HomeMy WebLinkAboutResolution_N Thorp Hwy Yakima River Bridge_ProspectusKITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
AGENDA STAFF REPORT
AGENDA DATE: July 21, 2020
ACTION REQUESTED: Request to approve the Resolution Authorizing the Chair's
Signature on the Local Agency Federal Aid Project
Prospectus for the North Thorp Highway -Yakima River
Bridge CRP 302-20.
BACKGROUND: On December 30, 2019, Kittitas County Public Works was
advised by Washington State Department of Transportation
(WSDOT) that our North Thorp Highway -Yakima River
Bridge Project was selected to receive funding through the
Local Bridge Program.
This project originally required 13.5 percent match in local
funds for the Preliminary Engineering phase. The Federal
Highway Administration has recently advised that projects
in certain programs that are obligated for funding prior to
September 30, 2020 will be eligible for 100 percent federa
funding for eligible costs.
This Project Prospectus covers the Federal Funding for the
preliminary engineering phase and needs to be approved by
WSDOT Local Programs. The approval needs to happen so
WSDOT can evaluate the need to assign Kittitas County an
Underutilized Disadvantaged Business Enterprise (UDBE)
participation commitment goal prior to advertisement for
design services.
Public Works is preparing to solicit for design services in
2020. This requires the Local Agency Federal Aid Project
Prospectus to be signed and approved by the Chair of the
BOCC.
INTERACTION: Public Works
RECOMMENDATION:. Approve the Resolution Authorizing the Chair's signature
on the Local Agency Federal Aid Project Prospectus for the
North Thorp Highway -Yakima River Bridge CRP 302-20.
HANDLING: Return two (2) originals to Public Works
ATTACHMENTS: Resolution, Local Agency Federal Aid Project Prospectus
LEAD STAFF: Mark Cook, Director
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2020 -
AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY
FEDERAL AID PROJECT PROSPECTUS FOR NORTH THORP HIGHWAY-
YAKIMA RIVER BRIDGE CRP 302-20
WHEREAS: The North Thorp Highway -Yakima River Bridge Federal Funding will be
used for preventative maintenance to extend the life of the structure; and
WHEREAS: The existing paint system has failed throughout much of the bridge truss's
bottom chord, floor beams, stringers and bearings. Joint repairs will
include strip seals at the ends of the truss and silicon sealant at the floor
beams. The truss portal members that have been damaged by traffic
impacts will be repaired by heat straightening or replacing members. The
concrete spalls at the piers will be repaired and the bridge will be painted.;
and
WHEREAS: In preparation to advertise the project for design services in the Fall of
2020 Public Works is requesting the Washington State Department of
Transportation to release the Federal Funds for preliminary engineering;
and
WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the
Chair acknowledging the project has been reviewed and is consistent with
the agency's comprehensive plan for community development; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in
the best interest of the public, does hereby approve the Chair's signature
on the Local Agency Federal Aid Project Prospectus for North Thorp
Highway -Yakima River Bridge CRP 302-20.
DATED on this 21" day of July 2020, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY,
WASHINGTON
Brett Wachsmith, Chairman
Laura Osiadacz, Vice -Chairman
Cory Wright, Commissioner
Allift
Washington Mai e
vP DepartmeuA 09 T'Pansportation
Local Agency Federal Aid
Project Prospectus
DOT rvrro vas-iw, Page1
Revised 04/2015 Previous Editions Obsolete
Prefix
Route
( )
Date
7/7/2020
Federal Aid
ProectNumber
DUNS Number
01-020-2547
Local Agency
Project Number
CRP 302-20 / RC2092-HPr
WSDOT `
` Use Only J
Federal Employer
Tax ID Number
91-601349
Agency
CAAgency
Federal Program Title
Kittitas County Public Works
❑�/ Yes [—]No
0✓ 20.205 ❑ Other
Project Title
Start Latitude N 47 6'3.34"
Start Longitude W 120 42'8.48"
N. Thorp Hwy -Yakima River Bridge
End Latitude N 47 63.34"
End Longitude W 120 428.48"
Project Termini From -To
Nearest City Name
Project Zip Code (+4)
9.56 9.56
Ellensburg
98946-9561
Begin Mile Post
End Mile Post
Length of Project
Award Type
9.56
9.56
0.00
❑✓ Local ❑ Local Forces ❑ State ❑ Railroad
Route ID
Begin Mile Point
End Mile Point
City Number
County Number
County Name
9.56
9.56
19
Kittitas
WSDOT Region
Legislative District(s)
Congressional District(s)
Urba n Area Number
South Central Region
13
8
Total
Local Agency
Phase Start
Phase[2,378,900
Estimated Cost
Funding
Federal Funds
Date
Nearest Hundred Dollar
Nearest Hundred Dollar
Nearest Hundred Dollar
Month Year
P. E.
87,500
387,500
September 2020
R/W
Const.
280,200
2,098,700
September 2021
Total
2,766,400
280,200
2,486,200
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width
Number of Lanes
20'
2
Paint system failure, pack rust, failing rubber joints, truss portal damage and concrete spalling of piers
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)The Nora, Thorp Highway Firiage spanning the Yaldma River is in need of
DDreventattve maintenance to extend the Lite of the fracture critical structure. The existing system hes failed throughout much of the truss's bottom
paint chord,
auorbearns stringers and bearhtgs There is pack mst at multiQle bottom chord panel points which would also be repaired during the paint project. The asphalt plug
fomts a[ the ends of the truss and Che tubber Joints at the floorbeams havefeiled (adore.
poured which arecontrtbuttrsg to the The joint repairs include strip seals at
Fheends of the truss andsiliconsealant at the fborbeams. The truss portal memhers have been damaged by haftic impacts which will be repaired by heat
straightening:o"eplaeing members. The <oncretespalls at Fhe piers will be repaired.
Local Agency Contact Person
Title
Phone
Darren Case
Construction Manager
509-962-7019
Mailing Address
City
State
Zip Code
411 North Ruby, Suite 1
El ensburg
WA
98926
By
Project Prospectus
Approving Authority
Title Public Works Director / County Engineer
erart/5' Z(/LO
DOT rvrro vas-iw, Page1
Revised 04/2015 Previous Editions Obsolete
Agency
Project Title
Date
Kittitas County Public Works
N.
Thorp Hwy -Yakima River Bridge
7/7/2020
Type of Proposed Work
Project Type (Check all that Apply)
Roadway Width
Number of Lanes
❑ New Construction ❑ Path / Trail
❑ 3-R
20
2
✓❑ Reconstruction ❑ Pedestrian / Facilities
❑ 2-R
❑ Railroad ❑ Parking
❑ Other
❑✓ Bridge
Geometric Design Data
Description
Through Route
Crossroad
❑ Principal Arterial
❑ Principal Arterial
Federai
❑ Urban
❑ Minor Arterial
❑ Urban
❑ Minor Arterial
Functional
0 Rural
El Collector
El Rural
E] Collector
Classification
❑ NHS
0 Major Collector
❑ NHS
❑ Major Collector
❑ Minor Collector
❑ Minor Collector
❑ Local Access
❑ Local Access
Terrain
❑✓ Flat ❑ Roll ❑ Mountain
[:]Flat ❑ Roll ❑ Mountain
Posted Speed
50
Design Speed
50
Existing ADT
423
Design Year ADT
Design Year
Design Hourly Volume (DHV)
Performance of Work
Preliminary Engineering Will Be Performed By
Others
Agency
Consultant
100
Construction Will Be Performed By
Contract
Agency
Contractor
100
Environmental Classification
❑ Class I - Environmental Impact Statement (EIS)
❑✓ Class II - Categorically Excluded
(CE)
❑ Project Involves NEPA/SEPA Section 404
0 Projects Requiring Documentation
Interagency Agreement
(Documented CE)
❑ Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPASection 404
Interagency Agreements
Environmental Considerations
Protection measures need to be taken, to keep all material from landing, blowing or draining
into the Yakima
River.
.,.. Fv.m 140-101 Page
Revised 04/2015 Previous Editions Obsolete
Agency
Project Title
Date
Kittitas County Public Works
N. Thorp Hwy -Yakima River Bridge
7/7/2020
Right of Way
❑✓ No Right of Way Needed
❑ Right of Way Needed
All construction required by the
❑ No Relocation ❑ Relocation Required
contract can be accomplished
within the exiting right of way.
Utilities
Railroad
❑ No utility work required
❑✓ No railroad work required
❑✓ All utility work will be completed prior to the start
El All railroad work will be completed prior to the start of
of the construction contract
the construction contract
F] All utility work will be completed in coordination
❑ All the railroad work will be completed in coordination
with the construction contract
with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
If utilities are identified to be in conflict with the scope of work, they will be temporarily relocated prior to
construction by the utility owners.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes ✓❑ No
Remarks
This project has been revieweo by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Agency
Date By
Mayor/Chairperson
DOT Form 140-101 Page 3
Revised 04/2015 Previous Editions Obsolete