My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2020-131 Yakima River Bridge
>
Meetings
>
2020
>
07. July
>
2020-07-07 10:00 AM - Commissioners' Agenda
>
Res-2020-131 Yakima River Bridge
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 11:58:12 AM
Creation date
7/15/2020 11:58:09 AM
Metadata
Fields
Template:
Meeting
Date
7/7/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
m
Item
Request to Approve a Resolution to Establish a County Road Project Number for the Painting of the North Thorp Highway - Yakima River Bridge
Order
13
Placement
Consent Agenda
Row ID
64177
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESoLUIoN rvo. 9PJ 0 - t b l <br />BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter <br />of initiating a county road project designated as: <br />CRP NO: 302-20 JOB NO: RC2091-HP <br />lT lS HEREBY RESOLVEo N Thorp Hwy-Yakima River Bridge <br />The North Thorp Highway Bridge spanning the Yakima River needs preventative Maintenance to extend the life of the <br />fracture critical structure. The existing paint system has failed throughout much of the truss's bottom chord, floor beams, <br />stringers and bearings. The joint repairs will include strip seals at the ends of the truss and silicon sealant at the floor <br />beams. The truss portal members damaged by traffic impacts will be repaired by heat straightening or replacing members. <br />The concrete spalls at the piers will be repaired. Bridge will be painted. <br />ARTERIAL trAccEss X <br />This project is hereby declared to be a public necessity and the Director of Public Works acting as the County Engineer is hereby <br />ordered and authorized to report and proceed thereon as by law provided. (RcW 36.75.050, 46.80.030, 36.g0.0/0). <br />lT lS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the Director of <br />Public works' estimate, is hereby made in the amounts and for the purposes shown: <br />Mark Cook, P.E. <br />lnterim County Engineer <br />THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2O2O ANNUAL ROAD PROGRAM AS <br />ITEM NO <br />THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM PROJECT 13 <br />IN ACCORDANCE WITH RCW 36.81.130 <br />IT IS FURTHER RESOLVED THAT: <br />THE CONSTRUCTION IS TO BE ACCOMPLISHED BY rlN'CE WITH RCW 36.77.020 ET.SEQ. <br />SS/ <br />THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CO <br />wAc 136-18. <br />DANCE WITH RCW 36.77.065 ANDtr <br />ADoPTED this Wl dayof <br />BOARD OF COUNTY COMMISSIONERS <br />KITT]TAS COU , WASHINGTON <br />,r <br />tus <br />Brett Wachsmith, Chair <br />g :\base\forms\en g\crp-frm <br />illl <br />Commissioner <br />6t30t2020 <br />PRELMI RY ENGINEERING <br />TOTALS <br />415 <br />NT <br />CONSTRUCTION ENGINEERING $ 90,535 <br />RIGHT.OF-WAY ACQUISITION $50 <br />SUB-TOTAL $ 671,000 <br />County Forces coNsrRucrtoN $ <br />CONTRACT CONSTRUCTION $ 1,905,835 <br />SUB-TOTAL $ 1,905,835 <br />TOTAL PROJECT COST $ 2,576,835 <br />GRANT OR OTHER FUNDS $ 2,486,250 <br />Grant Source: HSIP <br />TOTAL ROAD FUND <br />2020. <br />Vice-Chair
The URL can be used to link to this page
Your browser does not support the video tag.