Loading...
HomeMy WebLinkAboutRes-2020-131 Yakima River BridgeRESoLUIoN rvo. 9PJ 0 - t b l BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter of initiating a county road project designated as: CRP NO: 302-20 JOB NO: RC2091-HP lT lS HEREBY RESOLVEo N Thorp Hwy-Yakima River Bridge The North Thorp Highway Bridge spanning the Yakima River needs preventative Maintenance to extend the life of the fracture critical structure. The existing paint system has failed throughout much of the truss's bottom chord, floor beams, stringers and bearings. The joint repairs will include strip seals at the ends of the truss and silicon sealant at the floor beams. The truss portal members damaged by traffic impacts will be repaired by heat straightening or replacing members. The concrete spalls at the piers will be repaired. Bridge will be painted. ARTERIAL trAccEss X This project is hereby declared to be a public necessity and the Director of Public Works acting as the County Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RcW 36.75.050, 46.80.030, 36.g0.0/0). lT lS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the Director of Public works' estimate, is hereby made in the amounts and for the purposes shown: Mark Cook, P.E. lnterim County Engineer THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2O2O ANNUAL ROAD PROGRAM AS ITEM NO THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM PROJECT 13 IN ACCORDANCE WITH RCW 36.81.130 IT IS FURTHER RESOLVED THAT: THE CONSTRUCTION IS TO BE ACCOMPLISHED BY rlN'CE WITH RCW 36.77.020 ET.SEQ. SS/ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CO wAc 136-18. DANCE WITH RCW 36.77.065 ANDtr ADoPTED this Wl dayof BOARD OF COUNTY COMMISSIONERS KITT]TAS COU , WASHINGTON ,r tus Brett Wachsmith, Chair g :\base\forms\en g\crp-frm illl Commissioner 6t30t2020 PRELMI RY ENGINEERING TOTALS 415 NT CONSTRUCTION ENGINEERING $ 90,535 RIGHT.OF-WAY ACQUISITION $50 SUB-TOTAL $ 671,000 County Forces coNsrRucrtoN $ CONTRACT CONSTRUCTION $ 1,905,835 SUB-TOTAL $ 1,905,835 TOTAL PROJECT COST $ 2,576,835 GRANT OR OTHER FUNDS $ 2,486,250 Grant Source: HSIP TOTAL ROAD FUND 2020. Vice-Chair