Original Professional Service Agreement and
Phase 2 -6
Phase 7
Total Adjust Service Contract Amount
October 27,2020
CH2M Hill Engineers'lnc. (Jacobs)
Attention: Tom Parker, PE, Project Manager
1100 sth Ave NE
Suite 500
Bellevue, WA 98425
RE: Amendment No. 7 to Professional Service Agreement
This Amendment will add Phase 7 ltems 1-2.3 per the scope attached to assist with the BRIC
grant application and preform the .
I have enclosed two copies of this change, please sign and return.
Approval
Kittitas of unty
b LV*thfnttth-
TITLE
1,230,404.00$ 34.735.00
$1,265,139.00
CH2M HillEngi neering lnc. (Jacobs)
DA
Kittitas Gounty Transfer Station Relocation Project - Phase 7 - Scope
of Work
This Phase 7 scope of work (SOW) encompasses additionaleffort provided by CH2M Hill Engineers, lnc.
(Jacobs) to support of Kittitas County (County) whh the completion of a FEMA Building Resilience in
Communities (BRIC) Grant Sub-Application.
Jacobs wrote a Pre-Application for FEMA Hazard Mitigation Assistance, which was submitted by the
County to the Washington Emergency Management Division (EMD) on September3,202O. The Pre-
Application was accepted by FEMA; triggering a Sub-Application that is due November 15, 2020.
Following is the scope and level of effort to complete Phase 7. This work will be performed in
accordance with the Professional Servlce Agreement and its Amendment No. 1-6.
Phase 7
Phase 7 project duration is expected to continue for 1 mdnth (October 9 through November L5,2020r,
overlapping with the ongoing efforts of Phase 6. lf the Sub-Application is accepted, additionaleffort is
foreseen for any required additionalsubmissions and is not defined in this Amendment.
Task l: Project Management
The full BRIC Sub-Application will require regular communication with the County and EMD to prepare
an accurate and compelling application. The following effort for Phase 7 includes:
r Communication caUmeeting agendas and high-levelsummaries (up to 5)
r Correspondence and meetings wlth EMD staff and high-level summaries (up to 3)
r One progress report and one invoice after completion of grant Sub-Application
Task 2: FEIvIABRIC Grant Sub-Application
The fullsub-Application, required attachments, and benefit cost analysis (BCA) will be submitted online
in the FEMA Grants Outcomes (FEMA Go) platform by November L5,2O2Ofor initialState revlew.The
County will registerJacobs as a Subrecipient Authorized Representative {SAR)'to facilitate Jacobs
submitting the 5ub-Application. lnstructions on how to register and create an account in FEMA G0 and
the System for Award Management (SAM.gov) is found here:
https://www.fema.eov/sites/default/files/2020-07fema-eo user-reeistration-loein reference-.'
euide.pdf lnformation required for this registration includes organization's legal name, mailing and
physical address, ElN, DUNS and DUNS +4 numbers, and the Electronic Business Point of Contact
(eBlZPoC).
Task 2.1 FEMA GO Sub-Application & Attaohments
The FEMA Go Sub-Application template will be populated by Jacobs and later uploaded by Jacobs into
FEMA GO. The sections of the 5ub-Application that will require substantial narrative include:
r Contact lnformation . Location - Project Benefiting Area,
. Scope of Work Project Site lnventory
r Budget
r Cost-Effectiveness (see Task 2.3)
r EnvironmentaUHistoricPreservation
Review
r Community Rating System (CRS)
r CooperatingTechnical Partner(CTP)
r Bullding Code Effectiveness Grading
Schedule (BCEGS)
Forms/Attachments to be completed by Jacobs that accompany the full Sub-Application include:
SF-424 - Application for Federal Asslstance
FEMA' BCA tool and Narratlve
SF424C - Budget lnformatlon for Constructlon Programs
SF 424D, Assurances & Certificatlon Constructlon Programs
FF 112-G3c or 2trX5C - Certlflcatlons Regardlng Lobbylng, Debaiment, Suspenslon and Other Responsiblllty
Matters; and Drug-Free Workplace Requlrements '
Malntenance Assurances
It is assumed that the following sectiong will be populated with information provided by the County:
o Projectfundingsources and types
. Contact lnformation
. Non-federal funding sources
r Various certifications e.g. Lobbying, drug-free workplace
Task 2.2 FEMA Benefit Cost Analysis @CA) Tool
Using the FEMA BCA Toolkit Version 5.Q Jacobs will identifo and estimate cost avoidance measures that
wllt be compared to total cost of the project. Jacobs will prepare a narrative that will accompanythe
toolkit describing assumptions and metrics behind the Costs/Avoided Costs and Benefits. OtherJacobs
specialists that can estimate costs of major flood event damage such as surface water contaminatlon
may be employed. The results of the BCA include:
. Populated FEMA BCAToolwith a goal result of 1.0 or higher
r BCA Tool Narrative
r Two virtual meeting session with the County to revise tool inputs until a satisfactory "benefit" is
calculated
Task2.3 FEMA GO Submittal
Followingthe FEMA GO Manualfound here httm;//www.fema.eov/sites/defuult/files/202G10/fuma femeso
subapolicationdevetonmggt user-manual Aueust-2020.pdf the products of the complete BRIC Sub'Applimtion
package will be uploaded to FEMA GO.
The Application Review Tool (ARTool) and Required Document Checklist will be populated priorto
submittal of the Sub-Application.
Deliverables
r Submission offull Sub-Application
. Notice to EMD of SAR request and FEMA Qo submittal (hma@mil.wa.gov)
Assumptions
r The County will collect the necessary signatures and legal documentation.
r The County will provide financiat information necessary to populate the BCA and Sub-Application
narratives.
r County will facilitate the signing of the documentation.
e We will request one review of the sub-application by EMD.
c lf the EMD provides comments after Nbvember 15, revlsions to the Sub-Application are out of
scope.
r The County will provl.de all necessary documentation, data and relevant information by October 21.
r Jacobs ls not responsible for schedule or submittal delays resulting from County actions or response
times.
. The submittal of the Sub-Application will not be delayed by locally or nationally imposed COVID-19
restrictibhs.'ldiob,s i3 not iespdnSibl€ foi-seheaule changes rcla'redto covlD-lg.
Schedule
The following key milestone dates form the basis of delivery of this scope of services (as the proJect
progresses, these dates are subject to change).
Progress Schedule
Mllestone Tlmefiame (20201
Project (8RlC Grant| Kickoff Meeting october 6
Notice to Proceed October 15
1s callwlth EMD October 19
Docomentation, Data, and Relevant lnformation Due October 21
lntemal Revlew of BCA & SubApplicatlon Form October 23
County Revlew of BCA & sub-Application Form October 27
Draft to EMD for review October 29
Final to EMD for approval November 4
Sub-Appllcatlon entry lnto FEMA GO November 13
Estimated Fee
Based upon the project scope, Jacobs proposes a not to exceed engineering fee of $i!4,735, to be billed
on a tlme-and-materials basis in accordance with unit billlng rates. Jacobs' estimated engineering fee is
summarized in the following table. Kittitas County will be notified of any changes to the estimated level
of effort and costs asspciated with this scope, and if necessary, changes to the approved estimate fee
will be discussed and agreed upon via change order ln advance of exceeding the proJect budget'