HomeMy WebLinkAboutResolution_PFacilitiesAgmt_CityofEllensburgKTTTTTAS COUNTY
DEPARTMENT OF PUBLIC WORKS
AGENDA STAFF REPORT
AGENDA DATE: July 7, 2020
ACTION REQUESTED: Request to Approve a Resolution for the 2020
Distressed County Sales and Use Tax
Infrastructure Improvement Program
Agreement with the City of Ellensburg
BACKGROUND: Kittitas County Conference of Governments
(COG) met to review the second round of 2020
submitted applications. COG recommended
awarding $224,617.00 to the City of Ellensburg.
This Agreement is the final step in the award
process.
INTERACTION: Public Works; City of Ellensburg
RECOMMENDATION: Approve & Sign the Resolution and the 2020
Distressed County Sales and Use Tax
Infrastructure Improvement Program
Agreement.
HANDLING: Return one (1) original to Public Works
ATTACHMENTS: Resolution; 2020 Distressed County Sales and
Use Tax Infrastructure Improvement Program
Agreement
LEAD STAFF: Mark Cook
Director of Public Works
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO: 2020 -
RESOLUTION TO APPROVE THE 2020 DISTRESSED COUNTY SALES AND USE TAX
INFRASTRUCTURE IMPROVEMENT PROGRAM AGREEMENT WITH THE CITY OF
ELLENSBURG
WHEREAS: The 1999 Legislature did pass RCW 82.14.370 Sales and Use Tax for Public
Facilities in rural counties; and
WHEREAS: These funds may only be used to finance public facilities serving economic
development purposes in rural counties and finance personnel in economic
development offices in the State of Washington; and
WHEREAS: The 2020 Distressed County Sales and Use Tax Infrastructure Improvement Program
Agreement with the City of Ellensburg has been executed by said entity with funding
available January 1, 2020; and
NOW, THEREFORE BE IT RESOLVED: The Kittitas County Board of County Commissioners
hereby approves the attached 2020 Distressed County Sales and Use Tax Infrastructure Improvement
Program Agreement with the City of Ellensburg.
ADOPTED this 7th day of July 2020.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Brett Wachsmith, Chairman
Laura Osiadacz, Vice -Chairman
❑ Deputy Clerk of the Board- Mandy Buchholz
Cory Wright, Commissioner
2020 DISTRESSED COUNTY SALES AND USE TAX INFRASTRUCTURE
IMPROVEMENT PROGRAM AGREEMENT
BETWEEN KITTITAS COUNTY AND CITY OF ELLENSBURG
This Contract dated 2020 is made and entered into by and
between KITTITAS COUNTY ("County"), a subdivision of the State of Washington, and
CITY OF ELLENSBURG ("Funding Recipient').
WHEREAS, the purpose of this Agreement is to provide for public facility
construction and foster economic development opportunities within Kittitas County;
NOW THEREFORE, in consideration of the terms and conditions contained herein,
or attached and incorporated and made a part hereof, the County and the Funding
Recipient mutually agree as follows:
Section 1. Scope of Work.
a. Funding Recipient shall provide the services and staff described in its Application
for Funds submitted to the Council of Governments, attached hereto as Exhibit "A"
which is attached hereto and incorporated herein by this reference.
b. Except as otherwise specifically provided in this Agreement, Funding Recipient shall
furnish the following as required to perform the services, described in Paragraph (a)
above, in accordance with this Agreement: Personnel, labor and supervision;
technical, professional and other services. All such services, property and other
items furnished or required to be furnished, together with all other obligations
performed, or required to be performed, by Funding Recipient under this Agreement
are collectively referred to herein as "Services."
Section 2. Payment.
a. As full compensation for satisfactory performance of the Funding Recipient Services,
the County agrees to pay Funding Recipient the sum of two hundred twenty four
thousand six hundred seventeen dollars ($224,617).
b. Additional payment terms: The County will make payment to the Funding Recipient
only on a reimbursement basis, as receipts for any items including marketing and/or
advertising are submitted to the County.
c. Requests for reimbursements must be submitted to:
Kittitas County Public Works
Attn: Joyce White
411 North Ruby, — Suite 1
Ellensburg, WA 98926
oyce.white(a)co.kittitas.wa us
Distressed County Sales and Use Tax Infrastructure Improvement Program Funding Agreement
Page 1
d. Reporting requirements of your events will be required on prescribed forms from the'
Kittitas County Public Works Department,
Section 3. Performance by Funding Recipient
a. Funding Recipient shall not (by contract, operation of law or otherwise) delegate or
subcontract performance of any Services to any other person or entity without the
prior written consent of the County. Any such delegation or subcontracting without
the County's prior written consent shall be voidable at the County's option.
b. Funding Recipient shall at all times be an independent Funding Recipient and not an
agent or representative of the County with regard to performing the Services.
Funding Recipient shall not represent that it is, or hold itself out as, an agent or
representative of the County. In no event shall Funding Recipient be authorized to
enter into any Agreement or undertaking for or on behalf of the County. It is
understood that the Funding Recipient and the Funding Recipient's staff and
employees are not employees of the County and are not, therefore, entitled to any
benefits provided employees of the County.
c. Funding Recipient shall comply with all applicable laws, ordinances, rules,
regulations, orders, licenses, permits, and other requirements, now or hereafter in
effect, of any governmental authority (including, but not limited to, such requirements
as may be imposed upon the County and applicable to Services). Funding Recipient
shall furnish such documents as may be required to effect or evidence such
compliance. All laws, ordinances, rules, and orders required to be incorporated into
agreements of this character are incorporated into this Agreement by this reference.
Funding Recipient agrees to obtain all required licenses and permits, and further
agrees to keep them in full force and effect during the term of this Agreement.
I. The County and the Funding Recipient agree that in fulfilling the terms and
conditions of this Agreement neither shall discriminate on the basis of race, creed,
color, national origin, age, sex, marital status, or the presence of a physical, sensory,
or mental handicap.
e. The Services shall at all times be subject to inspection by and approval of the
County, but the County's making (or failure or delay in making) such inspection or
approval shall not relieve Funding Recipient of its responsibility to perform the
Services in accord with this Agreement, notwithstanding the County's knowledge of
defective or non -complying performance, or the substantiality or ease of discovering
the same. Funding Recipient shall provide the County with sufficient, safe, and
proper facilities and equipment for such inspection and free access to such facilities.
This contract is subject to review by any Federal or State auditor. Funding Recipient
shall promptly furnish the County or its designee, or such Federal or State auditor
with such information related to the Services as may be requested by the applicable
governmental entity. Funding Recipient shall preserve and maintain all financial
records and records relating to performance of Services under this Agreement for six
(6) years after contract termination. For such duration after the County makes final
payment of compensation due hereunder, Funding Recipient shall provide the
County access to (and the County shall have the right to examine, audit and copy,
with or without notice) all of Funding Recipient's books, documents, papers and
Distressed County Sales and Use Tax Infrastructure Improvement Program Funding Agreement
Page 2
records related to the Services or this Agreement.
g. Funding Recipient understands and acknowledges that Funding Recipient is solely
responsible for its own reporting and accounting of all state, federal, social security, and
local taxes, of every nature, arising from Funding Recipient's performance of this
Agreement. All compensation received by the Funding Recipient will be reported to the
Internal Revenue Service at the end of the calendar year in accord with the applicable
IRS regulations.
Section 4. Release. Indemnity, and Hold Harmless.
The County assumes no liability for the Funding Recipient's actions under this Agreement.
Funding Recipient releases and shall defend, indemnify, and hold harmless the County, its
officers and employees, agents, representatives, attorneys and/or volunteers, from and
against all claims, costs, liabilities, damages, and expenses, (including, but not limited to,
reasonable attorney fees) which arise or may arise or be alleged to arise out of or by
reason of this Agreement including:
• Any fault, negligence, strict liability or product liability of Funding Recipient in
connection with the Services for this Agreement;
• Any lien asserted upon any property of the County in connection with the Services
for this Agreement;
• Any failure of Funding Recipient, or of the Services, to comply with any applicable
law, ordinance, rule, regulation, order, license, permit and other requirement, now or
hereafter in effect, of any governmental authority; or
• Any breach of or default under this Agreement by Funding Recipient.
Section 5. Compliance with Public Records Law.
a. In compliance with Washington's public records law, the County will retain copies of
any documents associated with this Agreement, which may be required by law
unless legally exempt from such retention, for any applicable legally required
retention period.
b. In the event a public records request is made to the County for documents created in
relation to this Agreement, should legal uncertainty arise regarding the disclosability
of any documents under federal or state public records laws, the County shall
provide notice to Funding Recipient pursuant to Washington's public records act,
chapter 42.56 RCW, to allow Funding Recipient to seek a court injunction.
c. The County specifically shall not be liable to Funding Recipient for the County's
release under public records laws of any documents not protected by trademark,
copyright or other law.
Distressed County Sales and Use Tax Infrastructure Improvement Program Funding Agreement
Page 3
Section 6. Industrial Insurance Waiver.
With respect to performance of this Agreement and as to any claims against the County, its
Additional Insureds, officers, agents and employees, the Funding Recipient expressly waives
its immunity under Title 51 of the Revised Code of Washington, the Industrial Insurance Act,
for injuries to Funding Recipient's employees and agrees that the obligations to indemnify,
defend and hold harmless provided in this Agreement extend to any claim brought by or on
behalf of any employee of the Funding Recipient. This waiver is mutually negotiated by the
parties to this Agreement.
Section 7. Insurance and Endorsements.
a. The County may require through a request in writing that the Funding Recipient
provide the County with a certificate, binder, or policy of liability insurance,
acceptable to the County in an amount specified by the County.
b. Such liability insurance shall be such as will protect Funding Recipient, its
employees, agents and representatives, from all claims, losses, harm, costs,
liabilities, damages and expenses arising out of personal injury (including death) or
property damage that may result from performance of the Services or this
Agreement, whether such performance is by Funding Recipient or any of its
employees, agents or representatives.
c. Should the County require such liability insurance, the Funding Recipient agrees to
provide proof of insurance prior to commencing performance of this Agreement.
d. Copies of the County's written request and the insurance documents provided by
Funding Recipient shall be attached to this Agreement and by this reference will be
made part hereof.
e. Where insurance is requested by the County, all liability insurance policies shall be
endorsed to include the County as an Additional Insured and shall stipulate that the
insurance afforded by the policies shall be primary insurance, and that any
insurance, self-insured retention, deductibles, or risk retention trusts maintained or
participated in by the Parties shall be excess and not contributory to any other
insurance maintained by the County. Funding Recipient shall furnish the County a
certificate of insurance with Endorsement as evidence that the required policies are
in full force and effect.
Section 8. Termination.
The County may, by written notice thereof to Funding Recipient, terminate this Agreement
as to all or any portion of the Services not yet performed, whether or not Funding Recipient
is in breach or default. Upon receiving such notice of termination, Funding Recipient shall,
except as otherwise directed by the County, immediately stop performing the Services to
the extent specified in the notice. In the event the County terminates the Funding
Recipient's Services, the Funding Recipient is obligated and hereby agrees to refund to the
County all monies paid for Services not yet rendered by the Funding Recipient, if any, as of
the date of the notice of termination.
Distressed County Sales and Use Tax Infrastructure Improvement Program Funding Agreement
Page 4
Section 9. Miscellaneous.
a. Funding Recipient shall not (by contract, operation of law or otherwise) assign this
Agreement or any right or interest in this Agreement without the County's prior
written consent.
b. This Agreement embodies the entire Agreement between the County and Funding
Recipient, and supersedes any and all prior oral or written communications, proposals,
conditions, promises, representations, or understandings regarding the Services. No
change, amendment or modification of any provision of this Agreement shall be valid
unless set forth in a written amendment to the Agreement signed by both parties.
c. Notice for any purpose under this Agreement, except service of process, shall be
given by the Funding Recipient to the Kittitas County Commissioners and the Kittitas
County Public Works birector, 411 North Ruby, Suite 1, Ellensburg, WA 98926. For all
purposes under this Agreement, any notice by the County to the Funding Recipient
shall be given to the Funding Recipient's address provided on the signature page.
Notice may be given by delivery or by depositing in the U.S. Mail, first class, postage
prepaid, certified mail, return receipt requested.
d. The section and paragraph headings of this Agreement are for reference
convenience only and are not intended to restrict, affect or be of any weight in
interpreting or construing the provisions of such sections or paragraphs.
e. This Agreement may be executed in one or more counterparts and by facsimile,
each of which will be deemed an original, but all of which together will constitute one
and the same instrument.
Funding Recipient warrants to the County that the individual signing on Funding
Recipient's behalf has the requisite power and authority to enter into and to perform
Funding Recipient's obligations under this Agreement. Funding Recipient further
warrants to the County that Funding Recipient has made no misrepresentation or
misleading statement in connection with this Agreement, and is not in violation of any
applicable law, ordinance, or regulation the consequence of which will or may
materially affect Funding Recipient's ability to perform its obligations under this
Agreement.
g. If any term or condition of this Agreement or the application thereof to any person(s) or
circumstances is held invalid, such invalidity shall not affect the other terms, conditions
or applications which can be given effect without the invalid term, condition or
application. To this end, the terms and conditions of this Agreement are declared
severable.
h. The exclusive venue for any action brought to enforce this Agreement or any of its
terms shall be in Kittitas County, State of Washington.
Distressed County Sales and Use Tax Infrastructure Improvement Program Funding Agreement
Page 5
KITTITAS COUNTY
BOARD OF COUNTY COMMISSIONERS
Brett Wachsmith, Chair
Laura Osiadacz, Vice- Chair
Cory Wright, Commissioner
Dated:
ATTEST:
Clerk of the Board
APPROVED AS TO FORM:
Deputy Prosecuting Attorney
CITY OF ELLENSBURG
So 1 AL,
Address
50`f- `�E2-7ZZo
Telephone
Dated: G —fig -Z.0
Distressed County Sales and Use Tax Infrastructure Improvement Program Funding Agreement
Page 6
Original Application Submitted on time and rated with first project call.
Although not required to submit for the 2"d round, we have filled out the new
application for ease in reviewers scoring our application in comparison of any
new applications that were not originally submitted, and therefore on differing
application forms.
Kittitas County
Department of Public Works
DISTRESSED COUNTY SALES AND USE TAX INFRASTRUCTURE
IMPROVEMENT PROGRAM APPLICATION
The Distressed County Sales and Use Tax Infrastructure improvement Program supports
improvements to infrastructure systems that foster economic development in Kittitas County. The
goal is to create economic opportunity through Infrastructure investment.
APPLICANT INFORMATION
Applicant: City of Ellensburg
Contact Name: Derek Mayo
Address: 501 N. Anderson St.
Address:
City:
Telephone:
E-mail Address:
Project Location:
Ellensburg WA Zip:
509-962-7230 FAX:
Intersection of 5`h
Ave. and Railroad
Ave.
98926
509-962-7127
Jurisdiction Population: 19,960
Project Title: 5`h Ave. and Railroad Ave. Signalization — Safety and Capacity Improvements
APPLICATION THRESHOLDS
Applicant Requirement:
Check -off:
X 1. The project is improvement to an infrastructure system(s) linked to economic development.
X 2. A detailed 81/2 X 11" vicinity map that clearly shows the project is included in the
application package.
X 3. Distressed County funds are not being substituted for other funds that are already secured.
2
X 4. The project involves traditional improvements, instead of "non-traditional" improvements
eligible for "Enhancement" funding
X 5. Applicant has submitted only one application this round.
X 6. The local/regional economic development organization has been informed of the project.
a
o
O
O
o
0
0
4%
69
VH
tH
49
611
0
O
O
EA
r
U
O
C
N
R
m
O
O
O
r
O
O
a
N
/A
Ifl
fH
ffl
fA
fR
�D
69
649
W9
E9
!fl
fA
w
N
�
O
0
0
N
O
�
h
�
M
O
o
O
O
r
O
O
Cl)
to
to
/A
14
f9
613,f9
tLO
o
o
O
O
o
0
0
4%
69
VH
tH
49
611
0
C
EA
LOi
U
O
C
N
R
m
O
W
'6
e
O
O
N
O
O
f9
In
69
649
W9
E9
!fl
fA
w
m
w
O
A
W
C
EA
U
'O
C
R
m
W
'6
0
C
�
3
0.
LL
�
L
Y
C
�
0
0
C
�
h
�
a
4
Vl
P.
w
PROJECT NARRATIVE
1. Project Description: Describe the scope of work. Indicate the major work involved, including a brief
comparison of existing and proposed conditions.
The proposed project will install a traffic signal at the intersection of 5th Avenue and Railroad
Avenue. Both Railroad Avenue and 5th Avenue are minor arterial streets that are both on the
established City truck route, and both streets have significant truck volumes. In addition,
immediately west of this intersection is 350 acres of contiguous park and open space land. The
current configuration is a two-way (east -west) stop sign controlled intersection, which routinely
has significant traffic delays in the evening peak hour and when there are events at Rotary
Park. The above land uses create a unique transportation challenge at the intersection that
affect freight mobility, hamper future industrial development, and limit regional activities and
events at Rotary Park, which can be resolved with the proposed improvements. The proposed
traffic signal will be an eight phase traffic signal, with phases dedicated for each through and
left turning movement. The traffic signal will also include radar/video vehicle and bicycle
detection, emergency vehicle detection and preemption, pedestrian push buttons and displays,
and will be connected to the City's existing traffic signal management system. These
improvements will greatly enhance the safety and functionality of the intersection, which is the
entrance to Rotary Park.
2. Explain the specific Infrastructure issues the project addresses and how they are linked to economic
development improvements.
The City of Ellensburg's Comprehensive Plan (Dec. 2017) has adopted a minimum level of
service (LOS) standard of C. Development that would drop the LOS below the minimum
allowed standard could not be permitted. Currently the eastbound and westbound legs
approach a 20 second delay during the evening peak hour and exceed that during special
events at Rotary Park. A peak hour delay exceeding 25 seconds will drop the LOS to a D and
be below the adopted minimum. Based on current growth, this is anticipated within the next 3
to 4 years. Once at these levels, building permits (commercial or residential) would not be able
to be issued for any project that would create vehicle trips at this location. Installation of a
traffic signal at this location, as outlined in our Comprehensive plan would improve the LOS of
the intersection to an LOS A, with minimal delays. Railroad Avenue and Dolarway Road have
a significant amount of undeveloped land which is zoned light industrial. Signalization of this
intersection would allow for development of these areas, which may not be permitted without
the project. In addition, the improvements would also allow for expanded activities at Rotary
Park, including regional baseball, softball, and soccer tournaments. These activities include
events and toumaments which is a significant economic generator in Ellensburg.
The signalization of this intersection will also significantly improve the safety of the intersection.
The non -motorized or active modes of travel (pedestrian and bicycle) will have pedestrian push
buttons and walk/don't walk displays to provide specific dedicated pedestrian crossing times to
safely cross the busy intersection.
3. Project Construction:
Estimated Start Date: April 2021 Estimated End Date: Sept. 2021
Please explain phase status of the project (bid ready, design complete or preliminary design).
When the City of Ellensburg constructed the improvements on Dolarway Road / Railroad
Avenue in 2011, underground conduits for a future traffic signal at the intersection of 5th Avenue
and Railroad Avenue were installed across each leg of the intersection. Draft signal pole
locations were designed at that time to ensure the conduit crossings were installed at the
correct location. Therefore a partial design for the traffic signal was completed at that time to
about and is currently about 30% complete. In addition, a complete topographic survey was
completed with the previous project and will only require minor updates and/or spot checking of
the previous survey. Completing a final design can begin immediately upon receiving grant
award and can be complete within 6 months. It is anticipated that the project would be out to
bid late -summer 2020. Due to the typical lead time for traffic signal poles, construction would
likely begin Spring 2021 and be completed late summer 2021.
4. Indicate if the project is consistent with the following applicable state, regional and local plans and
prioritization processes:
X Overall Economic Development Plan — Officially Adopted Dec. 18, 2017
The following two goals are from the Economic Development Chapter of our
Comprehensive Plan:
1. Goal ED -2: Stimulate and diversify Ellensburg's economy
o Policy D: Encourage development of light industrial uses within the City of
Ellensburg (Large amount of undeveloped land within close proximity to the
proposed project that is currently zoned light industrial)
Program 1: Develop City -owned property off Dolarway Road for a
light industrial park (This is immediately NW of the proposed project)
2. Goal ED -5: Embrace tourism as an economic development tool
o Policy A: Market Ellensburg's tourism opportunities by developing a
marketing strategy to address all tourism segments (Large amount of
undeveloped land within close proximity to the proposed project that is
currently zoned light industrial)
® Program 5: Promote Ellensburg's role as a destination to regional
recreation and cultural activities (Rotary Park, immediately west of
the proposed project, is a regionally significant park facility. The
park has been expanding and now has the capability to host
regional sports tournaments and other recreational activities.)
X Comprehensive Land Use Plan — Officially Adopted Dec. 18, 2017
The following goals are from the Transportation Chapter of our Comprehensive Plan:
1. Goal T-1: Create a transportation network that provides safe and comfortable
connections for all users to key destinations
o Policy C: Prioritize safety improvements as part of every project
o Policy F: Where possible provide higher comfort pedestrian facilities (The
proposed traffic signal includes dedicated vehicle, cyclist and pedestrian
movements to greatly increase the safety of the intersection and meeting
the intent of Policies C and F. In addition the signal will have emergency
10
vehicle detection that will allow the signal to give priority to emergency
vehicles.)
2. Goal T-2: Prioritize connections with state highway routes and removal of
bottlenecks that delay the movement of people and goods (51h Ave., Railroad Ave.
and Dolarway Ave. are on the City's truck routes and have a significant amount of
freight)
o Policy D: Establish LOS C for collectors and arterial streets (5'" Ave. and
Railroad Ave. are both classified as Minor Arterial Streets)
o Policy G: Focus industrial growth along specific transportation corridors
that are designed to accommodate heavy vehicles and other industrial
users (As previously mentioned, there is a significant amount of
undeveloped land zoned light industrial within close proximity of the
proposed project and the proposed signal is necessary to accommodate
future development of these areas)
X Capital Facility Plan — Officially Adopted November 2016
The following excerpts are from the 2016 Parks and Recreation System Comp. Plan Update:
Page 23 of the Plan, "Trail activities as the most desired type of
recreation activities. Given time, money, and transportation
considerations, walking and biking for pleasure were the top two
recreational activities chosen by 444 individuals responding to an on-
line survey.
• Page 52, "Trails and connectivity provide opportunities for walking,
running and bicycling and serve as a visual connections for habitat
viewing, exercise and outdoor enjoyment."
o The 511 and Railroad intersection is located along the 'River to
Rodeo Trail' which is a 2.25 mile trail linking Irene Rinehart
Riverfront Park to the Kittitas Valley Rodeo and Fairgrounds.
Page 231 — "A lack of safe trails and connections was the top reason
why respondents aren't currently using trails."
o By creating safer crossing at 5th and Railroad, community
members can access over 4.68 miles of trail located within the
315 combined acres of park and open space at West Ellensburg
Park, Rotary Park, Irene Rinehart Riverfront Park, and the
Reecer Creek Floodplain property.
❑ Community Action Plan (or other community-based plan) — Officially Adopted
X Six -Year Transportation Improvement Plan — Officially Adopted June 17, 2019
(This specific project is included in our Current Six Year Transportation Imp. Plan)
X Site-specific development plans; e.g., Community Master Plan — Officially Adopted 2008
The following excerpts are from the City of Ellensburg's Non -motorized Transportation
Plan — 2008:
• The River to Rodeo Trail is a High Priority connection of non -motorized
(pedestrians and cyclists) connection between Irene Rinehart Riverfront Park
to the Kittitas County Rodeo and Fairgrounds, using sidewalks for pedestrians
II
and the roadways for cyclists. Pedestrian and bicyclist crossing of Railroad
Avenue is an obstacle due to the high volumes of vehicular and truck traffic on
Railroad Avenue. The proposed traffic signal will provide a dedicated crossing
phase for pedestrians and cyclists to safely cross Railroad Avenue.
❑ Other
5. Explain how this infrastructure project has been coordinated, or will be coordinated with other
jurisdictions, such as counties, cities, state/federal agencies, and with \economic development
organizations during planning, design, financing, construction and/or operation phases.
The proposal is in accordance with the City Comprehensive plan, the Quadco RTPO plan, and
also mirrors several of the planning goals stated in Washington States Growth Management
Act:
1. Urban Growth: "Encourages development in urban areas where adequate public
facilities and services exist..."
2. Reduce Sprawl: "Reduce the inappropriate conversion of undeveloped land into
sprawling, low-density development."
3. Transportation: "Encourage efficient multimodal transportation systems that are based
on regional priorities and coordinated with county and city comprehensive plans."
4. Economic Development: "Encourage economic development throughout the state that is
consistent with adopted comprehensive plans, promote economic opportunity for all
citizens of this state..."
5. Public Facilities and Services: "Ensure that those public facilities and services necessary
to support development shall be adequate to serve the development at the time the
development is available for occupancy and use without decreasing current service
levels below locally established minimum standards."
6. Explain how the infrastructure project will helpmeet the economic development goals of your community
and/or region. If this project is not done, will the anticipated private development still take place?
As stated above, this intersection is rapidly approaching the minimum adopted level of service
standard. When this happens, development impacting this intersection can't be permitted. If
awarded and the intersection improvements are completed, development will be allowed to
continue along the 2.5 mile long Anderson Road/Railroad Avenue/Dolarway Road corridor.
The proposed improvements would improve the Level of Service (LOS) standards from a low C
to an A, which could then accommodate significant development for many years. Also stated,
there is a significant amount of undeveloped land, zoned light industrial, along Railroad Avenue
and Dolarway Road that the proposed project would support. See the attached map showing
existing zoning and undeveloped property within the vicinity of the project.
7. Describe any feasibility or predevelopment studies that demonstrate the linkage between the proposed
Distressed County Infrastructure improvements and the anticipated economic outcomes.
The Growth Management Act requires cities and counties to adopt minimum Levels of Service
for roads and intersections. Any proposed development which may drop the Level of Service
below the minimum adopted standard will not be allowed. A recently completed Traffic Impact
Analysis shows this intersection being at a LOS C, which is the minimum adopted standard.
The proposed improvements to the traffic signals will improve the current and future Levels of
Service to ensure the ability for future economic growth for many years.
12
8. Indicate if other needed infrastructure (e.g., sewer, water, power) is in place or if there is a plan for getting
it in place.
All other necessary infrastructure improvements (water, sewer, storm, natural gas, and power)
were completed with the road widening in 2012, and no other infrastructure improvements are
needed. Also, with the previous road widening project, underground conduits for a future traffic
signal were installed across each of the intersection legs, so installation of the traffic signal will
not require road crossings.
9. Indicate the Estimated Number of Businesses Created/Retained by the Project. 73
Currently there is approximately 220 acres of undeveloped land along the Railroad
Ave./Anderson Rd./Dolarway Road corridor, with the majority of the undeveloped land being
zoned light industrial. If you take an average lot size of 3 acres per business, then there is the
potential that the proposed project can support and serve an additional 73 businesses within
this two and a half mile road corridor.
10. Indicated the Estimated Number of Short Term and/or Permanent Jobs Created/Retained by the
Project. 365
As stated above, the 220 acres of undeveloped land can support 73 new businesses, assuming
3 acre lots. If these businesses employed an average of 5 employees each, the proposed
project can support and serve approximately 365 employees.
Submit the original application to:
t£ittitas County Department of Public Works
411 N. Ruby, Suite #1
Ellensburg, WA 98926
13
Applicant Certification
Certification is hereby given that the infonnation provided is accurate and the applicable attachments are
complete and included as part of the application package.
I certify that application thresholds are met at the time of application.
of
Sponsoring Agency
(if Applicable)
Signature of Agency Representative
Typed or Printed Name
Date
Date
Date
Associate Economic Development Organization Notification
The organization listed below has received notification of this project as demonstrated by the
signature of the organization's representative.
�. G. C" bey o f (�mmerce,
ame of Organization
Il /"16;LD I
ignature of re native Date
Kittitas County Department of Public Works Conceptual Approval
Approval of the project feasibility, scope and estimated costs.
Signature of Kittitas County DPW Representative
Typed or Printed Name
Date
14
KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS
DISTRESSED COUNTY INFRASTRUCTURE IMPROVEMENT PROGRAM
APPLICATION DUE DATES
FY 2020
Distressed County Infrastructure Improvement Program, applications are initially due to Kittitas County
Department of Public Works for conceptual approval of the infrastructure project. Distressed County
Infrastructure Improvement Program applicants are invited to appear at the COG meeting when the project's
criterion is reviewed.
APPLICATIONS DUE
2020 Application due Date
COG MEETING DATES
COG Meetings
November 8, 2019.........................................................December 2019 COG Meeting
**Funding available January 1, 2020
15
Ellensburg Traffic Impact Fee Project Estimate
Project Name: 5th Ave. and Railroad
General Discription: Intersection Improvements and Signalization
Work Item
Qty.
Unit
Unit Cost
Total
INTERSECTION IMPROVEMENTS
Mobilization
I
LS
$
40,000.00
$
40,000.00
Traffic Control
I
LS
$
30,000.00
$
30,000.00
ADA Ramps
8
Ramp
$
1,100.00
$
8,800.00
Curb and Gutter
100
LF
$
40.00
$
4,000.00
Sidewalk
100
LF
$
40.00
$
4,000.00
Clear & Grub/Demo
I
LS
$
6,000.00
$
6,000.00
Removal of Structures and Obstructions
I
LS
$
2,000.00
$
2,000.00
Removal of Sidewalk and Curb
100
LF
$
4.00
$
400.00
SIGNALIZA TION
Signal Poles
4
EA
$
28,000.00
$
112,000.00
Pedestrian Poles
4
EA
$
5,000.00
$
20,000.00
Signal Cabinet
1
EA
$
25,000.00
$
25,000.00
Service Cabinet
I
EA
$
7,000.00
$
7,000.00
Conduit
200
LF
$
45.00
$
9,000.00
Detection System
I
EA
$
55,000.00
$
55,000.00
Illumination
8
EA
$
3,000.00
$
24,000.00
Preemption Equipment
I
LS
$
7,000.00
$
7,000.00
Interconnect
I
LS
$
10,000.00
$
10,000.00
Signal Heads
12
EA
$
1,200.00
$
14,400.00
Pedestrian Heads
8
EA
$
800.00
$
6,400.00
Minor Change
1
EST
$
10,000.00
$
10,000.00
ENGINEERING
Engineering (25%)
EST
$
65,000.00
TOTAL: $ 460,000.00
�4470
GGtaTcP\
N
ACr
�o
U -INC
—FtNB hyo CH
`I uc
AN
t
F'P
t
J V-
Proposed Traffic Signal - SN Ave m Railroad Ave �t
® Undeveloped Parcels
Roads
Minor Arterials
US Highways
US Highway
US Interstate
Zoning Map
CH COMMERCIAL HIGHWAY
CT COMMERCIAL TOURIST
IH INDUSTRIAL HEAVY
IL INDUSTRIAL LIGHT
MHP MANUFACTURED HOME PARK
PR PUBLIC RESERVE
PUD PLANNED UNIT DEVELOPMENT
RL RESIDENTIAL LOW DENSITY
RM RESIDENTIAL MEDIUM DENSITY
RO RESIDENTIAL OFFICE
RS RESIDENTIAL SUBURBAN
UNINCORPORATED ISLANDS
IL
WASHINGTON
i
t PR
Ffs r
PR
W 15TH:AVE �_
MHP„
i .tip, • t
� \t
RM y
r�#rt a 1
CH
+Y�
+0 Rd -.
®Y pLF
S�T••H'AVE
IH
Proposed Traffic Signal
5th Ave & Railroad Ave
Comprehensive Plan
i
- 1
tw-
t
10
o�rTNI\U
■eia%'�'..aRR"� +:, �. .'tip---�� �?�iii ` ` r Ia ��
CITY OF ELLENSBURG COMPREHENSIVE PLAN -i
Program 2 Promote economic activity to diversify sources of revenue and expand
the employment base.
Policy B Promote the retention and expansion of existing businesses as well as
the development of new businesses.
Program 1 Solicit comments and feedback from local businesses on things that the
City could change to better support local businesses.
Program 2 Establish incentives and development flexibility to retain existing
businesses, attract new businesses, and encourage quality development.
Program 3 Partner with economic development groups to inventory and share
information regarding vacant building and lot space.
Program 4 Promote development of vacant lots and infill development within
Ellensburg's urban core.
Program 5 Continue to provide high quality and cost efficient city services and
facilities, and promote these as one of Ellensburg's economic
development assets.
Program 6 Coordinate with economic development stakeholders to assist businesses
in creating strategies and action plans.
Policy C Develop and maintain an effective and predictable regulatory
environment.
Program I Provide efficient, predictable, and customer -service oriented permitting
CITY OF ELLENSBURG COMPREHENSIVE PLAN e ECONOMIC DEVELOPMENT o PAGE �?0
processes.
Program 2
Consider streamlining permitting by establishing a one-stop permit
center for all permits.
Program 3
Encourage the use of the pre -application process as a means of
identifying potential obstacles to the development of a particular site.
Program 4
Establish predictable processing times and consistent review processes,
and post timelines on the City's website.
Policy D
Encourage development of light industrial uses within the City of
Ellensburg.
Program 1
Develop City -owned property off Dolarway Road for a light industrial
park.
Program 2
Continue to partner with Kittitas County on development of the Kittitas
County Industrial Park at the airport.
CITY OF ELLENSBURG COMPREHENSIVE PLAN e ECONOMIC DEVELOPMENT o PAGE �?0
Program 2 Keep detailed and updated content management platforms such as
websites and mobile applications.
Program 3 Support visitor information centers and kiosks.
Program 4 Explore future development of visitor information services near freeway
interchanges.
Program 5 Promote Ellensburg's role as a destination to regional recreation and
cultural activities.
Program 6 Support destination marketing organizations through lodging tax funds.
Policy B Market Ellensburg's central location for conventions, business
meetings, sports tournaments, cultural events, and other activities.
Program 1 Inventory and manage data about where regional tourism -based
enterprises can meet and use community spaces and resources.
Program 2 Coordinate and promote a central website for public/private regional
facilities.
Program 3 Provide a consistent level of reliable public transportation between public
Goal ED -6 Foster economic development through promoting energy
efficiencies and use of renewable energy.
*Policies and programs on renewable energy and promotion of energy efficiencies are
addressed in the Capital Facilities and Utilities chapter.
..r ___ '1S5_PG COInPREHENSi','E HVzLOPLAE'i - :2
and private local facilities and accommodations.
Program 4
Leverage lodging tax funding to support events and promotions and
development of facilities.
Policy C
support and expand opportunities for tourism based investments.
Program 1
Identify appropriate zoning districts to allow for short-term rental
properties.
Program 2
Identify appropriate zoning districts to allow for ancillary tourism
activities.
Goal ED -6 Foster economic development through promoting energy
efficiencies and use of renewable energy.
*Policies and programs on renewable energy and promotion of energy efficiencies are
addressed in the Capital Facilities and Utilities chapter.
..r ___ '1S5_PG COInPREHENSi','E HVzLOPLAE'i - :2
GOALS AND POLICIES
Ellensburg has established six goals to accomplish its overall vision for transportation in the
future. The goals establish overarching priorities that serve the vision of this Transportation
chapter while policies lay out specific actions. Together, the goals and policies lay the
foundation for the remainder of this chapter, including the proposed action items and ongoing
implementation of the chapter.
Goal T-1: Create a transportation networks that provides safe and
comfortable connections for all users to key destinations.
Policy A Every project considers all users in a complete streets context, including
pedestrians, bicyclists, transit, motorists, and freight.
Policy B Increase pedestrian and bicyclist safety along arterial streets or provide
alternative routes.
Policy C Prioritize safety improvements as part of every project, including maintenance
tasks when possible.
Policy D Reduce auto demand on local and arterial streets by encouraging alternative
modes of transportation, such as walking, biking, and transit.
Policy E Implement calming measures to slow traffic on non -arterial streets.
Policy F Where possible provide higher comfort pedestrian facilities, and accommodate
on -street parking in commercial districts.
Policy G In planning facilities for active modes, when feasible choose lower stress parallel
bicycle and pedestrian routes in order to increase safety by separating auto and
active transportation modes.
Policy H Improve pedestrian use while maintaining automobile access to the Central
Commercial zones by enhancing pedestrian access throughout the Central
Commercial zones.
Policy I Consider aligning streets to take advantage of views of landmarks when
designing subdivisions.
Policy J Make progress in building transportation facilities that are consistent with the
City's adopted plans, including function classification and street standards,
nonmotorized plan, and downtown plan.
CiTv GF ELLENSBURG COMPREHENSIVE PLAN o TRANSPORTATION o PAGE 87
CITY OF ELLENSBURG COMPREHENSIVE PLAN
Goal T-2 Prioritize connections with state highway routes and removal of
bottlenecks that delay the movement of people and goods.
Policy A Maintain interconnectedness and high levels of access through a well-developed
grid network and high quality connections between the walking, biking, auto,
freight, and transit networks.
Policy B Design of new streets in the city shall use a street grid system at an interval of
1/2 mile for arterial streets. Within the 1/2 mile sections, attempt to maintain a
1/4 mile connection for auto circulation, with 200 to 600 foot pedestrian
connections, depending on zone density.
Policy C For all undeveloped areas of the city and UGA, prepare maps of future street
alignments, especially for arterials, considering existing development patterns
and physical barriers such as streams and steep slopes.
Policy D Establish LOS B as the standard for local streets, LOS C for collectors and
arterials, and LOS D for the 1-90 interchanges.
Policy E Wherever possible, seek to increase route options through strategic additions to
the transportation system that fill gaps and add alternative routes.
Policy F Maintain and enforce truck routes through the city and ensure connection to
freeway interchanges.
Policy G Focus industrial growth along specific transportation corridors that are designed
to accommodate heavy vehicles and other industrial users.
Policy H Concentrate land uses that generate long-haul truck traffic nearby the City's
freeway interchange areas.
Policy I Ensure development regulations and street standards are current with
contemporary truck design criteria, particularly as they apply to those areas near
the freeway interchanges.
Goal T-3 Fill gaps in the system to accommodate safe, enjoyable, and energy
efficient travel by those of all abilities choosing to walk, bike, or use
transit.
Policy A Prioritize building streets, trails, linear parks, and pathways to connect
neighborhoods, schools, parks, and commercial areas so that walking and biking
are viable modes for both recreation and transportation purposes.
Policy B Establish bicycle and pedestrian priority networks that highlight the most critical
facilities to accommodate those modes.
CITY OF ELLENSBURG COAQPREHENSIVE PLAN o-RANSPORTATION o PAGE 88
City of Ellensburg
"
The Key Findings summary describes the results of the questionnaire and includes
comparisons with the statistically valid survey conducted in February 20025. Where possible
any changes in public opinion over time are noted as compared to the 2002 statistical
Survey. The 2015 questionnaire entire report is Appendix C-lattached, and available on the
city's website (http://www.ci.eliensburg.wa.us)
Key Findings: Parks and Recreation Questionnaire Results Summary
Parks:
a Parks recreation and open spaces are very important to respondents
The majority of the respondents (85%) indicated that parks and recreation programs are
important to the overall quality of life in Ellensburg. Close to 60% of the respondents
indicated that natural open spaces are very important to the community.
Developed parks trails and waterfront areas are the most popular types of parks
Based on the questionnaire, respondents visited these areas frequently (at least once a
week or 1-2 times a month). Similarly, parks were mostly used for physical activity including
walking or biking.
Respondents are generally satisfied with park maintenance, but there is some desire for
improved maintenance.
Nearly 58% of respondents found the general upkeep and maintenance of parks as
excellent or good while another 25% found it ok. However, based on the open-ended
responses, there were many comments expressing a need to improve maintenance.
Recreation Facilities and Trails:
• There is interest in adding greater variety in the park system.
Ideas expressed by respondents included a water playground or splash pad, skating rink,
disc golf, off -leash dog areas and places for kids to play.
Respondents voiced a need to maximize use of existina parks and public land.
In existing parks and facilities, respondents suggested adding lights to ball fields to increase
hours for field use and multi-purpose indoor space for use during colder weather. Some
respondents noted that there is existing vacant or underused public land that could be
improved for public use.
Surrounding natural open spaces are highly valued.
Ellensburg is surrounded by outdoor recreation areas and outcomes highlight the
importance that these resources have for residents.
Trail activities are the top most desired types of recreation activities.
Given time, money and transportation considerations, walking and biking for pleasure
were the top two activities chosen by respondents.
s Part of the City of Ellensburg Park, Recreation & Open Space Plan (August 12, 2002 and update to the plan in 2006)
Page 23
Ory of EMensburg Parks & Recreation System comprehensive Plan Update 2016
#3.1-G: TRAILS AND CONNECTIONS
Linear corridors contribute to the city's ability to preserve and protect natural areas,
ecological and art features and cultural assets. The connectedness can be natural corridors
or man-made non -motorized linkages that at some locations serve as visual connections
through historic and scenic corridors. Trails and connectivity provide opportunities for
walking, running and bicycling and serve as visual connections for habitat viewing, exercise
and outdoor enjoyment. In 2008 the City of Ellensburg completed the Ellensburg Non -
motorized Transportation Plan. In 2009 The City —to -Canyon Trails Committee, working with
the National Park Service Rivers & Trails Program, completed a concept plan for a five mile
trail corridor along the scenic Yakima River connecting local and regional trails and parks.
Surrounding Ellensburg and throughout Kittitas County, recreationalists can enjoy a wide
variety of outdoor activities on trails for walking, hiking, snowmobiling, horseback riding and
birding in a number of unique and varied terrains. Community trails located within the City
of Ellensburg primarily serve its residents for linking community facilities or recreation
oriented parks and open spaces. Most multi -use trail facilities within the city are currently
associated with existing parks and so are maintained by the Parks Department. As part of the
larger recreational planning, the Parks and Recreation Department plans, funds, constructs
and maintains stand-alone facilities such as the John Wayne Trail Reconnection route, which
reconnects the John Wayne Trail through Ellensburg. This project is still in the process of
being completed.
Table 3.3 Existing TRAILS & Connections
Miles
Feet
John Wayne Trail between Water St & Reecer Cr Rd
1.25
6,615'
John Wayne Trail between fairgrounds and Pfenning Rd
0.64
3,336'
The Ellensburg Greenway John Wayne Trail
Reconnection
0.23
1,186'
Dolarway Loop Trail
2.70
14,248'
Howards Way Trail
1.00
5,190'
Sagebrush Trail /Craig's Hill Connection
0.13
706'
River to Rodeo Trail
2.25
11,863
McElroy Park Trail
0.19
1,000'
Irene Rinehart Riverfront Park Carey Lake Trail
1.10
5,829'
Rotary Park Trail
0.70
3,631'
Irene Rinehart Riverfront Park Trail to Rotary under to 1-90
.12
980'
Irene Rinehart Riverfront Park Entrance Road
0.73
3,846'
West Ellensburg Trail
0.70
3696
City to Canyon Trails (proposed)
5.14
27,127'
Lower Reecer Creek Trail (Levee)
1.02
5,381'
Wildlife Habitat Trails in Paul Rogers Park
0.69
3,652'
18.59 Miles
394,454'
Page 52
City of Ellensburg Parks & Recreation System Comprehensive Plan Update 2016
Trail activities are the top most desired types of recreation activities. Given the time, money
and transportation, walking and biking for pleasure were the top two activities chosen by
respondents as those they would like to do most.
Respondents prefer paved trails and trails that link neighborhoods or connect to other trails.
Based on the questionnaire, respondents are most interested in developing more trails for
exercise and to increase non -motorized transportation options. A lack of safe trails and
connections was also the top reason why respondents aren't currently using trails.
Recreational trails are also popular. Respondents expressed a need to provide natural
surface trails for mountain biking and trail running.
Recreation Programs and Special Events
There is potential to increase recreation program participation. Although 54% of all
respondents responded that their household had used City -sponsored recreational programs
last year, many respondents were unaware of current offerings. In addition, a smaller
percentage of respondents indicated that members of their family had used City -provided
recreational programs in the last year compared to the 2002 survey.
There is interest in special interest programs. When asked what additional City -provided
recreation programs should be offered or expanded, respondents indicated a need for
outdoor/environmental programs (37%) and fitness classes (25%). The majority of
respondents also indicated they would or would consider paying more for these types of
programs.
Respondents expressed a need for more opportunities for children and families. Based on the
open-ended responses, many respondents felt that children and families are the most
underserved by recreation programs.
Future Improvements
Respondents prioritized upgrading and maintaining existing parks and facilities. Based on
outcomes of the questionnaire, 41% of respondents indicated a need to upgrade existing
parks followed by maintaining existing parks and facilities (28%). Based on open ended
responses, examples of facilities with an expressed need for improvement include the
Racquet Center, city pool, tennis courts and playground equipment.
New trails are the top priority if funding were available. Prioritizing a citywide trail system
was the top ranked option according to questionnaire outcomes.
There is interest in a multi-purpose community facility. The second most popular response
for prioritization if funding were available was a multi-purpose community facility. In
addition, respondents preferred several types of features to include in such a facility, tennis
or racquet courts.
Though respondents value parks and natural areas, adding or developing new parks and
natural areas are not as prioritized. 16% for developing new parks and only 13% of
respondents indicated that acquiring land for future parks was a desired future
improvement.
Respondents prefer that funding and maintenance for parks and recreation is a shared
responsibility. Outcomes highlighted that funding should stem mostly from tax dollars and
some user fees. In addition, respondents prefer that private groups continue to share sports
field maintenance with the city. Fewer indicated that no fees should be charged or that the
city should develop and maintain sports fields and leagues without support.
Page 231
Cit) n/ Ellensbwg Par" & Pe reoticn Systzm ComprEnensive Plon Update 2019
4
0
a
. Vvffl--r- I.. -
-7i)V i 111
1-1
4 4f xi: -
2.4.4c Historic downtown
The historic commercial core of Ellensburg has been targeted for pedestrian
friendly improvements for many years. Brick pavers, period lighting, and sidewalk
bulbs at intersections were installed decades ago. Two to three story historic
buildings set against the sidewalk (zero lot line) with interesting window displays
add comfort and interest to the pedestrian. The City's Comprehensive Plan
includes goals to maintain and increase pedestrian circulation downtown with
increased housing density, a parking plan, and improved University Way crossing.
Main Street remains difficult to cross at times due to the high volume of motor
vehicle traffic. It is a major north -south arterial, a truck route, and a freeway by-
pass route. Signals are timed to maximize traffic flow. East -west travelers
crossing Main Street often have to wait several moments.
Future downtown development, particularly infill, should reinforce the pedestrian
focus of Downtown with buildings built to and oriented to the sidewalk. Parking
lots adjacent to the sidewalk interrupt the building lines and sense of enclosure.
There are no off-street parking requirements in the Central Commercial zone.
Recommendation 2.4.4c: Maintain pedestrian focus of historic
downtown.
1. Sign by-pass route to encourage truck and auto traffic to use
Water Street rather than Main Street as a preferred north -south
route.
2. Discourage parking lots abutting the sidewalk in the Central
Commercial zone.
2.4.4d River to Rodeo Trail
The River to Rodeo Trail was identified in the 1997 Nonmotorized Plan. The goal
of the "trail' is to link the trail system at Rotary and Irene Rinehart Riverfront Parks
on the west to the fairgrounds and John Wayne Trail on the east through
downtown on Fifth Avenue (see Figure 3a route #12). The corridor should be
identifiable so that trail users can find their way from one trail system to the other
safely and efficiently. It should be designed to accommodate both pedestrians
and bicyclists. While many equestrians utilize the John Wayne trail and rodeo
grounds, it is not anticipated that the River to Rodeo Trail would be designed to
accommodate horse travel.
The route passes through industrial, commercial and residential land uses. A trail
under 1-90 connecting Irene Rinehart Riverfront Park to Rotary Park is funded by a
State grant and is scheduled for completion in 2009. An asphalt trail within Rotary
Park from the freeway to the entrance is completed. Sidewalks are complete
along most of the route, except a section on the north side from Railroad Avenue
to Wenas Street. Some additional curb -cuts are needed on the north side.
December 2008 City of Ellensburg Nonmotorized Transportation Plan Page 2-30
Walking is unpleasant adjacent to Twin City Foods due to noise and odor. To
avoid the missing sidewalks on the north and Twin City on the south, pedestrians
could be directed to cross at Wenas Street, but the intersection is off -set, with
traffic control only on Wenas. Crossing can be difficult at the Railroad Avenue
intersection (Fifth is controlled by stop signs, Railroad Ave. is not); a traffic control
upgrade may soon be warranted. The crossing at Chestnut Street has stops at 5"
not Chestnut, but generally not difficult. At the John Wayne Trial trail head at the
north entrance to the rodeo grounds public restrooms are available much of the
year. For bicyclists, the main issue is that there is insufficient right-of-way to stripe
a dedicated lane along Fifth Avenue. On -street parking exists along the length of
the route, and is necessary within the commercial area to serve local businesses.
At the May 21 Open House, 61% of participants rated the River to Rodeo trail as a
high priority. Participants were asked what treatments they favored to identify the
corridor, ranging from simple and cheap to complex and expensive (see Appendix
A for the display, comment form, and results). In general, participants favored the
simpler solutions of completing missing sidewalks, providing way -finding signs and
adding lighting and benches, especially in the commercial area. Special sidewalk
and cross -walk treatments had some support, again with stronger support for
these treatments within the commercial area of the trail.
The preferred treatment for bicyclists within the commercial and residential areas
was to mark the street as sharrows, where bicyclists share the street with cars
(see section 2.3.2), while within the industrial area, participants favored removing
parking from one side of the street and striping lanes.
Recommendation 2.4.4d: Develop River to Rodeo Trail
1. Complete missing sidewalks on the north side of 5th or
develop plan for crossing Fifth at N. Wenas St.
2. Complete missing curb -cuts
3. Develop branding and logo; implement way -finding plan
4. Consider uniform, distinctive lighting consistent with way -
finding plan
5. Consider vandal -proof bench design and placement; develop
bench donation program
6. Mark Fifth Avenue as a shared bike route (see
recommendation 2.3.3)
December 2008 City of Ellensburg Nonmotorized Transportation Plan Page 2-31
RCW 36.70A.020
Planning goals.
The following goals are adopted to guide the development and adoption of
comprehensive plans and development regulations of those counties and cities that are
required or choose to plan under RCW 36.70A.040. The following goals are not listed in order
of priority and shall be used exclusively for the purpose of guiding the development of
comprehensive plans and development regulations:
(1) Urban growth. Encourage development in urban areas where adequate public
facilities and services exist or can be provided in an efficient manner.
(2) Reduce sprawl. Reduce the inappropriate conversion of undeveloped land into
sprawling, low-density development.
(3) Transportation. Encourage efficient multimodal transportation systems that are
based on regional priorities and coordinated with county and city comprehensive plans.
(4) Housing. Encourage the availability of affordable housing to all economic segments
of the population of this state, promote a variety of residential densities and housing types,
and encourage preservation of existing housing stock.
(5) Economic development. Encourage economic development throughout the state
that is consistent with adopted comprehensive plans, promote economic opportunity for all
citizens of this state, especially for unemployed and for disadvantaged persons, promote the
retention and expansion of existing businesses and recruitment of new businesses, recognize
regional differences impacting economic development opportunities, and encourage growth in
areas experiencing insufficient economic growth, all within the capacities of the state's natural
resources, public services, and public facilities.
(6) Property rights. Private property shall not be taken for public use without just
compensation having been made. The property rights of landowners shall be protected from
arbitrary and discriminatory actions.
(7) Permits. Applications for both state and local government permits should be
processed in a timely and fair manner to ensure predictability.
(8) Natural resource industries. Maintain and enhance natural resource-based
industries, including productive timber, agricultural, and fisheries industries. Encourage the
conservation of productive forestlands and productive agricultural lands, and discourage
incompatible uses.
(9) Open space and recreation. Retain open space, enhance recreational
opportunities, conserve fish and wildlife habitat, increase access to natural resource lands and
water, and develop parks and recreation facilities.
(10) Environment. Protect the environment and enhance the state's high quality of life,
including air and water quality, and the availability of water.
(11) Citizen participation and coordination. Encourage the involvement of citizens in
the planning process and ensure coordination between communities and jurisdictions to
reconcile conflicts.
(12) Public facilities and services. Ensure that those public facilities and services
necessary to support development shall be adequate to serve the development at the time the
development is available for occupancy and use without decreasing current service levels
below locally established minimum standards.
(13) Historic preservation. Identify and encourage the preservation of lands, sites, and
structures, that have historical or archaeological significance.