Loading...
HomeMy WebLinkAboutRes-2020-178fi*,u BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION No.2o2o- lW A RESOLUTION AUTHORIZING SIGNATURE ON THE DBE PLAN FOR BOWERS F'IELD WHEREAS, a Disadvantaged Business Enterprise (DBE) plan is mandated by the FAA; and WHEREAS, Airport Director Benjamin West has produced the plan which is ready for submittal; and WHEREAS, Director West needs signature authority to sign the plan prior to submitting it. Now, Therefore, Be it Resolved: Kittitas County hereby authorizes Director Benjamin West to have signature authority to sign the202L-2023 DBE Plan for Bowers Field. Be it further Resolved: That the Airport Director shall have ongoing signature authority for signing DBE Plans for Bowers Field in the future without requiring specific board action. DATED this 3'd day of November 2020, at Ellensburg, Washington. BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Cory Wright,sioner District I Attest: of the Board- Julie Kjorsvik Commissioner District 2 Clerk of the Board- Mandy Buchholz Brett th, Commissioner District 3rnn c/) 49 CFR Part 26 Revised: February 12, 2019 49 CFR Part 26 Revised: February 12, 2019 POLICY STATEMENT Section 26.1, 26.23 Objectives/Policy Statement Kittitas County, owner of Bowers Field has established a Disadvantaged Business Enterprise (DBE) Program in accordance with regulations of the U.S. Department of Transportation (DOT), 49 CFR Part 26. Kittitas County has received Federal financial assistance from the Department of Transportation, and as a condition of receiving this assistance, Kittitas County has signed an assurance that it will comply with 49 CFR Part 26. It is the policy of Kittitas County to ensure that DBEs as defined in Part 26, have an equal opportunity to receive and participate in DOT-assisted contracts. lt is also our policy: 1. To ensure nondiscrimination in the award and administration of DOT- assisted contracts' 2. To create a level playing field on which DBEs can compete fairly for DOT-assisted contracts' 3. To ensure that the DBE Program is narrowly tailored in accordance with applicable law; 4. To ensure that only firms that fully meet 49 CFR Part 26 eligibility standards are permitted to participate as DBEs; 5. To help remove barriers to the participation of DBEs in DOT assisted contracts; 6. To promote the use of DBEs in all types of federally-assisted contracts and procurement activities; 7 . To assist the development of firms that can compete successfully in the market place outside the DBE Program; and 8. To provide appropriate flexibility to recipients of Federal financial assistance in establishing and providing opportunities for DBEs. Benjamin West has been delegated as the DBE Liaison Officer. ln that capacity, Benjamin West is responsible for implementing all aspects of the DBE program. lmplementation of the DBE program is accorded the same priority as compliance with all other legal obligations incurred by Kittitas County in its financial assistance agreements with the Department of Transportation. Kittitas County has disseminated this policy statement to Kittitas County and all of the components of our organization. We have distributed this statement to DBE and non-DBE business communities that perform work for us on DOT-assisted contracts. The distribution was accomplished by posting a link on Kittitas County's website. Benjamin West, Director of Airport Operations Kittitas County Date 2 49 CFR Part 26 Revised: February 12, 2019 SI.JBPART A - GEN REQUIREMENTS Section 26.1 Objectives The objectives are found in the policy statement on the first page of this program. Section 26.3 Applicability Kittitas County is the recipient of Federal airport funds authorized by 49 U.S.C. 47101, et seq Section 26.5 Definitions Kittitas County will use terms in this program that have the meaning defined in Section 26.5. Section 26.7 Non-discrimination Requirements Kittitas County will never exclude any person from participation in, deny any person the benefits of, or othenryise discriminate against anyone in connection with the award and performance of any contract covered by 49 CFR Part 26 on the basis of race, color, sex, or national origin. ln administering its DBE program, Kittitas County will not, directly or through contractual or other arrangements, use criteria or methods of administration that have the effect of defeating or substantially impairing accomplishment of the objectives of the DBE program with respect to individuals of a particular race, color, sex, or national origin. Section 26.11 Record Keeping Requirements Reportinq to DOT: 26.11 We will report DBE participation to DOT/FAA as follows: We will transmit to FAA annually on December 1, the "Uniform Report of DBE Awards or Commitments and Payments" form, found in DOT 26.11. We will also report the DBE contractor firm information either on the FAA DBE Contractor's Form or other similar format. 3 49 CFR Part 26 Revised: February 12, 2019 Bidders List: 26.1 1(c) Kittitas County will create and maintain a bidders list. The purpose of the list is to provide as accurate data as possible about the universe of DBE and non-DBE contractors and subcontractors who seek to work on our DOT-assisted contracts for use in helping to set our overall goals. The bidders list will include the name, address, DBE and non-DBE status, age of firm, and annual gross receipts of firms. We will collect this information in the following ways: lnclusion of a Bidder's List in the project bidding document. A copy of the proposed list is included in Attachment 3. Section 26.13 Federal Financial Assistance Agreement Kittitas County has signed the following assurances, applicable to all DOT-assisted contracts and their administration: Assurance: 26.13(a) - Each financial assistance agreement Kittitas County signs with a DOT operating administration (or a primary recipient) will include the following assurance. Kittitas County shall not discriminate on the basis of race, color, national origin, or sex in the award and performance of any DOT-assisted contract or in the administration of its DBE program or the requirements of 49 CFR part 26. Kittitas County shall take all necessary and reasonable steps under 49 CFR part 26 to ensure nondiscrimination in the award and administration of DOT-assisted contracts. Kittitas County's DBE program, as required by 49 CFR part 26 and as approved by DOT, is incorporated by reference in this agreement. lmplementation of this program is a legal obligation and failure to carry out its terms shall be treated as a violation of this agreement. Upon notification to Kittitas County of its failure to carry out its approved program, the Department may impose sanctions as provided for under 49 CFR part26 and may, in appropriate cases, refer the matter for enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986 (31 U.S.C. 3801 etseq ) Contract Assurance'.26.13b - Kittitas County will ensure that the following clause is included in each contract we sign with a contractor and each subcontract the prime contractor signs with a subcontractor: The contractor, sub recipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR part 26 in the award and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as Kittitas County deems appropriate, which may include, but is not limited to: (1) Withholding monthly progress payments; (2) Assessing sanctions; (3) Liquidated damages; and/or (4) Disqualif,Ting the contractor from future bidding as non-responsible. 4 49 CFR Part 26 Revised: February 12, 2019 SUBPART B - ADMINI IVE REQUIREMENTS Section 26.21 DBE Program Updates Kittitas County is required to have a DBE program meeting the requirements of this part as it will receive grants for airport planning or development and will award prime contracts, cumulative total value of which exceeds $250,000 in FAA funds in a federal fiscal year. We are not eligible to receive DOT financial assistance unless DOT has approved our DBE program and we are in compliance with it and this part. We will continue to carry out our program until allfunds from DOT financialassistance have been expended. We do not have to submit regular updates of our program, as long as we remain in compliance. However, we will submit significant changes in the program for approval. Section 26.23 Policy Statement The Policy Statement is elaborated on the first page of this DBE Program Section 26.25 DBE Liaison Officer (DBELO) We have designated the following individual as our DBE Liaison Officer: Benjamin West, Director of Airport Operations 411 North Ruby Street, Suite 1 Ellensburg, WA 98926 (s09) 312-2017 benjgm i n.west@co. kittitas.wa. us ln that capacity, the DBELO is responsible for implementing all aspects of the DBE program and ensuring that Kittitas County complies with all provision of 49 CFR Part26. The DBELO has direct, independent access to the Port Commission Government concerning DBE program matters. An organization chart displaying the DBELO's position in the organization is found in Attachment 2 to this program. The DBELO is responsible for developing, implementing and monitoring the DBE program, in coordination with other appropriate officials. The DBELO has a staff of the Port's Attorney and the Airport's Engineer of record to assist in the administration of the program. The duties and responsibilities include the following: 1. Gathers and reports statistical data and other information as required by DOT. 2. Reviews third party contracts and purchase requisitions for compliance with this program. 3. Works with all departments to set overall annual goals. 4. Ensures that bid notices and requests for proposals are available to DBEs in a timely manner. 5 49 CFR Part 26 Revised: February 12, 2019 5. ldentifies contracts and procurements so that DBE goals are included in solicitations (both race-neutral methods and contract specific goals) and monitors results. 6. Analyzes Kittitas County's progress toward attainment and identifies ways to improve progress. 7. Participates in pre-bid meetings. 8. Advises the CEO\governing body on DBE matters and achievement. 9. Chairs the DBE Advisory Committee. 10. Determine contractor compliance with good faith efforts. 11. Provides DBEs with information and assistance in preparing bids, obtaining bonding and insurance. 12. Plans and participates in DBE training seminars. 13.Acts as liaison to the Uniform Certification Process. 14. Provides outreach to DBEs and community organizations to advise them of opportunities. 15. Maintains the agency's updated directory on certified DBEs. Section 26.27 DBE Financial lnstitutions It is the policy of Kittitas County to investigate the full extent of services offered by financial institutions owned and controlled by socially and economically disadvantaged individuals in the community, to make reasonable efforts to use these institutions, and to encourage prime contractors on DOT-assisted contracts to make use of these institutions. An effort to identify DBE financial institutions is included in the goal calculation included in Attachment 5 found in the Washington State Minority & Women's Business Enterprises directory. Similar efforts will be made whenever a new goal is set. Section 26.29 Prompt Payment Mechanisms Kittitas County requires that all subcontractors performing work on DOT-assisted contracts shall be promptly paid for work performed pursuant to their agreements, in accordance with all relevant federal, state, and local law ln accordance with 49 CFR parl 26.29, Kittitas County established a contract clause implementing this requirement and requires prime contractors to pay subcontractors for satisfactory performance of their contracts no later than 30 days from the prime contractor's receipt of each payment from Kittitas County. Kittitas County ensures prompt and full payment of retainage from the prime contractor to the subcontractor within 30 days after the subcontractor's work is satisfactorily completed. Pursuant to part 49 CFR 26.29, Kittitas County will include the following clause in each DOT- assisted prime contract: a. From the total of the amount determined to be payable on a partial payment, 10 percent of such total amount will be deducted and retained by the Owner for protection of the Owner's interests. Unless otherwise 6 49 CFR Part 26 Revised: February 12, 2019 instructed by the Owner, the amount retained by the Owner will be in effect until the final payment is made except as follows: (1) Contractor may request release of retainage on work that has been partially accepted by the Owner in accordance with Section 50-14. Contractor must provide a certified invoice to the RPR that supports the value of retainage held by the Owner for partially accepted work. (2) ln lieu of retainage, the Contractor may exercise at its option the establishment of an escrow account per paragraph 90-08. b. The Contractor is required to pay all subcontractors for satisfactory performance of their contracts no later than 30 days after the Contractor has received a partial payment. Contractor must provide the Owner evidence of prompt and full payment of retainage held by the prime Contractor to the subcontractor within 30 days after the subcontractor's work is satisfactorily completed. A subcontractor's work is satisfactorily completed when all the tasks called for in the subcontract have been accomplished and documented as required by the Owner. \Mren the Owner has made an incremental acceptance of a portion of a prime contract, the work of a subcontractor covered by that acceptance is deemed to be satisfactorily completed. c. When at least 95% of the work has been completed to the satisfaction of the RPR, the RPR shall, at the Owner's discretion and with the consent of the surety, prepare estimates of both the contract value and the cost of the remaining work to be done. The Owner may retain an amount not less than twice the contract value or estimated cost, whichever is greater, of the work remaining to be done. The remainder, less all previous payments and deductions, will then be certified for payment to the Contractor. Section 26.31 Directory Kittitas County uses the State of Washington DBE directory, maintained by the State The directory lists the firm's name, address, phone number, and the type of work the firm has been certified to perform as a DBE. ln addition, the directory lists each type of work forwhich a firm is eligible to be certified by using the most specific NAICS code available to describe each type of work. The State of Washington revises the Directory daily. We make the Directory available as follows: by listing the website where interested persons may access the Directory. The Directory may be found in Attachment 4. 1 49 CFR Part 26 Revised: February 12, 2019 Section 26.33 Over-concentration Kittitas County has not identified that over-concentration exists in the types of work that DBEs perform. Section 26.35 Business Development Programs Kittitas County has not established a business development program Section 26.37 Monitoring and Enforcement Mechanisms Kittitas County implements and carries out appropriate mechanisms to ensure compliance with 49 CFR Parl26 program requirements by all program participants, including prompt payment, and describes and set forth these mechanisms in Kittitas County DBE program. Kittitas County actively monitors participation by maintaining a running tally of actual DBE attainments (e.9., payments actually made to DBE firms), including a means of comparing these attainments to commitments. Monitoring Payments to DBEs and Non-DBEs Kittitas County undertakes ongoing monitoring of prime payments to subcontractors over the course of any covered contract. Such monitoring activities will be accomplished through the following method(s): Making prime contractor payments accessible to subcontractors upon request. Use of an automated system that requires real time entry of payments to, and receipts by, prime contractors and subcontractors and regularly monitoring that system. Kittitas County requires prime contractors to maintain records and documents of payments to subcontractors, including DBEs, for a minimum of three (3) years unless othenruise provided by applicable record retention requirements for Kittitas County financial assistance agreement, whichever is longer. These records will be made available for inspection upon request by any authorized representative of Kittitas County or DOT. This reporting requirement extends to all subcontractors, both DBE and non-DBE. Kittitas County proactively reviews contract payments to subcontractors including DBEs quarterly to ensure compliance. Payment reviews will evaluate whether the actual amount paid to DBE subcontractors is equivalent to the amounts reported to Kittitas County by the prime contractor. a a a B 49 CFR Part 26 Revised: February 12, 2019 Promot Pavme nt Disoute Resolution Kittitas County will take the following steps to resolve disputes as to whether work has been satisfactorily completed for purposes of $26.29. . The steps include meetings between prime and subcontractors, with project representatives and/or project manager as appropriate. lt is recommended that any meeting forthe purpose of dispute resolution include individuals authorized to bind each interested party, including Kittitas County representative(s) with authority to take enforcement action. Kittitas County has established, as part of its DBE program, the following mechanism(s) to ensure prompt payment and return of retainage: a Alternative dispute resolution (ADR) o Kittitas County requires the prime contractor to submit a detailed alternative dispute resolution plan for your approval prior to the issuance of any notice to proceed. Promot Pavme nt Complaints Complaints by subcontractors regarding the prompt payment requirements are handled according to the following procedure: Subcontractors may contact the DBELO for coordination with the prime in regards to payment discrepancies. Kittitas County will assist to resolve prompt payment disputes in the event that the DBELO is unable to resolve the complaint. Pursuant to Sec. 157 of the FAA Reauthorization Act of 2018, all complaints related to prompt payment will be reported in a format acceptable to the FAA, including the nature and origin of the complaint and its resolution Enforcement Actions for N oncom oliance of Particioants Kittitas County will provide appropriate means to enforce the requirements of $26.29. These means include: ln accordance with the contract, assessing liquidated damages against the prime contractor for each day beyond the required time period the prime contractor fails to pay the gubcontractor. Kittitas County may terminate the contract for failure to comply with the agreement. Kittitas County will actively implement the enforcement actions detailed above a a a a 9 49 CFR Part 26 Revised: February 12, 2019 Monltorinq Contracts and Work Sites Kittitas County reviews contracting records and engages in active monitoring of work sites to ensure that work committed to DBEs at contract award or subsequently (e.9., as the result of modification to the contract) is actually performed by the DBEs to which the work was committed. Work site monitoring is performed by the Airport Consultant under Kittitas County, who will maintain written certification that contracting records have been reviewed and work sites have been monitored for this purpose. Section 26.39 Fostering small business participation Kittitas County has created a Small Business element to structure contracting requirements to facilitate competition by small business concerns, taking all reasonable steps to eliminate obstacles to their participation, including unnecessary and unjustified bundling of contract requirements that may preclude small business participation in procurements as prime contractors or subcontractors. Kittitas County's small business element is incorporated as Attachment 10 to this DBE Program. We will actively implement the program elements to foster small business participation; doing so is a requirement of good faith implementation of our DBE program. SUBPART C _ GOALS. GOOD FAITH EFFORTS. AND COUNTING Section 26.43 Set-asides or Quotas Kittitas County does not use quotas in any way in the administration of this DBE program Section 26.45 Overall Goals Kittitas County will establish an overall DBE goal covering a three-year federal fiscal year period if we anticipate awarding DOT/FAA funded prime contracts the cumulative total value of which exceeds $250,000 during any one or more of the reporting fiscal years within the three-year goal period. ln accordance with Section 26.45(f) Kittitas County will submit its Overall Three- year DBE Goal to FAA by October 1st as required by the established schedule below. Airport Type ruon-eiimary (GAs, Relievers and State DOTs) Region New england, Northwest Mountain, & Southern Date Due (Goal Period) October 1,2020 (2021t2022120231 Next Goal Due (Goal Periqd) August 1, 2023 (202412025120261 The DBE goals will be established in accordance with the 2-step process as specified in 49 CFR Part 26.45. lf Kittitas County does not anticipate awarding DOT/FAA funded prime contracts the cumulative total value of which exceeds $250,000 during any of the years within the three-year reporting period, we will not develop an overallgoal; however, this DBE Program 10 49 CFR Part 26 Revised: February 12, 2019 will remain in effect and Kittitas County will seek to fulfill the objectives outlined in 49 CFR Part 26.1. (c) Step 1. The first step is to determine the relative availability of DBEs in the market area, "base figure". We will use DBE Directories and Census Bureau Data as a method to determine our base figure. The second step is to adjust the "base figure" percentage from Step 1 so that it reflects as accurately as possible the DBE participation the recipient would expect in the absence of discrimination based on past participation, a disparity study and/or information about barriers to entry to past competitiveness of DBEs on Contracts. lf we use a bidders list, we will do the following: Determine the number of DBEs that have bid or quoted (successful and unsuccessful) on your DOT-assisted prime contracts or subcontracts in the past three years. Determine the number of all businesses that have bid or quoted (successful and unsuccessful) on prime or subcontracts in the same time period. Divide the number of DBE bidders and quoters by the number of all businesses to derive a base figure for the relative availability of DBEs in your market. When using this approach, we will establish a mechanism (documented in our goalsubmission) to directly capture data on DBE and non-DBE prime and subcontractors that submitted bids or quotes on our DOT-assisted contracts. Any methodology we choose will be based on demonstrable evidence of local market conditions and be designed to ultimately attain a goal that is rationally related to the relative availability of DBEs in our market. We understand that the exclusive use of a list of prequalified contractors or plan holders, or a bidders list that does not comply with the requirements of paragraph (c)(2) of this section (above), is not an acceptable alternative means of determining the availability of DBEs. (d) Step 2. Once we have calculated a base figure, we will examine all of the evidence available in our jurisdiction to determine what adjustment, if any, is needed to the base figure to arrive at our overall goal. lf the evidence does not suggest an adjustment is necessary, then no adjustment shall be made. 26.45 (gXt) ln establishing the overall goal, Kittitas County will provide for consultation and publication This includes consultation with minority, women's and general contractor groups, community organizations, and other officials or organizations which could be expected to have information concerning the availability of disadvantaged and non-disadvantaged businesses, the effects of discrimination on opportunities for DBEs, and Kittitas County efforts to establish a level playing field for the participation of DBEs. The consultation will include a scheduled, direct, interactive exchange (e.9., a face-to-face meeting, video conference, teleconference) with as many interested stakeholders as possible focused on obtaining information relevant to Kittitas County's goal setting process, and it will occur before we are required to submit our goal methodology to the operating administration for review.pursuant to paragraph (f) of this section. We will document in our goal submission the consultation process that we engaged in. Notwithstanding paragraph (f)(a) of this section, we will not implement our proposed goal until we have complied with this requirement. 11 49 CFR Part 26 Revised: February 12, 2019 ln addition, Kittitas County will publish a notice announcing our proposed overall goal before submission to the operating administration on October 1st. The notice will be posted on our official internet web site and may be posted in any other sources (e.9., minority-focused media, trade association publications). lf the proposed goal changes following review by the operating administration, the revised goal will be posted on our official internet web site. We will inform the public that the proposed overall goal and its rationale are available for inspection during normal business hours at our principal office and that Kittitas County and DOT/FAA will accept comments on the goals for 30 days from the date of the notice. Notice of the comment period will include the addresses to which comments may be sent (including offices and websites) where the proposal may be reviewed. The public comment period will not extend the October 1't deadline. Our Overall Three-Year DBE Goal submission to DOT/FAA will include a summary of information and comments received, if any, during this public participation process and our responses. We will begin using our overall goal on October 1 of the reporting period, unless we have received other instructions from DOT. Section 26.45 (e) - Project Goals lf permitted or required by the FAA Administrator we will express our overall goals as a percentage of funds for a particular grant or project or group of grants and/or projects, including entire projects. Like other overall goals, a project goal may be adjusted to reflect changed circumstances, with the concurrence of the appropriate operating administration. A project goal is an overall goal, and must meet all the substantive and procedural requirements of this section pertaining to overall goals. A project goal covers the entire length of the project to which it applies. The project goal should include a projection of the DBE participation anticipated to be obtained during each fiscal year covered by the project goal. The funds for the project to which the project goal pertains are separated from the base from which your regular overall goal, applicable to contracts not part of the project covered by a project goal, is calculated. lf we establish a goal on a project basis, we will begin using our goal by the time of the flrst solicitation for a DOT-assisted contract for the project. Section 26.45(f) - Prior Operating Administration Concurrent Kittitas County understands that we are not required to obtain prior operating administration concurrence with our overall goal. However, if the operating administration's review suggests that our overall goal has not been correctly calculated or that our method for calculating goals is inadequate, the operating administration may, after consulting with us, adjust our overall goal or require that we do so. The adjusted overall goal is binding. ln evaluating the adequacy or soundness of the methodology used to derive the overall goal, the U.S. DOT operating L2 49 CFR Part 26 Revised: February 12, 2019 administration will be guided by the goal setting principles and best practices identified by the Department in guidance issued pursuant to $ 26.9. A description of the methodology to calculate the overall goal and the goal calculations can be found in Attachment 5 to this program. Section 26.47 Failure to meet overall goals. Kittitas County will maintain an approved DBE Program and overall DBE goal, if applicable as well as administer our DBE Program in good faith to be considered to be in compliance with this part. lf Kittitas County awards and commitments shown on our Uniform Report of Awards or Commitments and Payments at the end of any fiscal year are less than the overall goal applicable to that fiscal year, we will do the following in order to be regarded by the Department as implementing your DBE Program in good faith: (1) Analyze in detail the reasons for the difference between the overall goal and our awards and commitments in that fiscal year; (2) Establish specific steps and milestones to correct the problems we have identified in our analysis and to enable us to meet fully your goal for the new fiscal year; (3) Kittitas County will prepare, within 90 days of the end of the fiscal year, the analysis and corrective actions developed under paragraph (cX1) and (2) of this section. We will retain copy of analysis and corrective actions in records for a minimum of three years, and will make it available to FAA upon request. Section 26.51(a-c) Breakout of Estimated Race-Neutral & Race-Gonscious Participation (a) Kittitas County will meet the maximum feasible portion of its overall goal by using race- neutral means of facilitating race-neutral DBE participation. Race-neutral DBE participation includes any time a DBE wins a prime contract through customary competitive procurement procedures or is awarded a subcontract on a prime contract that does not carry a DBE contract goal. Race-neutral means include, but are not limited to the following: (1) Arranging solicitations, times for the presentation of bids, quantities, specifications, and delivery schedules in ways that facilitate participation by DBEs and other small businesses and by making contracts more accessible to small businesses, by means such as those provided under 526.39 of this part. (2) Providing assistance in overcoming limitations such as inability to obtain bonding or financing (e.9., by such means as simplifying the bonding process, reducing bonding 13 49 CFR Part 26 Revised: February 12, 2019 requirements, eliminating the impact of surety costs from bids, and providing services to help DBEs, and other small businesses, obtain bonding and financing); (3) Providing technical assistance and other services; (4) Carrying out information and communications programs on contracting procedures and specific contract opportunities (e.9., ensuring the inclusion of DBEs, and other small businesses, on recipient mailing lists for bidders; ensuring the dissemination to bidders on prime contracts of lists of potential subcontractors; provision of information in languages other than English, where appropriate); (5) lmplementing a supportive services program to develop and improve immediate and longterm business management, record keeping, and financial and accounting capability for DBEs and other small businesses; (6) Providing services to help DBEs, and other small businesses, improve iong-term development, increase opportunities to participate in a variety of kinds of work, handle increasingly signifi cant projects, and achieve eventual self-sufficiency; (7) Establishing a program to assist new, start-up firms, particularly in fields in which DBE participation has historically been low; (8) Ensuring distribution of your DBE directory, through print and electronic means, to the widest feasible universe of potential prime contractors; and (9) Assisting DBEs, and other small businesses, to develop their capability to utilize emerging technology and conduct business through electronic media. The breakout of estimated race-neutral and race-conscious participation can be found in Attachment 5 to this program. Section 26.51(d-g) Gontract Goals Kittitas County will arrange solicitations, times for the presentation of bids, quantities, specifications, and delivery schedules in ways that facilitate participation by DBEs and other small businesses and by making contracts more accessible to small businesses, by means such as those provided under S 26.39. lf our approved projection under paragraph (c) of this section estimates that we can meet our entire overall goal for a given year through race-neutral means, we will implement our program without setting contract goals during that year, unless it becomes necessary in order meet our overall goal. We will establish contract goals only on those DOT-assisted contracts that have subcontracting possibilities. We need not establish a contract goal on every such contract, and the size of contract goals will be adapted to the circumstances of each such contract (e.9., type and location of work, availability of DBEs to perform the particular type of work). I4 49 CFR Part 26 Revised: February 12, 2019 We will express our contract goals as a percentage of the total amount of a DOT-assisted contract. Section 26.53 Good Faith Efforts Procedures Demonstration of qood faith efforts (26.53(a) & (c)) The obligation of the bidder/offeror is to make good faith efforts. The bidder/offeror can demonstrate that it has done so either by meeting the contract goal or documenting good faith efforts. Examples of good faith efforts are found in Appendix A to Part26. Benjamin West is responsible for determining whether a bidder/offeror who has not met the contract goal has documented sufficient good faith efforts to be regarded as Responsive. We will ensure that all information is complete and accurate and adequately documents the bidder/offeror's good faith efforts before we commit to the performance of the contract by the bidder/offeror. lnformation to be submitted (26.53(b)) /FAA-assisted contracts for whi established. we will uire the followinq. (3) Award of the contract will be conditioned on meeting the requirements of this section; All bidders or offerors will be required to submit the following information to the recipient, at the time provided in paragraph (b)(3) of this section: (i) The names and addresses of DBE firms that will participate in the contract; (ii) A description of the work that each DBE will perform. To count toward meeting a goal, each DBE firm must be certified in a NAICS code applicable to the kind of work the firm would perform on the contract; (iii) The dollar amount of the participation of each DBE firm participating; (iv) Written documentation of the bidder/offeror's commitment to use a DBE subcontractor whose participation it submits to meet a contract goal; and (v) Written confirmation from each listed DBE firm that it is participating in the contract in the kind and amount of work provided in the prime contractor's commitment. (vi) lf the contract goal is not met, evidence of good faith efforts (see Appendix A of this part). The documentation of good faith efforts must include copies of each DBE and non-DBE subcontractor quote submitted to the bidder when a non-DBE subcontractor was selected over a DBE for work on the contract; and We will require that the bidder/offeror present the information required by paragraph (bX2) of this section: (1) (2) Under sealed bid procedures, as a matter of responsiveness, or with initial proposals, under contract negotiation procedures; 15 49 CFR Part 26 Revised: February 12, 2019 Admin istrative reconsideration (26.53(d)) Within 5 business days of being informed by Kittitas County that it is not responsive because it has not documented sufficient good falth efforts, a bidder/offeror may request administrative reconsideration. Bidder/offerors should make this request in writing to the following reconsideration official : Greg Zempel, Prosecutor Attorney Kittitas County 411 North Ruby Street, Suite 1 Ellensburg, WA 98926 prosecutor@co. kittitas.wa. us (509) 962-7520 The reconsideration official will not have played any role in the original determination that the bidder/offeror did not document sufficient good faith efforts. As part of this reconsideration, the bidder/offeror will have the opportunity to provide written documentation or argument concerning the issue of whether it met the goal or made adequate good faith efforts to do so. The bidder/offeror will have the opportunity to meet in person with our reconsideration official to discuss the issue of whether it met the goal or made adequate good faith efforts to do. We will send the bidder/offeror a written decision on reconsideration, explaining the basis for finding that the bidder did or did not meet the goal or make adequate good faith efforts to do so. The result of the reconsideration process is not administratively appealable to the Department of Transportation. Good Faith Efforts orocedures in situations when there are contract ooals (26.53(fl(o)) We will include in each prime contract a provision stating The contractor shall utilize the specific DBEs listed to perform the work and supply the materials for which each is listed unless the contractor obtains your written consent as provided in this paragraph 26.53(f); and That, unless our consent is provided under this paragraph 26.53(f), the contractor shall not be entitled to any payment for work or material unless it is performed or supplied by the listed DBE. We will require the contractor that is awarded the contract to make available upon request a copy of all DBE subcontracts. The subcontractor shall ensure that all subcontracts or an agreement with DBEs to supply labor or materials require that the subcontract and all lower tier subcontractors be performed in accordance with this part's provisions. I6 49 CFR Part 26 Revised: February 12, 2019 ln this situation, we will require the prime contractor to obtain our prior approval of the substitute DBE and to provide copies of new or amended subcontracts, or documentation of good faith efforts. We will require that a prime contractor not terminate a DBE subcontractor listed in response to paragraph (bX2) of this section (or an approved substitute DBE firm) without our prior written consent. This includes, but not limited to, instances in which a prime contractor seeks to perform work originally designated for a DBE subcontractor with its own forces or those of an affiliate, a non-DBE firm, or with another DBE firm. We will provide such written consent only if we agree, for reasons stated in our concurrence document, that the prime contractor has good cause to terminate the DBE firm. For purposes of this paragraph, good cause includes the following circumstances: (1) The listed DBE subcontractor fails or refuses to execute a written contract; (2) The listed DBE subcontractor fails or refuses to perform the work of its subcontract in a way consistent with normal industry standards. Provided however, that good cause does not exist if the failure or refusal of the DBE subcontractor to perform its work on the subcontract results from the bad faith or discriminatory action of the prime contractor; (3) The listed DBE subcontractor fails or refuses to meet the prime contractor's reasonable, non-discriminatory bond requirements. (4) The listed DBE subcontractor becomes bankrupt, insolvent, or exhibits credit unworthiness; (5) The listed DBE subcontractor is ineligible to work on public works projects because of suspension and debarment proceedings pursuant to 2 CFR Parts 180, 215 and 1,200 or applicable state law; (6) We have determined that the listed DBE subcontractor is not a responsible contractor; (7) The listed DBE subcontractor voluntarily withdraws from the project and provides to us written notice of its withdrawal; (8) The listed DBE is ineligible to receive DBE credit for the type of work required; (9) A DBE owner dies or becomes disabled with the result that the listed DBE contractor is unable to complete its work on the contract; (10) Other documented good cause that we have determined compels the termination of the DBE subcontractor. Provided, that good cause does not exist if the prime contractor seeks to terminate a DBE it relied upon to obtain the contract so that the prime contractor can self-perform the work for which the DBE contractor was engaged or so that the prime contractor can substitute another DBE or non-DBE contractor after contract award. Before transmitting to us its request to terminate and/or substitute a DBE subcontractor, the prime contractor must give notice in writing to the DBE subcontractor, with a copy to us, of its intent to request to terminate and/or substitute, and the reason for the request. I1 49 CFR Part 26 Revised: February 12, 2019 The prime contractor must give the DBE five days to respond to the prime contractor's notice and advise us and the contractor,of the reasons, if any, why it objects to the proposed termination of its subcontract and why we should not approve the prime contractor's action. lf required in a particular case as a matter of public necessity (e.9., safetV), we may provide a response period shorter than five days. ln addition to post-award terminations, the provisions of this section apply to pre-award deletions of or substitutions for DBE firms put fonrvard by offerors in negotiated procurements. Kittitas County will require a contractor to make good faith efforts to replace a DBE that is terminated or has othenryise failed to complete its work on a contract with another certified DBE. These good faith efforts shall be directed at finding another DBE to perform at least the same amount of work under the contract as the DBE that was terminated, to the extent needed to meet the contract goal that we established for the procurement. The good faith efforts shall be documented by the contractor. lf we request documentation from the contractor under this provision, the contractor shall submit the documentation to us within 7 days, which may be extended for an additional 7 days if necessary at the request of the contractor, and the recipient shall provide a written determination to the contractor stating whether or not good faith efforts have been demonstrated. We will include in each prime contractthe contract clause required by $ 26.13(b) stating that failure by the contractor to carry out the requirements of this part is a material breach of the contract and may result in the termination of the contract or such other remedies set forth in that section that we deem appropriate if the prime contractor fails to comply with the requirements of this section. lf the contractor fails or refuses to comply in the time specified, our contracting office will issue an order stopping all or part of paymenUwork until satisfactory action has been taken. lf the contractor still fails to comply, the contracting officer may issue a termination for default proceeding. Bid Soe cification: The requirements of 49 CFR Part. 26, Regulations of the U.S. Department of Transportation, apply to this contract. lt is the policy of Kittitas County to practice nondiscrimination based on race, color, sex, or national origin in the award or performance of this contract. All firms qualifying under this solicitation are encouraged to submit bids/proposals. Award of this contract will be conditioned upon satisfying the requirements of this bid specification. These requirements apply to all bidders/offerors, including those who qualify as a DBE. A DBE contract goal of 7.8 percent has been established for this contract. The bidder/offeror shall make good faith efforts, as defined in Appendix A, 49 CFR Part 26 (attachment 1), to meet the contract goal for DBE participation in the performance of this contract. 1B 49 CFR Part 26 Revised: February 12, 2019 The bidder/offeror will be required to submit the following information: (1) the names and addresses of DBE flrms that will participate in the contract; (2) a description of the work that each DBE firm will perform. To count toward meeting a goal, each DBE firm must be certified in a NAICS code applicable to the kind of work the firm would perform on the contract; (3) the dollar amount of the participation of each DBE firm participating; (4) Witten documentation of the bidder/offeror's commitment to use a DBE subcontractor whose participation it submits to meet the contract goal; and (5) Written confirmation from each listed DBE firm that it is participating in the contract in the kind and amount of work provided in the prime contractor's commitment; (6) if the contract goal is not met, evidence of good faith efforts. Section 26.55 Counting DBE Participation We will count DBE participation toward overall and contract goals as provided in 49 CFR 26.55. We will not count the participation of a DBE subcontract toward a contractor's final compliance with its DBE obligations on a contract until the amount being counted has actually been paid to the DBE. lf the firm is not currently certified as a DBE in accordance with the standards of subpart D of this part at the time of the execution of the contract, we will not count the firm's participation toward any DBE goals, except as provided for in 26.870. SUBPART D - CERTIFICATION STANDARDS Section 26.61 -26.73 Certification Process Kittitas County will use the certification standards of Subpart D of Part 26 to determine the eligibility of firms to participate as DBEs in DOT-assisted contracts. To be certified as a DBE, a firm must meet all certiflcation eligibility standards. We will make our certification decisions based on the facts as a whole. For information about the certification process or to apply for certification, firms should contact: Sarah Erdmann Assistant Director of Certification and Compliance OMWBE 360.664.9771 erdmanns@omwbe.wa. qov Our certification application forms and documentation requirements are found in Attachment 8 to this program. I9 49 CFR Part 26 Revised: February 12, 2019 SUBPART E - CERTIFICATION PROCEDURES Section 26.81 Unified Certification Programs Kittitas County is the member of a Unified Certification Program (UCP) administered by Washington State. The UCP will meet all of the requirements of this section. A copy of the application is included in Attachment 9. SUBPART F - COMPLIANCE AND ENFORCEMENT Section 26.109 lnformation, Confidentiality, Cooperation and intimidation or retaliation We will safeguard from disclosure to third parties information that may reasonably be regarded as confidential business information, consistent with Federal, state, and local law. Notwithstanding any provision of Federal or state law, we will not release any information that may reasonably be construed as confidential business information to any third party without the written consent of the firm that submitted the information. This includes applications for DBE certification and supporting information. However, we will transmit this information to DOT in any certification appeal proceeding under S 26.89 of this part or to any other state to which the individual's firm has applied for certification under S 26.85 of this part. All participants in the Department's DBE program (including, but not limited to, recipients, DBE firms and applicants for DBE certification, complainants and appellants, and contractors using DBE firms to meet contract goals) are required to cooperate fully and promptly with DOT and recipient compliance reviews, certification reviews, investigations, and other requests for information. Failure to do so shall be a ground for appropriate action against the party involved (e.9., with respect to recipients, a finding of noncompliance; with respect to DBE firms, denial of certification or removal of eligibility and/or suspension and debarment; with respect to a complainant or appellant, dismissal of the complaint or appeal; with respect to a contractor which uses DBE firms to meet goals, findings of non-responsibility for future contracts and/or suspension and debarment). Kittitas County, contractor, or any other participant in the program will not intimidate, threaten, coerce, or discriminate against any individual or firm for the purpose of interfering with any right or privilege secured by this part or because the individual or firm has made a complaint, testified, assisted, or participated in any manner in an investigation, proceeding, or hearing under this part. lf we violate this prohibition, we are in noncompliance with this part. 20 49 CFR Part 26 Revised: February 12, 2019 ATTACHMENTS Attachment 1 Regulations: 49 CFR Part 26 or website link Attachment 2 Organizational Chart Attachment 3 Bidder's List Collection Form Attachment 4 DBE Directory or link to DBE Directory Attachment 5 Overall Goal Calculations Attachment 6 Demonstration of Good Faith Efforts or Good Faith Effort Plan - Forms 1 & 2 Attachment 7 DBE Monitoring and Enforcement Mechanisms Attachment 8 DBE Certification Application Form Attachment 9 State's UCP Agreement Attachment 10 Small Business Element Program 2I 49 CFR Part 26 Revised: February 12, 2019 ATTACHMENT 1 Regulations: 49 CFR Parl26, or link to website https://unr v.ecfr.qov/cqi-bin/text-idx?tpl=/ecfrbrowse/Title49/49cfr26 main 02.tpl t) 49 CFR Part 26 County Commission Member ATTACHMENT 2 Orsanizational Ghart County Commission Member Public Works Director Administrative Assistant Revised: February 12, 2019 County Commission Member 49 CFR Part 26 Revised: February 12, 2019 ATTACHMENT 3 Bidder's List Collection Form Firm Name Firm Address/ Phone # DBE or Non- DBE Status (verify via State's UCP Directoryl Age of Firm Annual Gross Receipts E Less than 1 year E 1-- 3 years E 4-7 years E 8-10 years E More than 1.0 years E Less than S5o0K tr Ss00K - $l million E $1"-2 million E S2-5 million E Greaterthan 55 million E Less than L year E 1,- 3 years E 4-7 years E 8-L0 years E More than 10 years E Less than $500K tr 5500K - $l million E 51-2 million E S2-5 million E Greaterthan 55 million E Less than 1, year E 1- 3 years E 4-7 years E 8-1.0 years E More than L0 Vears E Less than $500K tr Ss00K - Sl million E $1-2 million I S2-5 million E Greaterthan 55 million E Less than L year E 1- 3 years E 4-7 years E 8-10 years D More than L0 years E Less than S500K tr S500K - $1 million E $1-2 million E S2-5 million D Greaterthan 55 million E Less than 1 year E L- 3 years E 4-7 years E 8-10 years E More than L0 years E Less than 5500K tr S500K - $1" million E S1-2 million E S2-5 million n Greaterthan 55 million E Less than L year E L- 3 years E 4-7 years E 8-10 years E More than 10 years n Less than S500K tr Ss00K - Sl million E S1-2 million E S2-5 million D Greater than 55 million 24 49 CFR Part 26 Revised: February 12, 2019 ATTACHMENT 4 Washington DBE Directory or web link to DBE directory httos://omwbe.d iversitvcom pl ia nce.com/ z3 49 CFR Part 26 Revised: February 12, 2019 ATTACHMENT 6 Demonstration of Good Faith Efforts - Forms 1 & 2 FORM 1: DISADVANTAGED BUSINESS ENTERPRISE (DBE) UTILIZATION The undersigned bidder/offeror has satisfied the requirements of the bid specification in the following manner (please check the appropriate space): The bidder/offeror is committed to a minimum of % DBE utilization on this contract. The bidder/offeror (if unable to meet the DBE goal of _o/o) is committed to a minimumof % DBE utilization on this contract and should submit documentation demonstrating good faith efforts. Name of bidderiofferor's firm State Registration No. By (Signature)Title zo 49 CFR Part 26 FORM 2: LETTER OF INTENT Revised: February 12, 2019 Name of bidder/offeror's firm Address: City:State Name of DBE firm Address City State Zip: _ Telephone Description of work to be performed by DBE firm The bidder/offeror is committed to utilizing the above-named DBE firm for the work described above The estimated dollar value of this work is $ Affirmation The above-named DBE firm affirms that it will perform the portion of the contract for the estimated dollar value as stated above and that the firm is DBE certified to perform the specific trades. Date: (Signature) (Title) lf the bidder/offeror does not receive award of the prime contract, any and all representations in this Letter of lntent and Affirmation shall be null and void. Submit this page for each DBE subcontractor. zip: By 21 49 CFR Part 26 Revised: February 12, 2019 ATTACHMENT 7 DBE Monitorinq and Enforcement Mechanisms Kittitas County has available several remedies to enforce the DBE requirements contained in its contracts, including, but not limited to, the following: 1. Breach of contract action, pursuant to the terms of the contract; 2. Breach of contract action, pursuant to Secretary's Executive Order Number E 1009.02]; ln addition, the Federal government has available several enforcement mechanisms that it may apply to firms participating in the DBE problem, including, but not limited to, the following: 1. Suspension or debarment proceedings pursuant to 49 CFR Parl26 2. Enforcement action pursuant to 49 CFR Part 31 3. Prosecution pursuantto 1B USC 1001. 2B 49 CFR Part 26 Revised: February 12, 2019 ATTACHMENT 8 DBE Certification Application Form (New form October 2, 2014) https://www.transportation.qov/sites/dot.qov/files/docs/New%20DBE%20Certification%2OApplication% 2011-18-2014.odt 29 49 CFR Part 26 Revised: February 12, 2019 ATTACHMENT 9 State's UCP Agreement https://omwbe.wa. qov/ 30 49 CFR Part 26 Revised: February 12, 2019 ATTACHMENT 1O Small Business Element 1. Objective/Strategies Kittitas County will: (1) Establishing a race-neutral small business set-aside for prime contracts under a stated amount ($1 million). (2) ln multi-year design-build contracts or other large contracts requiring bidders on the prime contract to specify elements of the contract or specific subcontracts that are of a size that small businesses, including DBEs, can reasonably perform. (3) On prime contracts not having DBE contract goals, requiring the prime contractor to provide subcontracting opportunities of a size that small businesses, including DBEs, can reasonably perform, rather than self-performing all the work involved. (4) ldentifying alternative acquisition strategies and structuring procurements to facilitate the ability of consortia or joint ventures consisting of small businesses, including DBEs, to compete for and perform prime contracts. (5) To meet the portion of your overall goal you project to meet through race-neutral measures, ensuring that a reasonable number of prime contracts are of a size that small businesses, including DBEs, can reasonably perform. 2. Definition of Small Business For purposes on this program, "small business" or "small business concern" will be defined as set forth in 49 CFr 26.5, which as of March 2012 is: "... a small business concern as defined pursuant to section 3 of the Small Business Act and Small Business Administration regulations implementing it (13 CFR Part 121) lhat also does not exceed the cap on average annualgross receipts specified in 26.65(b)." 3. Verification Kittitas County will diligently attempt to minimize fraud and abuse in the Small Business Element of its DBE program by verifying program eligibility of firms. 4. Monitoring/Record Keeping Kittitas County will maintain and monitor the records for the Small Business Element and be able to provide those records if requested. 5. lmplementation Timeline lmplementation will occur within 6 months of FAA's approval 31 49 CFR Part 26 Revised: February 12, 2O1S 6. Assurance Kittitas County will provide the following assurances 1. assurance that the program is authorized under state law; 2. assurance that certified DBEs that meet the size criteria established underthe program are presumptively eligible to participate in the program; 3. assurance that there are no geographic preferences or limitations imposed on any federally assisted procurement included in the program; 4. assurance that there are no limits on the number of contracts awarded to firms participating in the program but that every effort will be made to avoid creating barriers to the use of new, emerging, or untried businesses; and 5. assurance that aggressive steps will be taken to encourage those minority and women owned firms that are eligible for DBE certification to become certified. 6. assurance that the program is open to small businesses regardless of their location (i.e., that there is no local or other geographic preference). 32 49 CFR ParL 26 Revised: Feb. 12,2079 ATTACHMENT 5 Section 26.45: Overall DBE Three-Year Goal Methodoloqv Name of Recipient: Kittitas County, owner of Bowers Field Goal Period: FY2021,FY2022,FY2023 - October 1,2021through September 30,2023 DOT-assisted contract amount: FY-2021 $ 0FY-2022 $ 350,000 FY-2023 $ 2,450,000 Total $ 2.800.000 Overall Three-Year Goal: 1 .9Yo, to be accomplished through 0% RC and 1.9% RN (Note: the goal may be reflected as (1) an average of the three years; (2) three year Median; or (3) weighted percentage) Total dollar amount to be expended on DBE's 1.9%X $2,800,000 = $53,200 Describe the Number and Type of Contracts that the airport anticipates awarding Contracts Fiscal Year #1 1. No Award Anticipated Contracts Fiscal Year #2 1. Wetland mitigation for EA projects - Design Contracts Fiscal Year #3 1. Wetland mitigation for EA projects - Construction and Land Acquisition Market Area: Kittitas, King, Pierce, Yakima, and Chelan counties were used forthe NA/CS codes utilized in these projects. Step 1. 26.45(c) Actual relative availability of DBE's The base figure for the relative availability was calculated as follows: The data source or demonstrable evidence used to derive the numerator was the Wash i ngton State O MWB E data base: http ://omwbe.wa. sov/d i rectorv-of- certified-firms/ The data source or demonstrable evidence used to derive the denominator was the U.S. Census Bureau Economic Census, 2017 County Business Patterns for Washington State: http ://wmry. census. qov/eco n/cbp/index. htm I The firms reviewed included engineering, drafting, and surveying services and firms to reflect the scope of work for the fiscal year periods 2021 to 2023. 49 CFR Part 26 FiscalYear 2021 For FY-2027, We do not anticipate an award for FY-2021 FiscalYear 2022 For FY-2022,We anticipate an award of the following for FY-2022 FiscalYear 2023 For FY-2023, We anticipate the award of the following at Bowers Field Revised: Feb. 12,2019 Contract Name Trade Description NAICS Description NAICS Trade ($)Census DBE Directory DBE (W DBE ($) (= Trade $xDBE %) No Project Anticipated Total Contract Total FY- 2021 Contract Name Trade Description NAICS Description NAlCS Trade ($)Census DBE Directory DBE (W DBE ($) (= Trade $x DBE %) Wetland Mitigation for EA Projects - Design Engineering Services Engineering Services 541330 $ I 75,000 864 l5 1.7%82,97s Environmental Services Environmental Services i41620 $175,000 197 3l 15.7%i24,47s Total Contract $350,000 1061 t6 4.3% Total FY- 2021 $3s0,000 l06l +6 +.3%130,450 Contract Name Trade Description NAICS Desciption /v4/cs Trade ($)Census DBE Directory DBE (%) DBE ($) (= Trade $x DBE %) Wetland Mitigation for EA Projects - Construction and Land Acquisition Engineering Services Sngineering Services 14 1 330 $l 50,000 864 15 r.7%$2,550 HWY, Street, and Bridee Construction HWY, Street, and Bridse Construction 137310 $2,250,000 9l 2 >-.2Vo $49,500 lffices of Real Estate {ppraisers Offices of Real Estate Aooraisers t31320 $s0,000 350 0 0%$0 Total Controct $2,450,000 1305 t7 13%$ Total FY- 2023 $2,450,000 1305 l7 l.3o/o $52,050 49 CFR Part 26 Revised: Feb. 12,2019 Base Figure = 1(Total FY-2021 DBE%)+(Total FY-2022 DBE%)+(Total FY-2023 DBE%)/[3 Years) Base Figure = (0.0%+4.3o/o+1.3o/o)13 Years = 1.9To of allfirms ready, willing and able The data source or demonstratable evidence used to derive the numerator was: htto ://omwbe.wa. qov/oov/d irectory-of-certifi ed-firms/ The data source or demonstratable evidence used to derive the denominator was http ://www. cen s u s. gov/ced s i/ Step 2. 26.a5(d): Adjustments to Step 1 base figure. There is no historical DBE data to reference to make an adjustment to the Sfep 7 base figure; therefore, the Airport is adopting,fs Sfep 1 base figure as its overall goal for this three-year goal period. Breakout of Estimated "Race and Gender Neutral" (RN) and "Race and Gender Conscious" (RC) Participation. 26.51 (b) (1-9) The recipient will meet the maximum feasible portion of its overall goal by using RN means of facilitating DBE participation. Examples 1. Arranging solicitations, times for the presentation of bids, quantities, specifications, and delivery schedules in ways that facilitates DBE, and other small businesses, participation; 2. Providing assisfance in overcoming limitations such as inability to obtain bonding or financing; 3. Providing technicalassisfance and other seryrces; 4. Carrying out information and communications programs on contracting procedures and specific contract opportunities; 5. lmplementing a supportive services program to develop and improve immediate and long-term busrness management, record keeping, and financial and accounting capability for DBE's and other small businesses; 6. Providing services to help DBE's and other small businesses improve long-term development, increase opportunities to participate in a variety of kinds of work, handle i ncreasing ly sig nifica nt projects, a nd ach ieve eventu al self-sufficiency; 7. Establishing a program fo assrsf new, start-up firms, pafticularly in fields in which DBE pafticipation has historically been low; 8. Ensuring distribution of DBE directory, through print and electronic means, to the widest feasible universe of potential prime contractors; 9. Assisf DBE's and other smallbusrnesses, to develop their capability to utilize emerging technology and conducf busrness through electronic media; and 1 0. (ndu& dher ne neutnl masures as apprcpiate) 49 CFR Part 25 Revised: Feb. 12,2019 The recipient estimates that in meeting its overall goal 1.9%, it will obtain 1.9% from RN participation and0o/o through RC measures This breakout is based on Kittitas County does not have a history of DBE participation or over-achievement of goals to reference and expects to obtain its DBE participation through the use of DBE contract goals or a consclous effort to obtain DBE participation. Therefore, we are applying the entire goal of 1.9 percent to race-neutral participation. Kittitas County will adjust the estimated breakout of RN and RC DBE participation as needed to reflect actual DBE participation (see Section 26.51(f)) and track and report RN and RC participation separately. For reporting purposes, RN DBE participation includes, but is not necessarily limited to, the following: DBE participation through a prime contract obtained through customary competitive procurement procedures; DBE participation through a subcontract on a prime contract that does not carry a DBE goal, DBE participation on a prime contract exceeding a contract goal and DBE participation through a subcontract from a prime contractor that did not consider a firm's DBE status in making the award. PUBLIC PARTICIPATION Gonsultation: Section 26.as(gX1 ). Kittitas County submits its overall DBE three-year goalto DOT on October 1 as required by fhe sef schedule. ln establishing the overall goal, Kittitas County provided for consultation and publication. This included consultation with minority, women's and general contractor groups, community organizations, and other officials or organizations which could be expected to have information concerning the availability of disadvantaged and non-disadvantaged businesses, the effects of discrimination on opportunities for DBEs, and Kittitas County's efforts to establish a level playing field for the participation of DBEs. The consultation included a scheduled, direct, interactive exchange teleconference with as many interested stakeholders as possible focused on obtaining information relevant to Kittitas County's goal setting process, and it occurred before we were required to submit our goal methodology to the operating administration for review pursuant to paragraph (f) of this section. Notwithstanding paragraph (0(4) of this section, we will not implement our proposed goal untilwe have complied with this requirement. Kittitas County submits its overall DBE three-year goal to DOT on October 1 as required by the set schedule. Kittitas County consulted with the Washington State Office of Minority & Women's Business Enterprises (OMWBE), without limiting consultation to these persons or groups, to obtain information concerning the availability of disadvantaged and non-disadvantaged businesses, the effects of discrimination on opportunities for DBEs, and Kittitas County efforts to establish a level playing field for the participation of DBEs. 49 CFR Part 26 Revised: Feb. 12,2019 A notice will be published in the Daily Record of the proposed overall goal informing the public that the proposed goal and its rationale are available for inspection during normal business hours at the airport administration building for 30 days following the date of the notice. Kittitas County and DOT will accept comments on the goals for 30 days from the date of the notice. 49 CFR Part 26 Revised: February 12, 2019 PUBLIC NOTICE Kittitas County hereby announces its fiscal year 2021,2022, and 2023 goal of 1.9o/o for Disadvantaged Business Enterprise (DBE) airport construction Contracts. A public telecom will be held on September 8, 2020 at 9am. lf you would like to participate please reach out to Samantha Peterson at speterson@centurywest.com for meeting details. Please contact the Director of Airport Operations for a copy of the DBE Plan and or Goal. Comments on the DBE goal will be accepted for 30 days from the date of this publication and can be sent to the following: Benjamin West Director of Airpoft Operations Be nia m i n.West@ co. kittita s.wa. u s (509) sl2-2017 AND Federal Avi ation Ad m i n i strat ion Northwest Mou ntain Reg ional Office Office of Civil Rights Staff Attn: Sonia Cruz 2200 S 21dh Street Des Moines, WA 98198 Contract Goals Kittitas County will use contract goals to meet any portion of the overall goal that the recipient does not project being able to meet using RN means. Contract goals are established so that, over the period to which the overall goal applies, they will cumulatively result in meeting any portion of the recipient's overall goal that is not projected to be met through the use of RN means. Kittitas County will establish contract goals only on those DOT-assisted contracts that have subcontracting possibilities. lt need not establish a contract goal on every such contract, and the size of the contract goals will be adapted to the circumstances of each such contract (e.9., type and location of work and availability of DBE's to perform the particular type of work). We will express our contract goals as a percentage of the Federal share of a DOT- assisted contract. 6 BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO.2020- A RESOLUTION AUTHORIZING SIGNATURE ON THE DBE PLAN FOR BOWERS FIELD WHEREAS, a Disadvantaged Business Enterprise (DBE) plan is mandated by the p4,q; and WHEREAS, Airport Director Benjamin West has produced the plan which is ready for submittal; and WHEREAS, Director West needs signature authority to sign the plan prior to submitting it. Now, Therefore, Be it Resolved: Kittitas County hereby authorizes Director Benjamin West to have signature authority to sign the202I-2023 DBE Plan for Bowers Field. Be it further Resolved: That the Airport Director shall have ongoing signature authority for signing DBE Plans for Bowers Field in the future without requiring specific board action. DATED this 3'd day of November 2020, at Ellensburg, Washington. BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Cory Wright, Commissioner District I Attest: n Clerk of the Board- Julie Kjorsvik Laura Osiadacz, Commissioner District 2 f Deputy Clerk of the Board- Mandy Buchholz Brett Wachsmith, Commissioner District 3