Loading...
HomeMy WebLinkAboutRes-2020-145 Hungry Junction RdBOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON . p/{RESOLUTION NO. 2O2O AUTHORIZING CHAIR SIGNATURE ON THE COUNTY ROAI) ADMINISTRATION BOARD RURAL ARTERIAL PROGRAM PROJECT FINAL PROSPECTUS FOR BIENNTUM 202I-2023 FOR THE IIUNGRY JUNCTION ROAD WIDENING PROJECT WIIEREAS: The Department of Public Works is proposing to widen and improve Hungry Junction Road from MP 0.00 - MP 1.74; and WIIEREAS: The Department of Public Works submitted a preliminary prospectus to the County Road Administration Board in February of 2020; and WHEREAS: The Department of Public Works is competing forRural Arterial Trust Account (RATA) funds within the region; and WTTEREAS: This construction project is included on the county's Six year Transportati on Improvement Plan; NOW' THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby approve the Chair's signature on the County Road Administration Board Rural Arterial Program Project Final Prospectus for Biennium 2021-2023 for the Hungry Junction Road Widening Project. DATED on this 18th day of August 2020, atEllensburg, Washington. BOARD OF COI.INTY COMMISSIONERS KITTITAS ASHINGTON Chairman 7\|'Attest llilil[tlt Board- Julie Kjorsvik Vice-Chairman I Deputy Clerk ofthe Board- Mandy Buchholz Cory Wright, Commissioner STATE OF WASHINGTON - COUNTY ROAD ADMINISTRATION BOARD RURAL ARTERIAL PROGRAM FINAL PROSPECTUS Bienniuml 2021 - 2023 Region: SE County: Kittitas IDENTIFICATION State Legislative District: 13 Six-Year T.l.P. Priority No: 17 Total Points: Road Number(s)Road Name(s)FFc(s)TRG(s) 91.37 BMP(s)EMP(s) PROJECT TYPE Project Type: 3R - Rehabilitate, Resurface, Restore DESGRIPTION OF PROPOSED IMPROVEMENTS - Attach Ratinq Worksheets Roadway Structural Section, or Bridge Condition: The existing BST pavement is narrow with areas of significant longitudinal cracking, and settling over the top of drainage structures. lt will be removed and replaced with 9 inches of CSBC and 0.30 foot of HMA asphalt. Horizontal Alignment: 31510 Hungry Junction Road 08 T3 0.0001 1.740 There will be no effect on the horizontal alignment Vertical Alignment: are four vertical curves that need to be corrected to meet safe sight stopping distance design ndards for the posted speed limit. width existing roadway has two - 10 foot lanes with little to no shoulder, the roadway will be widened 12foot lanes with 2 foot shoulders Other; Clear Zone, Slopes, Guardrail, lllumination, signals etc. The clear zone will be improved by removing or relocating above ground obstacles, beveling culvert ends, and installing guardrail or flattening slopes where warranted. ESTIMATED FUNDING AND TIMING Phase EstTotal Cost RATA Amount Estimated Year Start End Design/Prelim. Engr $461,000 $414,900 Mar-22 Jun-23 Right of Way $100,000 $e0,000 Sep-22 Jun-23 Construction $3,474,000 $3,126,600 Sep-23 Dec-24 TOTAL $4,035,000 $3,63'1,500 Schedule of CRAB reimbursements for Construction will be or dependent on Proiect SPEGIAL CONSIDERATIONS THAT MAY AFFECT PROJECT SCHEDULE: fiwettands flruvrs [n.o.w. flshoretines fiusrws lsrn [neA nRR [WOrw @Cuttruat (Hist. Arch. Pateo.) !fieO (Other agency work) [Other Zusnce LOCAL PROJECT APPROVAL RAP Project Prospectus prepared under the supervision of: Signature -E i Date u23 RAP Project Prospectus submitted to CRAB with the approval of: Commissioners or County Executive / Date r I B laoaoofthe Board of County Page 1 of 1