenance Dept., 1300 East Third Avenue Links to Other Proiects or Facilities Description Construct maintenance/grounds equipment warehouse Jus tific ation (Ne e d /D emand ) Level of Service &OS / Proiect Tvne Comprehensive Plan Citations CF.G4, CF-P28 GapitalCost 2021 2022-2026 Total Desisn and Ensineerins 87s,000 $75,000 Construction 822s.000 $225.000 TOTAL 8300,000 8300,000 Fundins Sources 2021 2022-2026 Total General Fund transfers 8300.000 $s00,000 TOTAL 8300.000 $300.000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savinss Due to Proiect D epartment Respons ibl e for Operations Education Page 58 Kittitas County Capital lmprovement Plogram January 5, 2021 Education - Ellensburg School District, New Ellensburg High School Portable Relocation j . -.-5;,r, i Proiect lnformation and Selection Griteria Location Ellensburg Hieh School, 1203 East Capitol Avenue Links to Other Proiects or Facilities Description Relocate two portables to high school campus to house Special Programs Jus tifi cati on (Ne ed/D emand) Level ofService (LOS) / Proiect Type Comprehensive Plan Citations CF-G4. CF-P28 Capital Gost 2021 2022-2026 Totul Desisn and Ensineerins $200,000 $0 $200,000 Construction $r 5.000 $0 $r 5,000 TOTAL 82 r s.000 $0 82 r s.000 Funding Sources 2021 2022-2026 Total Commis s ioner approved bond $2s,000 $0 $2s,000 General Fund transfer $r90.000 $0 $190,000 TOTAL $21 s,000 $0 $2 r s,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savings Due to Proiect D epartment Respons ibl e for Operations Education Page 59 Kittitas County Capital lmprovement Program January 5, 2021 Education - Ellensburg School District, New lT Mitigation Plan Proiect Information and Selection Griteria Location Information Technology Dept., 1300 East Third Avenue Links to Other Proiects or Fscilities Description IT Mitieation Jus tilication (Ne e d/D emand) Level of Service (LOS / Proiect Tvoe Comprehensive Plan Citations CF-G4. CF-P28 CapitalGost 2021 2022-2026 Total Desisn and EnsineerinE Purchase $645,000 $3,678,927 84,324,227 TOTAL $645.000 $3,678.927 $4,324,227 Fundinq Sources 2021 2022-2026 Total Tech Lew 8688.000 83.689.909 84.377.909 TOTAL $688,000 85,583,000 $6,264,000 Annual Operations and Maintenance Estimated Costs Estimated Revenues Anticipated Savinss Due to Proiect D ep ar tment Res p ons ib I e for Operations Education Page 60 Kittitas County Capital lmprovement Program January 5,2021 11. Water - Group A Systems This section includes an inventory of Water - Group A Systems facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table l1 below also describes facility's size in order to determine if it addresses the County's long-term community needs. Table 11 Existing Public Facilities and Services Water (Group A Systems) Facility Provider Description Size Ronald Water System Kittitas County Water District No. 2, Special District Community provider Sewes 227 persons with 119 connections, 150 total approved connections. Effective since llll1970. 125,000 gal Thorp Water System Kittitas County Water District No. 4, Special District Community provider Serves 230 persons with 104 connections, ll2 total approved connections. Effective since 7llll987 . 156,000 gal Elk Meadows Water System Kittitas County Water District No. 5, Community provider 141 Swallow Ln, Cle Elum, serves 600 persons with 296 connections, 340 total approved connections. Effective since Ut/r970. 75,000 gal Easton Water System Easton Water District, Community provider 141 Swallow Ln, Cle Elum, serves 250 residential persons and 106 non-residential persons with 2l I connections, 405 total approved connections. Effective since t/t/1970. 195,000 gal Sunlight Waters Water System Kittitas County Water District No. 7, Special District Community provider 1710 Sunlight Dr., Cle Elum, serves 380 residential persons and 169 non-residential persons with225 connections, 223 tolal approved connections. Effective since 11111970. 200,000 gal Vantage Water System Vantage Water System, Investor Community provider Serves 73 residential persons and 105 non- 50,000 gal residential persons with 80 connections, 129 total approved connections. Effective since Ut/t910. Evergreen Valley Water System Evergreen Valley Utilities, Investor Community provider Serves 35 residential persons and 5 non- residential porsons with 262 connections, 41 I total approved connections. Effective since31212004. 120,000 gal Reservoir Hill Water System Reservoir Hill Maintenance Association, Private Community provider South Cle Elum, serves 33 residential persons with 20 connections, 25 total approved connections. Effective since 2/2s1t999. 20,000 gal Water- Group A Systems Page 61 Kittitas County Capital lmprovement Program January 5, 2021 Table 11 - Continued Existing Public Facilities and Services Water (Group A Systems) Fqcilitv Provider Description Size Central Mobile Home Park Central Mobile Home Park, Private Community provider Wilson Creek Rd. mobile home park, serves 2,100 gal 1 I 0 residential persons with 52 connections, 52 lotal approved connections. Effective since l/111970. Snoqualmie Pass Private - Snoqualmie Pass Utility District Well capacity of 385 gallons per minute and 1,361 acres 3 rsservoirs storing 565,000 gallons. Serves 250 residential persons with 760 connections and 1053 approved connections. Serves 90 residential persons with 409 calculated connections, 439 total approved connections. Effective date of 1/l/1970 137,000 galPine Loch Sun Beach Club Water System Private Community provider Serves 52 residential persons and 1 10 non- residential persons wilh 329 calculated connections and 335 total approved connections. Effective system date of 1lUt970 164,200 galskv Meadows Ranch Country Club WTR Private Community provider Serves 219 residential persons and l6 non- 258,600 gal residential persons with2lT total calculated connections and 300 total approved connections. Effective date of lllll970. Sun Country Estates 1-2- 3 Water System Private Community provider S. Cle Elum mobile home park, serves 30 residential persons and I non-residential person with l9 total calculated connections and24 total approved connections. Effective system date of 1/111970. 0 galSwiftwater Trailer Park Swiftwater Trailer Park, Private Community provider Serves 45 residential persons & 48 non- residential persons with 51 total calculated connections & 78 total approved connections. Effective system date of 1lllt970. 45,000 galWildwood 2 & 3 Water System Private Community Provider Serves 29 residential persons with 14 total calculated connections and 14 total approved connections. Effective system date of 12120/2006. 0 galGrasslands Park Private Community Provider Serves 245 residential persons with 105 total 0 gal calculated connections and 105 total approved connections. Effective system date of l/l/1970. Millpond Mobile Manor Investor Community Provider Millpond Mobile Manor Suncadia Resort Investor Community Provider Serves 103 residential persons & 903 non- residential persons with 590 total calculated connections and l50l total aooroved l,o70,oo0 gal Water-GroupASystems Page 62 Kittitas County Capital lmprovement Program January 5, 2021 connections .Effective system date of sl29/2008. Table 11 - Continued Existing Public Facilities and Services Water (Group A Systems) Facilitv Provider Description Size Driftwood Acres Maintenance Corporation Association Community Provider Serves 60 residential persons with 130 total calculated connections and 141 total approved connections. Effective system date of l/111970. 100,000 gal Sun Island Maintenance Assn. Association Community Provider Serves 30 residential persons and 100 non- residential persons with I 15 total calculated connections and an undetermined number of total connections. Effective system date of r/111970. 1,8000 gal Serves 260 residential persons with 75 total calculated connections and 8l total approved connections. Effective system date of llI/1970. 21,000 galGrasslands Water System Association Community Provider Water- Group A Systems Page 63 Kittitas County Capital lmprovement Program January 5,2021 12. Sanitary Sewer This section includes an inventory of Sanitary Sewer facilities and a detailed description of each facility improvement that is included in the six-year plan. The inventory of facilities in Table 12 below also describes each facility's size in order to determine if it addresses the County's long- term community needs. Table 12 Existing Public Facilities and Services Sanitary Sewer Provider DescriptionFacilitv Size Ellensburg treatment facilities Kittitas County Utility District Serves within Ellensburg city limits and has acapacity of 2,5 M - 3.5 M gpd that flows to the Yakima River. Single lift station that conveys wastewater flows from the Water District area to the City of Roslyn sewor systom, 37 acresRonald treatment facilities Kittitas County Water District No. 2 Average daily flow approximately 170000 mgd., permitted treatment and discharge capacity of 0.368 mgd. and storage of excess flows of about 30 mill. Gal. Serving 638 customers total. Lagoon normal storage is 10.5 MG with an additional l0 MG emergency storage. 1,799 acres Snoqualmie Pass Utility District Snoqualmie Pass Utility District Serves Vantage LAMIRD, wastewater collection and treatment system, capacity of about 87,000 gpd. Major upgrades completed in 2013. 80 residences Vantage wastewater collection and treatment system Vantage Water District No.6 Sequential Batch Reactor Facility, Capacity is 3.6 million gpd and can take instantaneous flow ofup to l0 million gpd. Upper Kittitas County Regional Wastewater Treatment Facility City of Cle Elum Sanitary Sewer Page 64 Kittitas County Capital lmprovement Program January 5,2421 13. Kittitas County Flood Gontrol Zone District The Kittitas County's Flood ControlZone District capital improvement plan is further detailed in Appendix C. Appendix C provides a detailed description of the proposed projects, mapping of the projects, and the funding plan. Flood Control Zone District Page 65 Kittitas County Capital lmprovement Program January 5, 2021 Frequently Asked Questions How does the County determine priorities for the projects listed in the CFP? This CFP provides general guidance on prioritizing public facility projects. Each project proposal is reviewed by the CFP Task Force using the following criteria: 1. Improvements to obsolete or worn out existing public facilities that achieve or maintain adopted levels of service. 2. New or expanded public facilities that achieve or maintain adopted levels of service. 3. Improvements to existing public facilities or new public facilities that eliminate hazards. 4. New or expanded public facilities that achieve or maintain adopted levels ofservice as forecasted during the next six-years. 5. Improvements to existing public facilities or new public facilities that reduce the operating cost ofproviding a public service or facility. 6. New facilities that provide excess capacily that will be needed beyond the next six-years. 7. All other facilities the County is obligated to complete that do not meet the criteria above. 8. Availability of funding. The Board of County Commissioners make the final determination of the priority order of the projects listed in the CFP. Are projects automatically given funding in priority order? No, if grant funds are applied for and received, chances are good that the grant funded project will become a priority. Grant funds awarded become new and additional revenue to the County, above and beyond the County's current resources. The County continually looks for ways to reduce the reliance on General Fund dollars for capital projects to stretch current resources. Wilt a project that is partially funded be listed in the CFP? It depends. If the project is still in-progress, but no additional money is needed beyond what has already been appropriated, it will not show up in the CFP in future years. If the project does need additional funds appropriated beyond the current level of funding, it will continue to show up in the CFP. Are all projects in the CFP completed within the next 6 years? No, for several reasons. First, the CFP is annually reviewed and amended to verify that fiscal resources are available. Second, the need for capital facilities is generated by population growth, existing facility deficiencies, major facility maintenance and repair needs, intemal operations, and Comprehensive Plan goals and policies. There is a need to continually assess which projects are affected and should be considered a priority. As a result, project estimates and timelines may change. Question 1: Answer: Question 2: Answer: Question 3: Answer: Question 4: Answer: Freq uently Asked Questions Page 66 Question 5: Answer: Question 6: Answer: Kittitas County Capital lmprovement Program January 5, 2021 What does level of service (LOS) mean? The LOS is a quantifiable measure of the amount of public facilities that is provided, such as acres of park land per capita, vehicle capacity of intersections, or water pressure per square inch available for water system. What is concurrency? All public facilities that are needed to serve new development or a growing service area population, must be in place at the time of initial need. If the facilities are not in place, a financial commitment must have been made to provide the facilities within six-years of the time of the initial need and must have the capacity to serve the new development or a growing service area population without decreasing service levels below locally established minimum standards. Question 7: Answer: How do I get involved in the Cf,'P process? Information on the CFP process will be posted on the County's website at the following address: https://www.co.kittitas.wa.us/cds/land-use/default.aspx. To receive email updates on when new information is posted, you can subscribe to Kittitas County's email notification subscription service for "Comprehensive Plan Announcements." All persons can provide written or verbal comments to the Planning Commission and to the Commissioners, before or during the scheduled public hearings. Frequently Asked Questions Page 67 Appendix A 2021 - 2026 Kittitas County Department of Public Works Road Fund Maintenance Division Capital Improvement Plan (Equipment Rental and Replacement Fund) Prepared on0913012020 Page 1 of5 Introduction Kittitas County Department of Public Works (KCDPW) provides planning, design and maintenance services to County residents for numerous assets on the County Road and Bridge transportation network. The maintenance division of Public Works controls various assets in the Public Works portfolio such as maintenance facilities (shops) and aggregate pits and quarries. All Road Fund assets are managed within the County's Equipment Rental and Replacement Fund (Fund 501). Owing to structural damage to the Upper County Shop in 2015 (Cle Elum), the shop is being replaced by a new maintenance facility whose construction completion is anticipated in late 2021. The Lower County Shop (Ellensburg) is under increasing pressure from urbanization and discussions are currently underway to relocate the facility to the new Transfer Station (Solid Waste) site on Highway 97. Land acquisition is programmed for 2022. Subsequent project actions are listed in EXHIBIT l. Current Assets Described Upper Countv Maintenance Shop (Cle Elum. WA) The existing Upper County Shop is an unreinforced concrete masonry building built in the early 1940s. The site is approximately one-half acre in size and booked in the 1940s as being worth approximately $310.00. Building improvements are currently valued at$140,032 +/-. Construction is currently underway ott u replacement facility in Cle Elum on Highway 903. The approximate $6 million facility is sited on land purchases in 2018 for $349,766 +/-. KCDPW paid cash for the land and the cost of construction is being underwritten by cash reserves. A schedule of the project is provided in EXHIBIT 1 of this plan along with the anticipated expense plan. A listing of assets for the existing facility is provided as EXHIBIT 2. The existing shop facility will be placed on surplus once final occupancy is issued by the County Building Department. Surplus revenue (sale of the existing Upper County Shop) appears in EXHIBIT I as forecast year 202I ($400,000). Hvak Joint Maintenance Facilitv with Snoqualmie Pass utilitv District KCDPW currently shares a joint maintenance facility with the Snoqualmie Pass Utility District (SPUD). The site is approximately one-quarter acre in size and supports improved paved parking for several vehicles. The building is wood framed and wrapped in metal and approximately 4,000 square feet in size. Current land value is booked at $51,480.50. Paving improvements are valued at $50,829.17. The building is valued at$203,536.57. SPUD is currently planning on significant water and wastewater improvements that will likely impact the existing joint maintenance facility. Discussions are underway that could result in transfer of the County's interest to SPUD for offsetting use of space in new planned facilities near the existing site. It is premature to forecast any impact to KCDPW at this time. No change in the operational Page 2 of5 status of the facility is being forecast for 2021-2026. Alisting of assets for the facility is provided as EXHIBIT 2. Lower County Maintenance Shop (Ellensburg. WA) The unreinforced concrete masonry wall construction building dates to the early 1930s. The site is approximately 4 acres (comprised of five separate tax parcels) in size and supports numerous outbuilding for equipment and material storage. The booked land value is approximately $2,619 (1930s) with building improvements estimated at$279,377 +l-. KCDPW is currently engaged in discussions with Solid Waste for acquiring approximately five acres of land allowing shop relocation in the next several years. Solid Waste is currently finalizingland use actions that will make land acquisition possible. A listing of current assets is provided in EXHIBIT 4 of this plan. Planning level costs and anticipated major actions associated with shop relocation over the next several years (2026) is provided as EXHIBIT 2. Pits and Ouarries KCDPW currently maintains ten pit sites within the Equipment Rental and Replacement Fund. The sites vary in size from one-half acre to several acres, the largest holding being the Hanson Ponds facility. The aggregate asset value of the pits is estimated at approximately $43,300 (based on acquisition year land value). Improvements at various locations (fencing) is estimated at 981,744 +l- invalue. The sites are predominately used for aggregate storage or burning of debris collected during road maintenance operations. The Hansen Pit facility is being considered for use as an Advanced Environmental Mitigation site and a forecasted action plan is provided as EXHIBIT 1. Specific actions associated with Hansen Pit are forecast in the six-year improvement plan while all other Pits and Quarries assets are listed in EXHIBIT 2. No forecast improvements are anticipated during the planning period (2021-2026) for the remaining pits and quarry sites. Page 3 of5 EXHIBIT 1: EQUIPMENT RENTAL & REPLACEMENT FLIND CAPITAL IMPROVEMENT PLAN 2021-2026 (All values are in $1,000 increments). Page 4 of5 o6!oo!trt46oU!o-9o!c5Btoqo6EaBcdEtsEt4!,m2sI!E-ncEE2024Ecm22EI4EN:22c4EEEKTTFASCol,NW20izr-202sSXYEAR ROAD MAINTEMNCE CAP|TAI, PIANtotals | 425013,100500250150250500{500)7,5001_500100725 t258oooo1o5m(s(xD-sm8,0q)75000250250250EO250015(|15f15()t5{,ilit)02s015{X)t7s1750L,7fi1J002so025075(,75{l7vt75()llml{m3,5m1m46rr32m32m320(onroing Ooffitiona On Croital lmoMenB Plannad.ANNUAL CAPITAL IMPROVEMENT TOTA1S I.OTHER FUT{DS IGRANTSSONDS}hNET TOCAI FUNDS NEEDEIHyak Joint Mair*enance Faciliw with SPUDUoEr Counw Maintenance ShooBuilding constroction Completq Site lmprcvements Complet€. SurplussistinSfacility in de Elum onThird Stret.Lower Counw Maintenarce ShooPrelimlnary design @mdde rupporting pemitting and bond slebmulation.Flnal building and site d68n,Hansn PitldEnced miti8ation daluatlon and Dreliminary dsiqnFinal midsation d6iqn ard imdm.nHion of Pha* ICther Dlts and ouaries)rgoinA ODeBtions, On Capital lmprevments Planned.L245IETEfiIIIIlrIITIIIIlof 4 EXHIBIT 2: ROAD FLIND (MAINTENANCE DTVISION) EXISTING ASSETS Page 5 of5 ER&R ASSETS 9l29l2O2O PITS: BALLARD PITS 5 ACRES & 13.43 ACRES BENNETT PIT 6,9 ACRES DYER PIT 6.44 ACRES ELK HEIGHTS PIT 8,33 ACRES GLADMAR PITS 24,85 ACRES HANSEN PIT 62.84 ACRES KERN PITS 18.26 ACRES & 6.25 ACRES SADDLEMOUNTAIN PIT 17.23 ACRES SCHNEBLY PITS 10 ACRES & 10 ACRES SPECKHART PIT 12,8 ACRES ELK HEIGHTS PIT FENCING SADDLE MOUNTAIN PIT FENCING STATE PIT FENCING BOWERS PIT FENCING LOWER COUNW SHOP: LOWER COUNTY ELLENSBURG SHOP LAND 4.2223 ACRES LC EAST EQUIPMENT SHED LC NORTHEAST EQUIP SHED LC NW EQUIP SHED LC REPAIR SHOP LC SHOP OFFICE ADDITION LC WEST EQUIP SHED LC SHOP OFFICE ADDITION LC EAST EQUIPMENT SHED LC NORTHEAST EQUIP SHED LC WEST EQUIP SHED 5OOO GL LIQUID DE ICER STORAGE 1OOOO GL LIQUID DE ICER STORAGE ASPHALT TANK FOOTINGS PLACEMENT LOWER COUNTY SHOP FENCING LOWER COUNTY WASH RACK UPPER COUNTY CtE EIUM SHOP UPPER COUNTY CLE ELUM SHOP LAND,61 ACRE UC 2O1O EQUIP STORAGE UC EAST EQUIP STORAGE UC REPAIR SHOP UC REPAIR SHOP HYAK JOINT FACITIW HYAK JOINT FACILITY .87 ACRES HYAK JOINT FACILITY 2014 HYAK FACILITY PARKING LOT New UC Shop COST ALLOCATE D 2OT7 -2019 UPPER COUNTY NEW SHOP SITE LAND 6.65 ACRES CONSTRUCTION CONTRACT UTILITIES COUNTY FORCE WORK tAND 500.00 1,400.00 1.00 5,424.50 2,270.00 t7,400.00 7,363.00 4,000.00 4,500.00 500.00 BOOK VATUE s00.00 1,400.00 1.00 5,424.50 2,270.00 17,400.OO 7,363.00 4,000.00 4,500.00 500.00 BUITDING IMPROVEMENTS DEPR. 5,188.70 8,926,55 t9,937.57 43,298.50 t"AND 2,618.80 tAND 309.48 TAND 51,480.50 51,480.50 I.AND 349,765.86 309.48 191,398.32 82,252.89 23,03s.68 25,535.68 48,207.O8 30,335.70 70,009.6L 2,618.80 279,376.64 47 666.58 27 7O,324,M NETVAI.UE 2,678.80 23,683.22 27,480.78 63,972.20 7,267.O9 5651.24 13960.41 t4636.52 50621.42 s7293.99 258,s66.87 505,37s.92 35,186.39 55,839.45 4L,600.20 25,770.44 NET VAIUE 309.48 68,248.23 7.7L .36 L4O,O3r,7L 235,L75.45 96,564,06 IMPROVEMENTS DEPR.NET VAI.UE 51,480.50 180,921.3922,6t5.18 17 707.30 1.87 50,829.L7 35,322,48 27O,523.76 NET VATUE 349,765.86 32L,775.76 IMPROVEMENTS DEPR. 7 8L,744.94 54,7t9.40 BUITDING IMPROVEMENTS DEPR. 5,188.70 8,926.ss 79,937.57 82,252.89 23,03s.68 25,535.68 48,207.08 30,335.70 70,009.61 23,683.22 2I,984.63 5L,I77.76 s,813.68 5,651.24 13,960.41 74,636.52 50,62t.42 5,496.15 I2,794.44 L,453.47 BUILDING IMPROVEMENTS DEPR. 124,087.68 41,600.20 25,710.44 BUITDING 203,536.s7 203,536.s7 BUIIDING 1,022,839.O7 5,699,244.24 t86,242.00 32t,7t5.76 7 1of 1 Appendix B Kittitas County Department of Public Works Capital Facility Plan 2021-2026 Prepared on September 29,2020 Introduction Every year, Kittitas County Department of Public Works develops a listing of county road and bridge improvements for Board of County Commission consideration. The listing is accompanied by a public outreach effort. Public comments are evaluated, and staff adjusts the original proposal that is then finalized and presented to the Board of County Commissioners during the annual County budget process. Given the complexity of municipal engineering, environmental permitting, right of way acquisition and construction; Public Works schedules projects an additional five years behind the first budget year. The planning schedule includes programmed funding amounts and sources along with project forecast expenses. The schedule identifies the various projects beginning in the first budget year (202I) extending to the last year in program (2026). This plan This plan is organized into three major components for the ease of understanding the various projects contained in the six-year plan: I - Map identifying the various projects scattered around the County 2 -The six-year project listing and associated funding plan 3 - Project specific sheets listing specific project information including: County Road Project Number (if assigned at the time of publication), Priority number, title, project description, project status, photos and funding sources. Kiftitas Gounty2021-2026Slx Year Transportation lmprovement Plan,+,223184l971021225l57o14I1763Road LogendAll RoadsOwned By- cLE ELUM- ELLENSBURG- Kt]-flTAS: KtfitTAS COUNry_ PRIVATE_ ROSLYN- S CLE ELUM- STATE PARKS- TBD- usFs-wsDoT[l Boundaryl6Projectsl-T66nMy Rd HydEulic lrprov€ment2- \r'antag€ Htrry! Kach€s Lake Rd Cufued Repb@mnt+ Faiwiow Road lmpwem€nt$ UniveFtiy and R6sor lnt€F@tion Signal (CN)e Upper County Trafrc Crlming7- N. Thorp Hvry - Yakim River Bnidgo& Dickey Cr. Bddge Redacemnt9- Manastash Rd. Creek Bank Stabilalion1'l-Clearah€ lNentory12- Clea. Zone lmpreyement Prcjed 2022-231 3- Lamb€rt Rd. Bridge 06345 Maintenance1+ Hung.y Junc.lion Road lMdening1+ Y€IoFtone Culverlle Airpod Road Culvod R€placemnt'I 7- Badgor P@k€t Road HMA'l & Badger Poc*et Orchard Roads Ph6c 120- SandeB Road lrlprwemnt21- BoreF Road Exte6ion22- Badger Pock€t Orchard Roa& Phde 22! HMA Oveday-Vado62+ Clear Zone lmproverents 2026-270 1.75 3.5 7 '0.5 11EMilesIDe,GffiAffiEK IIffiD@ffi@FKr,B@,mer IIeDhrnillra@,Bdocmh''nffidtE IIMEdw*fr*|edFED.dMud IIa*'6E.EDo|E@EnE6manmI 314o142DOa7m@2S83277420I312275 pAffi10!i!Eesla@b6/J&K Eanhwotu [c12S 1154B6unv Foc hshdin472S915133378s3363631ssEsII359Ia4!q!!EEg.9II!EFtItIBPEa3zaG:{9Eiz| 11813u9| 201 3s(,e3st I 3st 915t3I 250zJ I lol so(| 321ffiI mlufit@t I 35t 7frqeie| 7ol2r9(2Stl10l mlH16lHIdt 9tffitz75ts,qi3I DIE2161 I fil 2252IJ]El2xJSgl I ilmPJ@tDIl_el I K3t:!lFddmbH.ldrtur&_l4[FEb1&101ElaEE'ROs92+1KTTITASCOUNTY2021-2026sXT YEAR TRANSPORTATIOI{ IMPROVETI'EIfT NAt{GGGGG617IEwa'@watwa@z.sG*I rrLS6915St17zsffi9fl567Dt71of3 ,61 DolleB20268g8q8rqffilDolla62025@lOdla.s2024oBI Oollars2023o€l Doila62022mlDdla6202lherGknbllD ln.omelanned sre /P'lannedHS|P/lP,l.nned amcntlclpated bn*ructlon Adwdb€m€ntbld Tobltr01230t001630!tet790250onStrudonlshmbn EnSlnoedof lCEllSht ofWlerlgntBhdlonEIHIEmMbn End@nng lCE)Itlt olsrvleallnlslsbnrffilon [nSlnsdng (CE)l8ftt of w.yeslgnbnshdlon En8lneering (CElleslsshdlonbrffilon EnShedq (Cqtht otweyesl&dhctldhsMon Enltnedm (cEll8ltr otw.ylclsn (PElls.lIPIftjed numb€raxD,7D2!a3eJ3EBlHs=o=!{!<os362i!b2NgFEI6;2I cRP 270-L6:Location:Last Updated:Priority #1Teanaway Rd Hydraulic Improvement, phase 2: Lick creekNorth Fork Teanaway Rd, CLe E[umSeptember 9,2O2OProjectNumber: RC1569-81: 0.30 milesBasis forHydraul.ic ImrovementConstruction: 2O2tThe primary purpose is to remove existing undersized culverts and reptace them with aconcrete box culvertover Lick Creek. This wil.t improve storm water drainage and fish passage whil.e also re-ducing pavement damage and maintenance costs during highwater events. This is the second phase of theTeanaway RdHydraul.ic Improvement project. Storie Creekwas completed in 2019.Status: Pect has been awarded. construction is scheduled to start June zoztTraffic Impacts: Preliminary construction is schedu[e to take 20 weeks. A singl.e [ane, restricted bypass road wil.l. be buil.t to ac-commodate vehicles during construction.Funding Sources:FLAP/FHWAFundsLocaLFunds$950,000$314,000Totat: $1,264,000N.F. Teanaway Rd existing cutvertsStorie Creek cutvert finished in 2019 CRP 298-L9:Location:Last Updated:Vantage HwyVantage Hwy, MP ?L.25-27.51, VantageSeptember 9, ?O2OPriority #2Project Number: RC1913-RPBasis for Proect: Safety and StructureLength: 6.26 mil.esConstruction: zOZtproiec,l Dencription: An HMA overtay wil.l. be completed on a portion of Vantage Hwy between the truck lane at Mp 21.25 andRecreation Dr. at MP 27.5! to improve the structure of the road to accommodate the highervolumes of traffic as seen in KCpW'sannual traffic studies.and.pavement rating repo{s.. Safety measures wil.l. al.so be compLeted by repl.acing and instal.ting guardrail.where warranted. Other del.ineation such as fl.exibte guide posts wil.l. be instatl.ed as needed. 'Status: DesiTraffic Impacts: To be determinedFunding Sources:RAPfunding$1,259,000HSIPfunding$1,154,000Totat: $2,4!2,OOOn is underway with tentative construction for Summer ZOZ!MP 27_ LOOKING WESTBOUNDa- r.For more information onthis project, contact Daren Case @509-962-7523 orMP 22.8- LOOKING WESTBOUND cRP# 284-L8:Location:Last Updated:Priority #3Kachess Lake Rd Cutvert ReptacementKachess Lake Rd, MP ?.5O, Kachess AreaSeptember 9,2O2OProect Number: RC1587-C1: 0.50 miles estimateBasis for Pect: Cutvert Replacement/Fish Barrier Construction: ZOZLPrOject DeScfiption: _ Damage upstream has caused sediment to annual.l.y travel. downstream, clogging the faiting cutvert. Cul.-vert is corroded through.and i? col.l.apsing fr.om the top. Replacement of the cutvert with a larger struituie that me6ts currentdesign standards wi[[ reduce the annual maintenance and al.l.ow for accommodation of high f[6ws which wil.l. improvehin naOitat.Status: Design is underway. Construction is tentative for Spring/Summer 2OZLTraffic Impacts: A singLe [ane, restricted bypassroad witt be buitt to accommodate vehicles during construction.Funding Sources:HIP/LP fund-ing$73,000STBG/LPfunding$62,000LocaI funds$1,632,000Tota[:$1,767,000LOOKING UPSTREAM FROM CULVERTLOOKING UPSTREAM TO CULVERT cRP# 303-20:Location:Last Updated:Priority #4Fairview Rd ImprovementFairview Rd, MP 5.03- MP 6.05September 9,2O2OProect Number: RC2190-G1: t.O? milesBasis for Project: SurfacingConstruction: Spring zOZtProiect DesCription: Two faiLed short span bridges are being reptaced and the roadway is being widened. County forces wil.comptete paving the project in 2O2t.Status: Construction is schedul.ed for spring/summer ZOZLTraffic Impacts: Surfacing of Fairview Rd wil.[ cause temporary del.ays. Fl.aggers wil.l. be present to control traffic.Funding Sources:Grant funding$Other funding$Local funds$220,000Totak $220,000LOOKING SOUTHBOUNDLOOKING NORTHBOUND cRP# 293-18:Location:Last Updated:Priority #5University way and Reecer creek Rd Intersection signaLuniversity way and Reecer creek Rd, Mp t. T-Mp 1.94, EU.eisburgSeptember 9,2O20Project Number: RC1592-F1Length:0.47 mitesproiect Oescription As devetopment increases in the area of University Way and Reecer Creek Rd intersection, transporta-tion planning has shown a need for signalization for the intersection to improv-e the fl.ow of the vehic1e and pedesirian traffic aswe[[ as increase the safety of the publJc. The signalization project wil.l. instdll a traffic signal. system to contrbl both tegsof theintersection.Basis for Project: Traffic Control and SafetyConstruction: 202!Status: Open for Bid in Fal.l. 2O2OTraffic Impacts: To be determinedFunding Sources:HIP/LP funding$56,000STBG/LP funding$467,00087,000$610,000Reecer Creek and University Way IntxUniversity Way and Reecer Creek IntxLocaI fundsTota[:For more information on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kittitas.wa.us CRP# XXX-XX:Location:Last Updated:Priority #6Upper County Traffic CaLmingELk Heights Rd to Netson Siding Rd, Thorp to EastonSeptember 9, 2020Project Number: RC XXXXLength:N/ABasis for Project: Traffic control and safety construction: zoztProiect Description: Traffic fl.uctuations in the Nel.son Siding Rd/ Westside Rd to El.k Heights Rd areas continue to be a con-cern for community members. The County has performed traffic studies in the area and the Upper County Traffic Task force hasb.eglrn reviewing and pr.eparing_.suggestions for solutions. In response to the Uppgr County fr'aific Task f6rce, tne County wi1t in-stall measures to catm the traffic in these areas. This project wil.l. be designeO driO construtted in 202L.Status:Design phase; Construction scheduted for 2OZlTraffic Impacts: To be determinedFunding Sources:Grant fundingOther funding$oEASTBOUND A/31 FRI 511WESTBOUND 9/3MON 726MASPEED6.4WreUNDMdSPEEOAS.5ffiUND4e5 aDr at MP 4-E (9/ZO1A)1O9 trucb p€. day wlth Gross Annual Tonsol 277,5@56-30 mph ry.r.se 85ih Dcrc.nttl.43.a% 4STBOUND55.2% WESOUNO979 AOT at MC a-rs l9/2or8lof 4A3,OOo49-50 hph arcra8c asth p.rccnttt.46.3% E$TBOUND53.ZWEEOUND90s aDT at MP 2.A9 (9/201at194trucks per day wlth Gro3s Annuat Tohs47-20 mph .craAe ASth Fercenttte56.ZEAsrcUND43.3% WESTBOUNDaDT at MP 1.41 (9/2O1a)491 trucks per day wlth Gross Annual Tonsol 469.2504,O mph .v€raAe asth percenttle45,% EAiBOUNOg-1%wsouNo423 ^Dr at MP 4.e (7f2oaa'7a trucb pe. daywlth Gross Annuat Tonsot 236,5@55-$ hph aw..aae asth p.rc€nrtl€45.4% EASTBOUND9.6%WBEOUND947 ADT at MP 3.75 (7/2018)218 trucks pe. day wlth G.oss AnhualTohs of 56,5@5O-2O hph ac.e8. asth pcrc.ntttc39.3% EASTBOUND@.U reEOUNDaDT at MP 2.49 (7nOaA'155 trucks per day wth Gro3s AnnuatTo sd4O3,7sO47-30 mph .E.a& ASth p€r.enttte45.4% ESTBOUND9,6%WEEOUND/64 ^D t .t MP r-4L \7/zoLE'174 tru.ks per day wth Gross AnnualTons of439,5@47-70 fiph .wer.F asth percentlleg-8%@ouND4Os ADT at MP 4.O5 (5/2048)234,250sa.@ hph awcraAc esth pc.c.dllc47,2 ESTBOUNDOa FFC (RuEl Mlhor64r aur ar MP 3,7s (s/zota)124 truck per daywlth Gross Annuat Tons d3O7,@44,5% ESTBOUND51-5% WSEOUND3 accldehts h the la* 5 years@ FFC (Rural Ml6or Coll€dor)EST- 24'-24' wldrhr5laaDr at MP 2.16 (s/Zoaat271 truck per day wlth Grog annual Tons ot629.25O42.@ hph .vera8e asth Der.entuc97,3%E@UND42.2 WESTEOUND4 aaldehB ln the last 5 VeartOa FFC (Rural Mlnor ColledortaoT at MP a.o (s/2o16)126 trucb p€r day wlth G.oss Annual Tons of3@,5@52.@ mph .veraBe asth pc.centlle54.%ffiouND44.60l WESTSOUND2 aGldents ln the last 5 yeaBOa FFc (Rural Mhor Colledor)fro@ Pr.rrrG Rd1527rO'(Elk HelEhts/Elk PondstSPEED LIMTMP 3.6G MP 6.56(246aot(watson cutotr/rhorySPEED LIMT35 MPHa27tol(Mohat/woods &SPEED LIMITN.ltor gdlna id(23O3Ot(Little Creek RdlstorieSPEED LIMITEETBOUNO g/tsAf 25OWESTEOUND 9/3 MON 3a4MA SFE€D 75.O ffiOUNDMdSFEED A6.5 WCSBOUNDEASTBOUND Al3LFRI 574WESTBOUND 9/3 MON 697MA SPECD AO.4 E TOUNDEASTBOUND 9/3 MON A94wEstBouNo 8/31 FRt 53aMd SPCED '7.8 WESEOUNDMd SPEED 83.O C TOUND$0$500,000$500,000Locat fundsTotat: cRP# 302-2A:Location:Last Updated:Priority #7N. Thorp Hwy- Yakima River BridgeN. Thorp Hwy, MP 9.36- MP 9.76, ThorpSeptember 9,2020Project Number: RC2092-HPLength: 0.40 mil.esBasis for Project: Bridge RepairConstruction: ?OZLProject Description: The bridge spanning over the Yakima River is in need of preventative maintenance to extend the Life ofthe fracture critical structure. The existing paint system has faited throughout the bridge. The proposed joint repairs incLude stripseats at the end of the truss and siticon sealant at the floor beams.Status: Design phase with construction in 2O22Traffic Impacts:To be determinedFunding Sources:PtannedBRAC funds' Local FundsN. Thorp Hwy Bridge over Yakima RiverUnder bridge during inspection$2,486,000$0$2,486,000Totat:For more information on this oroieri-.nntacf flarrenCase @ 50!l'952-7523. or Darren-casedco,kittita-q,wa,uq cRP# 295-18:Location:Last Updated:Priority #8Dickey Creek Bridge ReplacementN.F. Teanaway Rd, MP 2.84, Cte E[umSeptember 9, 2020ProjectNumber: RC1594-B1Length: 0.01 mil.esBasis for Project: Bridge ReptacementConstruction: 2023Proiect Description: This bridge has one of the Lowestsufficiency ratings in the County and is currently load restricted. Teana-way River has migrated stowl.y across the fl.oodplain and started erosion behind the abutment wat[, the County pl.aced largerocks to arrest the erosion until. a permanent fix could be impl.emented. Work wil.l. inctude replacement of the bridge with a muchlarger structure to meet current design standards.Status: Design phase with construction in 2023Traffic Impacts: To be determinedFunding Sources:P[anned$6,415,000I FLAP/FHWAr fundsI Local. Funds$1,500,000Total:$7,915,000N.F. Teanaway Rd Bridge # 16203-l.ooking South N.F. Teanaway Rd Bridge #16203-l.ooking East cRP# 273-t6:Location:Last Updated:Priority #9Manastash Rd Creek Bank Stabil.ization & Sno-Park ImprovementsManastash Rd, MP 10.7-MP 11.0September 9,2O2OProjectNumber: RC1573-E1Length: 0.30 mitesBasis for Project: Repair and SafetyConstruction: 2O2ZProiect Description: Erosion caused by the South Fork Manastash Creek has caused bank instabil.ity under the county road.The road is currently one lane at this Location. The road wil.L need to be restored and the bank stabitized to provide two Lanes oftraffic. Sno-Park improvements wiil. also be incl.uded during construction.Status: Design phase with construction in ZOZZTraffic Impacts: To be determinedFunding Sources:: Ptanned] FLAP/FHWA, fundsr Local Funds$1,333,000$537,000$1,870,000TotaL:ForUndercutting of bankSno-Park area and barrier cl.osing one lane cRP# 286-1,8:Location:Last Updated:Bar t4 Rd TurnaroundBar L4 Rd, MP 1.15, EllensburgSeptember 9,2Q2OPriority #LOProject Number: RC1583-G1Length: N/ABasis for Project: Bus TurnaroundsConstruction: 2O2!Proiect Description: Turnarounds witl. be buitt at each dead end of Bar 14 Rd that were created after the fl.ood events of2017. During the flood, water overtopped the bridge causing significant damage to the girders. The County decided to removethe bridge and complete channel repair work to atleviate ftood probl.ems. Locat forces wiLl. construct turnarounds.Status: Right of Way establishment; construction tentative for ZO?LTraffic Impacts: County forces wil.l. be constructing the bus turnarounds. Traffic wil.l. be minimal.ty impacted during construc-tion. Fl.aggers witl be present during construction.'*'llker^Funding Sources:Grant fundsLocal Funds$200,000$oTotat:$200,000Flood event of 2Ot7; overtopping bridgeBar t4 Rd with barricades after bridge removed cRP# 301-20Location:Last Updated:Priority #IIClear Zone InventoryVarious locations throughout countySeptember 9,202OProject Number: RC2090-H5Length:VariesBasis for Project Safety ImprovementsConstruction: UnknownProiect DescfiptiOn: This project wil.l. conduct a clear zone inventory for safety anatysis. This inventory wil. inform the County of unsafeelements such as narrow travel lanes, side slopes, fixed objects and water that a vehicte may encounter when teaving roadway. EvaLuation ofmitigation measures such as removal, relocation, shiel.ding and del.ineation wil.l. be performed.Status: Design is underwayTraffic Impacts: NoneJudge Ronal.d RdGroeschetl RdFunding Sources:P[annedHSIP/LP$78,000LocaI Funds$0Totat:$78,000 CRP# XXX.XX:Location:Last Updated:Priority #I?Clear Zone Improvement Project 2O22-ZOZ3Various locations throughout countySeptember 9,2O2OProject Number: RC XXXXLengthVariesBasis for Project: Safety ImprovementsConstruction: 2023Proiect Description: This project wil.l. be designed after the resul.ts of the Cl.ear Zone Inventory project is completed in ZOZ1,.Construction wiLl. take place in 2023 to resolve safety issues that are identified by the Cl.ear Zone Inventory project and priori-tized by the Safety Pl.an Project that is compteted every other year. This wil.l. be an ongoing project that wil. be updated a1ongwith the data collected. One year may be bridge rail. improvements and the next phase would be guardrail instaL1ation.StatusAwaiting results from Clear Zone Inventory projectTraffic Impacts: To be determinedFunding Sources:P[annedHSIP/LP$303,000Local Funds$47$350,000Bridge Raits to be replaced-Denmark RdBridge Rail.s to updated-4th Parail.et. RdDarren.case@co.kittitas.wa.us--.r.inr.*/:i;n.!-el!**;,.d.n*rijitur;rtutui:!;t jbn!!6k\-;1"d$"!ilMeiddit*.,,.,w.Tota[:For more informationon this project, contad Darren Case509-952-7523 or CRP# XXX.XX:Location:Last Updated:Priority #I3Lambert Rd- Bridge #06345Lambert Rd over Teanaway River, Mp 0.67- Mp 0.6g, cle ELumSeptember 9,2O2OProject Number: RC XXXXLength: 0.01 mitesBridgenstruction:Proiect Description: The Lambert Rd Bridge spans the Teanaway River and is need of preventative maintenance to extend theLife of the bridge. The original construction of the precast T-girders did not incl.ude an overlay, which allows water to infil.trate be-tween the adjacent flanges resulting in spatl.s, delamination and cracks at the wel.d tab locations. A deck overtay woul.d includea[[ow for repairs before adding deck membrane and modified concrete overtay.Status: Design phase with construction in ZOZZTraffic ImpactsTo be determinedFunding Sources:PlannedBRAC fundsLocal Funds$346,000$54,000Tota[:$400,000 ,Lambert Rd Bridge # 06345SpaLl.ing at wetd tabs cRP# 304-20:Location:Last Updated:Priority #L4Hungry Junction Rd Widening-Hungry Junction, Mp 0.00- Mp tl4, EltensburgSeptember 9,202OProjectNumber: RCz093-RpLength: 1.74 mitesBasis for ProjectReconstruction and SafetyConstruction: ZOZ4Project Description: Hungry Junction Rd from US97 to Reecer creek Rd is narrow as wel.[ as having verticaI curves that do notprovide adequate sight distance. The road has moderate trucktraffic from a local. hay processing facil.ity. The work wil.l. incl.udechanging the verticaI curve profil.e to compl.y with WSDOT design manual, widening and paving the road to increase paving struc_tureStatus: Design in 2O22-2023, obtain Right of Way 2022-2023 with construction in zoz4Traffic Impacts: To be determined.. :,1.::i.t rnii.,L'-i frIr,t.:!itt,j t::::' , .'.:Funding Sources:Pl.anned RAPfundsLocaI Funds$3,631,000$720,000$4,351,000 :,Hungry Junction looking eastngry JuHoi:on AngLe -00 0Zoor -1 0Ihlog1tuncl,cn MP0 00 laakrng eastlczo r ri000m0D0S86E,l67l€le!ationOatunTotat:For more information on this project, contact Darren Case @ 5og-g62-7s23 or Darren.case@co.kittitas.wa.usphon CRP# XXX.XX:Location:Last Updated:Priority #I5Yetlowstone Cu lvert ReplacementYellowstone, MP 0.70, Snoqualmie passSeptember 9,2O2OProject Number: RC XXXXLength: 0.01ranage,er aneaonnon:Proiect Description: The Yel.lowstone cutvert project wil.L repLace the undersized and deteriorating culvert with a larger culvertwith the capacity to handLe high water fLow and sediment that has been found in the fish bearing stream. This wi1[ prevent wash-out of the county road as we[[ as improve fish passage.Status: Design in 2O22-2023, obtain Right of Way 2022-2023 with construction in ZOZ4Traffic Impacts: To be determinedFunding Sources:P[annedSTBG funds$500,000Local Funds$332,000Totat:$832,000Yettowstone Rd at faiLing cutvertUndersized cutvert CRP# XXX-XX:Location:Last Updated:Priority #16Airport Rd Culvert ReplacementsAirport Rd, MP 0.00- MP 2.0, C[e E[umSeptember 9,2O2OProject Number: RC XXXXLength:2.OBasis for Project: Drainage and ReconstructionConstruction: 2023Proiect Description: Undersized irrigation culverts underAirport Rd in Cl.e El.um have increased drainage issues in the area.Reptacement of these undersized cutverts with Larger, adequate culverts wil.l. decrease fl.ooding issues for nearby property ownerswhil.e atso protecting the roadway from damage.Status: Design tn 2022 with construction in 2023Traffic Impacts: To be determinedFunding Sources:Grant fundsLocal Funds$1,535,000$1,535,000$oAirport Rd in Cl.e El.umWest of White RdAirport Rd in Cl.e El.umEast of White RdTota[:For more information on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kittitas.wa.us CRP# XXX-XX:Location:Last Updated:Priority #I7Badger Pocket Rd HMABadger Pocket Rd, MP 0.00- MP 0.52 KittitasSeptember 9,202OProect Number: RC XXXXLen0.57asis for Project: Rehabil.itationConstruction: 2023Proiect Description: Local. hay press operations have deteriorate existing hot mix asphatt resulting in pavement rutting condi-tions. HMA overl.ay wil.l. remediate the rutted condition and restore the roadway segment. The road segment is widened to accom-modate the larger truck loads entering and exiting the hay press facil.ity.5tatus:Design in zuzs wttnconstructlonrn ?o?3-?o24Traffic Impacts: To be determinedFunding Sources:Ptanned STBG/LP funds$500,000Local Funds$705,00Badger Pocket @ Cl.eman RdBadger Pocket RdTotat:$1,205,000 CRP# XXX.XX:Location:Last Updated:Priority #LBBadger Pocket Orchard Roads Phase tBadger Pocket Area, E[[ensburg/KittitasSeptember 9,2O20Project Number: RC XXXXLength:VariesBasis for Project: Safety and Rehabil.itationConstruction: 2024Proiect Description: An increase in agricuttural activities in the Badger Pocket area has brought issues to the surface of road net-work. Poor roadway construction, geometrics, narrow right of way widths, impacts to existing irrigation franchises and congestionare some of the items to be broken into phases as it affects many roads In the area.Status:Design and right of way acquisition in 2023 with construction in zoz4Traffic Impacts: To be determinedi I.iTr!54,-Wit_$" L:1.,1!i,r;./:. . ,-i'Funding Sources:Grant fundsLocaI Funds$3,700,000$0,titTotat:$3,700,000Orchard Rd and Dodge RdDodge Rd and Thral.l. Rd intersection CRP# XXX.XX:Location:Last Updated:Priority #I9Clear Zone Improvement Project ZOZ4-ZOZ1Various locations throughout countySeptember 9,2O2OProject Number: RC XXXXLength:VariesBasis for Project: Safety ImprovementsConstruction: 2025Proiect Description: This project wil.l. be designed after the results of the Cl.ear Zone Inventory project is completed in ZOZ1,.Construction wil'L take place in 2025 to resolve safety issues that are identified by the Clear Zone Inventory project and priori-tized by the Safety Pl.an Project that is completed every other year. This witl. be an ongoing project that wil.l. be updated atongwith the data col'lected. One year may be bridge rait improvements and the next phase wou]d be guardrail. insta1tation.Status:Awaiting results from Ctear Zone Inventory projectTraffic Impacts: To be determinedFunding Sources:P[annedHSIP/LP$1,081,000Local Funds$149,000Totat:$1,230,000Vantage Hwy east of Parke Creek RdVantage Hwy east of Caribou Rd CRP# XXX-XX:Location:Last Updated:Priority #20Sanders Rd ImprovementsSanders Rd, MP 0.50-MP 1.03, EllensburgSeptember 9,2O2OProject Number: RC XXXXLength:0.53Basis for Project: Pedestrian SafetyConstruction:TBDproiect OescriptiOn: To accommodate the increase in traffic al.ong Sanders Rd and to Link future deveLopments to the city,the road wil.t need to be widened. Non-motorized pathw.ayswil.l. need-to be constructed for pedestrianinO tjicycle use. This wil.a[[ow for a uniform roadway from County to city Limits. Work wil.l. incLude widening and paving the road, construction of sidewaLkand instaLl.ation of drainage structures.Status: Design and right of way acquisition in ZOZ4.Traffic Impacts: To be determinedFunding Sources:PtannedSTBG/LPFundsLocaI Funds$350,000$150,000Sanders Rd-showing city sidewal.kTotat:$500,000Case7523 orSanders Rd-l.ooking east cRP# 2?6-O9:Location:Last Updated:Priority #2IBowers Rd ExtensionBowers Rd, MP 1.93- MP 2.02 EllensburgSeptember 9,2O2OProject Number: RC1505-F1Length:VariesBasis for Project: New constructionConstruction2025An extension of Bowers Rd to Look Rd wiLl. accommodate increasedcommercial. traffic near the airport.It[[ also connect the Rural. Minor Cotlector in the northeast witha Rural Major Col.l.ectorin the northwest at Reecer Creek Rd.This area has been identified in the urban growth area for E[l.ensburgStatus: Design wil.l. begin 2024 with construction in ZOZSTraffic Impacts: To be determinedFunding Sources:; Grant Funds. Local Funds$2,450,000$2,450,000Bowers Rd looking east$oTotat:ForBowers Rd tooking eastor Darren-case@co^kittitas-wa-us CRP# XXX.XX:Locatlon:Last Updated:Priority #22Badger Pocket Orchard Roads Phase ZBadger Pocket Area, Ellensburg/KittitasSeptember 9,2O2OProject Number: RC XXXXLength:VariesBasis for Project: Safety and Rehabil.itationConstruction: 2026Proiect Description: An increase in agricuttural activities in the Badger Pocket area has brought issues to the surface of roadnetwork. Poor roadway construction, geometrics, narrow right of way widths, impacts to existing irrigation franchises and conges-tion are some of the items to be broken into phases as it affects many roads in the area.Status: Design in 2024 and right of way acquisition in 2025 and construction in 2026Traffic Impacts: To be determinedFunding Sources:Grant fundsLocaI Funds$o$2,780,000$2,780,000Orchard Rd and Perry RdDodge Rd and Thral.l. Rd intersectionTota[:For more information on this oroiect. contact DarrenCase @ 509-962-7523orDarren.case@co-kittitas-wa -rrs CRP# XXX.XX:Location:Last Updated:HMA OvertayCou nty-wideSeptember 9, 2020Priority #23Project Number: RC XXXXLength:VariesBasis for Project: Rehabil.itationConstruction: 2025@t1.M4over[ayprovidesamorestructural'baseforroadsthatareusedbyahighervo[umeofheavytraffic.Higher truck traffic reflects rutting and al.l.igalor gf_aS-fing. in the annual pavement rating prdgrami Data wil.l. Ue anatyztrO anOroads identified that wil.[ benefit from overtaying HMA to increase structlral stabitity wliit'e re-ducing iuiure costs for maintenanceon a road.Status: Design in 2025 with construction in 2026Traffic Impacts: To be determinedFunding Sources:Grant funds$0Local Funds$1,790,000Totat:$1,790,000Umptanum RdHortick Rd damage from heavy truck traffic CRP# XXX.XX:Location:Last Updated:Priority #24Ctear Zone Improvement Project IOZG-ZOZTVarious locations throughout countySeptember 9,2O2OProject Number: RC XXXXLength:VariesBasis for Project: Safety ImprovementsConstruction: 2027Proiect Description: This project wil.t be designed after the resutts of the Ctear Zone Inventory project is completed in ZOZ;.Construction wiLl' take place in 2027 to resolve safety issues that are identified by the Cl.ear Zone Inventory project and priori-tized by the Safety Ptan Project that is completed every other year. This wil.L be an ongoing project that witt be updated al.ongwith the data cotlected' One year may be bridge rait improvements and the next phase would be guardrail. instau.ation.Status:Awaiting results from Clear Zone Inventory projectTraffic Impacts: To be determinedFunding Sources:PtannedHSIP/LP$216,000LocaI Funds$34,000Tota[:$250,000Cooke Canyon Rd tooking northRobinson Canyon Rd Looking west Appendix CKittitas County Flood Control Zone DistrictCapital Facility Plan 202t-2026Prepared on September 30, 202A IntroductionEvery year, the Kittitas County Flood Control Zone District ("District") develops a list of capital improvement projects for Board ofCounty Commission consideration. The listing is reviewed and approved by the Flood Control Zone District Advisory Committee, anentity composed of county rate payers that is responsible for assisting the Flood Control Zone District Administrator formulate theannual capital facility plan and advising on annual District work program elements. The proposal is finalized and presented to theBoard of County Commissioners during the annual County budget process. Given the complexity of flood,hazard,planning,engineering, environmental permitting, and construction, the Flood Control Zone District Advisory Committee schedules projects anadditional five years behind the first budget year. The planning schedule includes prograrnmed funding amounts and sources alongwith project forecast expenses. The schedule identifies the various projects beginning in the first budget year (202I) extending to thelast year in program (2026).This planThis plan is organized into three major components for the ease of understanding the various projects contained in the six-yearplan:1. Map identifring the various projects located around the County.2. The six-year project listing and associated funding plan.3. Project specific sheets listing specific project information including title, project description, projectstatus, photos and funding sources. \k rhbn t..\1go'--t, not1 ll i,,,y,c,''! I4{+;t:asaAI)IIIjKittitas County202L-2026Year Floodplains ImprovementFITcj@@Etr"012trtr-trE..,,''tl:'N.A8Environmental Sy(ems ResearchDtlnc. (ESRI), U S- Geological SuryeyDataGeological Suwey'U.5. Board on Geographic NamesProjects1- Repetitive Loss Program2- Floodplains by Design Property Acquisition3- Ringer Loop Property Improvements4- Hanson Pits Restoration Plan and Design5- Hanson Pits Restoration Implementation6- Reecer Creek Dollarway to University7- Stream Gaging and Early Warning System8- CTP Flood Studies (Multiple Locations)9- East Branch Wlson Re-Route10- Whiskey Creek at EWC Siphon11- WNC - Phase 212- WNC - Phase 313- Reach Assessment (Thorp to Gladmar)14- Flow Conveyance Restoration, Site TBD15- Flow Conveyance Restoration, Site TBD16- Crystal Creek Conveyance Project17- Manastash - Cove Road Replacement.946(BCN),Geospatial lntelligence Agency11.: oilnfomation Systems (USG$ NASCkGT€E@ Md@t+ Eozl!IoJEozouoagozo(,ocoz.E(,ocozl!oJIco2lEIoooYaklma RhnrRerchRlErRlnfer ReadtReachReachWn$Filan4n CheryWNC&T6nMVGcnlralwllsn-ltlanomNAMELOSS PROGRAMFTOODPIAINS BYis expeded to be expended in 2019 and is not captured in this work planof413 acres of continuous Yakima Rive floodprain, to facilitate implementataon offuture flood risk redudionpreventdevelopmentandessociatedriskwithin 2mfloodhazardacres.Notethats3MingrantfundinsforthisPROPERTY IMPROVEMENTSbuilding dftomissaoning at County-@ned propeniestor invasile spsiet riparbn buffer plantings, andPITS RESTORATIONDESIGNmodifications tothese structures, habitat restoEtion goals, and private property and t€nsrctution facilities. Setedjon ofHANSON PITS'MPtof preferred altemantivefrom Hanson Pits ReioEtion plan end Oesign .2023 SRFB design onlySEnt.CREEK DOIARWAYTO UNIVERSIW2021.construds€ond bridgeelong Dolaruay Rd. Funding is anticipated to be expended in 2020, but sohe may be expendedcontrol zone ustrict costshare in suppon ofcityofEltensbu.g projedto purchase propefty, construct setback teveesGAGING AND EARLYRtuer Gage.Whiskey Mercer, Wilson and Naneum Creeks, located downstream of respedive sptits. Suruey and eA/eC supFrtand annuel maintenance costs of real time stream gage n€tuork at 5 l*etions: Combined Wilson-NaneumSTUDIESfunding through FEMA's Cooperating Technical partnership (CTp) program to improve flood modelschannel migration zone mapping. Costs in 2021 are for the Crystal Creek CTp match, with FEMA fundsto be expehded in 2020. 2022: Coleman, Caribou, Cherry; 2023: yakima River (Elk Meadows); 2O2S:River CMZBranch WilsonDesign and grant developmentKFilTAS COUNW FTOOD CONTROTZONE202t-2026SIX YEAR CAPITAT IMPROVEMENT PLAN#2#3#5#5#7*9I@III ItozooItrozooicoz(!uotEozooIEoz(!oIcozoIo0fowllsn-Nansmwilson-Nan4m ChenywllsoFf{andmYallma MalostemwllbFNaneumcreekManast shAND NON.IOCATAMOUNTSISKEY CREEK AT EWCflood conveyance, eliminate canel /crek intermingling, and address fish pessage barrier by replacing current EWCWhiskeyCreek with a saphon. XCCD managed projed, with FCZD cosFshare. Cost estimate based on 2016 KCCOadjusted for inflation.R.rc& F.aslHllty Strdyanalysiswith existing 2-d mdel to evatuate WhiskeyCreektie-in at ReecerCreek projed. Evatuate effec ofCreek flow routing nodh otthe aifrt on hydrologic regimg design specifjcation needed at proposed reitroadand within ReecerCreekfloodplain sitq and water needs downsreem ofproposed rero4e site,3capital recommendations from Phase 2 FeasibilatyStudyD6l8nASSESSMENTcrossing. Request SRFB funding in 2023 round for implementatior in ZO24/2O25.of the Yakima River, extending from just upstream of Thorp, to Gladmar park and the F90to identify and prioritize flood alleviation and habitat restoration actions in a 4-mileRESTORANON. SITE 2of projectsimilerto Mercer at Helena flow conveyanre projed, stteTBDRESTORATION. SITE 3of prcjedsimilarto Mercer at Helena flow conveyance projed, siteTBOCREEK CONVEYANCEidentified through Crytal Creek gP studv. COVE ROADexisting Cove Road bridge with bridge ofsufticientfreeboard and span to pass sediment and flood flows.2026:PermiftingPROGRAM ANNUATKITflTAS COUNW FTOOD CONTROT ZONE202l-2026SIX YEAR CAPITAL IMPROVEMENT PLAN#10#tL*13#14*17E@@I3rrIIII@IrI .f qolect Nqme: #I Repetitive Loss projectYakima and Teanaway RiversLast Updated: September 20, 2OZOBasis for Project: Kittitas County Hazard Mitigation pLanSchedute: 2O2O-2OZLProject Description:Unincorporated Kittitas County has 7 repetitive loss areas. Four of these areas are atong the yakima River, two are al.ong theTeanaway River, and one is along the Middte Fork Teanaway River. Kittitas County witl. conduct a repetitive Loss area ani1ysis inzOZt to support subsequent retrofitting, purchase, or relocation of structures or infrastructure Located in hazard-prone areas.This anal.ysis wil.l. produce a detail.ed mitigation pl.an needed to pursue funding for mitigation measures.Status: In progressFtood Impacts:Reduce impacts and costs associated with frequentty ftooded properties.Funding. FCZD Levy. Future phases wil.l. be grantel.igibl.e .fqolect Name: #2 Ftoodptains By Design AcquisitionsYakima River-Ringer ReachLast Updated: September 30, 2020Basis for Project: Yakima River Corridor Pl.anSchedute: 2O!9-2OZLProject Description:Acquisition of 413 acres of continuous Yakima Rive fl.oodpl.ain, to facil.itate impl.ementation of future ftood risk reduction projectsand prevent development and associated riskStatus: Inress: one taeted pwas auired in 2019.Fl,ood rmpacts: Prevent future frequentty fl.ooded losses associatedthe Yakima River Fl.oodpl.ain.with residential development and channel migration alongFunding. Floodplains by Design(secured) 'f qolect Name: #3 Ringer Reach Property ImprovementsYakima River-Ringer ReachLast Updated: September 30, 2020Basis for Project: Yakima River Corridor Pl.anSchedute: 2O2O-2O21Project Description:Control' for invasive species, riparian buffer ptantings, and buil.ding decommissioning at County-owned properties that were pur-chased for fl.oodplain conservation and restoration.Status: InressFl,ood Impacts: Improved ftoodpl.ain function.Funding. Yakima Basin Integrated Ptan(secured) Project NameYakima River-RiLast Updated: Se: #4 Hanson Pits Restoration plan and Designnger Reachptember 30, 2O2OBasis for Project: Yakima River Corridor pLanSchedute: 2O2O-2O2!Proiect Description:Technical investigation of potentiat risks associated with the Hanson Pits and the downstream private berm, and impl.ications formodifications to these structures, habitat restoration goals, and private property and transportation facil.ities.Status: InressFl,ood Impacts: Managed fl.ood hazard risks and improved fl.oodptain function.Funding. Yakima Basin Integrated Ptan(secured) : #5 Hanson Pits Restoration Impr.ementationnger ReachProject NameYakima River-RiLast Updated: September 30, 2020Basis for Project: Yakima River Corridor pl.anSchedute: 2022-2025Project Description:Implementation of preferred alternative from Hanson Pits Restoration Pl.an and Design (FczD project #4)Status: FutureprojectFlood Impacts:Managed fl.ood hazard risks and improved ftoodpr.ain function.Funding. Satmon Recovery FundingBoard (potentiat) ect Name: #6 Reecer Creek Dol.arway to universityn-Naneum-Cherry 5ubbasinProjWiLsoLast Updated: September 30, 2020Basis for Project: Wi lson-Na neu m-Cherry AssessmentSchedule: 2O2O-2O21,Project Description:FLood ControL Zone District Cost share in support of City of El.l.ensburg Project to purchase property, construct setback levees andconstruct second bridge along Dolarway Rd to address Reecer Creek fLooding.Status: In progressFlood Impacts: Decreased fl.ood risk to West Ellensburg Community and Dol.arway RoadFunding. FCZD Levy .f.1.oject Name: #7 Stream Gaging and Earty Warning SystemWilson-Naneu m-Cherry 5u bbasi nLast Updated: September 30, 2020Basis for Project: Wilson-Naneum-Cherry AssessmentSchedute: 2O2O-2OZ1:Project Description:Instal.tation and annual maintenance costs of real time stream gage network at 5 Locations: Combined Wil.son-Naneum Creeks,Whiskey, Mercer, Wilson and Naneum Creeks, located downstream of respective sptits. Survey and M/eC support for TeanawayRiver Gage.Status: InroressFtood fmpacts: Improved real-time fl.ood communication and devetopment of a hydrol.ogic dataset to inform future fl.oodprojects.Funding. FCZD LeW Project Name: #8 CTP Flood StudiesCounty-WideLast Updated: September 30, 2020Basis for Project Kittitas County Hazard Mitigation pl.anSchedule: 2O2O-2O25Project Description:Continued funding through the Federal Emergency Management Agency's Cooperating Technical partnership (CTp) program toimprove fl.ood models and channet migration zone mapping. costs in 2o2l are for the crystal. creek cTp match, with FEMA fundsprojected to be expended in 2O2O; tn 2O22: Coleman, Caribou, Cherry ; in 2O23: Yakima River (ELk Meadows); in ZOZE: TeanawayRiver CMZ.Status: In progressFlood Impacts: Improved ftood risk informationFunding. Community Technical Partner-ship Program (potential.). FCZD Levy Project Name: #9 East Branch wiLson Re-RouteWitson-Naneum-CherryLast Updated: September 30, 2020Basis for Project: Recurring fLood issuesSchedule: 2O2tProject Description:Design, survey, and grant appl.ication support for proposat to relocate East Branch of Wil.son Creek from current location in road-side ditch to Central. Washington University-owned property.Status: Grant sol.icitationFlood rmpacts: Reduced fl.ooding in El.l.ensburg's Brooklane communityFunding. FCZD Levy. Grant funding wil.l. be pursuedfor project i m plementation. .f.1.oject Name: #Lo whiskey creek at EWc siphonWilson-Naneu m-CherryLast Updated: September 30, 2020Basis for Project: Wi lson-Na neu m-Cherry AssessmentSchedul.e: 2OZL-2O22Project Description:Increase fl'ood conveyance, etiminate canal and creek intermingting, and address fish passage barrier by repl.acing current theEtlensburg Water Company crossing at Whiskey Creek with a siphon. Finat design is expecte d in ZO?1- with construction in ZO2Z.Status: Planned projectFlood Impacts: Decreased fl.ooding along Whiskey Creek.Funding. FCZD Levy-design. Grant or partner support forconstruction. Project Name: #LI WNC Phase 2Wilson-Naneum-CherryLast Updated: September 30, 2020Basis for Project: Witson-Naneum-Cherry AssessmentSchedute: 2O2O-2OZ1-Project Description:HydroLogic analysis with existing 2-d model to evaluate a potential. Whiskey Creek tie-in at the Reecer Creek F1oodptain project.Evatuate the effects of Mercer Creek flow routing north of the airport on hydrol.ogic regime, determine the design specificationsneeded at proposed raitroad crossing, evatuate the avaitabl.e ftood capacity within Reecer Creek ftoodpl.ain site, and assess water-right considerations downstream of the proposed reroute site.Status: Planned projectFtood rmpacts: Decreased fl.ood risk to the west El.l.ensburg community.Funding. FCZD Levy Project Name: #L2 WNC phase 3Wilson-Naneum-CherryLast Updated: September 30, Z02OBasis for Project: Wi lson-N a neu m-Cherry AssessmentProject Description:Implement capital. recommendations from Phase 2 Feasibil.ity study (FczD project # tL)Schedute: 2025-2026Status: PtannedectFlood Impacts: Decreased fl.oodrisk to the West Eltensburg Community.Funding. FCZD Levy. Flood control assistanceaccount program (potentiat)i{I!IIIi{i Name: #L3 Reach Assessment (Thorp to Gl.admar)iverProjectYakima RLast Updated: September 30, 2020Basis for Project: Planning needSchedule: 20?3-2024Project Description:Assessment to identify and prioritize fLood al,leviation and habitat restoration actions in a 4-mite reach of the yakima River, ex-tending from just upstream of Thorp, to GLadmar Park and the I-90 river crossing.Status: Planned projectFlood Impacts: Fl.ood hazard risk identification.Funding. FCZD Levy. Salmon Recovery FundingBoard (potentiat) ct Name: #L4 Ftow Conveyance Restoration (Site z)on needProjeBasedLast Updated: September 30, 2020Basis for Project: Recurring needSchedute: 2022-2023Project Description:Implement ftow conveyance restoration project that exceeds scope of annual f]ow conveyance maintenance activities. Typical.tythese project require the removal of crack wil.l.ow and associated sediment accumulations. Site to be determined.Status: Planned projectFlood Impacts: Decreased fl.ood frequency.Funding. FCZD Levy. Ecology Centennial Cl.eanWater Grant (potential.) Project Name: #I5 Fl.oBased on needw Conveyance Restoration (Site 3)Last Updated: September 30, Z0ZOBasis for Project: Recurring needSchedule: 2O?2-2O23Project Description:Imptement fl'ow conveyance restoration project that exceeds scope of annual flow conveyance maintenance activities. Typical.tythese project require the removal of crack wiLl.ow and associated sediment accumulations. Site to be determined.Status: Ptanned projectFlood Impacts: Decreased ftood frequency.Funding. FCZD Levy. Ecotogy CentenniaL CLeanWater G rant (potential.) ProjeCrystaLast Uct Name: #16 crystal creek conveyance projectI Creek FLood Studypdated: September 30, 2O2OBasis for Project: Crystat Creek Ftood StudySchedule: 2025-2026Project Description:Implement Crystal' Creek conveyance project identified through current Crystal. Creek fl.ood study. Site to be determined.Status: Pl.anned projectFtood fmpacts: Decreased fl.ooding al.ong Crystal. Creek.Funding. Grant funding to be identifiedafter project identification. Project Name: #L7 Manastash Cove Road ReplacementCrystat Creek Fl.ood StudyLast Updated: September 30, 2020Basis for Project: Manastash Creek Corridor PlanSchedule: 2026Project Description:Repl.ace existing Cove Road bridge with bridge of sufficient freeboard and span to pass sediment and fl.ood fl.ows.Status: Future ProjectFlood Impacts: Decreased fl.ood risk along the Manastash River a[[uvia[ fan during significant fl.ood events.Funding. FCZD Levy. Flood control assistanceaccount program (potentiat)