HomeMy WebLinkAboutResolution_LAG Prospectus_ManastashSnoParkandStablizationKITTITAS COUNTY
Board of County Commissioners
AGENDA STAFF REPORT
AGENDA DATE: January 5, 2021
ACTION REQUESTED: Request to Approve a Resolution Authorizing the Chair's signature on
the Local Agency Federal Aid Project Prospectus for the Manastash
Road Creek Bank Stabilization and Snow Park Improvement, CRP
273-16.
BACKGROUND: On August 2, 2016 Kittitas County Public Works requested to add a
County Road Project, CRP 273-16, for the realignment, and bank
stabilization of Manastash Road in the vicinity of milepost 11.0. In
February of 2018 Kittitas County Public Works submitted a proposal
to the Washington Federal Lands Access Program (FLAP) for
Manastash Road Washout Repair — Safety and Snow -Park
construction. On June 8, 2018 Kittitas County was informed that our
submittal under the 2018 (FLAP) had been approved for
programming for up to $1,332,968.00, and that the selected proposal
would be programmed to receive construction funding in fiscal years
2021, 2022, or 2023. This project prospectus covers the preliminary
engineering phase and needs to be approved by WSDOT prior to
funds being obligated to the project.
INTERACTION: Public Works.
RECOMMENDATION: Approve the Resolution Authorizing the Chair's signature on the
Local Agency Federal Aid Project Prospectus for the Manastash Road
Creek Bank Stabilization and Snow Park Improvement, CRP 273-16.
HANDLING: Return one (1) original to Public Works
ATTACHMENTS: Resolution, Local Agency Federal Aid Project Prospectus.
LEAD STAFF: Mark Cook, Director.
BOARD OF COUNTY COMMISSI4
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2021 -
AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL
AID PROJECT PROSPECTUS FOR THE MANASTASH ROAD CREEK BANK
STABILIZATION AND SNOW PARK IMPROVEMENT, CRP 273-16
WHEREAS: The Manastash Road realignment and bank stabilization project was requested in
2016 due to a deteriorating roadway and bank erosion resulting from Manastash
Creek; and
WHEREAS: Kittitas County Public Works submitted for, and was approved for a Federal
Lands Access Program (FLAP) Grant for up to $1,332,968.00; and
WHEREAS: In preparation to starting the preliminary engineering phase Public Works is
requesting the Washington State Department of Transportation to release the
Federal Funds for design; and
WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair
acknowledging the project has been reviewed and is consistent with the agency's
comprehensive plan for community development; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best
interest of the public, does hereby approve the Chair's signature on the Local
Agency Federal Aid Project Prospectus for the Manastash Road Creek Bank
Stabilization and Snow Park Improvement, CRP 273-16.
DATED on this 5th day of January 2021, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Chairman
Vice -Chairman
Commissioner
Adak
Washington State
vP Department of Transportation
Local Agency Federal Aid
Project Prospectus
DO] Form 140-101 Page 1
Revised 04/2015 Previous Editions Obsolete
Prefix
Route
( )
Date
12/18/2020
Federal Aid
Pro eat Number
DUNS Number
01-020-2547
LoalAgency
RC 1573 CRP 273-16
i WSDOY
Federal Employer
91-601349
Project Number
` Use Only
Tax ID Number
Agency
CAAgency
Federal Program Title
Kittitas County Public Works
Z Yes ❑ No
❑✓ 20.205 ❑ Other
Project Title
Start Latitude N 46 57'33.51"
Start Longitude W 120 47'12.59"
Manastash Road Creek Bank Stabilization and Snow Park Improvement
, „
End Latitude N 46 57 39.17
End Longitude W 120 47'38.02"
Project Termini From -To
Nearest City Name
Project Zip Code (+4)
10.65 11.01
Ellensburg
98926-7989
Begin Mile Post
End Mile Post
Length of Project
Award Type
10.65
11.01
0.36
0 Local ❑ Local Forces ❑ State ❑ Railroad
Route ID
Begin Mile Point
End Mile Point
City Number
County Number
County Name
10.65
11.01
19
Kittitas
WSDOT Region
Legislative District(s)
Congressional District(s)
Urban Area Number
South Centra] Region
13
8
Total
Local Agency
Federal Funds
Phase Start
Phase
Estimated Cost
Funding
Date
Nearest Hundred Dollar
Nearest Hundred Dollar
Nearest Hundred Dollar
Month Year
P.E.
263,000.00
35,500.00
227,500.00
January 2021
RAN
Const.
1,188,000.00
83,000.00
1,105,000.00
June 2022
Total
1,451,000.00
118,500.00
1,332,500.00
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width
Number of Lanes
16-22' varies due to washout area
2
Manastash Road is currently restricted to one lane due to an actively eroding streambank of Manastash Creek. This lane restriction is impacting a heavily
used snowpark, local residents, access to the Okanogan Wenatchee National Forest (OWNF) and the Countys ability to maintain the roadway during winter.
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
The project will repair the embankment and washed out portion of the roadway, widen approximately 0.36
miles of Manastash Road to accommodate parking for recreational access, and provide a tum around for
trailers, County equipment and other recreational vehicles.
Local Agency Contact Person
Title
Phone
Darren Case
Construction Manager
509-962-7019
Mailing Address
City
State
Zip Code
411 North Ruby, Suite 1
Ellensburg
WA
98926
By
Project Prospectus
Approving Authority
Title Deputy Director / County Engineer
L
Datg�`Fi� Lo
DO] Form 140-101 Page 1
Revised 04/2015 Previous Editions Obsolete
Agency
Project Title
Date
Kittltas County Public Works
Manastash Road Creek Bank Stabilizmion and Snow Park lmprovcmcm
12/18/2021
Type of Proposed Work
Project Type (Check all that Apply)
Roadway Width
Number of Lanes
❑✓ New Construction ❑ Path / Trail
❑ 3-R
24'
2
❑✓ Reconstruction ❑ Pedestrian / Facilities
❑ 2-R
❑ Railroad ❑ Parking
✓❑ Other
❑ Bridge
Geometric Design Data
Description
Through Route
Crossroad
❑ Principal Arterial
❑ Principal Arterial
Federal
❑ Urban
❑ Minor Arterial
❑ Urban ❑ Minor Arterial
Functional
❑✓ Rural
❑ Collector
❑ Rural ❑ Collector
Classification
E] NHS
Major Collector
El❑NHS
ElMajor Collector
❑✓ Minor Collector
El minor Collector
❑ Local Access
❑ Local Access
Terrain
❑ Flat ❑✓ Roll [:]Mountain
❑ Flat ❑ Roll ❑ Mountain
Posted Speed
35
Design Speed
35
Existing ADT
567
Design Year ADT
Design Year
Design Hourly Volume (DHV)
Performance of Work
Preliminary Engineering Will Be Performed By
Others
Agency
County 60 %, Consultant 40%
40 oho
60
Construction Will Be Performed By
Contract
Agency
100
Environmental Classification
❑ Class I - Environmental Impact Statement (EIS)✓❑
Class II - Categorically Excluded (CE)
❑ Project Involves NEPA/SEPA Section 404
❑ Projects Requiring Documentation
Interagency Agreement
(Documented CE)
❑ Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreements
Environmental Considerations
Work within the ordinary high water mark of Manastash
Creek. Tree clearing (<1 ac) for sno-park and
turnaround.
DOT Form 140-101 Page 2
Revised 0412015 Previous Editions Obsolete
Agency
Project Title
I Date
Kittltas County Public Works
Manastash Road CnaA Bank stabilization and Snow Park Improvement
12 1 g�2020
Right of Way
✓❑ No Right of Way Needed
❑ Right of Way Needed
All construction required by the
❑ No Relocation ❑ Relocation Required
contract can be accomplished
within the exiting right of way.
Utilities
Railroad
❑ No utility work required
❑✓ No railroad work required
✓❑ All utility work will be completed prior to the start
❑ All railroad work will be completed prior to the start of
of the construction contract
the construction contract
F1 All utility work will be completed in coordination
All the railroad work will be completed in coordination
with the construction contract
with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
There are existing overhead powerlines and power poles that will need to be moved prior to construction.
There is also buried communication lines that may need to be temporarily relocated. Utilities will be moved
by the franchisee prior to construction.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes ❑✓ No
Remarks
No airports within 2 miles
This project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Agency
Date By
Mayor/Chairperson
DOT Form 140-101 Page 3