Loading...
HomeMy WebLinkAboutResolution_CRP_N Thorp Hwy Bridge PaintingKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: July 7, 2020 ACTION REQUESTED: Request to Establish County Road Number supporting the painting of the North Thorp Highway -Yakima River Bridge BACKGROUND: Kittitas County has been selected to receive $2,486, 250.00 from the Federal Local Bridge Program for the North Thorp Highway -Yakima River Bridge repair and painting. The North Thorp Highway Bridge spanning the Yakima River needs preventative maintenance to extend the life of the fracture critical structure. The existing paint system has failed throughout much of the truss's bottom chord, floor beams, stringers and bearings. The joint repairs will include strip seals at the ends of the truss and silicon sealant at the floor beams. The truss portal members damaged by traffic impacts will be repaired by heat straightening or replacing members. The concrete spalls at the piers will be repaired and the bridge will be painted. INTERACTION: Public Works RECOMMENDATION: Approve the Resolution establishing a county road number supporting the painting of the North Thorp Highway -Yakima River Bridge HANDLING: Return two (1) originals to Public Works ATTACHMENTS: Resolution establishing CRP No 302-20 LEAD STAFF: Mark Cook, Director RESOLUTION NO. BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter of initiating a county road project designated as: CRP NO: 302-20 JOB NO: RC2091-HP IT IS HEREBY RESOLVED N Thorp Hwy -Yakima River Bridge The North Thorp Highway Bridge spanning the Yakima River needs preventative Maintenance to extend the life of the fracture critical structure. The existing paint system has failed throughout much of the truss's bottom chord, floor beams, stringers and bearings. The joint repairs will include strip seals at the ends of the truss and silicon sealant at the floor beams. The truss portal members damaged by traffic impacts will be repaired by heat straightening or replacing members. The concrete spalls at the piers will be repaired. Bridge will be painted. ARTERIAL ❑ ACCESS This project is hereby declared to be a public necessity and the Director of Public Works acting as the County Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the Director of Public Works' estimate, is hereby made in the amounts and for the purposes shown: PURPOSE AMOUNT TOTALS PRELMINARY ENGINEERING $ 580,415 CONSTRUCTION ENGINEERING $ 90,535 RIGHT-OF-WAY ACQUISITION $ 50 SUB -TOTAL 1 ,.,, 7 �_ $ 671,000 Count Forces CONSTRUCTION $ CONTRACT CONSTRUCTION $ 1,905,835 SUB -TOTAL 7717905,835 TOTAL PROJECT COST $ 2,576,835 GRANTOR OTHER FUNDS $ 2,486,250 Grant Source: HSIP TOTAL COUNTY ROAD FUND ALLOCATION $ 90,585 Mark Cook, P.E. Interim County Engineer ❑ THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2020 ANNUAL ROAD PROGRAM AS ITEM NO. ® THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM PROJECT 13 IN ACCORDANCE WITH RCW 36.81.130 IT IS FURTHER RESOLVED THAT: ® THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ. ❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND WAC 136-18. ADOPTED this day of , 2020. Attest: BOARD OF COUNTY COMMISSIONERS Clerk of the Board KITTITAS COUNTY, WASHINGTON Brett Wachsmdh, Chair Laura Osiadacz, Vice -Chair Cory Wright, Commissioner g'\base\forms\eng\crp-frm 6130/2020