1. Call to Order
2. Request to Approve a Resolution Correcting Scrivener Error on Resolution 2020-122, a
Resolution Authorizing the Chairs Signature on the Local Agency Federal Aid Project
Prospectus for the Bullfrog Road Project, CRP 300-20.
3. Request to Approve a Resolution to Authorize the Chair's Signature on County Road
Administration Board Rural Arterial Program Funding Contract.
4. Request to Approve a Resolution to Authorize the Chair's Signature on Washington State
Department of Transportation Amendment No. 1 to GM 752 (Interstate 90 and Sparks Road).
5. Baker Road Construction Traffic Discussion.
6. New Boat Launch with Washington State Department of Fish and Wildlife Discussion.
7. Other business
8. Adjourn
Created on 6/19/2020 9:20:16 AM
KITTITAS COUNTY
PUBLIC WORKS STUDY SESSION MINUTES
COMMISSIONERS' AUDITORIUM, 205 WEST 5TH ROOM 109 - ELLENSBURG
Regular Meeting
MONDAY 1:30 PM JUNE 22, 2020
Board members present: Chairman Brett Wachsmith, Vice -Chairman Laura
Osiadacz
Others: Candie Leader, Justin Turnbull, Arden Thomas, Public Works;
Dan Carlson, Lindsey Ozbolt, Calvana Carper, Jessica Miller, Mike
Flory, Community Development Services and Two (2) members of the
Public.
At 1:48 pm Chairman Brett Wachsmith opened the Public Works Study
Session.
NEW BOAT LAUNCH WITH WASHINGTON STATE DEPARMENT OF FISH AND WILDLIFE
DISCUSSION
Arden Thomas gave background on the ongoing issues with the current
boat launch on Ringer Loop. Arden Thomas explained the new project
being discussed and the use of the Stalder property acquired by the
Flood Control Zone District as a potential new site for the boat
launch. Arden Thomas continued that the neighboring property owner
is the City of Ellensburg and staff is looking for direction to begin
conversation with the City of Ellensburg on the project. Discussion
was held. Staff was directed to move forward with discussions with
the City of Ellensburg about the project.
REQUEST TO APPROVE A RESOLUTION CORRECTING SCRIVENER ERROR ON
RESOLUTION 2020-122, A RESOLUTION AUTHORIZING THE CHAIR'S SIGNATURE
ON THE LOCAL AGENCY FEDERAL AID PROJECT PROSPECTUS FOR THE BULLFROG
ROAD PROJECT, CRP 300-20
Justin Turnbull stated that Resolution 2020-122 was approved at the
last agenda session, however, an error in the title was discovered.
Justin Turnbull explained that this action is to correct that error.
Chairman Brett Wachsmith made a motion to approve Resolution 2020-124
correcting Scrivener Error on Resolution 2020-122, a Resolution
authorizing the Chair's Signature on the Local Agency Federal Aid
Project Prospectus for the Bullfrog Road Project, CRP 300-20. Vice -
Chairman Laura Osiadacz seconded the motion. Motion passed 2-0.
2020-06-22 MINUTES
REQUEST TO APPROVE A RESOLUTION TO AUTHORIZE THE CHAIR'S SIGNATURE ON
COUNTY ROAD ADMINISTRATION BOARD RURAL ARTERIAL PROGRAM FUNDING
CONTRACT
Justin Turnbull stated that the County Road Administration Board had
additional funding available for the Vantage Highway Overlay Project
and this action secures that funding for use. Chairman Brett
Wachsmith made a motion to approve Resolution 2020-125 Authorizing
the Chair's Signature on County Road Administration Board Rural
Arterial Program Funding Contract. Vice -Chairman Laura Osiadacz
seconded the motion. Motion passed 2-0.
REQUEST TO APPROVE A RESOLUTION TO AUTHORIZE THE CHAIR'S SIGNATURE ON
WASHINGTON STATE DEPARTMENT OF TRANSPORTATION AMENDMENT NO. 1 TO GM
752 (INTERSTATE 90 AND SPARKS ROAD)
Justin Turnbull presented the Resolution and Amendment for Board
consideration. Discussion was held. Chairman Brett Wachsmith made a
motion to approve Resolution 2020-126 Authorizing the Chair's
Signature on Washington State Department of Transportation Amendment
No. 1 to GM 752 (Interstate 90 and Sparks Road). Vice -Chairman Laura
Osiadacz seconded the motion. Motion passed 2-0.
BAKER ROAD CONSTRUCTION TRAFFIC DISCUSSION
Justin Turnbull gave background on the ongoing traffic issues in the
Evergreen Valley area and Baker Road. Vice -Chairman Laura Osiadacz
stated that she has been involved in discussions about this issue and
Suncadia is aware of the issue and would like to have a meeting
scheduled with all parties involved to get a solution. Staff was
directed to get a follow up meeting scheduled.
Meeting adjourned at 1:59 pm
2020-06-22 MINUTES
KITTITAS COUNTY COMMISSIONE:
KITTITAS COUNTY, WASHINGTON
Brett Wachsmith, Chairman
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2020 --04
CORRECTING SCRIVENER ERROR ON RESOLUTION NO. 2020-122 A
RESOLUTION AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL
AGENCY FEDERAL AID PROJECT PROSPECTUS FOR THE BULLFROG
ROAD PROJECT, CRP 300-20
WHEREAS: Resolution No. 2020-122 Authorizing the Chair's Signature on the Local
Agency Federal Aid Project Prospectus for the Bullfrog Road Project,
CRP 300-20 was approved and signed on June 16, 2020 by the Kittitas
County Board of Commissioners; and
WHEREAS: Said resolution inadvertently contained an error in the resolution title; and
WHEREAS: The resolution title should have read as shown below:
AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL
AGENCY FEDERAL AID PROJECT PROSPECTUS FOR THE
BULLFORG ROAD PROJECT. CRP 300-20
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners of
Kittitas County, Washington that the foregoing recitals are hereby
affirmed and that the title of Resolution 2020-122 is hereby corrected.
DATED on this 22nd day of June 2020, at Ellensburg, Washington.
\\\\1111111111111/////
Go�M SSIoly 9s
`h
[ 7 g1trk"of the B i Julie Kjorsvik
/TT�T11 COON
�"/111/11111111111\\U\\
9 -Deputy Clerk of the Board- Mandy Buchholz
4V LkI if
� l
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY
WAS GTON
Pretta smith, Chairman
L acz, ice -Chairman
ABSENT
Cory Wright, Commissioner
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2020 -�
AUTHORIZING THE CHAIR'S SIGNATURE ON COUNTY ROAD
ADMINISTRATION BOARD FUNDING CONTRACT FOR VANTAGE HIGHWAY
WHEREAS: The County Road Administration Board (CRAB) has previously allocated
$1,039,660 in Rural Arterial Program (RAP) funding toward Public Works'
Vantage Highway improvement project; and
WHEREAS: CRAB is now offering an additional $268,200 in funding towards the Vantage
Highway improvement project; and
WHEREAS: CRAB requires the Board of County Commission Chairman sign the funding
agreement on behalf of the full Board; and
WHEREAS: The additional funding offsets financial impact to the County Road Fund (106);
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby authorize the Chair's signature on CRAB's funding
contract providing and additional $268,200 in RAP funding towards the Vantage Highway
improvement project (RC1913).
DATED this 22nd day of June 2020, at Ellensburg, Washington.
g10 N ERS
` Oma•• ••� •�•''•. 2�`;
,J
i°
❑ Clerk of the Board- Julie Kjorsvik
C�a,Dy eputy Clerk of t e Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, 3KASHINGTON
Chairman
ABSENT
Cory Wright, Commissioner
STATE OF WASHINGTON - COUNTY ROAD ADMINISTRATION BOARD
RURAL ARTERIAL PROGRAM
PROJECT AGREEMENT FOR CONSTRUCTION PROPOSAL
AMENDMENT NO. 1
Submitting County: Kittitas Project Number: 1919-01 Date Approved: 04/25/2019
Road Number(s) Road Name(s) BMP(s) EMP(s) Segment #
94001 Vantage Highway - Overlay 21.250 27.510 1
This is Amendment No. 1 to the above described Project Agreement, between the County of Kittitas, hereinafter the "County" and
the State of Washington County Road Administration Board, hereinafter the "CRABoard."
WHEREAS, the COUNTY and CRABoard desire to amend the original Project Agreement to allow an increase in RATA funding
under the conditions described in WAC 136-161-070.
NOW, THEREFORE, pursuant to chapter 36.79 RCW and in consideration of the terms, conditions, covenants, and performance
contained herein, or attached and incorporated and made a part hereof,
IT IS MUTUALLY AGREED AS FOLLOWS:
The following new language is added as section 15 to the Project Agreement:
RATA funding is increased by $268,200 to $1,307,860 per CRABoard approval dated 04-16-20 and as authorized under WAC 136-
161-070.
2. All other terms and conditions of the original Project Agreement shall remain in full force and effect except as modified by
this Amendment No. 1.
IN WITNESS WHEREOF, the PARTIES hereto have executed this AMENDMENT No. 1 as of the PARTY's date last signed below.
COUNTY ROAD ADMINISTRATION BOARD:: '
By: AL4
Date: �Zq�Lp
Kittitas, COUNTY:
By:
Date: A, -n-, 7--Z I. 7-47 ZC)
Page 1 of 1 AMENDMENT NO. 1
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2020 - 12b
AUTHORIZE THE CHAIR'S SIGNATURE ON AMENDMENT NO. 1 TO
WASHINGTON STATE DEPARTMENT OF TRANSPORTATION AGREEMENT
GM 752
WHEREAS: The Kittitas County Board of County Commissioners entered into a general
agreement with the Washington State Department of Transportation (WSDOT)
supporting Interstate 90 (I-90) construction with agreement GM 752; and
WHEREAS: WSDOT is embarking on another phase of I-90 construction impacting existing
westbound lanes and a portion of Sparks Road; and ,
WHEREAS: Both parties to the agreement concur that actions contemplated in Amendment
No. 1 to GM 752 are in each other's interest and the interest of the motoring
public;
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby authorize the Chair's signature on Amendment No. 1 to
WSDOT agreement GM 752.
DATED this 22nd day of June 2020, at Ellensburg, Washington.
` o°„nwuninnp,,
SIONEq '%
=Q •. �/ 'fie;
Alt . TA,
❑ Clerk of the Board- Julie Kjorsvik
G�eputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Brett W chsmith, C airman
aura si ce-Chairman
ABSENT
Cory Wright, Commissioner
GM 752 Amendment No. 1
WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
AND KITTITAS COUNTY
Interstate 90 and Sparks Road
This Amendment No. 1 to Agreement GM 752 is made and entered into between the
Washington State Department of Transportation, hereinafter the "STATE," and Kittitas
County, hereinafter the "COUNTY"; together the "Parties".
WHEREAS, the Parties entered into Agreement GM 752 on May 23, 1973, which contained
certain terms and conditions related to the construction of Interstate 90 and to certain
intersecting County roads and frontage roads; and
WHEREAS, the Agreement obligated the State to convey certain lands in fee simple
interest to the County, one segment of which was that portion of what is now known as
West Sparks Road in the vicinity of and passing under Interstate 90. This was done by
Quit Claim Deed recorded under Auditor's File No. 430495; and
WHEREAS, the Agreement obligated the State to convey an easement to the County for
the portion of what is now known as West Sparks Road that passes under the westbound
lanes of Interstate 90. This conveyance never took place; and
WHEREAS, the State now requires ownership of a portion of West Sparks Road that was
conveyed to the County by the Quit Claim Deed cited above for its current project involving
the realignment of the westbound lanes of Interstate 90; and
WHEREAS, the State will eventually abandon or surplus the existing westbound lanes of
Interstate 90 after construction of the new westbound lanes is complete, and
WHEREAS, the State must convey an easement to the County prior to the abandonment of
the former westbound lanes of Interstate 90 so that West Sparks Road can remain intact,
and
1
WHEREAS, it is in the interests of the Parties and the motoring public that the terms and
conditions of GM 752 and this Amendment are fulfilled;
NOW, THEREFORE, for and in consideration of the exchange of real property interests, the
terms, conditions, covenants and performances contained herein, together with the
attached Exhibits which are incorporated and made a part hereof,
IT IS MUTUALLY AGREED AS FOLLOWS:
1. After the construction of the new westbound lanes of Interstate 90 and prior to the
State abandoning and/or surplusing the formerwestbound lanes of Interstate 90, the
State will convey an easement to the County for that portion of West Sparks Road
that crosses under the westbound lanes of Interstate 90 that are to be
abandoned/surplused by the State as shown in green on Exhibit A, attached hereto
and by this reference incorporated herein.
2. The County will convey back to the State a portion of West Sparks Road as shown
in red on Exhibit A prior to December 31, 2020 by Quit Claim Deed. The State shall
provide to the County the deed and legal description of the portion of West Sparks
Road to be conveyed.
All other terms and conditions of the original Agreement shall remain in full force and effect
except as modified by this Agreement Amendment No. 1.
IN WITNESS WHEREOF, the Parties hereto have executed this Agreement Amendment
No. 1 as of the Party's date signed last, below.
KITTITAS COUNTY
B
2
WASHINGTON STATE DEPARTMENT OF
TRANSPORTATION
By:
Todd Trepani , P.E.
SCR Regional Administrator
.`P G OMMIS
s�0
vN Date:
5 U? 1
SEAL z
Att
UNTY o``
"'�n'lluullwno\
Dated this day of 20tfm
APPROVED AS TO FORM:
Counte/Prosecutor
Date:
ICde - °=eIu R t aerg
mnS.0 - N pp S1L V..p 8a �w � r yPH mPoi
°$13';. �4n euvof = g aq ��O2f / di�oPe nFlyo
0$-
Iii �.es �j0 Ca, r� A �exe•o /// iro" r��'�f. 5
of
'RA u at44p
k, �11
f p q0 of d" �F+�11 eh `V N p
e � � L ✓ n i � ��+ '1"r A SSCiOJ11^ ��� � e l , i O 1' ^C r ` A
40 7
s ao• ..1 �.s I'�d� r e
e
pa
NA
4' FJy `f f .i rYQ y\ o�R :! Q ` �; 4^"^ •rCG
�y t & !. D f �T •]
I �.��E��Np 1'. � e� `, ep •to 3Y8gg glr �t� �z � �; c> mns°_°
ante ` r £Fe
Ge.Of AAoa
v
.3 - f'• 1 # . n
MT
41,
¢q
3°ki!
Ei • '� o't"
yaWii a;
a_ x
L a o ai 34. a'1,5
I� np r
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: June 22, 2020
ACTION REQUESTED: Request to Approve a Resolution Correcting Scrivener
Error on Resolution 2020-122, a resolution Authorizing the
Chair's Signature on the Local Agency Federal Aid Project
Prospectus for the Bullfrog Road Project, CRP 300-20.
BACKGROUND: On June 16, 2020 the Board of County Commissioners
approved Resolution 2020-122 Authorizing the Chair's
Signature on the Local Agency Federal Aid Project
Prospectus for the Bullfrog Road Project, CRP 300-20.
After Board approval it was discovered that the title of said
resolution contained a scrivener's error and needs to be
corrected.
INTERACTION: Public Works
RECOMMENDATION: Approve the Resolution Correcting Scrivener Error on
Resolution 2020-122, a resolution Authorizing the Chair's
Signature on the Local Agency Federal Aid Project
Prospectus for the Bullfrog Road Project, CRP 300-20.
HANDLING: Return two (2) originals to Public Works
ATTACHMENTS: Resolution
LEAD STAFF: Mark Cook, Director
BOARD OF COUNTY COMMISSIONERS
COUNTY OF K{ITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2020 -
CORRECTING SCRIVENER ERROR ON RESOLUTION NO. 2020-122 A
RESOLUTION AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL
AGENCY FEDERAL AID PROJECT PROSPECTUS FOR THE BULLFROG
ROAD PROJECT, CRP 300-20
WHEREAS: Resolution No. 2020-122 Authorizing the Chair's Signature on the Local
Agency Federal Aid Project Prospectus for the Bullfrog Road Project,
CRP 300-20 was approved and signed on June 16, 2020 by the Kittitas
County Board of Commissioners; and
WHEREAS: Said resolution inadvertently contained an error in the resolution title, and
WHEREAS: The resolution title should have read as shown below:
AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL
AGENCY FEDERAL AID PROJECT PROSPECTUS FOR THE
BULLFORG ROAD PROJECT, CRP 300-20
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners of
Kittitas County, Washington that the foregoing recitals are hereby
affirmed and that the title of Resolution 2020-122 is hereby corrected.
DATED on this 22nd day of June 2020, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY,
WASHINGTON
Brett Wachsmith, Chairman
Laura Osiadacz, Vice -Chairman
Cory Wright, Commissioner
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: June 22, 2020
ACTION REQUESTED: Request to Approve a Resolution to Authorize the Chair's
Signature on County Road Administration Rural Arterial
Program Funding Contract
BACKGROUND: The County Road Administration Board (CRAB) is
offering additional Rural Arterial Program (RAP) funding
for our Vantage Highway safety project. CRAB is offering
an additional $268,200 increasing total project funding to
$1,307,860. The project overlays failing asphalt and
replaces all guardrail. The project limits extend from
Vantage to the top of the hill.
INTERACTION: Public Works.
RECOMMENDATION: Approve the Resolution to authorize the Chair's signature
on the CRAB RAP funding contract.
HANDLING: Return one original to Public Works.
ATTACHMENTS: Resolution; CRAB funding agreement.
LEAD STAFF: Mark R. Cook, Director
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2020 -
AUTHORIZING THE CHAIR'S SIGNATURE ON COUNTY ROAD
ADMINISTRATION BOARD FUNDING CONTRACT FOR VANTAGE HIGHWAY
WHEREAS: The County Road Administration Board (CRAB) has previously allocated
$1,039,660 in Rural Arterial Program (RAP) funding toward Public Works'
Vantage Highway improvement project; and
WHEREAS: CRAB is now offering an additional $268,200 in funding towards the Vantage
Highway improvement project; and
WHEREAS: CRAB requires the Board of County Commission Chairman sign the funding
agreement on behalf of the full Board; and
WHEREAS: The additional funding offsets financial impact to the County Road Fund (106);
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby authorize the Chair's signature on CRAB's funding
contract providing and additional $268,200 in RAP funding towards the Vantage Highway
improvement project (RC1913).
DATED this 22nd day of June 2020, at Ellensburg, Washington.
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY. WASHINGTON
Brett Wachsmith, Chairman
Attest:
❑ Clerk of the Board- Julie Kjorsvik
Laura Osiadacz, Vice -Chairman
❑ Deputy Clerk of the Board- Mandy Buchholz
Cory Wright, Commissioner
STATE OF WASHINGTON - COUNTY ROAD ADMINISTRATION BOARD
RURAL ARTERIAL PROGRAM
PROJECT AGREEMENT FOR CONSTRUCTION PROPOSAL
AMENDMENT NO. 1
Submitting County: Kittitas Project Number: 1919-01 Date Approved: 04/25/2019
Road Number(s) Road Name(s) BMP(s) EMP(s) Segment #
94001 Vantage Highway - Overlay 21.250 27.510 1
This is Amendment No. 1 to the above described Project Agreement, between the County of Kittitas, hereinafter the "County" and
the State of Washington County Road Administration Board, hereinafter the "CRABoard."
WHEREAS, the COUNTY and CRABoard desire to amend the original Project Agreement to allow an increase in RATA funding
under the conditions described in WAC 136-161-070.
NOW, THEREFORE, pursuant to chapter 36.79 RCW and in consideration of the terms, conditions, covenants, and performance
contained herein, or attached and incorporated and made a part hereof,
IT IS MUTUALLY AGREED AS FOLLOWS:
The following new language is added as section 15 to the Project Agreement:
RATA funding is increased by $268,200 to $1,307,860 per CRABoard approval dated 04-16-20 and as authorized under WAC 136-
161-070.
2. All other terms and conditions of the original Project Agreement shall remain in full force and effect except as modified by
this Amendment No. 1.
IN WITNESS WHEREOF, the PARTIES hereto have executed this AMENDMENT No. 1 as of the PARTY's date last signed below.
COUNTY ROAD ADMINISTRATION BOARD: Kittitas COUNTY:
By: By:
Date:
Date:
Page 1 of 1 AMENDMENT NO. 1
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: June 22, 2020
ACTION REQUESTED: Approve a Resolution to Authorize the Chair's Signature
on Washington State Department of Transportation
Amendment No. 1 to GM 752 (Interstate 90 and Sparks
Road)
BACKGROUND: In May 1973, the Washington State Department of
Transportation (W SDOT) and the Kittitas County Board of
County Commissioners agreed to mutually support
construction of Interstate 90 in Kittitas County. A small
portion of Sparks Road was omitted from agreement
exhibits. The pending I-90 improvements now require
amending the general agreement (GM 752) reflecting the
new westbound lanes and the required overcrossing of
Sparks Road. DPA Caulkins has reviewed the amendment
and approved as to form.
INTERACTION: Public Works
RECOMMENDATION: Authorize the Chair's signature on Amendment 1 to
WSDOT Agreement GM 752.
HANDLING: Return one original to Public Works.
ATTACHMENTS: Resolution; GM 752 and amendment 1.
LEAD STAFF: Mark R. Cook, Director.
r ��"�.�w / ,
AGRL'EMEi1T 6
gym`✓LG 52
t
Tl is AG;„_._I,.. ;i, made and ent,ared into this eC�Jl=i__ day o` U Pr_
19'�a
, by d between the State of Va'sh'_ngton, 'Washington State laghww Commission,
acting by and through the Director of Hin,hvmys, hereinafter called the "State", and
the Board of Commissioners of Kitt:it2s County, hereinafter referred to as the "County".
VaMREAS, the State plans, the construction of a fully access controlled
four lane highway, SR 90 from Milepost 67.41 to 72.22 in the vicinity of Easton
to replace existing SR 90, and
VI!ERL-AS, such construction is necessary to provide a highway facility con-
sistent with standards established for the functional classification assigned by the
Vashi.ngton State Highway Commission to SR 90 in this area, and
the above -noted construction requires the rearrangement of certain
existinu uuu",y i..& un d the, conctr"Vion of access and frontage roads to
preserve access to adjacent properties,
NOW T,IEREFORE, in accordance with a policy entitled "Design Standards for
Rearranged County Roads, Frontage Roads, Access Roads, Interoections, Romps and
Crossings", approved May 20, 1966, by the Vashi.ngton State Association of County
Commissioners and approved August 15, 1966, by the Vashington State Highway Coamissi.on,
by Resolution No. 1773 or amendments thereto, which by this reference is made a part
hcrcof for all intents and purposes as if fully set forth herein,
IT IS MUTUALLY AG2ErD THGT:
t
The State will construct such county road connections and frontage roads
as are shown marked in red and green on attached Exhibit "A", which is hereby made
a part of this agreement. The State will further construct such roachiays in conformance
with Washington State Standard Specifications for Road and 5riiige Construction, and in
PROPERTY MANAGEMENT
Inventory Control Number
.r_
accordance with r.et:d;.c.y sectiora as indicated an Exhibit L" , which is hrxeby msdc
a part of this agreement,
This agreement covers the folloai.ng roads shown on Exhibits "A" and "B",
County Road Name Identification Prefix Shown on Attached
IA -.Line Exhibit A, Sheet 1 of 5
Exhibit B, Sheet 1-B of 3
FR -
Lane
Exhibit A,
Sheet
1,
2,
3, & 4
of 5 Exhibit B,
Sheet
1 of 3
LN -
Iine
Exhibit A,
Sheet
2
of
5
Exhibit L',
Sheet
1
of
3
WX -
Line
Exhibit A,
Sheet
3
and
4 of 5
Exhibit Ls,
Sheet
2
of
3
B -
Line
Exhibit A,
Sheet
5
of
5
Exhibit P,,
Sheet
3
of
3
Upon completion of construction of all or part of the roads described im-
mediately above, an inspection will be made by appropriate representatives of the
State and County to determine that said road connections were constructed in confor-
mance with the attached Exhibits "A" and "B" and in a wanner acceptable to the County.
Upon thb satisfactory completion of said inspection, the Washington State Highway
Department District Engineer shall notify the County in writing and the County shall
inmiediately accept the maintenance responsibilities of those inspected sections of
;State constructed roadway as shorn in red and green on the attached Exhibit "A".
Within one (1) year from the date of acceptance by the County of maintenance
responsibilities for such inspected .roads, the State agrees to provide and transfer
all instruments of title for such areas of right of way as Kown inred on the attached
Exhibit "A", and to provide and transfer by easement the areas of right of way shown
in green on the attached Exhibit "A".
The County shall maintain said rights of way and roads described herein in
conformity with the recognized requirements for maintenance of the type of roans in-
volved.
Wlthiu Un_ r..""ns Lo be transferred to We County under this agrce,nent, the
County .agrees to protect access, control co l ubli.shed by the Washington State I r.,ji gay
Commkoion as shown on the attached Exhibit A.
The County h•sreby agrees to protect the State of Oashington and hold. the
State harmless from liability or loss of any nature arising out of the performance
of this agreement on the pert of the County, its employees, contractors, or assigns.
IN WITNESS MOM, the parties ha'._ executed this agreement as of the clay
and year first above ixi.tten.
COUNTY OF KITTITAS
BOARD OF COUNTY COMNISSDOIERS
Ch --airmen
e / STATE OF WAS!iIGTON
VIASHIP;GTON STATE HIGH"!AY CO&AS!SIO;
County Auditor and Clerb of Board+ L ZZ��
Assistant Direct.or'for Planning,
Research and Mate Aid
Approved as to form-,
Aa'istant-Attorney General
t_
ce
ID
11,
o`
GovT. L „ Lua o
k� hti LOTS SEC?
d y ie°'•a,$ �' .. �` casa�a2 Ta�r1•
2[w` ' IDp�u i�4 ryby �'\ / • LL j/ 9/F AE SWS NES SFG.i
b_--• "e9°N{ FME i N[ i / ' �!*S °0.b
10 $. �
°co'ur`vneuz �.E=1.; i ,,•' ,Pa`
z,,
L,e Wp L
° +.o ^ ] �\ / ay "` "'"`I'.'w"W....wr ""` "/ / 4 % J •'t�!/ !e dao
�" / �uLANE EASTON
aoa.. $34'a °d We/
� �� STATE PARK
GW T LOT 6 SEC.3 \�/ N mj8 .# C'v� 3i/ /'� NW If 9E'S 4.C.3
16
LEGEND e
xET
/ 91.rie�eo �� 9 v asl 11� - C / / e �' iy % •f° /'
°EXili61��0. A
y \, 1 v �_ e a NP exryExr :
W � \ ♦ewNII. 0.,)EN NW Si)EC.3
VE /d eSW V SEC
d —9. C60SSINS 21
...e. e.. C-11
- [v _ d. .n / j uox'°o+' nEXHIBIT A
-
8" _ ,��Js r.:. „ - . ` r" \ e eu,we,*tlw:ree -•,.,�
SSI3z
z hIN,»� sb �' °a \ ExeE "xnra'"j f uw wunrowr.
! F ACCESS NOTE ustox .1-1 ox
�\ "Q+\ w...� \\\ see. xL I.xE _T..es.,s:.
�• ° FW'ri NW'4 1. Q �a—T/ --�eee
SEC f�
o .
NATE E waCEe cein t v "
s - EEFEE SKExEET � i ---
OWNE p \
fM Sol MEE
eide6 'euAxeem xooMllx M '=E f ei xa a 1 'w' �ia��
SMS ..Se......�� _�=� ...... m.+n.«..."n..
A
N
d_
N
v
0
G
MI
4t4'^' Fps
�I
x
�q c�,nr«n ad Zi
m
w
c
a
3
v
N
to
M
ZOO
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2020 -
AUTHORIZE THE CHAIR'S SIGNATURE ON AMENDMENT NO. 1 TO
WASHINGTON STATE DEPARTMENT OF TRANSPORTATION AGREEMENT
GM 752
WHEREAS: The Kittitas County Board of County Commissioners entered into a general
agreement with the Washington State Department of Transportation (WSDOT)
supporting Interstate 90 (I-90) construction with agreement GM 752; and
WHEREAS: WSDOT is embarking on another phase of I-90 construction impacting existing
westbound lanes and a portion of Sparks Road; and
WHEREAS: Both parties to the agreement concur that actions contemplated in Amendment
No. 1 to GM 752 are in each other's interest and the interest of the motoring
public;
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby authorize the Chair's signature on Amendment No. 1 to
WSDOT agreement GM 752.
DATED this 22nd day of June 2020, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Brett Wachsmith, Chairman
Laura Osiadacz, Vice -Chairman
Cory Wright, Commissioner
GM 752 Amendment No. 1
WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
AND KITTITAS COUNTY
Interstate 90 and Sparks Road
This Amendment No. 1 to Agreement GM 752 is made and entered into between the
Washington State Department of Transportation, hereinafter the "STATE," and Kittitas
County, hereinafter the "COUNTY"; together the "Parties".
WHEREAS, the Parties entered into Agreement GM 752 on May 23, 1973, which contained
certain terms and conditions related to the construction of Interstate 90 and to certain
intersecting County roads and frontage roads; and
WHEREAS, the Agreement obligated the State to convey certain lands in fee simple
interest to the County, one segment of which was that portion of what is now known as
West Sparks Road in the vicinity of and passing under Interstate 90. This was done by
Quit Claim Deed recorded under Auditor's File No. 430495; and
WHEREAS, the Agreement obligated the State to convey an easement to the County for
the portion of what is now known as West Sparks Road that passes under the westbound
lanes of Interstate 90. This conveyance never took place; and
WHEREAS, the State now requires ownership of a portion of West Sparks Road that was
conveyed to the County by the Quit Claim Deed cited above for its current project involving
the realignment of the westbound lanes of Interstate 90; and
WHEREAS, the State will eventually abandon or surplus the existing westbound lanes of
Interstate 90 after construction of the new westbound lanes is complete, and
WHEREAS, the State must convey an easement to the County prior to the abandonment of
the former westbound lanes of Interstate 90 so that West Sparks Road can remain intact,
and
1
WHEREAS, it is in the interests of the Parties and the motoring public that the terms and
conditions of GM 752 and this Amendment are fulfilled;
NOW, THEREFORE, for and in consideration of the exchange of real property interests, the
terms, conditions, covenants and performances contained herein, together with the
attached Exhibits which are incorporated and made a part hereof,
IT IS MUTUALLY AGREED AS FOLLOWS:
1. After the construction of the new westbound lanes of Interstate 90 and prior to the
State abandoning and/or surplusing the formerwestbound lanes of Interstate 90, the
State will convey an easement to the County for that portion of West Sparks Road
that crosses under the westbound lanes of Interstate 90 that are to be
abandoned/surplused by the State as shown in green on Exhibit A, attached hereto
and by this reference incorporated herein.
2. The County will convey back to the State a portion of West Sparks Road as shown
in red on Exhibit A prior to December 31, 2020 by Quit Claim Deed. The State shall
provide to the County the deed and legal description of the portion of West Sparks
Road to be conveyed.
All other terms and conditions of the original Agreement shall remain in full force and effect
except as modified by this Agreement Amendment No. 1.
IN WITNESS WHEREOF, the Parties hereto have executed this Agreement Amendment
No. 1 as of the Party's date signed last, below.
KITTITAS COUNTY
ME
2
WASHINGTON STATE DEPARTMENT OF
TRANSPORTATION
IN
Todd Trepanier, P.E.
SCR Regional Administrator
Date:
Attest:
Dated this day of 2019
APPROVED AS TO FORM:
.4 p 2175
Cour rosecutor
Date:
rR
' ;z iEpti33 e"i py n ¢ Q� R
Y i°ski#[57'3Rf gag ut
l:g
I��vg.tig�yi� xaW 8 is mg � s �1
o oza e%W
C � ODp• 777l A (W��, )<i �' s I I [
dddd s iy a
-I�, � ♦ a `i gg94 �iA
T��
PI. �/ / . sy'" \\�\'\• \\\\\ S@ r \Y'�RF,r��c\'!t�d�ld �a*'�, \ :� �e`D�a•"�.o' a\4\.b\.`F\ .. 'sf�\[ \\ \ \ \ ai� ��'4ij =opj{�YY{{PleeeP4 3 �aW ;Fe2, � = � �F
��Ij�
'
$I�
die
V
Ile
rs
OS
r• tri 1 C J.d' e'P ei \ ' 1. �? r' �' F L
�&.yrs �^i ` � �1tn '• . J' 'ss �*�oe i •..a\h F+t � �
J` .r PLL.
oo•u m
IT
o i . m . . - 8880. i •P`.`� "6° s R"8e �`\ / �.
p0 [�j .tog g' $'D'J• �\ y M VY Mu [£<�� \ II
Z
I �p rJ Ay
-i^
Le I
\ KJJiiN.
•, oo.ea Qes � � ��\\\ _Ib 4 ��ew —�� /• / � ya.e+ s 'ry p.�l«�
LLI oo. hPc D ,\ :��� �s.jp x °D^^� W� i � .a4 �a�• �
P C'�
? /rfs/ cerd•ast a^„ .�.+. �� \ ' r A 8 'i
¢r•'n edea I j .S IIII '�^P... > Ct eOOpp 2 r E'
�53 sc �yo .M•tLP-0 dv 'v�^ oon
v py W.[Lp O'QiOCFJ � nSi Y.k
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: June 22, 2020
TOPIC: Baker Road Construction Traffic
ACTION REQUESTED: Direct Temporary Road Closure
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Direct staff temporarily close Baker Road to Suncadia construction traffic.
BRIEFING SUMMARY:
• Suncadia construction traffic is using Baker Road as primary access.
• Evergreen Valley residents are aggravated over the traffic.
• Suncadia maintains a locked access at Highway 903.
• Suncadia has consistently stated concern over access to the resort via
Baker Road as being problematic for the resort.
BACKGROUND:
For the past several years, Suncadia construction traffic has used Baker Road supporting
significant Suncadia construction. This access avoids having to traverse the development
from the main entrance on Bullfrog Road. Numerous attempts to get the locked gate
open at Highway 903 have failed. Increasing frustration on the part of Evergreen Valley
residents may likely end up with a law enforcement response at some point if left
unmanaged. Last year, Public Works (PW) placed jersey barriers in the roadway
thwarting construction access. This action was taken without Board coordination and
was removed a short time later.
DISCUSSION:
Suncadia has attempted on several occasions to engage PW on vacating Winston Creek
Road. This roadway is the old access road over Cle Elum River and remains in public
ownership. PW has reached out to Suncadia requesting that construction traffic be
allowed to utilize Swiftwater Drive at Highway 903 without success. Closing Baker
Road to construction traffic is expected to result in complaints from the construction
industry. Access will shift to the main entrance of the resort on Bullfrog Road. PW
proposes placing barriers in a manner allowing recreational access to Winston Creek
Road while thwarting use of the road by construction vehicles. In a recent communication
from Mr. Steve Lathrop (representing Suncadia interest in the matter), he states that
Suncadia has no objection to and supports the temporary closure of Baker Road to all
Page 1 of 4
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
traffic. Closing the road to construction traffic is expected to be met with approval from
Evergreen Valley residents. Resolving the fate of Winston Creek Road while
maintaining recreational access for county residents appears to be in the best interest of
the County, US Forest Service and Suncadia. The temporary closing of Baker Road to
construction traffic appears to be the first step in the process of resolution.
FISCAL IMPACTS:
The cost of advertising notice and barrier placement is expected to cost in the range of
$1,000 to $2,000.
ATTACHMENTS:
Exhibit 1: Map
Exhibit 2: Lathrop Electronic Communication
Page 2 of 4
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
Page 3 of 4
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
oill Co
a O
M CL
Pi y W y
m
n
C) O
w c
z
0
A
Z
fD
m
W
9
L
I
`.L
r
wnw+
i)
CL
AAte,,•
0� W
w
W �
N
.ZI
aC 'A
V'A,
/ VA,,
Q
00
a�
CD
0
M
CL
EXHIBIT 2: LATHROP ELECTRONIC COMMUNICATION
Page 4 of 4
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
Candie Leader
From: Steve Lathrop <Steve@lwhsd.com>
Sent: Thursday, June 18, 2020 3:53 PM
To: Mark Cook
Cc: Candie Leader; Lindsey Ozbolt; Roger Beck (rbeck@suncadia.com); Kittleson, Gary
(g kittleson @su ncad i a.com)
Subject: RE: Highway 903
Thanks for letting Suncadia comment on your draft study session memorandum on the temporary closure of Baker
Road, the only objections to which are the portions casting Suncadia as opposing the closure and "forcing construction
traffic" through Evergreen Valley. Suncadia has consistently viewed the access to the resort via Baker Road as a problem
and has attempted to make all traffic, not just construction, use Swiftwater Drive and Suncadia Trail to the main
Suncadia entrance. As a public road coupled with the old easements, Suncadia has no authority to close or reroute it,
and there remains the positions of BOR/USES as to access to the old campground and the river. The gate at 903 is an
option but staffing is a problem for now due to cost.
To be clear: Suncadia has no objection to and supports the temporary closure of Baker Road to all traffic. Please note
that the development agreement with the county and Suncadia's covenants prohibit ATV type vehicles and all motorized
vehicles are prohibited in the Cie Elum River Corridor. Again, Suncadia may not be able to prevent some vehicular use of
the public road itself, but will object to any and all use which attempts to leave that limited area.
It would be appreciated if you could adjust your comments to better reflect Suncadia's position on this matter. As
always, thank you for your courtesies in allowing Suncadia's comments.
F. Steven Lathrop, Attorney at Law
Lathrop, Winbauer, Harrel, Slothower & Denison, LLP
Direct Telephone: 509-925-5622; Direct Fax: 509-925-3861 Mobile: 206-799-0728
steve(cDlwhsd.com
NOTICE: This e-mail message and its attachments are confidential and/or attorney work product and subject to the
attorney-client communication privilege. This e-mail is being transmitted to and is intended only for the use of the recipient
named above. Reading, disclosure, discussion, dissemination, distribution, or copying of this email, attachments to this
email and the information contained herein by anyone other than the named recipient or his or her employees or agents is
strictly prohibited. If you have received this e-mail in error, please immediately notify the sender by reply e-mail and delete
and/or destroy the original and all copies of the e-mail.
From: Mark Cook <mark.cook@co. kittitas.wa.us>
Sent: Monday, June 15, 2020 4:46 PM
To: Steve Lathrop <Steve@lwhsd.com>
Cc: Candie Leader <candie.leader@co.kittitas.wa.us>; Lindsey Ozbolt<lindsey.ozbolt@co.kittitas.wa.us>
Subject: Highway 903
I have attempted to locate the gated access requirement for Swiftwater Drive at Highway 903 to no
avail. Neighbors are agitated with Suncadia construction traffic along Baker Road. I intend requesting road
closure at Baker attempting to deal with the construction traffic issue. I am attaching a draft brief for your
read. I welcome any insight you might have on the issue prior to finalizing and presenting to the Board of
County Commissioners. I have also discussed relocation of Winston Creek Road with the Forest Service and
they appear open to discussing the matter will all parties. Regards, Cook.
Mark R. Cook, PE
Public Works Director
Direct line: 509-962-7692
Cellular: 509-859-6879
Electronic mail address: mark.cook co.kittitas.wa.us
The information transmitted by this email is intended only for the person or entity to which it is addressed. This email may contain confidential anther privileged
material. If you are not the intended recipient of this message, be aware that any use, review, retransmission, distribution, or reproduction is strictly prohibited, If
you received this in error, please contact the sender immediately and delete the material from all devices,
message id: 38eb45916c6dcbdac24bb3719d004a14
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: June 22, 2020
TOPIC: Washington Department of Fish and Wildlife Potential Use of Stalder Property
for a New Boat Launch
ACTION REQUESTED: Direction to staff regarding communication with City of
Ellensburg regarding the relocation of the WDFW South
Ringer Road Boat Launch.
LEAD STAFF:
Arden Thomas.
RECOMMENDATION:
Direct staff to reach out to the City of Ellensburg for including the City in conversations
between the Washington Department of Fish and Wildlife (WDFW) and Kittitas County
regarding the potential relocation of the South Ringer Road Boat Launch to an alternative
site located on County -owned property (formally the Stalder property).
BRIEFING SUMMARY:
• The WDFW boat launch at South Ringer Road is a heavily used boat launch site
site.
Within the Ringer Road vicinity, the Yakima River is experiencing large channel
changes, threatening the boat launch. Large wood in the river immediately
downstream of the boat launch is a safety hazard for boaters.
The Kittitas County Yakima River Public Access Plan identifies the flooding and
safety concerns at the South Ringer Loop site and identifies the Thrall Road /
Wilson Creek Access site as the first safe access to the Yakima River below Irene
Reinhard Park. This site is owned by Kittitas County and is also referred to as the
Stalder Property.
Kittitas County (Public Works and Sheriff's Office) and WDFW staff have been
meeting to discuss the feasibility of locating a boat launch at the Stalder Property.
WDFW has determined that there is sufficient space for the site to meet its design
criteria and has selected a preferred access route that would continue to utilize
South Ringer Road. City of Ellensburg property may need to be crossed to utilize
this access.
• Staff recommends that these discussions include the City of Ellensburg.
Page 1 of 4
PUBLIC WORKS BOARD OF COUNTY CON1MISSIONERS WORK SESSION STAFF REPORT
BACKGROUND:
Kittitas County Public Works acquired the Stalder Property with Yakima Basin
Integrated Plan funding on May 15, 2017. In discussions with WDFW, public works staff
has expressed openness to considering this site as an alternative location for the WDFW
South Ringer Road Boat Launch, given flood and safety concerns associated with the
current boat launch. WDFW has determined that the Stalder property is a feasible
location and is recommending site access from South Ringer Road, where a railroad
crossing is already established. This access may also cross land owned by the City of
Ellensburg. WDFW would like to pursue grant funding to develop the Stalder site.
DISCUSSION:
Public Works will be conducting a property survey of the Stalder Property this summer to
verify the property boundary. If the boat launch is relocated to the Stalder Property,
WDFW is expected to need to have control and tenure of the property. Kittitas County
would also need to work with the Recreation and Conservation Office to address the
terms of a restrictive covenant on the property that was associated with the funding
source. Transfer of the County owned property to WDFW will require concurrence from
RCO and will also likely require support from the City of Ellensburg.
FISCAL IMPACTS:
Staffing costs associated with WDFW coordination is in the Flood Control Zone District
2020 annual budget.
ATTACHMENTS:
Exhibit 1: Overview Map with Ownership
Exhibit 2: WDFW conceptual drawings
Page 2 of 4
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
EXHIBIT 1: OVERVIEW MAP WITH OWNERSHIP
Page 3 of 4
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
i
Fr�a
Kittitas
County
{r
BLM 4. w
I
City of rL
Ellensburg '1
f
of rs"e-Y
BNSF
Kittitas BNSF
County
EXHIBIT 2: WDFW CONCEPTUAL DRAWINGS
Page 4 of 4
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
RINGER ROAD
ENTRANCE SIGN
. y
TO ELLENSBERG
F
a
1 i
ALTERNATE ENTRi
GRAVEL PARKING AREA
36 TRAILER STALLS
al '
�7
THRALL ROAD • SR 821
STATE PARK ENTRANCE
ALTERNATE ENTRANCE o 250 500
APPROX.SCALE
RINGER ROI'
ACCESS DEVF'
ALTERNATE 2, NORTH ENTRANCE
SITE DEVELOPMENT PLAN
N =
A
F
N
O
O
(f
a
o•
m
2�
O
m
n
STATE PARK ENTRANCE
ALTERNATE ENTRANCE o 250 500
APPROX.SCALE
RINGER ROI'
ACCESS DEVF'
ALTERNATE 2, NORTH ENTRANCE
SITE DEVELOPMENT PLAN
I
ENTRANCE SIGN
12'x60' CONCRETE PLA
BOAT LAW
Q
ALTERNATE ENTRANCE
* A
GRAVEL PARKING AREA
36 TRAILER STALLS O
O
E
STATE PARK ENTRANCE
I W TO ELLENSBERG
Y
ry err vwJLT TOILET
KIOSK 4 ' O
I t z
O
z
0
a
0
A N
D A
O �
�..
ALTERNATE ENTRANCE M
0 100 200
APPROX.SCALE
ROAD
ACCESS DEVELOPMh-.,N
ALTERNATE 2
��^^ SITE DEVELOPMENT PLAN