HomeMy WebLinkAboutRes-2020-145 Hungry Junction RdBOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
. p/{RESOLUTION NO. 2O2O
AUTHORIZING CHAIR SIGNATURE ON THE COUNTY ROAI)
ADMINISTRATION BOARD RURAL ARTERIAL PROGRAM PROJECT
FINAL PROSPECTUS FOR BIENNTUM 202I-2023 FOR THE IIUNGRY
JUNCTION ROAD WIDENING PROJECT
WIIEREAS: The Department of Public Works is proposing to widen and improve
Hungry Junction Road from MP 0.00 - MP 1.74; and
WIIEREAS: The Department of Public Works submitted a preliminary prospectus to
the County Road Administration Board in February of 2020; and
WHEREAS: The Department of Public Works is competing forRural Arterial Trust
Account (RATA) funds within the region; and
WTTEREAS: This construction project is included on the county's Six year
Transportati on Improvement Plan;
NOW' THEREFORE BE IT RESOLVED that the Board of County Commissioners, in
the best interest of the public, does hereby approve the Chair's signature
on the County Road Administration Board Rural Arterial Program Project
Final Prospectus for Biennium 2021-2023 for the Hungry Junction Road
Widening Project.
DATED on this 18th day of August 2020, atEllensburg, Washington.
BOARD OF COI.INTY
COMMISSIONERS
KITTITAS ASHINGTON
Chairman
7\|'Attest
llilil[tlt
Board- Julie Kjorsvik
Vice-Chairman
I Deputy Clerk ofthe Board- Mandy Buchholz
Cory Wright, Commissioner
STATE OF WASHINGTON - COUNTY ROAD ADMINISTRATION BOARD
RURAL ARTERIAL PROGRAM
FINAL PROSPECTUS
Bienniuml 2021 - 2023
Region: SE County: Kittitas
IDENTIFICATION
State Legislative District: 13 Six-Year T.l.P. Priority No: 17 Total Points:
Road Number(s)Road Name(s)FFc(s)TRG(s)
91.37
BMP(s)EMP(s)
PROJECT TYPE
Project Type: 3R - Rehabilitate, Resurface, Restore
DESGRIPTION OF PROPOSED IMPROVEMENTS - Attach Ratinq Worksheets
Roadway Structural Section, or Bridge Condition:
The existing BST pavement is narrow with areas of significant longitudinal cracking, and settling
over the top of drainage structures. lt will be removed and replaced with 9 inches of CSBC and 0.30
foot of HMA asphalt.
Horizontal Alignment:
31510 Hungry Junction Road 08 T3 0.0001 1.740
There will be no effect on the horizontal alignment
Vertical Alignment:
are four vertical curves that need to be corrected to meet safe sight stopping distance design
ndards for the posted speed limit.
width
existing roadway has two - 10 foot lanes with little to no shoulder, the roadway will be widened
12foot lanes with 2 foot shoulders
Other; Clear Zone, Slopes, Guardrail, lllumination, signals etc.
The clear zone will be improved by removing or relocating above ground obstacles, beveling culvert
ends, and installing guardrail or flattening slopes where warranted.
ESTIMATED FUNDING AND TIMING
Phase EstTotal Cost RATA Amount
Estimated Year
Start End
Design/Prelim. Engr $461,000 $414,900 Mar-22 Jun-23
Right of Way $100,000 $e0,000 Sep-22 Jun-23
Construction $3,474,000 $3,126,600 Sep-23 Dec-24
TOTAL $4,035,000 $3,63'1,500 Schedule of CRAB reimbursements for
Construction will be or dependent on Proiect
SPEGIAL CONSIDERATIONS THAT MAY AFFECT PROJECT SCHEDULE:
fiwettands flruvrs [n.o.w. flshoretines fiusrws lsrn [neA nRR
[WOrw @Cuttruat (Hist. Arch. Pateo.) !fieO (Other agency work) [Other
Zusnce
LOCAL PROJECT APPROVAL
RAP Project Prospectus prepared under the supervision of:
Signature -E i Date
u23
RAP Project Prospectus submitted to CRAB with the approval of:
Commissioners or County Executive / Date r I B laoaoofthe Board of County
Page 1 of 1