HomeMy WebLinkAboutResolution_N Thorp Hwy Yakima River Bridge_ProspectusKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: July 21, 2020 ACTION REQUESTED: Request to approve the Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the North Thorp Highway -Yakima River Bridge CRP 302-20. BACKGROUND: On December 30, 2019, Kittitas County Public Works was advised by Washington State Department of Transportation (WSDOT) that our North Thorp Highway -Yakima River Bridge Project was selected to receive funding through the Local Bridge Program. This project originally required 13.5 percent match in local funds for the Preliminary Engineering phase. The Federal Highway Administration has recently advised that projects in certain programs that are obligated for funding prior to September 30, 2020 will be eligible for 100 percent federa funding for eligible costs. This Project Prospectus covers the Federal Funding for the preliminary engineering phase and needs to be approved by WSDOT Local Programs. The approval needs to happen so WSDOT can evaluate the need to assign Kittitas County an Underutilized Disadvantaged Business Enterprise (UDBE) participation commitment goal prior to advertisement for design services. Public Works is preparing to solicit for design services in 2020. This requires the Local Agency Federal Aid Project Prospectus to be signed and approved by the Chair of the BOCC. INTERACTION: Public Works RECOMMENDATION:. Approve the Resolution Authorizing the Chair's signature on the Local Agency Federal Aid Project Prospectus for the North Thorp Highway -Yakima River Bridge CRP 302-20. HANDLING: Return two (2) originals to Public Works ATTACHMENTS: Resolution, Local Agency Federal Aid Project Prospectus LEAD STAFF: Mark Cook, Director BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2020 - AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL AID PROJECT PROSPECTUS FOR NORTH THORP HIGHWAY- YAKIMA RIVER BRIDGE CRP 302-20 WHEREAS: The North Thorp Highway -Yakima River Bridge Federal Funding will be used for preventative maintenance to extend the life of the structure; and WHEREAS: The existing paint system has failed throughout much of the bridge truss's bottom chord, floor beams, stringers and bearings. Joint repairs will include strip seals at the ends of the truss and silicon sealant at the floor beams. The truss portal members that have been damaged by traffic impacts will be repaired by heat straightening or replacing members. The concrete spalls at the piers will be repaired and the bridge will be painted.; and WHEREAS: In preparation to advertise the project for design services in the Fall of 2020 Public Works is requesting the Washington State Department of Transportation to release the Federal Funds for preliminary engineering; and WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair acknowledging the project has been reviewed and is consistent with the agency's comprehensive plan for community development; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby approve the Chair's signature on the Local Agency Federal Aid Project Prospectus for North Thorp Highway -Yakima River Bridge CRP 302-20. DATED on this 21" day of July 2020, at Ellensburg, Washington. Attest: ❑ Clerk of the Board- Julie Kjorsvik ❑ Deputy Clerk of the Board- Mandy Buchholz BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Brett Wachsmith, Chairman Laura Osiadacz, Vice -Chairman Cory Wright, Commissioner Allift Washington Mai e vP DepartmeuA 09 T'Pansportation Local Agency Federal Aid Project Prospectus DOT rvrro vas-iw, Page1 Revised 04/2015 Previous Editions Obsolete Prefix Route ( ) Date 7/7/2020 Federal Aid ProectNumber DUNS Number 01-020-2547 Local Agency Project Number CRP 302-20 / RC2092-HPr WSDOT ` ` Use Only J Federal Employer Tax ID Number 91-601349 Agency CAAgency Federal Program Title Kittitas County Public Works ❑�/ Yes [—]No 0✓ 20.205 ❑ Other Project Title Start Latitude N 47 6'3.34" Start Longitude W 120 42'8.48" N. Thorp Hwy -Yakima River Bridge End Latitude N 47 63.34" End Longitude W 120 428.48" Project Termini From -To Nearest City Name Project Zip Code (+4) 9.56 9.56 Ellensburg 98946-9561 Begin Mile Post End Mile Post Length of Project Award Type 9.56 9.56 0.00 ❑✓ Local ❑ Local Forces ❑ State ❑ Railroad Route ID Begin Mile Point End Mile Point City Number County Number County Name 9.56 9.56 19 Kittitas WSDOT Region Legislative District(s) Congressional District(s) Urba n Area Number South Central Region 13 8 Total Local Agency Phase Start Phase[2,378,900 Estimated Cost Funding Federal Funds Date Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month Year P. E. 87,500 387,500 September 2020 R/W Const. 280,200 2,098,700 September 2021 Total 2,766,400 280,200 2,486,200 Description of Existing Facility (Existing Design and Present Condition) Roadway Width Number of Lanes 20' 2 Paint system failure, pack rust, failing rubber joints, truss portal damage and concrete spalling of piers Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary)The Nora, Thorp Highway Firiage spanning the Yaldma River is in need of DDreventattve maintenance to extend the Lite of the fracture critical structure. The existing system hes failed throughout much of the truss's bottom paint chord, auorbearns stringers and bearhtgs There is pack mst at multiQle bottom chord panel points which would also be repaired during the paint project. The asphalt plug fomts a[ the ends of the truss and Che tubber Joints at the floorbeams havefeiled (adore. poured which arecontrtbuttrsg to the The joint repairs include strip seals at Fheends of the truss andsiliconsealant at the fborbeams. The truss portal memhers have been damaged by haftic impacts which will be repaired by heat straightening:o"eplaeing members. The <oncretespalls at Fhe piers will be repaired. Local Agency Contact Person Title Phone Darren Case Construction Manager 509-962-7019 Mailing Address City State Zip Code 411 North Ruby, Suite 1 El ensburg WA 98926 By Project Prospectus Approving Authority Title Public Works Director / County Engineer erart/5' Z(/LO DOT rvrro vas-iw, Page1 Revised 04/2015 Previous Editions Obsolete Agency Project Title Date Kittitas County Public Works N. Thorp Hwy -Yakima River Bridge 7/7/2020 Type of Proposed Work Project Type (Check all that Apply) Roadway Width Number of Lanes ❑ New Construction ❑ Path / Trail ❑ 3-R 20 2 ✓❑ Reconstruction ❑ Pedestrian / Facilities ❑ 2-R ❑ Railroad ❑ Parking ❑ Other ❑✓ Bridge Geometric Design Data Description Through Route Crossroad ❑ Principal Arterial ❑ Principal Arterial Federai ❑ Urban ❑ Minor Arterial ❑ Urban ❑ Minor Arterial Functional 0 Rural El Collector El Rural E] Collector Classification ❑ NHS 0 Major Collector ❑ NHS ❑ Major Collector ❑ Minor Collector ❑ Minor Collector ❑ Local Access ❑ Local Access Terrain ❑✓ Flat ❑ Roll ❑ Mountain [:]Flat ❑ Roll ❑ Mountain Posted Speed 50 Design Speed 50 Existing ADT 423 Design Year ADT Design Year Design Hourly Volume (DHV) Performance of Work Preliminary Engineering Will Be Performed By Others Agency Consultant 100 Construction Will Be Performed By Contract Agency Contractor 100 Environmental Classification ❑ Class I - Environmental Impact Statement (EIS) ❑✓ Class II - Categorically Excluded (CE) ❑ Project Involves NEPA/SEPA Section 404 0 Projects Requiring Documentation Interagency Agreement (Documented CE) ❑ Class III - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPASection 404 Interagency Agreements Environmental Considerations Protection measures need to be taken, to keep all material from landing, blowing or draining into the Yakima River. .,.. Fv.m 140-101 Page Revised 04/2015 Previous Editions Obsolete Agency Project Title Date Kittitas County Public Works N. Thorp Hwy -Yakima River Bridge 7/7/2020 Right of Way ❑✓ No Right of Way Needed ❑ Right of Way Needed All construction required by the ❑ No Relocation ❑ Relocation Required contract can be accomplished within the exiting right of way. Utilities Railroad ❑ No utility work required ❑✓ No railroad work required ❑✓ All utility work will be completed prior to the start El All railroad work will be completed prior to the start of of the construction contract the construction contract F] All utility work will be completed in coordination ❑ All the railroad work will be completed in coordination with the construction contract with the construction contract Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project If utilities are identified to be in conflict with the scope of work, they will be temporarily relocated prior to construction by the utility owners. FAA Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes ✓❑ No Remarks This project has been revieweo by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development. Agency Date By Mayor/Chairperson DOT Form 140-101 Page 3 Revised 04/2015 Previous Editions Obsolete