My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SOQ_N Thorp Hwy Yakima River Bridge
>
Meetings
>
2020
>
10. October
>
2020-10-20 10:00 AM - Commissioners' Agenda
>
SOQ_N Thorp Hwy Yakima River Bridge
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2020 1:44:02 PM
Creation date
10/15/2020 1:43:50 PM
Metadata
Fields
Template:
Meeting
Date
10/20/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
m
Item
Request to Approve a Request for Qualifications Supporting Design and Environmental Permitting for Preventative Maintenance on North Thorp Highway - Yakima River Bridge Kittitas County, Washington
Order
13
Placement
Consent Agenda
Row ID
67830
Type
Hearing notice
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />Board of County Commissioners <br />AGENDA STAFF REPORT <br />AGENDA DATE: October 20, 2020 <br />ACTION REQUESTED: Request to Advertise a Request for Statement of Qualifications <br />Supporting Design, and Environmental Permitting for Preventative <br />Maintenance on North Thorp Highway -Yakima River Bridge CRP <br />302-20 <br />BACKGROUND: Kittitas County Public Works was informed December 30, 2019 that <br />this project was selected to receive funding through the Local Bridge <br />Program, administered through Washington State Department of <br />Transportation. The work is expected to include painting, and <br />repairing damaged steel, concrete piers, and bridge connection joints. <br />The Preliminary Engineering phase of the project was authorized to <br />proceed August 20, 2020 in the amount of $387,531.00 by WSDOT <br />Local Programs The total project costs are currently estimated at <br />$2,486,000.00 and the project will be 100 percent funded under the <br />Federal Program with no local match requirements up to this amount. <br />INTERACTION: Public Works <br />RECOMMENDATION: Authorize Issuing a Request for Statement of Qualifications <br />Supporting Design, and Environmental Permitting for Preventative <br />Maintenance on North Thorp Highway -Yakima River Bridge CRP <br />302-20. <br />HANDLING: Return One original to Public Works <br />ATTACHMENTS: Statement of Qualifications, CRP 302-20 design services <br />LEAD STAFF: Mark R. Cook, Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.