HomeMy WebLinkAboutResolution_KPFF TO 2_Bridge InspectionKITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
AGENDA STAFF REPORT
AGENDA DATE: August 18, 2020
ACTION REQUESTED: Request to Approve a Resolution authorizing the Chair's
Signature on KPFF Task Order No. 2 - 2020 Bridge
Inspection Support Services.
BACKGROUND: KPFF was selected as one of two structural engineers for
on-call task order contracting following a procurement
effort in April 2020. KPFF has been inspecting County
bridges for the past two years. Public Works desires
having KPFF support bridge inspections for 2020. 96
bridges will be inspected at a cost of $55,000.
INTERACTION: Public Works
RECOMMENDATION: Approve the Resolution to authorize the Chair's signature
on KPFF Task Order No. 2
HANDLING: Return one original to Public Works
ATTACHMENTS: Resolution; Task Order No. 2 — 2020 Bridge Inspection
Support Services
LEAD STAFF: Mark R. Cook, Director
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2020 -
AUTHORIZE THE CHAIR'S SIGNATURE ON KPFF TASK ORDER NO.2 — 2020
BRIDGE INSPECTION SUPPORT SERVICES
WHEREAS: Kittitas County of Public Works procured on-call task orders professional
engineering services from KPFF consistent with state law and local purchasing
policies in April 2020; and
WHEREAS: KPFF has been conducting bridge inspection support services for Public Works
for the past several years; and
WHEREAS: The value of Task Order No. 2 exceeds the contract authorization amount
currently provided the Public Works Director; and
WHEREAS: Annual bridge inspections are required by State and Federal government,
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby authorize the Chair's signature on KPFF Task Order No.
2 in the amount of $55,000.
DATED this 18th day of August 2020, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Brett Wachsmith, Chairman
Laura Osiadacz, Vice -Chairman
Cory Wright, Commissioner
t
'�`" KZTTZTgiS COUNTY
DEPARTMENT OF PUBLIC WORKS
KITTITAS COUNTY
Formal Task Order Document
Maximum Amount
Payable
(KPFF)
Task Order
Number
$55,000
002
Completion 3/30/2021
Date
The general provisions and clauses of the On -Call Professional Services Agreement shall
be in full force and effect for this Task Order.
LOCATION OF PROJECT
Kittitas County, City of Cle Elum and Town of Kittitas
PROJECT TITLE
2020 Routine, Inventory, and "Short -Span" Bridge Inspections and Repair List.
DESCRIPTION OF WORK
KPFF will provide a WSDOT Certified Bridge Inspector to serve as inspection team leader for 96
County bridge inspections, 4 City of Cie Elum bridge inspections, and 3 Town of Kittitas bridge
inspections. Of the 96 County bridges, there are 48 bridges that meet the National Bridge
Inventory (NBI) definition of a 'Bridge', namely the abutment to abutment distance is greater
than 20 feet. The remaining bridges do not meet the NBI definition and are referred to as
"short -span" bridges. Regardless of the bridge span length or definition all bridge structures will
receive an inspection, which is in general conformance with the standard WSDOT Routine
Bridge Inspection methods and formats.
A list of all bridges to be inspected by KPFF is included as an attachment to this scope of work.
s
3KZTTZTA6 COUNTY
DEPARTMENT OF PUBLIC WORKS
MTTITAS COUNTY
In addition to the routine inspections mentioned above, KPFF will provide the following:
• Inventory inspection of Coleman at Vantage Highway (new construction)
• Inventory inspection of Fairview Road Bridge (new construction)
• Inventory inspection of Big Boulder Bridge (new construction)
KPFF will also compile a repair list for all structural defects observed during the 2020
inspections. The repair list will include the priority of each repair and categorize the repair type
to allow the County maintenance workers to group similar repairs.
Travel restrictions due to COVID-19 may result in a KPFF inspector being unable to overnight in
Kittitas County. Item 2.0 below includes additional travel hours and costs which may occur as a
result of COVID-19 travel restrictions. This effort will only be utilized if necessary and with the
approval of the County.
ITEM NO. 1.0 — PROJECT MANAGEMENT AND COORDINATION
KPFF shall provide project management and contract administration services to organize,
manage, and coordinate the staff required to accomplish the work and to facilitate efficient
progress. Project Management services shall include:
• Project team management and coordination
• Monthly progress reporting
• Prepare inspection schedule and coordination with Kittitas County
• Prepare and review inspection safety plan
ITEM NO. 2.0 — TRAVEL TO ELLENSBURG
KPFF will travel from Seattle to Ellensburg/Kittitas County to perform bridge inspections. If
possible, KPFF will group inspections into trips of two to three days. In the event that the State
and/or Kittitas County does not allow overnight stays due to COVID-19 restrictions, additional
travel will be required which is included in this task.
ITEM NO. 3.0 — KITTITAS COUNTY INSPECTIONS AND REPORTS
• The KPFF Bridge Inspector will plan for each inspection trip by reviewing previous
inspection reports, planning trip routes, booking travel accommodations, preparing
inspection equipment and other miscellaneous tasks needed for the inspection. KPFF
Bridge Inspector will coordinate with County co -inspector on trip timing and details.
\t ChliC�11Y5...'ID 11/G CIS
M„ `°'�., KITTZTAB COUNTY
4p
DEPARTMENT OF PUBLIC WORKS
KMITAS COUNTY
• For NBI reportable bridges, the KPFF Bridge Inspector will serve as inspection team
leader, prepare, sign, and upload routine and inventory reports to the WSBIS Bridge
Inspection Database. The County will provide a co -inspector for these inspections.
For "short -span" bridges, the KPFF Bridge Inspector will serve as inspection team leader
and will review (QC) the inspection report prepared by the County's co -inspector. The
County will provide a co -inspector who will prepare, sign and upload the "short -span"
bridge inspection reports to the WSBIS Bridge Inspection database.
• The field inspection schedule is anticipated to be as provided below:
TASK NO. 3.10 -August 2020: County Bridge Inspections
• 16 "short -span" bridge inspections
• 1 trip
• 2 days of on-site inspection with one overnight stay
TASK NO. 3.20 - September 2020: County Bridge Inspections
• 7 NBI bridge inspections
• 1 day of on-site inspection
4h F^ Cy
MMTAS COUNTY
KZTTZTAS COUNTY
DEPARTMENT OF PUBLIC WORKS
TASK NO. 3.30 - October 2020: County Bridge Inspections
• 12 NBI bridge inspections
• 10 "short -span" bridge inspections
• 3 days of on-site inspection with two overnight stays
TASK NO. 3.40 — October 2020: New Construction Inventory Inspections
• Inventory inspection of Coleman at Vantage Highway, Fairview Road Bridge and
Big Boulder Creek Bridge.
• 1 trip
1 day of on-site inspection
TASK NO. 3.50 - November 2020: County Bridge Inspections
• 29 NBI bridge inspections
• 4 "short -span" bridge inspections
• 2 separate trips
• 4 days of on-site inspection, two overnight stays
TASK NO. 3.60 - December 2020: County Bridge Inspections
18 "short -span" bridge inspections
• 1 trip
• 3 days of on-site inspection, two overnight stays
'`� G``` KZTTITAtS COUNTY
DEPARTMENT OF PUBLIC WORKS
KITTITAS COUNTY
ITEM NO. 4.0 — CITY OF CLE ELUM BRIDGES
See Item No. 3.0 for description of work
TASK NO. 4.10 — City of Cie Elum Bridge Inspections
• 4 "short -span" bridge inspections
• Combined with December trip to perform County inspections
ITEM NO. 5.0—TOWN OF KITTITAS BRIDGES
See Item No. 3.0 for description of work
TASK NO. 5.10 — Town of Kittitas Bridge Inspections
• 3 "short -span" bridge inspections
• Combined with December trip to perform County inspections
ITEM NO. 6.0 — BRIDGE INSPECTION REPAIR LIST
Upon completion of all bridge inspections, KPFF will compile a list of all repairs for the 2020
County bridges (including short spans). This list will be in Microsoft Excel format.
ASSUMPTIONS
• New Construction at Fairview Road Bridge will replace existing short span bridges
89141 -OB, 89142 -OB, and 89144 -OB. Inspections for the existing bridges do not need
to be performed this year.
• No allowance is made for weather in the attached fee. Our general policy is to inspect in
difficult weather conditions but not engage in conditions or situations resulting from the
weather that the Team Leader feels are clearly unsafe. If such situations arise the
inspection will be rescheduled for as -soon -as -possible. Additional costs resulting from
weather delays will be issued to the County prior to any changes of the current schedule
or budget, for approval.
• The County will provide a Co -Inspector that will assist the KPFF Team Leader on all
inspections. Should the County provided Co -Inspector not be available for the scheduled
trip, KPFF will provide a co -inspector. Additional costs for the KPFF provided Co -
Inspector and/or changes to the inspection schedule will be issued to the County for
review and approval prior to commencement of the work.
KITTITAiB COUNTY
DEPARTMENT OF PUBLIC WORKS
KITTITAS COUNTI'
• KPFF will submit to the County signed inspection reports and inspection photographs
(PDF from Bridgeworks and JPEG files) in electronic format. County staff will update
bridge files (hard copy and/or electronic) with signed inspection reports
COST BREAKDOWN
See Attached
COMPLETION DATE
March 30, 2021
Agency Signature: Date:
Consultant Signature: Date: 8/04/2020
Aa on Icon, Associate
Overhead (OH) Cost
Fixed Fee (FF)
Classification
Principal
Senior Consultant
Project Manager
Associate
Senior Engineer II
Senior Engineer I
Design Engineer II
Design Engineer I
CAD Drafter II
CAD Drafter I
Proiect Coordinator
Reimbursables
Mileage
Hotel
Per Diem
Subtotal
Exhibit D-1
KPFF Consulting Engineers
Consultant Fee Summary
Negotiated Hourly Rate Consultant Agreement
Kittitas County 2020 Bridge Inspections
137.21%
30.00%
Direct Hourly
Rate
$
64.91
$
110.04
$
75.48
$
67.79
$
67.79
$
46.73
$
45.00
$
34.33
$ 45.87
$ 51.93
$ 35.20
Total Negotiated
Hours X Hourly Rate - Cost
4.00
X
$173.45
= $
693.78
0.00
X
$294.04
= $
-
0.00
X
$201.69
= $
0.00
X
$181.14
= $
-
1.00
X
$181.14
= $
181.14
73.00
X
$124.87
= $
9,115.31
350.00
X
$120.24
= $
42,085.58
0.00
X
$91.73
= $
-
0.00
X
$122.57
= $
0.00
X
$138.76
= $
-
5.00
X
$94.06
= $
470.29
X
$0.00
= $
-
X
$0.00
= $
X
$0.00
= $
X
$0.00
= $
-
X
$0.00
= $
X
$0.00
= $
X
$0.00
= $
X
$0.00
= $
X
$0.00
= $
Subtotal $ 52,546.10
(220 Miles Round Trip x 6 trips x $0.545/mile) $ 719.40
$100/night x 7 nights $ 700.00
$55/day x 12 days $ 660.00
$ 2,079.40
GRAND TOTAL: $54,625.50
AgrgW4.2030
BRIDGE GROUP
C15
Kittitas Count 2020 Bridge Inspections
Y 9 P
yr nipa ^ae"
Mare"
6,4.,
Freinee, Il
sma,
Ereineerl
penes P,mew
Freime, Il caa,mmlw
M1em
SCOPE OF WORK
St]3 <5 G.,..
Mir,
E1]•e]
51.
E9aW
1
f.10
P.J.Man mem aM Loortllnatlan
MBMgemenl
11f
Camram C[mpNen[e
;
;
SS9]
1;0
Invobin, S Progress 5ummerim l5 momM)
6
5
E1 GG
'09"
Communi[ationlpnora, email
10
$1219
fI0
Imernal Prgem Co[reinelbn
;
10
515%
150
Sale, Plan antl RWleN
;
E{33
2
2f0
Ltlor 6ubldal:
TrauM b ElMnNw
lw ust l lap, 3 Cayel
♦ 1
ZI
;
3
5
N,Bs]
.1
220
6eplerroer111nP.1 peY)
J
3.
230
MOSer 1NP.9 tleya)
3j
y351
Zap
Nmewber (z mpa,•e. .l
m
2 S
I Oeramper 11 tab 3 ee
3
sMl
260
covlo Tavel R.Niction ccnlin,are, (7 to.)
21
32C6
3
310
LabvsuslAY:
RMbas ..nIna baa antl Re Oa
Allgllal Britlges 116 sn[n Span,
o p p
ae
o
fi,eke
3.1f
3.13
Gfike Pre WO
SA[rt SWn MapecSom
•
16
wl
St.
3.13
OCReAmne Re ons
1;
{LW
320
J31
912
6e erroer8nd6es (7 N81)
Me Prep Work
InapOcuom
6
S[6f
fez
333
3.34
Report Prepare,ioP _ _
OC Rmew of Rapers
4
12
{4W
335
Drell antl Fired SSmd 6upmttals
•
f451
3.30
O[IbberB' 12 M. 105M1orl Spam)331 OTue Pre Work
•
yN1
3J2
Ins ea
13
y1,W
3.33
Re n PP.ae b
1p
y2pIM
334
SM1ort SpmImetm mio
1p
111Yf
335
OORMevol pl Reports
6
f1,T1
336
ID.ftbad Rural Signed 3ubmXels
•
W1
340
lrreal.lM Mammal, brltlpe¢)
OTrcePre WorkO
OCRSeewMR♦or4Orafimd4inel5ipme5ubuiSMeNoverMer
Bliduar Up NEI, 46Mn Spam)
OAce Prep WorkImpec3on¢Report
J
P,.,.b..6helSpanhalelbngpC
RerYaw of Rep.-
16
..I.. Fln.1 SI Be Subrri�ab
13SM1on8
an Ns
er'vb0
w NRepon¢
Repms148Mn6pans)re
W2%MamEgmlmpma.re.-
=R-
We_2
1.
pan"a'.re4
rtw m ReportsLaborSubbtal:
510
511
rR ¢aX6 gas
CSy m K6Mm lna"dom mC Reom(35.05pm¢)
OIl a Pnp Work2
p 6
0
1031,502
E2a0
512
SM1o0Span ka,der.
519
CC ReeW.dR.,Ra
3
9361
6.10
LaborSubtataki
..Me R.Ser Lkt
e I0 0
0
16
>
4534]9
0
Sa•2
Labor SubbM:
Labor Sum: 1
0 Ip 4
{ 1 0 t
t♦
73
♦
350
0
5
33,•]B
$52,5/5
RDIRMIU peble Sum:
$0
lp Page 1 oft
1
1
1
1
1
1
1
1
1
1
2
2
2.
2'.
2
2.
21
2'
27
2!
31
3:
3:
3:
3'
3`
3E
3
31
3E
4c
41
4i
4:
44
4!
Kittitas County Bridge Inspections 2020
SID
Bridge No.
Bridge Name
Owner
Lastlnsp.
Date
Insp. Due
Date
1 08479900
04351
WESTSIDE RD-HILINE CAN
Kittitas County
2018-10-26
26 -Oct -20
2 08088700
60091
ROSS RD -TURBINE CANAL
Kittitas County
2018-11-19
19 -Nov -20
3 08240000
63181
HUNTZINGER R-WANAPUM RES
Kittitas County
2018-09-01
1 -Sep -20
4 08158900
78132
CANYON RD -WILSON CREEK
Kittitas County
2018-09-01
1 -Sep -20
5 08174700
79144
DENMARK RD-PARKE CREEK
Kittitas County
2018-11-19
19 -Nov -20
5 08388300
79291
THRALL RD -CHERRY CREEK
Kittitas County
2018-09-01
1 -Sep -20
7 08282100
88212
FAUST RD -TOWN DITCH
Kittitas County
2019-11-13
13 -Nov -20
3 08359200
88273
REECER CR RD -TOWN DITCH
Kittitas County
2019-11-13
13 -Nov -20
3 08123300
89113
SCHNEBLY RD-HILINE CAN
Kittitas County
2018-10-27
27 -Oct -20
) 08141800
89123
SCHNEBLY RD -COLEMAN CR
Kittitas County
2018-09-01
1 -Sep -20
1 07971500
95011
U PEOH PT RD-HILINE CAN
Kittitas County
2018-10-26
26 -Oct -20
> 07985000
95021
U PEOH PT RD-HILINE CAN
Kittitas County
2018-10-26
26 -Oct -20
3 07998200
95031
MOHAR RD-HILINE CANAL
Kittitas County
2018-10-26
26 -Oct -20
1 08047200
95061
WESTSIDE RD-HILINE CANAL
Kittitas County
2018-10-26
26 -Oct -20
i 08132600
96111
THORP PRAIRIE RD-HILINE
Kittitas County
2018-10-27
27 -Oct -20
i 08330400
97251
SMITHSON RD -DRY CREEK
Kittitas County
2018-09-01
1 -Sep -20
08422200
97311
THORP PRAIRIE RD-HILINE
Kittitas County
2018-10-27
27 -Oct -20
3 08348800
98265
SMITHSON RD-HILINE CANAL
Kittitas County
2018-10-27
27 -Oct -20
08370200
98271
REECER CR RD-HILINE CAN
Kittitas County
2018-10-27
27 -Oct -20
I 08382300
98281
L GREEN CAN RD-HILINE CA
Kittitas County
2018-10-27
27 -Oct -20
08758200
89053
BAR 14 RD - HILINE CANAL
Kittitas County
2018-10-27
27 -Oct -20
08852200
04201 -OB
NELSON SIDING -NO NAME CR
Kittitas County
2018-12-31
31 -Dec -20
08850000
04273
NELSON SIDING -LITTLE CREEK
Kittitas County
2018-11-20
20 -Nov -20
i 08851600
04292
NELSON SIDING -BIG CREEK
Kittitas County
2018-11-20
20 -Nov -20
08804900
05012
WF TEAN- MF TEAN RIVER
Kittitas County
2018-09-01
1 -Sep -20
08693000
60152 -OB
N BOHANNON RD -GRAVITY D.
Kittitas County
2019-11-22
22 -Nov -20
08693500
60222 -OB
S BOHANNON RD -GRAVITY D.
Kittitas County
2019-11-22
22 -Nov -20
08884600
60223 -OB
SILICA ROAD - PUMP DITCH
Kittitas County
2018-10-26
26 -Oct -20
08622900
78021
ANDERSON RD CULVERTS
Kittitas County
2018-11-27
27 -Nov -20
07966000
79011
NO 81 RD-0OOKE CREEK
Kittitas County
2018-11-19
19 -Nov -20
08875400
79045
KITTITAS HWY-COLEMAN CR
Kittitas County
2018-11-19
19 -Nov -20
08873800
79046
KITTITAS HWY-TOWN DITCH
Kittitas County
2018-11-19
19 -Nov -20
08041500
79061
THIRD AVE -TOWN DITCH
Kittitas County
2018-11-27
27 -Nov -20
08688600
79062 -OB
PFENNING RD -TOWN DITCH
Kittitas County
2018-10-27
27 -Oct -20
08691300
79092 -OB
N FERGUSON RD -COLEMAN CR
Kittitas County
2018-12-14
14 -Dec -20
08692200
79112 -OB
FAIRVIEW RD -TOWN DITCH
Kittitas County
2018-12-14
14 -Dec -20
08692300
79121 -OB
HEMINGSTON RD -CASCADE C.
Kittitas County
2018-12-14
14 -Dec -20
08718300
79122 -OB
PARKE CR RD -CASCADE CANA
Kittitas County
2018-12-14
14 -Dec -20
08692400
79123 -OB
PARKE CR ROAD -CARIBOU CR
Kittitas County
2018-10-28
28 -Oct -20
08692500
79134 -OB
CARROLL RD -CASCADE CANAL
Kittitas County
2018-12-27
27 -Dec -20
08178800 1
79141
ITJOSSEM RD -TOWN DITCH
Kittitas County
2018-11-19
19 -Nov -20
08692700
79142 -OB
TJOSSEM RD -CARIBOU CREEK
Kittitas County
2018-08-31
31 -Aug -20
08692600
79143 -OB
DENMARK RD -CARIBOU CREEK
Kittitas County
2018-12-17
17 -Dec -20
08693400
79151 -OB
TJOSSEM RD-COOKE CREEK
Kittitas County
2018-12-27
27 -Dec -20
08693900
79173 -OB
TJOSSEM RD -COLEMAN CREEK
Kittitas County
2018-08-31
31 -Aug -20
1of3
t
4
4
S
S
5
5
5
5
5
5
5
5
6
6
6
6
6
6.
6
6'
6.
6'
71
7:
7:
7:
7,
7!
7(
71
7E
7S
8(
8]
8'
8'
8z
85
8E
87
8E
85
9c
Kittitas County Bridge Inspections 2020
SID
Bridge No.
Bridge Name
Owner
Last Insp.
Insp. DueDate Date
6 08695000
79211 -OB
S FERGUSON ROAD-COOKE CR
Kittitas County
2018-12-31
31 -Dec -20
7 08695300
79221 -OB
S FERGUSON RD -CARIBOU CR
Kittitas County
2018-12-31
31 -Dec -20
8 08294500
79222
S FERGUSON RD-PARKE CR
Kittitas County
2018-11-19
19 -Nov -20
9 08695500
79223 -OB
SORENSON RD -CHERRY CREEK
Kittitas County
2018-08-31
31 -Aug -20
0 08827800
79242
IBADGER POCKET RD -JOHNSON DRAINAGE
Kittitas County
2018-11-19
19 -Nov -20
1 08695800
79244 -OB
ISCRENSON RD-WIPPEL WASTW
Kittitas County
2018-08-31
31 -Aug -20
2 08696000
79245 -OB
SORENSON RD -TOWN DITCH
Kittitas County
2018-12-27
27 -Dec -20
3 08696700
79261 -OB
DENMARK ROAD -CHERRY CR
Kittitas County
2018-12-17
17 -Dec -20
4 08696600
79262 -OB
DENMARK RD-WIPPEL WSTWAY
Kittitas County
2018-12-27
27 -Dec -20
5 08696900
79272 -OB
EMERSON RD-WIPPEL WSTEWA
Kittitas County
2018-12-31
31 -Dec -20
5 08697400
79281 -OB
MOE ROAD - CHERRY CREEK
Kittitas County
2018-08-31
31 -Aug -20
7 08687100
79282 -OB
MOE ROAD-WIPPLE WASTEWA
Kittitas County
2018-08-31
31 -Aug -20
3 08699100
79361 -OB
I BADGER PKT RD -BADGER CR
Kittitas County
2018-08-31
31 -Aug -20
) 08214700
80171
COLOCKUM RD-HILINE CANAL
Kittitas County
2018-11-19
19 -Nov -20
) 08162000
87131
S THORP HWY-WESTSIDE DIT
Kittitas County
2019-11-12
12 -Nov -20
t 08693200
88151 -OB
REECER CR RD- CASCADE C.
Kittitas County
2019-11-13
13 -Nov -20
2 08742300
88261
BOWERS RD -WHISKEY CR
Kittitas County
2018-11-20
20 -Nov -20
3 08742400
88262 -OB
BOWERS RD -CASCADE CAN
Kittitas County
2018-10-27
27 -Oct -20
( 08365200
88272
DRY CREEK RD -CURRIER CR
Kittitas County
2019-11-12
12 -Nov -20
i 08375800
88282
OLD HWY 10 -FLOOD CHANNEL
Kittitas County
2018-11-20
20 -Nov -20
i 08691200
89081 -OB
IWILSON CR RD- WHISKEY CR
Kittitas County
2018-10-27
27 -Oct -20
i 08099500
89091
NANEUM RD-HILINE CANAL
Kittitas County
2018-11-27
27 -Nov -20
t 08691600
89092 -OB
RADER ROAD-NANEUM CREEK
Kittitas County
2018-10-27
27 -Oct -20
i 08691900
89101 -OB
RADER ROAD-NANEUM CREEK
Kittitas County
2018-08-31
31 -Aug -20
1 08152800
89131
LESTER RD-HILINE CANAL
Kittitas County
2018-11-19
19 -Nov -20
0870i2go
sola 41 OB
enioInnu on rni rMA ro
29W ii
20 Ney 22n
0874439g
4o��no
FAIRY rnN on WI-ImP.4.41 GR
%iFiItdS-C-BHFlty
2919112
20 nyaon
08687900
89143 -OB
ISCHNEBLY RD-NANEUM CR.
Kittitas County
2018-10-27
27 -Oct -20
0
891444 ,neon
FAIRVION on rni moon GR
vttit GSWAVI,
2n�T9
20 Ney 20
08689000
89182 -OB
LOOK ROAD -MERCER CREEK
Kittitas County
2018-08-30
30 -Aug -20
08688900
89183 -OB
LOOK ROAD -MERCER CREEK
Kittitas County
2018-08-30
30 -Aug -20
08694900
89212 -OB
BRICKMILL RD-NANEUM CR.
Kittitas County
2018-12-13
13 -Dec -20
08695400
89221 -OB
BRICKMILL RD-SCHNEBLY CR
Kittitas County
2018-08-31
31 -Aug -20
08701800
89272 -OB
LYONS ROAD - CREEK
Kittitas County
2019-11-20
20 -Nov -20
08697300
89281 -OB
LYONS ROAD-NANEUM CREEK
Kittitas County
2018-12-13
13 -Dec -20
08697200
89284 -OB
GAME FARM RD-NANEUM CR.
Kittitas County
2018-08-31
31 -Aug -20
08697500
89291 -OB
LYONS ROAD-NANEUM CREEK
Kittitas County
2018-12-13
13 -Dec -20
08405900
89301
SANDERS RD -WILSON CREEK
Kittitas County
2018-11-27
27 -Nov -20
08697600
89302 -OB
GAME FARM RD -CASCADE CA
Kittitas County
2018-12-13
13 -Dec -20
08433400
89321
WILSON CR RD -CASCADE CAN
Kittitas County
2018-11-27
27 -Nov -20
08698900 1
89341 -OB
IWATSON ROAD -COLEMAN CR
Kittitas County
2018-10-27
27 -Oct -20
08466600
89342
VANTAGE HWY-CASCADE CAN
Kittitas County
2018-11-27
27 -Nov -20
08642000
96071
MARKOVICH RD-HILINE CANL
Kittitas County
2018-11-20
20 -Nov -20
08082300
96082
U PEOH PT RD-HILINE CAN
Kittitas County
2018-11-20
20 -Nov -20
08100100
96091
U PEOH PT RD- HILINE CAN
Kittitas County
2018-11-20
20 -Nov -20
2of3
9E
97
98
99
100
101
102
103
104
105
106
Kittitas County Bridge Inspections 2020
SID
Bridge No.
Bridge Name
Owner
Lastlnsp.
Insp. DueDate Date
08285300
97211
HAYWARD RD-HILINE CANAL
Kittitas County
2018-11-20
20 -Nov -20
08697900
97302 -OB
THORP PRAIRIE RD-RELEIF
Kittitas County
2018-08-30
30 -Aug -20
08687400
98321 -OB
SMITHSON ROAD -CREEK
Kittitas County
2018-10-27
27 -Oct -20
08699200
98322 -OB
CATTAIL ROAD - CREEK
Kittitas County
2018-10-27
27 -Oct -20
08772200
99201
NANEUM ROAD-NANEUM CREEK
Kittitas County
2018-09-01
1 -Sep -20
08698600
99322 -OB
THOMAS ROAD -WILSON CREEK
Kittitas County
2018-08-30
30 -Aug -20
08698500
99323 -OB
ITHOMAS ROAD - CREEK
Kittitas County
2018-08-30
30 -Aug -20
08698400
99324 -OB
THOMAS RD -WHISKEY CREEK
Kittitas County
2018-08-30
30 -Aug -20
08434800
99325
THOMAS RD-NANEUM CREEK
Kittitas County
2018-11-27
27 -Nov -20
08546100
CLE ELUM2
ROSLYN CR -ALLEY 5 OF IST
CLE ELUM
2019-12-03
3 -Dec -20
08546300
CLE ELUM3
ROSLYN CR -ALLEY N OF 1ST
CLE ELUM
2019-12-03
3 -Dec -20
08546400
CLE ELUM4
ROSLYN CR -ALLEY ACCESS
CLE ELUM
2019-12-03
3 -Dec -20
08546500
CLE ELUM5
ROSLYN CR -W IST ST
CLE ELUM
2018-11-20
20 -Nov -20
08516300
1 KITTITAS3
THIRD AVE BRIDGE
KITTITAS
2018-12-31
31 -Dec -20
08516400
1 KITTITAS4
ISECOND AVE BRIDGE
KITTITAS
2018-12-31
31 -Dec -20
08516500 1
KITTITASS
I KING ST BRIDGE
KITTITAS
2018-12-31
31 -Dec -20
3of3